CN206942107U - Novel storage tank construction wall trailer arrangement - Google Patents

Novel storage tank construction wall trailer arrangement Download PDF

Info

Publication number
CN206942107U
CN206942107U CN201720937238.6U CN201720937238U CN206942107U CN 206942107 U CN206942107 U CN 206942107U CN 201720937238 U CN201720937238 U CN 201720937238U CN 206942107 U CN206942107 U CN 206942107U
Authority
CN
China
Prior art keywords
fastening bolt
support base
wall
connects
bolt holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720937238.6U
Other languages
Chinese (zh)
Inventor
李敬坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720937238.6U priority Critical patent/CN206942107U/en
Application granted granted Critical
Publication of CN206942107U publication Critical patent/CN206942107U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Novel storage tank construction wall trailer arrangement,Including wall hanging car,No.1 brace,Cantilever shalving,Firm banking,Support base,Tank wall,Fixed arm,The wall hanging car upper right connects 2 Right side support framves,The Right side support frame top has multiple climbing poles,On the left of the Right side support frame top connecting cantilever frame,There is firm banking groove inside the cantilever shalving,Be connected base inside the firm banking groove,There is support base groove inside the firm banking,The support base groove has multiple fastening bolt holes,The fastening bolt holes have internal thread,Connection support base inside the support base groove,The support base end connects multiple fastening bolts,In the fastening bolt top insertion fastening bolt holes,The fastening bolt top is meshed with fastening bolt holes,The support base bottom connects rotary shaft.

Description

Novel storage tank construction wall trailer arrangement
Technical field
It the utility model is related to Storage Tank Construction field, more particularly to a kind of Novel storage tank construction wall trailer arrangement.
Background technology
Existing Storage Tank Construction wall trailer arrangement around tank wall move during, due to there is no phase between tank wall The sliding rail answered and reliably be slidably connected, cause its neglected in occurring suddenly during the slip outside movement, can also lead Cause it not perfectly flat steady during slip, be not easy to the operation of Storage Tank Construction wall trailer arrangement.
Utility model content
The utility model is directed to deficiencies of the prior art, there is provided a kind of slip is more steady, more convenient operation Novel storage tank construction wall trailer arrangement.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of Novel storage tank construction wall trailer arrangement, including wall hanging car, No.1 brace, cantilever shalving, firm banking, support Base, tank wall, fixed arm, the wall hanging car upper right connect 2 Right side support framves, and the Right side support frame top has Multiple climbing poles, the Right side support frame top connecting cantilever frame left side, the cantilever shalving inside have firm banking groove, institute The base that is connected inside firm banking groove is stated, there is support base groove, the support base groove tool inside the firm banking There are multiple fastening bolt holes, the fastening bolt holes have internal thread, and support base is connected inside the support base groove, described Support base end connects multiple fastening bolts, and the fastening bolt top is inserted in fastening bolt holes, in the fastening bolt Portion is meshed with fastening bolt holes, and the support base bottom connects rotary shaft, the rotation axis connection rotating wheel, the rotation Bottom connection embedded board is taken turns, the embedded board bottom connects tank wall, connected on the right side of the tank wall and slide rail, the storage tank Pars intramuralis connects multiple embedded bars, and the embedded bar top connects embedded board.
Be connected arm on the right side of the cantilever shalving, and the fixed arm bottom has slide protrusion, the slide protrusion insertion Slide in rail, the slide protrusion is adapted with sliding rail, No. two braces of connection in the middle part of the fixed arm, described No. two Brace connecting cantilever frame.
The wall hanging car upper left-hand connects 2 Left-side support framves, and the Left-side support frame connects multiple support panels, institute Support panel connection Right side support frame is stated, the Left-side support frame top connects No.1 brace, the No.1 brace connection Cantilever shalving.
Beneficial effect:
Wall hanging car drives superstructure and then to move in movement, and cantilever shalving is moved by rotating wheel on embedded board, turns Driving wheel slides in the groove on embedded board top, ensure that the sliding trace of device, prevents it from deviateing original track and sliding, makes its shifting Dynamic operation becomes more to facilitate, and fixed arm is slided by slide protrusion on rail is slided, and slides rail and is mutually fitted with slide protrusion Should so that whole device is more steady in moving process, and be connected base inside cantilever shalving, and firm banking has protection cantilever The effect of frame, prevent being dismounted for multiple times support base from causing to damage to cantilever shalving, pass through the mutual cooperation between each component so that The slip of this Novel storage tank construction wall trailer arrangement is more steady, more convenient operation.
Brief description of the drawings
Fig. 1 is Novel storage tank described in the utility model construction wall hanging car apparatus structure schematic diagram.
Fig. 2 is Novel storage tank described in the utility model construction wall trailer arrangement partial structural diagram.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of Novel storage tank is constructed wall trailer arrangement, including wall hanging car 1, No.1 brace 6, cantilever shalving 7, firm banking 9, Support base 12, tank wall 18, fixed arm 21, the upper right of wall hanging car 1 connect 2 Right side support framves 2, the right side branch The top of support 2 has multiple climbing poles 3, the left side of the 2 top connecting cantilever frame of Right side support frame 7, inside the cantilever shalving 7 With firm banking groove 8, be connected base 9 inside the firm banking groove 8, and the inside of firm banking 9 has support bottom Seat slot 10, the support base groove 10 have multiple fastening bolt holes 11, and the fastening bolt holes 11 have internal thread, the branch The inside of bottom tub 10 connection support base 12 is supportted, the end of support base 12 connects multiple fastening bolts 13, the fastening spiral shell In the top of bolt 13 insertion fastening bolt holes 11, the top of fastening bolt 13 is meshed with fastening bolt holes 11, the support bottom 12 bottoms of seat connection rotary shaft 14, the rotary shaft 14 connect rotating wheel 15, and the bottom of rotating wheel 15 connects embedded board 16, institute The bottom of embedded board 16 connection tank wall 18 is stated, the right side of tank wall 18 connection is slided rail 19, connected inside the tank wall 18 Multiple embedded bars 17 are connect, the top of embedded bar 17 connects embedded board 16.
The right side of the cantilever shalving 7 is connected arm 21, and the bottom of fixed arm 21 has a slide protrusion 20, it is described slide it is convex Play 20 insertions to slide in rail 19, the slide protrusion 20 is adapted with sliding rail 19, the middle part of fixed arm 21 connection two Number brace 22, the connecting cantilever frame 7 of No. two braces 22.
The upper left-hand of wall hanging car 1 connects 2 Left-side support framves 5, and the Left-side support frame 5 connects multiple support panels 4, the support panel 4 connects Right side support frame 2, and the top of the Left-side support frame 5 connection No.1 brace 6, the No.1 is oblique The connecting cantilever frame 7 of pull bar 6, wall hanging car 1 drive superstructure and then to move in movement, and cantilever shalving 7 is by rotating wheel 15 pre- Moved on buried plate 16, rotating wheel 15 slides in the groove on the top of embedded board 16, ensure that the sliding trace of device, prevents that its is inclined Slided from original track, moving it operation becomes more to facilitate, and fixed arm 21 is slided by slide protrusion 20 on rail 19 is slided It is dynamic, slide rail 19 and be adapted with slide protrusion 20 so that whole device is more steady in moving process, connects inside cantilever shalving 7 Firm banking 9 is connect, firm banking 9 has the function that to protect cantilever shalving 7, prevents being dismounted for multiple times support base 12 from being made to cantilever shalving 7 Into damage, pass through the mutual cooperation between each component so that the slip of this Novel storage tank construction wall trailer arrangement is more steady, More convenient operation.

Claims (3)

  1. The wall trailer arrangement 1. a kind of Novel storage tank is constructed, it is characterized in that:Including wall hanging car, No.1 brace, cantilever shalving, fixation Base, support base, tank wall, fixed arm, the wall hanging car upper right connect 2 Right side support framves, the Right side support Frame top has multiple climbing poles, the Right side support frame top connecting cantilever frame left side, and the cantilever shalving inside has solid Determine bottom tub, be connected base inside the firm banking groove, has support base groove, the branch inside the firm banking Support bottom tub has multiple fastening bolt holes, and the fastening bolt holes have internal thread, branch is connected inside the support base groove Base is supportted, the support base end connects multiple fastening bolts, and the fastening bolt top is inserted in fastening bolt holes, described Fastening bolt top is meshed with fastening bolt holes, and the support base bottom connects rotary shaft, and the rotation axis connection rotates Wheel, the rotating wheel bottom connect embedded board, and the embedded board bottom connects tank wall, connected on the right side of the tank wall and slide steel Rail, the tank wall inside connect multiple embedded bars, and the embedded bar top connects embedded board.
  2. The wall trailer arrangement 2. Novel storage tank according to claim 1 is constructed, it is characterized in that:Connected on the right side of the cantilever shalving Fixed arm, the fixed arm bottom have slide protrusion, and the slide protrusion insertion is slided in rail, the slide protrusion and cunning Dynamic rail is adapted, No. two braces of connection, No. two braces connecting cantilever frame in the middle part of the fixed arm.
  3. The wall trailer arrangement 3. Novel storage tank according to claim 2 is constructed, it is characterized in that:The wall hanging car upper left-hand 2 Left-side support framves are connected, the Left-side support frame connects multiple support panels, and the support panel connects Right side support frame, The Left-side support frame top connects No.1 brace, the No.1 brace connecting cantilever frame.
CN201720937238.6U 2017-07-31 2017-07-31 Novel storage tank construction wall trailer arrangement Expired - Fee Related CN206942107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720937238.6U CN206942107U (en) 2017-07-31 2017-07-31 Novel storage tank construction wall trailer arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720937238.6U CN206942107U (en) 2017-07-31 2017-07-31 Novel storage tank construction wall trailer arrangement

Publications (1)

Publication Number Publication Date
CN206942107U true CN206942107U (en) 2018-01-30

Family

ID=61370625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720937238.6U Expired - Fee Related CN206942107U (en) 2017-07-31 2017-07-31 Novel storage tank construction wall trailer arrangement

Country Status (1)

Country Link
CN (1) CN206942107U (en)

Similar Documents

Publication Publication Date Title
CN201988985U (en) Hydraulic tilter
CN203487822U (en) Elevating rotary parking equipment with double tracks
CN205708398U (en) Drilling rod storage device
CN206942107U (en) Novel storage tank construction wall trailer arrangement
CN203515385U (en) Racking platform drill-pipe stand supporting device
CN205935866U (en) Ziche structure of car during stopping, intelligence is used for realizing holding in palm
CN203865274U (en) Fixing device for short pipes
CN203296614U (en) Water filling nozzle door cover plate and train
CN203543379U (en) Three dimensional printer
CN206379404U (en) Superimposed battery-mounting device
CN209352949U (en) Turnover device
CN209448630U (en) A kind of double wire binding machines
CN106760942A (en) A kind of railing of easy disassembly
CN207230078U (en) A kind of monitor camera embedded cradle head
CN207140332U (en) A kind of horizontal drawing pincers
CN203866660U (en) Assembly and disassembly tool for fasteners
CN206141663U (en) Automatic parking device
CN206544743U (en) Multistage stretches fork structure
CN201439148U (en) Tin furnace lead-out rack with rotary function
CN207826854U (en) A kind of transport device for hydraulic pressure oil drum
CN205234088U (en) Frame is sold to transmission case
CN204575344U (en) A kind of driver's cab turnover test unit
CN209300495U (en) A kind of civil engineering site operation drawing rack
CN205472230U (en) Thin layer mummification machine overhauls device
CN207500724U (en) A kind of Portable generating set pedestal support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20180731

CF01 Termination of patent right due to non-payment of annual fee