CN206936815U - Robot assisted operation high-voltage complete switch equipment general assembly streamline - Google Patents

Robot assisted operation high-voltage complete switch equipment general assembly streamline Download PDF

Info

Publication number
CN206936815U
CN206936815U CN201720855002.8U CN201720855002U CN206936815U CN 206936815 U CN206936815 U CN 206936815U CN 201720855002 U CN201720855002 U CN 201720855002U CN 206936815 U CN206936815 U CN 206936815U
Authority
CN
China
Prior art keywords
section
transport mechanism
cabinet
auxiliary
complete switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720855002.8U
Other languages
Chinese (zh)
Inventor
丁立科
丁红志
刘海龙
米旭东
李明升
宋方龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA LICHENG ELECTRIC GROUP CO Ltd
Original Assignee
NINGXIA LICHENG ELECTRIC GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA LICHENG ELECTRIC GROUP CO Ltd filed Critical NINGXIA LICHENG ELECTRIC GROUP CO Ltd
Priority to CN201720855002.8U priority Critical patent/CN206936815U/en
Application granted granted Critical
Publication of CN206936815U publication Critical patent/CN206936815U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Multi-Process Working Machines And Systems (AREA)

Abstract

A kind of robot assisted operation high-voltage complete switch equipment general assembly streamline is the utility model is related to, the 40.5kV pressures switchgear assembly bulky to weight weight that is particularly suitable for use in assembles.It is characterized in:If including the transport mechanism being formed by connecting by dry drum transfer block (1), passed through in the transport mechanism and be sequentially provided with cabinet load segment (2), components and parts assembling section (3), secondary connection section (4), wire body Product checking section (5), product lower line segment (6), be provided with auxiliary prepackage section (7) by transport mechanism in addition;The source of the gas connector (14) being connected with external air source and the network source interface (15) being connected with external network, power supply are wherein equipped with each roller transfer block (1).The beneficial effects of the utility model are, first, the utility model uses continuous-flow type assembly method, it is serious to solve the alternately stacked phenomenon of work, ineffective significant problem.

Description

Robot assisted operation high-voltage complete switch equipment general assembly streamline
Technical field
A kind of robot assisted operation high-voltage complete switch equipment general assembly streamline is the utility model is related to, it is especially suitable Assembled in the bulky 40.5kV pressures switchgear assembly of weight weight.
Background technology
During modern production, switchgear assembly is various as a kind of main electrical equipment, its complicated classification And 40.5kV high-voltage complete switch equipments manufacture assembling process complexity is various, final products shaping at least needs to fill by cabinet Match somebody with somebody, components and parts assembling, secondary connection and the examination and test of products detect four basic steps.Its weight weight, big this of volume allow for high pressure Switchgear assembly manufacturing firm uses plant area's piecemeal mostly, and the methods of ordering operation are processed operation.This mode Method, first, the alternately stacked phenomenon of work is serious, operating efficiency is low.Second, the product differentiation of manufacture assembling is big, properties of product Index can not be unified, and disqualification rate is high.Third, Product checking data uncertain factor is more, product particular problem can not be clicked through Row analysis and research.Fourth, product piecemeal process and handling process in use pallet mostly, easily cause product surface damage and Influence product appearance.
As can be seen here, the effective improvement of 40.5kV high-voltage complete switch equipments manufacture assembling progress will be obtained bigger Benefit.
Utility model content
The purpose of this utility model is to provide a kind of robot assisted operation high-voltage complete switch equipment general assembly streamline, Operating efficiency and product quality can be significantly improved and reduce labor strength.
A kind of robot assisted operation high-voltage complete switch equipment general assembly streamline, it is particular in that:Including by If the transport mechanism that dry drum transfer block is formed by connecting, passed through in the transport mechanism and be sequentially provided with cabinet assembling Section, components and parts assembling section, secondary connection section, wire body Product checking section, product lower line segment, auxiliary is provided with by transport mechanism in addition Pre-install section;
Wherein be equipped with each roller transfer block the source of the gas connector that is connected with external air source and with external network, electricity The network source interface of source connection;
Wherein cabinet load segment includes auxiliary cabinet assembly module, and the transport mechanism is from the auxiliary cabinet assembly module bottom Portion is passed through, and cabinet part mast-up is provided with above the auxiliary cabinet assembly module, is provided with by the auxiliary cabinet assembly module Liftable human users' platform;
Wherein components and parts assembling section includes guide tracked truss, is hung upside down on the guide tracked truss and is provided with manipulator, described Transport mechanism passes through below the guide tracked truss;
Packaged type ladder truck is provided with wherein by the transport mechanism of secondary connection section;
Wherein wire body Product checking section is sequentially provided with breaker and handcart enters between cabinet inspection and debugging and industrial frequency withstand voltage test Between;
Wherein auxiliary prepackage section includes product component prepackage work case.
Product inlet and outlet and tester gateway are provided with wherein between industrial frequency withstand voltage test, is tested in the industrial frequency withstand voltage It is interior to be provided with voltage-resisting test apparatus.
Wherein roller transfer block include be sequentially connected the first sheet metal component, the first series cylinder, the first antiskid plate, second group of rolling Cylinder, the second antiskid plate and the second sheet metal component, the gas being connected with external air source is provided with the first sheet metal component or the second sheet metal component Source connector and the network source interface being connected with external network, power supply.
Wherein burr adjustable tail margin is mounted in the first sheet metal component and the second sheet metal component bottom.
The utility model provides a kind of 40.5kV high-voltage complete switch equipment general assembly flowing water of robot assisted operation Line, and according to switchgear assembly manufacture assembly process clear and definite operating area on streamline, each region is according to process characteristics Exclusive auxiliary equipment and instrument are configured, regional is connected as an entity in order by roller conveying.It is of the present utility model Beneficial effect is, first, the utility model uses continuous-flow type assembly method, it is serious to solve the alternately stacked phenomenon of work, work effect The low significant problem of rate.Second, the utility model passes through roller using each region according to process configurations aid, regional Conveying connection in order, it is big to solve final products otherness, and disqualification rate is high, and Product checking data uncertain factor is more, and There are the problems such as unnecessary surface damage in product.
Brief description of the drawings
Accompanying drawing 1 is planar structure schematic layout pattern of the present utility model;
Accompanying drawing 2 is facade structures schematic diagram of the present utility model;
Accompanying drawing 3 is axle geodesic structure schematic diagram of the present utility model;
Accompanying drawing 4 is the structural representation of roller transfer block 1 in the utility model.
Embodiment
A kind of robot assisted operation high-voltage complete switch equipment general assembly streamline, if including by dry drum transfer block 1 The transport mechanism being formed by connecting, passed through in the transport mechanism and be sequentially provided with cabinet load segment 2, components and parts assembling Section 3, secondary connection section 4, wire body Product checking section 5, product lower line segment 6, auxiliary prepackage section 7 is provided with by transport mechanism in addition; If be wherein equipped with each dry drum transfer block 1 the source of the gas connector 14 being connected with external air source and with external network, electricity The network source interface 15 of source connection;Wherein cabinet load segment 2 includes auxiliary cabinet assembly module 22, and the transport mechanism is auxiliary from this Help the bottom of cabinet assembly module 22 to pass through, cabinet part mast-up 21 is installed above the auxiliary cabinet assembly module 22, at this The side of auxiliary cabinet assembly module 22 is provided with liftable human users platform 23.
Wherein components and parts assembling section 3 includes guide tracked truss 32, is hung upside down on the guide tracked truss 32 and is provided with manipulator 31, the transport mechanism passes through from the guide tracked lower section of truss 32;It is provided with wherein by the transport mechanism of secondary connection section 4 removable Dynamic formula ladder truck 41;Wherein wire body Product checking section 5 be sequentially provided with breaker and handcart enter cabinet examine and debugging between 51 and power frequency 52 between voltage-withstand test;Wherein auxiliary prepackage section 7 includes product component prepackage work case.
Product component prepackage work case is exactly the workbench formed by various pillars and table top welding assembly in fact, is set Prepackage work case be primarily due to high-voltage complete switch equipment parts it is relatively more, it is necessary to by this parts thereof be assembled into half into Then product are assembled in high-voltage complete switch equipment up again, be easy to staff to be carried out in prepackage work case to parts Semi-finished product assemble.
Product inlet and outlet 53 are provided with wherein 52 between industrial frequency withstand voltage test, tester gateway 54 is resistance in the power frequency Voltage-resisting test apparatus 55 is provided with 52 between pressure test.
Wherein roller transfer block 1 include be sequentially connected the first sheet metal component, the first series cylinder, the first antiskid plate, second group Roller, the second antiskid plate and the second sheet metal component, it is provided with what is be connected with external air source on the first sheet metal component or the second sheet metal component Source of the gas connector 14 and the network source interface 15 being connected with external network, power supply.In addition in the first sheet metal component and the second sheet metal component Bottom is mounted on burr adjustable tail margin 16.
Embodiment 1:
The utility model provides a kind of 40.5kV high-voltage complete switch equipment general assembly flowing water of robot assisted operation Line, preferable embodiment are as follows:
As shown in Figures 1 to 4, the utility model provides the 40.5kV high pressure complete switch of robot assisted operation a kind of and set Standby general assembly streamline, described general assembly streamline assemble suitable for 40.5kV high-voltage complete switch equipments, the general assembly flow Waterline is according to 40.5kV high-voltage complete switch equipments manufacture assembly process clear and definite operating area in the case of continuous productive process, each region One is connected as in order by roller transfer block 1 according to process characteristics configuration exclusive auxiliary equipment, instrument and regional to put down Whole entity.
Described general assembly streamline is sequentially arranged cabinet assembling 2 according to high-voltage complete switch equipment manufacture assembly process, Components and parts assembling 3, secondary connection 4, wire body Product checking 5,7 regions of product offline 6 and auxiliary prepackage.
Wherein roller transfer block 1 combines including three series cylinders 11, antiskid plate 12, sheet metal component 13.Wherein every two groups of rollings Antiskid plate 12, roller 11 and antiskid plate 12 is connected between cylinder 11 to be formed by connecting by the combination of sheet metal component 13.The outside of sheet metal component 13 Provided with source of the gas connector 14 and network source interface 15, can access using instrument by these interface each operation stages institute is made.Metal plate The golden bottom of part 13 connects burr adjustable tail margin 16, and adjusting roller transfer block 1 by burr adjustable tail margin 16 ensures that high-voltage complete switch equipment exists Conversion is stable between process.
The cabinet assembling 2 includes cabinet part mast-up 21 and auxiliary cabinet assembly module 22.Wherein aid in cabinet assembled The bottom of module 22 is provided with roller transfer block 1, be surrounded by liftable human users platform 23 be easy to personnel assemble cabinet when it is each Item operation.
The components and parts assembling 3 includes the manipulator 31 of auxiliary element assembling, and it hangs upside down and is connected to upper guide rail Truss 32.
The secondary connection 4 is disposed with packaged type ladder truck 41, and auxiliary prepackage 7 is disposed with product component prepackage work Case.Product component prepackage work case is exactly the workbench formed by various pillars and table top welding assembly in fact, sets prepackage Work case is primarily due to that high-voltage complete switch equipment parts are relatively more, it is necessary to which that this parts thereof is assembled into semi-finished product is right Be assembled in high-voltage complete switch equipment again up afterwards, be easy to staff parts are carried out in prepackage work case half into Product assemble.
The wire body Product checking 5 is disposed with breaker and handcart enters between cabinet inspection and debugging between 51 and industrial frequency withstand voltage test 52.52 are provided with product inlet and outlet 53, tester gateway 54 and voltage-resisting test apparatus 55 wherein between industrial frequency withstand voltage test.
The each operation stage uses instrument to be used from each distinct interface access in the outside of sheet metal component 13.Wherein each work The sequence stage uses auxiliary equipment and instrument to arrange different structure shapes according to high-voltage complete switch equipment and process operations property Formula, can be electric tool or pneumatic tool.
Operation principle:
As shown in Figures 1 to 4, high-voltage complete switch equipment cabinet parts pass through mast-up 21 and auxiliary tank in initial position Body assembly module 22 and human users' platform 23 of surrounding assemble cabinet main body frame, then pass through bottom cylinder transfer block 1 The region of components and parts assembling 3 is transported to, weight weight more by the progress 40.5kV high-voltage complete switch equipment partial amounts of manipulator 31 The assembling of component, then high-voltage complete switch equipment using roller transfer block 1 by personnel push sequentially carry out secondary connection 4, wire body Product checking 5, the offline 6 grade work of product.Parts thereof fills after the completion of being mounted in advance in auxiliary 7 regional work cases of prepackage It is fitted on high-voltage complete switch equipment.

Claims (4)

  1. A kind of 1. robot assisted operation high-voltage complete switch equipment general assembly streamline, it is characterised in that:If including by dry milling The transport mechanism that cylinder transfer block (1) is formed by connecting, passes through in the transport mechanism and is sequentially provided with cabinet load segment (2), components and parts assembling section (3), secondary connection section (4), wire body Product checking section (5), product lower line segment (6), are being transmitted in addition Auxiliary prepackage section (7) is provided with by mechanism;
    The source of the gas connector (14) and and extranets being connected with external air source are wherein equipped with each roller transfer block (1) Network, the network source interface (15) of power supply connection;
    Wherein cabinet load segment (2) includes auxiliary cabinet assembly module (22), and the transport mechanism is from the auxiliary cabinet assembly mould Group (22) bottom passes through, and cabinet part mast-up (21) is provided with above the auxiliary cabinet assembly module (22), in the auxiliary tank Liftable human users platform (23) is provided with by body assembly module (22);
    Wherein components and parts assembling section (3) includes guide tracked truss (32), is hung upside down on the guide tracked truss (32) and is provided with machinery Hand (31), the transport mechanism pass through below the guide tracked truss (32);
    Wherein packaged type ladder truck (41) is provided with by the transport mechanism of secondary connection section (4);
    Wherein wire body Product checking section (5) is sequentially provided with breaker and handcart enters (51) and industrial frequency withstand voltage between cabinet inspection and debugging and surveyed Between examination (52);
    Wherein auxiliary prepackage section (7) includes product component prepackage work case.
  2. 2. robot assisted operation high-voltage complete switch equipment general assembly streamline as claimed in claim 1, it is characterised in that: Product inlet and outlet (53) and tester gateway (54) wherein are provided with (52) between industrial frequency withstand voltage test, in the industrial frequency withstand voltage Between test voltage-resisting test apparatus (55) is provided with (52).
  3. 3. robot assisted operation high-voltage complete switch equipment general assembly streamline as claimed in claim 1, it is characterised in that: The first sheet metal component that wherein roller transfer block (1) includes being sequentially connected, the first series cylinder, the first antiskid plate, the second series cylinder, the Two antiskid plates and the second sheet metal component, the source of the gas connection being connected with external air source is provided with the first sheet metal component or the second sheet metal component Mouth (14) and the network source interface (15) being connected with external network, power supply.
  4. 4. robot assisted operation high-voltage complete switch equipment general assembly streamline as claimed in claim 3, it is characterised in that: Wherein burr adjustable tail margin (16) is mounted in the first sheet metal component and the second sheet metal component bottom.
CN201720855002.8U 2017-07-14 2017-07-14 Robot assisted operation high-voltage complete switch equipment general assembly streamline Active CN206936815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720855002.8U CN206936815U (en) 2017-07-14 2017-07-14 Robot assisted operation high-voltage complete switch equipment general assembly streamline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720855002.8U CN206936815U (en) 2017-07-14 2017-07-14 Robot assisted operation high-voltage complete switch equipment general assembly streamline

Publications (1)

Publication Number Publication Date
CN206936815U true CN206936815U (en) 2018-01-30

Family

ID=61369513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720855002.8U Active CN206936815U (en) 2017-07-14 2017-07-14 Robot assisted operation high-voltage complete switch equipment general assembly streamline

Country Status (1)

Country Link
CN (1) CN206936815U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113594944A (en) * 2021-07-27 2021-11-02 江苏亚开电气有限公司 Automatic production method of ring main unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113594944A (en) * 2021-07-27 2021-11-02 江苏亚开电气有限公司 Automatic production method of ring main unit

Similar Documents

Publication Publication Date Title
CN107443124A (en) A kind of sheet fabrication fixing device
CN206936815U (en) Robot assisted operation high-voltage complete switch equipment general assembly streamline
CN204674907U (en) A kind of vanning piling gripper equipment
CN203093334U (en) Laser coding device of six-bit electric energy meter
CN210272558U (en) Automatic assembling production line for fuel cell stack
CN205200830U (en) Lower car body welding production line structure
CN206827043U (en) A kind of automatic sequence boxing apparatus of weighing
CN110068296A (en) A kind of battery core detection of characteristic parameters platform
CN205984631U (en) Box transformer production line
CN205981586U (en) Gearbox leakage tester
CN205790249U (en) The fitting device of lead-acid battery package machine
CN207029725U (en) A kind of shaping packager for amenities
CN110293399A (en) A kind of engine pile and hydrogen tube assembly assembling line
CN207114117U (en) A kind of stop valve water examines machine
CN104029750A (en) Pipelining type assembly production line for chassis of heavy vehicle
CN210878504U (en) Battery module assembly production line
CN208537089U (en) Air makees the high-pressure manometer automatic calibrator of medium
CN102862701A (en) Large-diameter explosive roll clamping type claw
CN112595456A (en) Portable pressure sensor pressurization test equipment
CN206654244U (en) A kind of quick feeding device
CN110000113A (en) A kind of heat exchanger helium inspection equipment
CN212300734U (en) Capsule leakproofness and pressure release valve opening pressure sensitivity's detection frock
CN204441762U (en) A kind of electric power overhaul folding platform
CN216309944U (en) Food detection device capable of being operated by multiple persons
CN217467150U (en) Automatic calibrating installation of three-phase electric energy meter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Robot assisted high voltage switchgear assembly line

Effective date of registration: 20201231

Granted publication date: 20180130

Pledgee: China Construction Bank Corporation Yinchuan Xixia sub branch

Pledgor: NINGXIA LICHENG GROUP Co.,Ltd.

Registration number: Y2020640000006

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20230530

Granted publication date: 20180130