CN206934490U CN201720760914.7U CN201720760914U CN206934490U CN 206934490 U CN206934490 U CN 206934490U CN 201720760914 U CN201720760914 U CN 201720760914U CN 206934490 U CN206934490 U CN 206934490U
Authority
CN
China
Prior art keywords
chamber
valve
blender
filling opening
extinguishing chemical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720760914.7U
Other languages
Chinese (zh)
Inventor
徐杰
黄峥嵘
刘月平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Time Construction Group Ltd By Share Ltd
Original Assignee
Shanghai Yue Chun Construction And Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yue Chun Construction And Installation Engineering Co Ltd filed Critical Shanghai Yue Chun Construction And Installation Engineering Co Ltd
Priority to CN201720760914.7U priority Critical patent/CN206934490U/en
Application granted granted Critical
Publication of CN206934490U publication Critical patent/CN206934490U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model discloses a kind of fixed froth installation, including foam maker, blender and spray gun, foam solution and water are mixed and are sent to foam maker by the blender sprays foam through spray gun again, the blender is connected to water inlet pipe and extinguishing chemical conveyer, the extinguishing chemical conveyer includes fluid reservoir and the piston being arranged in fluid reservoir, fluid reservoir is divided into the first chamber and the second chamber by the piston, second intracavitary places extinguishing chemical, first chamber connects with water inlet pipe, second chamber is connected with blender and is provided with charging valve on the second chamber.Piston is slided in fluid reservoir, and the space of the first chamber and the second chamber is increased and diminished, and then the extinguishing chemical of the second intracavitary can be allowed to export and suck, so as to allow the addition of extinguishing chemical to become simple and convenient.

Description

Fixed froth installation
Technical field
It the utility model is related to a kind of fixed froth installation.
Background technology
Fire is most generally to threaten one of social development and the major casualty of public safety, and fire control technology is protection The guarantee of people's property and life safety.Foam fire extinguishing technique has the spy that flow is big, coefficient of foaming is high, foaming stabilization time is grown Point, fire area, heat-insulated fire extinguishing can be covered on a large scale, therefore be widely used in the production institute that fire height takes place frequently or flow of the people is big.
Announce and disclose a kind of novel foam extinguishing device for CN205759226U Chinese patent, by tank body and put Realize that spraying foam is put out a fire in the siphon pipe and shower nozzle of tank interior, still, in actual use, this fire extinguisher is only It can use once, it is impossible to fill extinguishing chemical for tank body, thereby using being limited, filling extinguishing chemical needs to re-start dismounting It can realize, it is cumbersome.
Utility model content
The purpose of this utility model is to provide a kind of fixed froth installation that can conveniently fill extinguishing chemical.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of fixed froth installation, including foam maker, blender and spray gun, the blender by foam solution and Water mixes and is sent to foam maker sprays foam through spray gun again, and the blender is connected to water inlet pipe and extinguishing chemical Conveyer, the extinguishing chemical conveyer include fluid reservoir and the piston being arranged in fluid reservoir, and the piston divides fluid reservoir Be cut into the first chamber and the second chamber, second intracavitary places extinguishing chemical, and first chamber connects with water inlet pipe, second chamber and Blender connects and is provided with charging valve on the second chamber.
By using above-mentioned technical proposal, piston is slided in fluid reservoir, and the space of the first chamber and the second chamber is carried out Increase and diminish, and then the extinguishing chemical of the second intracavitary can be allowed to export and suck, so as to allow the addition of extinguishing chemical to become letter Folk prescription is just.
The utility model is further arranged to:The fluid reservoir includes tank body and the lid being connected with tank body, the tank Body end portion is provided with feed tube, and the feed tube is connected with water inlet pipe, is provided with drain pipe on the lid, on the drain pipe Control valve is installed, and drain pipe is connected with blender.
By using above-mentioned technical proposal, the cooperation of feed tube and water inlet pipe, it can be carried out to the water of the first intracavitary Filling and discharge, so as to facilitate the slip of piston, meanwhile, by fluid reservoir can allow the extinguishing chemical of the second intracavitary can add and Release.
The utility model is further arranged to:Conical socket, the drain pipe and conical socket are provided with the lid Connect, circular cone is provided with the piston, the circular cone coordinates with conical socket.
By using above-mentioned technical proposal, the cooperation of conical socket and circular cone can allow the delivery ratio of the second chamber more dry Only.
The utility model is further arranged to:The lid is connected with tank body using flange.
By using above-mentioned technical proposal, the lid and tank body of flange connection are strong by its good sealing effect, the structure of connection Degree is high.
The utility model is further arranged to:The charging valve is installed, the charging valve includes valve on the drain pipe Body and the valve element in valve body, the valve body include entrance, outlet and filling opening, and entrance is connected with the second chamber, gone out Mouth is connected with drain pipe, and the valve body coordinates with outlet and filling opening respectively.
By using above-mentioned technical proposal, the setting of charging valve facilitates the addition of extinguishing chemical to allow its energy by the setting of valve element Enough that outlet and filling opening are closed respectively, then allowing not win a prize can unidirectionally input or unidirectionally export.
The utility model is further arranged to:The entrance is symmetrical arranged with filling opening, and the valve element includes flap and valve Bar, spring base is provided with the valve body, spring is installed, the spring, which is set on valve rod, deviates from liquid feeding on the spring base One end of mouth, and spring contradicts with flap, the flap matches with outlet and filling opening respectively.
By using above-mentioned technical proposal, the setting of spring base and valve rod can allow spring to be installed, and allow flap to exist Usually sealed when with filling opening, and when adding fireproof agent, with exit seal.
The utility model is further arranged to:First through hole is offered on the spring base, the valve rod deviates from filling opening One end be located in first through hole.
By using above-mentioned technical proposal, first through hole facilitates the positioning and slip of valve rod.
The utility model is further arranged to:The filling opening position is provided with banking stop, is offered on the banking stop Second through hole, the valve rod are located on the second through hole close to one end of filling opening.
By using above-mentioned technical proposal, the setting of banking stop can prevent flap from skidding off filling opening, the work of the second through hole With identical with first through hole.
Brief description of the drawings
Fig. 1 is the overall structure figure of the present embodiment;
Fig. 2 is the sectional view of fluid reservoir;
Fig. 3 is the enlarged drawing at A in Fig. 2.
In figure:1st, foam maker;2nd, blender;3rd, water inlet pipe;4th, fluid reservoir;41st, the first chamber;42nd, the second chamber;43、 Tank body;44th, lid;441st, conical socket;45th, feed tube;5th, drain pipe;51st, control valve;6th, piston;61st, circular cone;7th, add Liquid valve;71st, valve body;711st, spring base;712nd, first through hole;713rd, spring;714th, banking stop;715th, the second through hole;72nd, valve Core;721st, flap;722nd, valve rod;73rd, entrance;74th, export;75th, filling opening;76th, liquid outlet.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of fixed froth installation, as shown in figure 1, including foam maker 1, blender 2 and spray gun(Figure is not carried out Show), water and extinguishing chemical are sent to blender 2, foam solution is formed after being mixed by blender 2 according to certain ratio, Foam solution is sent to foam maker 1 again, most foam is sprayed through spray gun afterwards, is put out a fire.Blender 2 is connected into water Pipe 3 and extinguishing chemical conveyer, water inlet pipe 3 is that blender 2 provides water, and extinguishing chemical conveyer is the offer extinguishing chemical of blender 2.
Wherein, as shown in Figures 2 and 3, extinguishing chemical conveyer includes fluid reservoir 4 and the piston being arranged in fluid reservoir 4 6, fluid reservoir 4 is divided into by the first chamber 41 and the second chamber 42 by piston 6, places extinguishing chemical in the second chamber 42, and by first Chamber 41 is connected with water inlet pipe 3, and the second chamber 42 is connected with blender 2, when blender 2 needs extinguishing chemical, by entering in water inlet pipe 3 Row water delivery, so as to allow the pressure of the first chamber 41 to be more than the pressure of the second chamber 42, and then piston 6 is allowed by the extinguishing chemical in the second chamber 42 It is sent in blender 2.
As shown in Figures 2 and 3, fluid reservoir 4 includes tank body 43 and the lid 44 being connected with tank body 43, lid 44 and tank body 43 are connected using flange.There is feed tube 45 in the end set of tank body 43, feed tube 45 is connected with water inlet pipe 3.And in lid 44 On be provided with drain pipe 5, control valve 51 is installed on drain pipe 5(Reference picture 1), and drain pipe 5 is connected with blender 2, is passed through Control valve 51 controls the conveying of extinguishing chemical, and wherein control valve 51 can use common valve, can also use magnetic valve.Lid Conical socket 441 is provided with 44, drain pipe 5 connects with conical socket 441, and conical socket 441 engages with tank body 43, and is Allowing extinguishing chemical, more thoroughly, the end set of piston 6 has circular cone 61 to ratio, pass through circular cone 61 and conical socket in output 441 coordinate.
In order to allow extinguishing chemical when adding it is more convenient, reference picture 2 and Fig. 3, charging valve 7 is installed on drain pipe 5, passed through Extinguishing chemical be circulated into the second chamber 42 by charging valve 7, and during liquid feeding, control valve 51 is closed.Charging valve 7 wraps Valve body 71 and the valve element 72 in valve body 71 are included, valve body 71 includes entrance 73, outlet 74 and filling opening 75, entrance 73 Connected with the second chamber 42, outlet 74 is connected with drain pipe 5, and in normal use, extinguishing chemical is entered from drain pipe 5 by entrance 73 Extinguishing chemical is imported into blender 2 into valve body 71, and by outlet 74.Entrance 73 and filling opening 75 are symmetrical arranged, So that valve body 71 is into tubular structure.Valve element 72 includes flap 721 and valve rod 722, and valve rod 722 is located on flap 721, passed through Flap 721 is opened and closed respectively to entrance 73 and filling opening 75.
As shown in Figures 2 and 3, it is provided with spring base 711 on valve body 71, spring base 711 is fixed on valve body 71 close to going out Mouthfuls 74 one end, first through hole 712 is provided with valve seat, and be provided with for liquid between first through hole 712 and valve body 71 The liquid outlet 76 passed through.Valve rod 722 is through in first through hole 712, and spring 713 is installed on spring base 711, by bullet Spring 713 is set in the one end for deviating from filling opening 75 on valve rod 722, and allows spring 713 to be contradicted with flap 721 and spring base 711, So as to allow flap 721 to be on the valve body 71 of the side of filling opening 75, and then in normal use, filling opening 75 is closure state. In order to prevent flap 721 from being skidded off under the conflict of spring 713 from filling opening 75, the position of filling opening 75 is provided with banking stop 714, The second through hole 715 is offered on banking stop 714, allows valve rod 722 to be located in close to one end of filling opening 75 on the second through hole 715, Likewise, the liquid outlet 76 flowed through for liquid is provided between the second through hole 715 and valve body 71., will when adding extinguishing chemical The pipeline of addition carries out sealing with filling opening 75 and combined, and opens the top of flap 721 by the pressure of liquid, allows flap 721 to be placed in out 74 sides of mouth, so that entrance 73 connects with filling opening 75, and then add the purpose of extinguishing chemical.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (8)

1. a kind of fixed froth installation, including foam maker(1), blender(2)And spray gun, the blender(2)Will bubble Foam liquid and water mix and are sent to foam maker(1)Foam is sprayed through spray gun again, it is characterized in that:The blender(2) It is connected to water inlet pipe(3)With extinguishing chemical conveyer, the extinguishing chemical conveyer includes fluid reservoir(4)And it is arranged on liquid storage Tank(4)Interior piston(6), the piston(6)By fluid reservoir(4)It is divided into the first chamber(41)With the second chamber(42), described second Chamber(42)Interior placement extinguishing chemical, first chamber(41)With water inlet pipe(3)Connection, second chamber(42)With blender(2)Even Connect and the second chamber(42)On charging valve is installed(7).
2. fixed froth installation according to claim 1, it is characterized in that:The fluid reservoir(4)Including tank body(43)And With tank body(43)The lid of connection(44), the tank body(43)End set has feed tube(45), the feed tube(45)With entering Water pipe(3)Connection, the lid(44)On be provided with drain pipe(5), the drain pipe(5)On control valve is installed(51), and Drain pipe(5)With blender(2)Connection.
3. fixed froth installation according to claim 2, it is characterized in that:The lid(44)On be provided with conical socket (441), the drain pipe(5)With conical socket(441)Connection, the piston(6)On be provided with circular cone(61), the taper Block(61)With conical socket(441)Coordinate.
4. fixed froth installation according to claim 2, it is characterized in that:The lid(44)With tank body(43)Using flange Connection.
5. fixed froth installation according to claim 2, it is characterized in that:The drain pipe(5)On the liquid feeding is installed Valve(7), the charging valve(7)Including valve body(71)And installed in valve body(71)Interior valve element(72), the valve body(71)Bag Include entrance(73), outlet(74)And filling opening(75), entrance(73)With the second chamber(42)Connection, outlet(74)With drain pipe (5)Connection, the valve body(71)Respectively with outlet(74)And filling opening(75)Coordinate.
6. fixed froth installation according to claim 5, it is characterized in that:The entrance(73)With filling opening(75)Symmetrically set Put, the valve element(72)Including flap(721)With valve rod(722), the valve body(71)On be provided with spring base(711), it is described Spring base(711)On spring is installed(713), the spring(713)It is set in valve rod(722)It is upper to deviate from filling opening(75)One End, and spring(713)With flap(721)Contradict, the flap(721)Respectively with outlet(74)And filling opening(75)Phase Match somebody with somebody.
7. fixed froth installation according to claim 6, it is characterized in that:The spring base(711)On to offer first logical Hole(712), the valve rod(722)Away from filling opening(75)One end be located in first through hole(712)It is interior.
8. fixed froth installation according to claim 6, it is characterized in that:The filling opening(75)Position is provided with banking stop (714), the banking stop(714)On offer the second through hole(715), the valve rod(722)Close to filling opening(75)One end It is located in the second through hole(715)On.
CN201720760914.7U 2017-06-28 2017-06-28 Fixed froth installation Expired - Fee Related CN206934490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720760914.7U CN206934490U (en) 2017-06-28 2017-06-28 Fixed froth installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720760914.7U CN206934490U (en) 2017-06-28 2017-06-28 Fixed froth installation

Publications (1)

Publication Number Publication Date
CN206934490U true CN206934490U (en) 2018-01-30

Family

ID=61366286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720760914.7U Expired - Fee Related CN206934490U (en) 2017-06-28 2017-06-28 Fixed froth installation

Country Status (1)

Country Link
CN (1) CN206934490U (en)

Similar Documents

Publication Publication Date Title
CN203154684U (en) Compressed gas foam extinguishing system for fire fighting truck
JP2014516739A (en) Foam mixing system using compressed air
CN103459301A (en) Device for supplying water and soda
CN108675250A (en) A kind of liquid aerating auto-filling equipment and its packaging process
CN109515287A (en) A kind of washing and disinfection car decontamination solution liquid-supplying system and washing and disinfection car
CN206934490U (en) Fixed froth installation
KR102128202B1 (en) Nano-bubble generator
CN106986307A (en) Portable chlorine dioxide gas jet device
CN206837269U (en) Automatic fire-fighting device in a kind of warehouse
CN103015993B (en) Water and gas disperse injection device for core gas-injection flooding experiment
CN102350031B (en) Parallel composite tank
CN206121538U (en) Carbonic acid spring gas -liquid mixture device
CN104261150B (en) Discharge system for ammonium nitrate tank car
CN208642323U (en) Liquefied ammonia transfer pot protective treatment device in a kind of desulphurization denitration DCS control system
CN207605717U (en) A kind of chlorine dioxide synthetic reaction device
CN207648145U (en) A kind of valve
CN206751390U (en) Portable chlorine dioxide gas jet device
CN105214531A (en) Foam-making apparatus
CN209348450U (en) Hydrogen-rich water generating device with ejector
CN209316890U (en) A kind of electronic extinguishing device
CN207640869U (en) A kind of high-efficiency environment friendly fire-fighting equipment
KR101400591B1 (en) A carbonated water mixing apparatus
CN206139213U (en) Heat preservation dropping liquid experimental apparatus of a body structure
CN205235223U (en) Automatic balanced foam installation
CN205727450U (en) A kind of type slow-releasing water supply installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 201914 A1-57 room 58, Fumin Road, Chongming District, Shanghai.

Patentee after: China time construction group Limited by Share Ltd.

Address before: 201914 Hengtai Economic Development Zone, Chongming County, Shanghai, A1-57 (room 58, Fumin Road, Chongming)

Patentee before: Shanghai Yue Chun construction and Installation Engineering Co., Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20210628

CF01 Termination of patent right due to non-payment of annual fee