CN206917268U - It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement - Google Patents
It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement Download PDFInfo
- Publication number
- CN206917268U CN206917268U CN201720694077.2U CN201720694077U CN206917268U CN 206917268 U CN206917268 U CN 206917268U CN 201720694077 U CN201720694077 U CN 201720694077U CN 206917268 U CN206917268 U CN 206917268U
- Authority
- CN
- China
- Prior art keywords
- water power
- pipe joint
- power pipe
- prefabricated
- connecting tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model, which provides one kind, quickly prevents concreting from blocking water power pipe joint arrangement, including prefabricated sleeve pipe and connecting tube, the prefabricated sleeve upper end is to twist curved flattening end, the connecting tube is fixed on prefabricated sleeve upper end, and the prefabricated its lower end is connected by connecting tube with original water power pipe joint upper end.The utility model, which provides one kind, quickly prevents concreting from blocking water power pipe joint arrangement, curved flattening is twisted with vice in one end, the other end is directly inserted at original water power pipe joint, it is simple to operate, reduce and manually twine the adhesive tape time, it is reusable, any rubbish is not produced, meets green construction management requirement.
Description
Technical field
Water power pipe joint arrangement field is the utility model is related to, quickly prevents concreting from blocking more particularly to one kind
Water power pipe joint arrangement.
Background technology
In building engineering, floor face has substantial amounts of settled water & electric pipe joint, during casting concrete easily
Block settled water & electric pipe joint.Traditional construction technique is manually winds with adhesive tape, and this way is relatively complicated, and concreting finishes
After must manual demolition adhesive tape so that floor produces a large amount of adhesive tape rubbish.What is more important is being grasped because Artificial Rubber band blocks
Always there is closure situation not in place during work, concrete is had in concreting process and is entered in pipe, later stage cleaning phase
Work as trouble, need design is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement for this.
Utility model content
In order to solve above-mentioned problem, the utility model, which provides one kind, quickly prevents concreting from blocking water power pipe
Curved flattening is twisted in piecing devices, one end with vice, and the other end is directly inserted at original water power pipe joint, simple to operate, is reduced
Manually twine the adhesive tape time, it is reusable, any rubbish is not produced, meets green construction management requirement, for up to this purpose, this reality
Quickly prevent concreting from blocking water power pipe joint arrangement, including prefabricated sleeve pipe and connecting tube with new offer is a kind of, it is described
Prefabricated sleeve upper end is to twist curved flattening end, and the connecting tube is fixed on prefabricated sleeve upper end, and the prefabricated its lower end passes through company
Adapter is connected with original water power pipe joint upper end.
Further improvement of the utility model, the prefabricated a length of 15-20cm of sleeve pipe, the utility model obtain in practice
With typically using the prefabricated sleeve pipe of 15-20cm pipe ranges in practice.
The utility model is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement, using first prefabricated PVC length
Curved flattening is twisted in 15-20cm left and right joints, one end with vice, and the other end is directly inserted at original water power pipe joint, mixed pouring
Directly it is inserted at original water power pipe joint before solidifying soil, treats to extract after concreting, so designs reusable, operation
Simply, reduce and manually twine the adhesive tape time, and do not produce any rubbish, meet green construction management requirement.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model side view;
Illustrate:
1st, original water power pipe joint;2nd, prefabricated sleeve pipe;21st, curved flattening end is twisted;3rd, connecting tube.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
The utility model, which provides one kind, quickly prevents concreting from blocking water power pipe joint arrangement, and one end is twisted with vice
Curved flattening, the other end is directly inserted at original water power pipe joint, simple to operate, is reduced and is manually twined the adhesive tape time, repeatable to make
With not producing any rubbish, meet green construction management requirement.
As a kind of specific embodiment of the utility model, one kind that the utility model provides as shown in Figure 1-2 quickly prevents
Concreting blocks water power pipe joint arrangement, including prefabricated sleeve pipe 2 and connecting tube 3, and the prefabricated upper end of sleeve pipe 2 is to twist curved pressure
Flat end 21, the connecting tube 3 are fixed on the prefabricated upper end of sleeve pipe 2, and the prefabricated lower end of sleeve pipe 2 passes through connecting tube 3 and original water power
The upper end of pipe joint 1 is connected.
As a kind of specific embodiment of the utility model, the utility model, which provides one kind, quickly prevents concreting from blocking
Water power pipe joint arrangement, including prefabricated sleeve pipe 2 and connecting tube 3, prefabricated 2 a length of 15-20cm of sleeve pipe, the utility model is in reality
Found application in border, the prefabricated sleeve pipe of 15-20cm pipe ranges is typically used in practice, the prefabricated upper end of sleeve pipe 2 is stubborn curved
End 21 is flattened, the connecting tube 3 is fixed on the prefabricated upper end of sleeve pipe 2, and the prefabricated lower end of sleeve pipe 2 passes through connecting tube 3 and original water
The upper end of fulgurite joint 1 is connected.
The prefabricated PVC sleeve pipes production method of the utility model is as follows:
1)The water power pipe joint quantity of first floor plate is counted according to drawing first;
2)It is identical with original water power pipe joint to make external diameter, length 15-20cm pvc pipe.Curved pressure is twisted with vice in one end
Flat, the other end is directly connected to PVC.
The prefabricated PVC sleeve pipes assembling and disassembling mode of the utility model is as follows:
1)Before concreting, band PVC, directly prefabricated PVC sleeve pipes are inserted in original water power pipe joint.
2)Finished in concreting, flat surface, which can carry out extracting during construction operation, carries PVC directly prefabricated PVC sets
Pipe.
3)It may be reused when lower first floor plate carries out concreting with the direct prefabricated PVC sleeve pipes of PVC.
It is described above, only it is preferred embodiment of the present utility model, is not that any other is made to the utility model
The limitation of form, and any modification made according to the technical essence of the utility model or equivalent variations, it is new to still fall within this practicality
Type scope claimed.
Claims (2)
1. a kind of quickly prevent concreting from blocking water power pipe joint arrangement, including prefabricated sleeve pipe(2)And connecting tube(3), its
It is characterised by:The prefabricated sleeve pipe(2)Upper end is to twist curved flattening end(21), the connecting tube(3)It is fixed on prefabricated sleeve pipe(2)On
End, the prefabricated sleeve pipe(2)Lower end passes through connecting tube(3)With original water power pipe joint(1)Upper end is connected.
Prevent concreting from blocking water power pipe joint arrangement 2. one kind according to claim 1 is quick, it is characterised in that:
The prefabricated sleeve pipe(2)A length of 15-20cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720694077.2U CN206917268U (en) | 2017-06-15 | 2017-06-15 | It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720694077.2U CN206917268U (en) | 2017-06-15 | 2017-06-15 | It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206917268U true CN206917268U (en) | 2018-01-23 |
Family
ID=61314274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720694077.2U Active CN206917268U (en) | 2017-06-15 | 2017-06-15 | It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206917268U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962889A (en) * | 2020-07-29 | 2020-11-20 | 中冶天工集团天津有限公司 | Outdoor gap plugging device for masonry wall and construction method |
-
2017
- 2017-06-15 CN CN201720694077.2U patent/CN206917268U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962889A (en) * | 2020-07-29 | 2020-11-20 | 中冶天工集团天津有限公司 | Outdoor gap plugging device for masonry wall and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112604U (en) | The slip casting rebar connector of band cone tail | |
CN206800804U (en) | The attachment structure that building iron mechanically connects | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN106223496A (en) | A kind of post-cast strip antiseepage grouting device | |
CN206917268U (en) | It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement | |
CN204492142U (en) | A kind of pre embedded bolt wall-connecting piece | |
CN108104287B (en) | Concrete structure and the segmentation casting method for utilizing the concrete structure | |
CN207260441U (en) | A kind of grout sleeve of mortar leakage prevention | |
CN206554511U (en) | A kind of improved water-stop opposite-pulling screw rod device | |
CN208105876U (en) | A kind of mold for top plate hole to be provided | |
CN206052996U (en) | A kind of post-cast strip antiseepage grouting device | |
CN205745767U (en) | Socket type concrete water pipe | |
CN201891262U (en) | Embedded casing pipe for drainage pipeline crossing floor slab | |
CN201362961Y (en) | Split-type opposite-drawing screw rod | |
CN212866902U (en) | Inclined three-way pipe for pouring concrete in funnel tank | |
CN204112736U (en) | Formwork steel wooden construction back cord linkage | |
CN206752621U (en) | A kind of efficient emergency drainage device | |
CN207419713U (en) | A kind of built-in connection | |
CN207960164U (en) | Prefabricated enclosure wall | |
CN207453121U (en) | A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts | |
CN206555570U (en) | Exterior wall reserves sleeve pipe waterproof capping tools | |
CN205134749U (en) | Circular plastic tubing of bamboo -shaped prestressing force | |
CN202090599U (en) | Combined water stop screw rod | |
CN206916629U (en) | A kind of bridge building operations prestressed anchor | |
CN206220513U (en) | Three sections of Quick Release sealing up screw that a kind of two ends can recycle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |