CN206903201U - Arc formwork device - Google Patents

Arc formwork device Download PDF

Info

Publication number
CN206903201U
CN206903201U CN201720641297.9U CN201720641297U CN206903201U CN 206903201 U CN206903201 U CN 206903201U CN 201720641297 U CN201720641297 U CN 201720641297U CN 206903201 U CN206903201 U CN 206903201U
Authority
CN
China
Prior art keywords
modular unit
split bolt
plank sheathing
steel pipe
wood plywood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720641297.9U
Other languages
Chinese (zh)
Inventor
狄昊
肖辉
李兵
陈世伟
张庭旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201720641297.9U priority Critical patent/CN206903201U/en
Application granted granted Critical
Publication of CN206903201U publication Critical patent/CN206903201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of arc formwork device, and it includes small curvature template and deep camber template;Small curvature template includes the first modular unit and the second modular unit, and the first modular unit is attached with the second modular unit by the first split bolt;First modular unit and the second modular unit include from the interior wood plywood set gradually outward and round steel pipe, and the wood plywood and round steel pipe are curved, the flitch of spaced set first between wood plywood and round steel pipe;Deep camber template includes the 3rd modular unit and the 4th modular unit, and the 3rd modular unit is attached with the 4th modular unit by the second split bolt;3rd modular unit and the 4th modular unit include from the interior plank sheathing and reinforcing bar set gradually outward, and plank sheathing and reinforcing bar are curved, the flitch of spaced set second between plank sheathing and reinforcing bar.The utility model is simple in construction, can ensure that the production quality of arcuate structure concrete.

Description

Arc formwork device
Technical field
The utility model belongs to concrete construction formwork field, and in particular to a kind of arc formwork device.
Background technology
In concrete engineering construction, some arches or arcuate structure concrete are frequently encountered, is operated because cast in situs is present Inconvenient, the shortcomings that engineering time is long, operating efficiency is low, construction cost is high, therefore the construction party of generally use precast concrete Method., it is necessary to install arc formwork device in precast concrete construction, existing arc formwork apparatus structure is complicated, work effect Rate is very low, and easily causes template displacement, deformation, and the faulting of slab ends of formation, curtain, outward appearance are molded the quality defect of concrete such as difference.Cause This, we are there is an urgent need to a kind of new arc formwork device, and to overcome, existing arc formwork apparatus structure is complicated, operating efficiency is low The problem of.
Utility model content
The purpose of this utility model is to provide a kind of production quality simple in construction, can ensure that arcuate structure concrete Arc formwork device.
Technical scheme is used by the utility model:
A kind of arc formwork device, including small curvature template and deep camber template(Divided according to Practical Project, arc radius Arc formwork less than or equal to 4m is deep camber template, and arc formwork of the arc radius more than 4m is small curvature template);
The small curvature template includes the first modular unit and the second modular unit, the first modular unit and the second template list Member is attached by the first split bolt;First modular unit and the second modular unit include setting gradually outward from interior Wood plywood and round steel pipe, the wood plywood and round steel pipe are curved, are equidistantly set between wood plywood and round steel pipe Put the first flitch;
The deep camber template includes the 3rd modular unit and the 4th modular unit, the 3rd modular unit and the 4th template list Member is attached by the second split bolt;3rd modular unit and the 4th modular unit include setting gradually outward from interior Plank sheathing and reinforcing bar, plank sheathing and reinforcing bar are curved, the flitch of spaced set second between plank sheathing and reinforcing bar.
By such scheme, sleeve pipe is equipped with wood plywood and plank sheathing;One end of the screw rod of first split bolt is successively By the spiral shell of the first split bolt after through the sleeve pipe in the wood plywood of the first modular unit, the round steel pipe of the first modular unit Mother is fixed, and the other end of the screw rod of the first split bolt sequentially passes through sleeve pipe in the wood plywood of the second modular unit, first Fixed after the round steel pipe of modular unit by the nut of the first split bolt, the structure can prevent the first split bolt from being damaged when to drawing Bad wood plywood, it is ensured that the stability of total;Screw rod one end of second split bolt sequentially passes through the 3rd modular unit Sleeve pipe in plank sheathing, fixed after the reinforcing bar of the 3rd modular unit by the nut of the second split bolt, the spiral shell of the second split bolt The other end of bar is sequentially passed through after the reinforcing bar of sleeve pipe in the plank sheathing of the 4th modular unit, the 4th modular unit by second pair of drawing The nut of bolt is fixed, and the structure can prevent the second split bolt from damaging plank sheathing when to drawing, it is ensured that the stabilization of total Property.
By such scheme, the steel pipe of the first modular unit and the second modular unit has more, is be arranged in parallel along curved surface, Its vertical spacing is not more than 200mm, to increase the intensity of small curvature template, makes structure more stable, effectively can prevent concrete from pouring Template displacement, deformation during building, so as to prevent the quality defect of concrete such as faulting of slab ends, curtain, outward appearance shaping difference.
By such scheme, the thickness of the wood plywood is 2mm, and the thickness of the plank sheathing is 3mm;In the first template list On the wood plywood of member, the ring spacing between the first flitch is 300mm;On the wood plywood of the second modular unit, first Ring spacing between flitch is 300mm;On the plank sheathing of the 3rd modular unit, the ring spacing between the second flitch is 100mm;On the plank sheathing of the 4th modular unit, the ring spacing between the second flitch is 100mm.The structure can ensure that template Intensity, make total more stable reliable.
The beneficial effects of the utility model are:
Small curvature template is formed using wood plywood, round steel pipe, split bolt, using plank sheathing, reinforcing bar, split bolt group Into deep camber template, intensity can be effectively improved, avoids faulting of slab ends, the extension formed in concreting process by template displacement, deformation The quality defect of concrete such as curtain, outward appearance shaping difference;Ensure arcuate structure appearance requirement, reduce the repairing of later stage concrete surface Difficulty and input;
Simple in construction, easy installation and removal, reduce arcuate structure concrete for making workload, improve operating efficiency;
It can reuse, reduce cost of manufacture.
Reduce camber line measurement workload simultaneously, improve operating efficiency.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the structural representation of small curvature template;
Fig. 2 is the structural representation of deep camber template;
Fig. 3 is that round steel pipe installs schematic diagram;
1st, the first modular unit, the 2, second modular unit, the 3, first split bolt, 1.1, wood plywood, 1.2, round steel Pipe, the 1.3, first flitch, the 4, the 3rd modular unit, the 5, the 4th modular unit, the 6, second split bolt, 4.1, plank sheathing, 4.2, Reinforcing bar, the 4.3, second flitch.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this Utility model, it is not used to limit the utility model.
Referring to Fig. 1-Fig. 2, a kind of arc formwork device, including small curvature template and deep camber template.Small curvature template bag The first modular unit 1 and the second modular unit 2 are included, the first modular unit 1 and the second modular unit 2 pass through the first split bolt 3 It is attached;First modular unit 1 and the second modular unit 2 are included from the interior wood plywood 1.1 set gradually outward and circle Steel pipe 1.2, wood plywood 1.1 and round steel pipe 1.2 are curved, the spaced set between wood plywood 1.1 and round steel pipe 1.2 First flitch 1.3.Deep camber template includes the 3rd modular unit 4 and the 4th modular unit 5, the 3rd modular unit 4 and the 4th mould Slab element 5 is attached by the second split bolt 6;3rd modular unit 4 and the 4th modular unit 5 include from it is interior outward according to The plank sheathing 4.1 and reinforcing bar 4.2 of secondary setting, plank sheathing 4.1 and reinforcing bar 4.2 are curved, plank sheathing 4.1 and reinforcing bar 4.2 it Between the second flitch of spaced set 4.3.
In order to ensure the rigidity and intensity of small curvature template, make total more stable, the thickness of wood plywood 1.1 is 2mm, the specification of round steel pipe 1.2 is Φ 4.8mm × 3.0mm(A diameter of 4.8mm, thickness 3.0mm), the rule of the first flitch 1.3 Lattice are 40mm × 80mm, and the first split bolt is M14 split bolts, on the wood plywood 1.1 of the first modular unit 1, first Ring spacing between flitch 1.3 is 300mm;On the wood plywood 1.1 of the second modular unit 2, between the first flitch 1.3 Ring spacing is 300mm.The steel pipe 1.2 of first modular unit 1 and the second modular unit 2 can have more, be set along curved surface is parallel Put, its vertical spacing is not more than 200mm, referring to Fig. 3.
In order to ensure the rigidity and intensity of deep camber template, make total more stable, the thickness of plank sheathing 4.1 is 3mm, the specification of reinforcing bar 4.2 is Φ 25, and the specification of the second flitch 4.3 is 20mm × 40mm, and the specification of the second split bolt 6 is M14 split bolts;On the plank sheathing 4.1 of the 3rd modular unit 4, the ring spacing between the second flitch 4.3 is 100mm; On the plank sheathing 4.1 of 4th modular unit 5, the ring spacing between the second flitch 4.3 is 100mm.
In order to prevent the first split bolt 3 from damaging wood plywood 1.1 when to drawing, it is ensured that the stability of total, can Sleeve pipe is all provided with wood plywood 1.1, one end of the screw rod of the first split bolt 3 sequentially passes through the wood glue of the first modular unit 1 Sleeve pipe in plywood 1.1, fixed after the round steel pipe 1.2 of the first modular unit 1 by the nut of the first split bolt 3, first pair of drawing The other end of the screw rod of bolt 3 sequentially passes through sleeve pipe in the wood plywood 1.1 of the second modular unit 2, the first modular unit 1 Fixed after round steel pipe 1.2 by the nut of the first split bolt 3.In order to prevent the second split bolt 6 from damaging plank sheathing when to drawing 4.1, it is ensured that the stability of total, sleeve pipe can be set in plank sheathing 4.1, one end of the screw rod of the second split bolt 6 is successively By the second split bolt 6 after through the sleeve pipe in the plank sheathing 4.1 of the 3rd modular unit 4, the reinforcing bar 4.2 of the 3rd modular unit 4 Nut fix, the other end of the screw rod of the second split bolt 6 sequentially passes through the set in the plank sheathing 4.1 of the 4th modular unit 5 Manage, fixed after the reinforcing bar 4.2 of the 4th modular unit 5 by the nut of the second split bolt 6.
The manufacturing process of small curvature template:
The first step, snap the line is measured to small curvature template position, and round steel pipe 1.2 is entered using curvature steel pipe processing unit (plant) Row processing, specific curvature of processing are determined by design drawing;Second step, wood plywood 1.1 is processed, meets its size existing Field construction requirement;3rd step, secondary joist is installed, the first flitch 1.3 is equidistantly fixed on wood plywood 1.1 by 300mm, the 4th Step, drills on wood plywood 1.1, installs PVC sleeve pipes, the first split bolt 3 is pierced into PVC sleeve pipes;5th step, by round steel Pipe 1.2 is installed as main joist, when main joist is installed, according to design drawing in the both ends unwrapping wire of main joist, determines circular arc The position of two-end-point, after main joist installs, the both ends of arc-shaped device have to and design drawing main joist both ends unwrapping wire Point overlaps, and ensures installation accuracy, then by the way that the first split bolt 3 is fixed, the fixed device completed checks arc-shaped device Both ends unwrapping wire point whether deviate, in case of deviate in time adjustment, the next step operation can be carried out by adjusting the device finished;
Pay attention to:Steel pipe 1.2 is formed the curvature for meeting construction requirement in advance, the steel of varying number is used according to depth of beam Pipe 1.2,1.2 vertical spacing of steel pipe are not more than 200mm.
The manufacturing process of deep camber template:
The first step, snap the line is measured to deep camber template position, reinforcing bar 4.2 carried out using curvature reinforced bar processing device Processing, specific curvature of processing are determined by design drawing;Second step, plank sheathing 4.1 is processed, its size is met scene and apply Work requirement;3rd step, secondary joist is installed, the second flitch 4.3 is equidistantly fixed on plank sheathing 4.1 by 100mm, the 4th step, Drilled on plank sheathing 4.1, PVC sleeve pipes are installed, the second split bolt 6 is pierced into PVC sleeve pipes;5th step, using reinforcing bar 4.2 as Main joist is installed, and according to design drawing in the both ends unwrapping wire of main joist, determines the position of circular arc two-end-point, main joist installation After, the both ends of arc-shaped device have to overlap with the point of design drawing main joist both ends unwrapping wire, ensure installation accuracy, then lead to Cross the second split bolt 6 to be fixed, the fixed device completed checks whether the both ends unwrapping wire point of arc-shaped device deviates, in case of partially From timely adjustment, the next step operation can be carried out by adjusting the device finished;
It should be appreciated that for those of ordinary skills, can according to the above description be improved or converted, And all these modifications and variations should all belong to the protection domain of the appended claims for the utility model.

Claims (5)

  1. A kind of 1. arc formwork device, it is characterised in that:Including small curvature template and deep camber template;
    The small curvature template includes the first modular unit and the second modular unit, and the first modular unit leads to the second modular unit The first split bolt is crossed to be attached;First modular unit and the second modular unit are included from the interior wood glue set gradually outward Plywood and round steel pipe, the wood plywood and round steel pipe are curved, spaced set between wood plywood and round steel pipe One flitch;
    The deep camber template includes the 3rd modular unit and the 4th modular unit, and the 3rd modular unit leads to the 4th modular unit The second split bolt is crossed to be attached;3rd modular unit and the 4th modular unit are included from the interior wooden model set gradually outward Plate and reinforcing bar, plank sheathing and reinforcing bar are curved, the flitch of spaced set second between plank sheathing and reinforcing bar.
  2. 2. arc formwork device according to claim 1, it is characterised in that:Set is equipped with wood plywood and plank sheathing Pipe, one end of the screw rod of the first split bolt sequentially passes through sleeve pipe, the first template list in the wood plywood of the first modular unit Fixed after the round steel pipe of member by the nut of the first split bolt, the other end of the screw rod of the first split bolt sequentially passes through second Sleeve pipe in the wood plywood of modular unit, fixed after the round steel pipe of the first modular unit by the nut of the first split bolt;The After screw rod one end of two split bolts sequentially passes through the reinforcing bar of sleeve pipe in the plank sheathing of the 3rd modular unit, the 3rd modular unit Fixed by the nut of the second split bolt, the other end of the screw rod of the second split bolt sequentially passes through the wooden model of the 4th modular unit Sleeve pipe in plate, fixed after the reinforcing bar of the 4th modular unit by the nut of the second split bolt.
  3. 3. arc formwork device according to claim 1 or 2, it is characterised in that:First modular unit and the second template list The steel pipe of member has more, is be arranged in parallel along curved surface, its vertical spacing is not more than 200m.
  4. 4. arc formwork device according to claim 1, it is characterised in that:The thickness of the wood plywood is 2mm, described The thickness of plank sheathing is 3m.
  5. 5. arc formwork device according to claim 1, it is characterised in that:On the wood plywood of the first modular unit, Ring spacing between first flitch is 300mm;On the wood plywood of the second modular unit, between the ring between the first flitch Away from for 300mm;On the plank sheathing of the 3rd modular unit, the ring spacing between the second flitch is 100mm;In the 4th template list On the plank sheathing of member, the ring spacing between the second flitch is 100mm.
CN201720641297.9U 2017-06-05 2017-06-05 Arc formwork device Active CN206903201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720641297.9U CN206903201U (en) 2017-06-05 2017-06-05 Arc formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720641297.9U CN206903201U (en) 2017-06-05 2017-06-05 Arc formwork device

Publications (1)

Publication Number Publication Date
CN206903201U true CN206903201U (en) 2018-01-19

Family

ID=61286892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720641297.9U Active CN206903201U (en) 2017-06-05 2017-06-05 Arc formwork device

Country Status (1)

Country Link
CN (1) CN206903201U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442689A (en) * 2018-03-23 2018-08-24 中国十七冶集团有限公司 One kind exempting from plaster curved surface concrete walls shaped steel back cord gang form and construction method
CN108930283A (en) * 2018-06-29 2018-12-04 五冶集团上海有限公司 The installation method of large-scale circular basis plank sheathing
CN109014724A (en) * 2018-08-28 2018-12-18 佛山市粤优创钢结构有限公司 For welding the positioning device and its localization method of modular unit
CN113293987A (en) * 2021-04-27 2021-08-24 江苏盐城金达市政工程有限公司 Construction method of shaped wood plywood for circular structures
CN114033163A (en) * 2021-11-09 2022-02-11 中国二十二冶集团有限公司 Method for reinforcing arc-shaped and circular wall body shaping type wood formwork

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442689A (en) * 2018-03-23 2018-08-24 中国十七冶集团有限公司 One kind exempting from plaster curved surface concrete walls shaped steel back cord gang form and construction method
CN108930283A (en) * 2018-06-29 2018-12-04 五冶集团上海有限公司 The installation method of large-scale circular basis plank sheathing
CN109014724A (en) * 2018-08-28 2018-12-18 佛山市粤优创钢结构有限公司 For welding the positioning device and its localization method of modular unit
CN109014724B (en) * 2018-08-28 2024-02-27 佛山市粤优创钢结构有限公司 Positioning device for welding template unit and positioning method thereof
CN113293987A (en) * 2021-04-27 2021-08-24 江苏盐城金达市政工程有限公司 Construction method of shaped wood plywood for circular structures
CN114033163A (en) * 2021-11-09 2022-02-11 中国二十二冶集团有限公司 Method for reinforcing arc-shaped and circular wall body shaping type wood formwork

Similar Documents

Publication Publication Date Title
CN206903201U (en) Arc formwork device
CN108914965B (en) Continuous construction method of aluminum alloy template for comprehensive pipe gallery
CN103352564B (en) Horizontal structure shuttering system and construction method
CN207131072U (en) A kind of super thick shear wall corner template reinforcing device
CN205399157U (en) Template device for concrete placement
CN107083804B (en) A kind of wall structure column joint bar construction method
CN103216131A (en) Reserved hole pore-forming construction method for concrete structure
CN211037781U (en) Outer wall fastener type scaffold wall connecting piece
CN102912977A (en) Mold used for pouring shaped stair
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
WO2021189751A1 (en) Prestress string annular support system, and deformation control method thereof
CN215907403U (en) Fine adjustment tool for supporting large steel formwork
CN216109369U (en) Supporting structure for civil air defense engineering reinforced concrete wall
CN206053370U (en) A kind of prefabrication lifting component supports corner brace instrument
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN213330018U (en) L type constructional column template reinforcing apparatus
CN205742988U (en) The explosion-proof membrane module of template one word piece
CN205012621U (en) Template is pour to outside decorative layer of conical column
CN205314372U (en) Steel reinforcement cage protective layer cushion
CN103706734A (en) Stirrup manufacturing device for steel reinforcement cage
CN204024080U (en) Mouth of pipe location, tubular truss end moulding bed
CN203855988U (en) Post-cast strip steel pipe supporting structure
CN203067936U (en) High-altitude pipeline installation safe lifting bracket
CN201245974Y (en) UPVC casing tube performing and pre-embedding system
CN111576638A (en) Complete construction method for wallboard embedded part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant