CN206902935U - Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node - Google Patents
Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node Download PDFInfo
- Publication number
- CN206902935U CN206902935U CN201520926302.1U CN201520926302U CN206902935U CN 206902935 U CN206902935 U CN 206902935U CN 201520926302 U CN201520926302 U CN 201520926302U CN 206902935 U CN206902935 U CN 206902935U
- Authority
- CN
- China
- Prior art keywords
- exterior wall
- steel
- node
- facade exterior
- northern
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node, for the connection between northern facade exterior wall and girder steel, including the I-shaped prefabricated component in the southern side for being arranged at the northern facade exterior wall, the upper back timber of the I-shaped prefabricated component is welded in the girder steel, L-shaped pinboard is welded with its lower back timber, the part transverse slat of the L-shaped pinboard is welded in the lower back timber, and its riser is installed on the northern facade exterior wall by connector.So, by the installation node of this kind of structure type, work progress can be simplified, reduce difficulty of construction, while ensure that the connection reliability between northern facade exterior wall and girder steel, improve construction quality.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly to it is a kind of for steel construction overall assembled building body
Northern facade exterior wall and steel girder erection node.The utility model, which further relates to one kind, includes above-mentioned northern facade exterior wall and steel girder erection node
Steel construction overall assembled building body.
Background technology
With the increasingly raising of living standard, people for house and do utilities building demand it is increasing.It is existing
Building is mostly reinforced concrete structure, but traditional reinforced concrete structure building course is complex, is wasted substantial amounts of
Manpower and materials;Meanwhile, it is necessary to carry out destructive dismounting during the demolishing buildings of reinforced concrete structure, the Building wood after dismounting
Material can not carry out recycling, caused by resource serious waste.Based on this, steel construction overall assembled building body meet the tendency of and
Raw, it can quickly and easily complete building body and build.In assembled-type house system, there is provided a kind of northern facade exterior wall is pacified with girder steel
Node is filled, to simplify work progress, reduces difficulty of construction, while ensure that the connection between northern facade exterior wall and girder steel is reliable
Property, construction quality is improved, just turns into those skilled in the art's urgent problem to be solved.
Utility model content
The purpose of this utility model is to provide a kind of northern facade exterior wall and steel girder erection node, to simplify work progress,
Difficulty of construction is reduced, while ensures the connection reliability between northern facade exterior wall and girder steel, improves construction quality.The utility model
Another object be to provide a kind of steel construction overall assembled building body including above-mentioned northern facade exterior wall Yu steel girder erection node.
To achieve these goals, the utility model is provided outside a kind of northern facade for steel construction overall assembled building body
Wall and steel girder erection node, for the connection between northern facade exterior wall and girder steel, including are arranged at the south of the northern facade exterior wall
The I-shaped prefabricated component of side, the upper back timber of the I-shaped prefabricated component are welded in the girder steel, and L is welded with its lower back timber
Shape pinboard, the part transverse slat of the L-shaped pinboard are welded in the lower back timber, and its riser is installed on the north by connector
Facade exterior wall.
Alternatively, the connector includes screw rod, the first nut and the second nut, and the screw pre-buried is in the northern facade
Outside within the walls, and the riser is passed through with its revealed section, the both sides of the riser pass through first nut and second nut
Locking.
Alternatively, there is the first pad between first nut and the riser.
Alternatively, there is the second pad between second nut and the riser.
The utility model additionally provides a kind of steel construction overall assembled building body, including girder steel and by installing node installation
In the northern facade exterior wall of the girder steel, the installation node is northern facade exterior wall as described above and steel girder erection node.
The northern facade exterior wall of steel construction overall assembled building body provided by the utility model and steel girder erection node, for north
Connection between facade exterior wall and girder steel, including it is arranged at the I-shaped prefabricated component in the southern side of the northern facade exterior wall, institute
The upper back timber for stating I-shaped prefabricated component is welded in the girder steel, and L-shaped pinboard, the L-shaped pinboard are welded with its lower back timber
Part transverse slat be welded in the lower back timber, its riser is installed on the northern facade exterior wall by connector.So, this kind is passed through
The installation node of structure type, can simplify work progress, reduce difficulty of construction, at the same ensure that northern facade exterior wall and girder steel it
Between connection reliability, improve construction quality.
Brief description of the drawings
, below will be to institute in embodiment in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only described in the utility model
Some embodiments, for those of ordinary skill in the art, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is northern facade exterior wall provided by the utility model and a kind of structure of embodiment of steel girder erection node
Schematic diagram.
Embodiment
Core of the present utility model is to provide a kind of northern facade exterior wall and steel girder erection node, to simplify work progress,
Difficulty of construction is reduced, while ensures the connection reliability between northern facade exterior wall and girder steel, improves construction quality.The utility model
Another core be to provide a kind of steel construction overall assembled building body including above-mentioned northern facade exterior wall Yu steel girder erection node.
In order that those skilled in the art more fully understands the technical solution of the utility model, below in conjunction with accompanying drawing pair
The utility model is further detailed.
Fig. 1 is refer to, Fig. 1 is northern facade exterior wall provided by the utility model and a kind of specific implementation of steel girder erection node
The structural representation of mode.
In a kind of embodiment, the northern facade exterior wall of steel construction overall assembled building body provided by the utility model
With steel girder erection node, for the connection between northern facade exterior wall 1 and girder steel 2, including the south of the northern facade exterior wall 1 is arranged at
The I-shaped prefabricated component 3 of side, the upper back timber of the I-shaped prefabricated component 3 are welded in the girder steel 2, are welded on its lower back timber
There is L-shaped pinboard 4, the part transverse slat of the L-shaped pinboard 4 is welded in the lower back timber, and its riser is installed on by connector
The northern facade exterior wall 1.So, by the installation node of this kind of structure type, work progress can be simplified, it is difficult to reduce construction
Degree, while the connection reliability between northern facade exterior wall 1 and girder steel 2 is ensure that, improve construction quality.
Specifically, above-mentioned connector includes screw rod 5, the first nut 6 and the second nut 7, and the screw rod 5 is embedded in the north
In facade exterior wall 1, and the riser is passed through with its revealed section, the both sides of the riser pass through first nut 6 and described
Two nuts 7 are locked, to improve the connection reliability and convenience for construction between L-shaped pinboard 4 and northern facade exterior wall 1.It is theoretical
On, connector is also not limited to above-mentioned form, can also extend the transverse slat of L-shaped pinboard 4 so that its riser is bonded and is bonded in
On northern facade exterior wall 1, now connector is engineering glue-line.
In order to avoid the first nut 6, the second nut 7 are rigidly connected with riser, the working security of riser is improved, it is above-mentioned
There is the first pad 8 between first nut 6 and riser, there is the second pad 9 between the second nut 7 and riser.
It is pointed out that the ordinal number such as " first, second " described in text is to distinguish the different structure of same names,
It is convenient only for description, certain order is not indicated that, more should not be construed as any restriction.
Except above-mentioned northern facade exterior wall and steel girder erection node, the utility model also provides a kind of include outside above-mentioned northern facade
The steel construction overall assembled building body of wall and steel girder erection node, other Each parts of the Assembled Building body refer to existing
Technology, it will not be repeated here.
Some one exemplary embodiments of the present utility model are only described by way of explanation above, undoubtedly, for
One of ordinary skill in the art, can be with a variety of in the case of without departing from spirit and scope of the present utility model
Mode is modified to described embodiment.Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as
Limitation to the utility model claims protection domain.
Claims (5)
1. a kind of northern facade exterior wall for steel construction overall assembled building body and steel girder erection node, for northern facade exterior wall
(1) connection between girder steel (2), it is characterised in that including be arranged at the northern facade exterior wall (1) southern side it is I-shaped pre-
Product (3), the upper back timber of the I-shaped prefabricated component (3) are welded in the girder steel (2), and L-shaped switching is welded with its lower back timber
Plate (4), the part transverse slat of the L-shaped pinboard (4) are welded in the lower back timber, and its riser is installed on the north by connector
Facade exterior wall (1).
2. northern facade exterior wall according to claim 1 and steel girder erection node, it is characterised in that the connector includes spiral shell
Bar (5), the first nut (6) and the second nut (7), the screw rod (5) are embedded in the northern facade exterior wall (1), and with outside it
Dew section passes through the riser, and the both sides of the riser are locked by first nut (6) and second nut (7).
3. northern facade exterior wall according to claim 2 and steel girder erection node, it is characterised in that first nut (6)
There is the first pad (8) between the riser.
4. northern facade exterior wall according to claim 2 and steel girder erection node, it is characterised in that second nut (7)
There is the second pad (9) between the riser.
5. a kind of steel construction overall assembled building body, including girder steel (2) and by installing node installation in the north of the girder steel (2)
Facade exterior wall (1), it is characterised in that the installation node is northern the facade exterior wall and steel as described in claim any one of 1-4
Beam installs node.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520926302.1U CN206902935U (en) | 2015-11-19 | 2015-11-19 | Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520926302.1U CN206902935U (en) | 2015-11-19 | 2015-11-19 | Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206902935U true CN206902935U (en) | 2018-01-19 |
Family
ID=61293942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520926302.1U Expired - Fee Related CN206902935U (en) | 2015-11-19 | 2015-11-19 | Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206902935U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111259482A (en) * | 2020-01-23 | 2020-06-09 | 久瓴(上海)智能科技有限公司 | Installation node determination method and device, computer equipment and storage medium |
-
2015
- 2015-11-19 CN CN201520926302.1U patent/CN206902935U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111259482A (en) * | 2020-01-23 | 2020-06-09 | 久瓴(上海)智能科技有限公司 | Installation node determination method and device, computer equipment and storage medium |
CN111259482B (en) * | 2020-01-23 | 2022-11-25 | 久瓴(江苏)数字智能科技有限公司 | Installation node determination method and device, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103541504A (en) | Special-shaped section steel tube recycled concrete core column | |
CN205348393U (en) | Steel construction unit -installment wall body and girder steel cladding node thereof | |
CN207160314U (en) | A kind of hanging cupboard mounting structure of steel construction building body and its interior partition wall body | |
CN207392516U (en) | A kind of connection structure of shear wall up and down | |
CN206902935U (en) | Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node | |
CN202945816U (en) | Brickwork wall between windows and reinforced by high-ductility fiber concrete | |
CN205421592U (en) | Steel construction building body and embedded interior wall body that has wardrobe thereof | |
CN204876313U (en) | Take mesh frame clip heart light partition wall board | |
CN205171753U (en) | Steel construction unit -installment wall body and door frame wall body node thereof | |
CN205348394U (en) | Steel construction unit -installment wall body and girder steel cladding node thereof | |
CN204960125U (en) | Girder steel subassembly, wall body and building body give sound insulation | |
CN203613646U (en) | Prefabricated house convenient for wiring | |
CN103541512B (en) | A kind of preparation method of FRP pipe concrete hetermorphiscal column of built-in high strength concrete filled steel tube stem stem | |
CN205276554U (en) | Steel construction unit -installment building body and node is hung with steel column to outer wall thereof | |
CN202492930U (en) | Connecting device of composite wallboards and floorslabs | |
CN206591622U (en) | A kind of steel construction building body and its steel column connecting node | |
CN204898872U (en) | Depend on outer wall fire prevention girder steel subassembly, wall body and building body | |
CN205276485U (en) | Steel construction unit -installment building body and node is hung with building carrier plate to outer wall thereof | |
CN204898921U (en) | Post fossil fragments fire protection components and building body | |
CN205276567U (en) | Steel construction unit -installment building body and outer wall package girder construction thereof | |
CN205242673U (en) | Steel construction unit -installment building body and outer wall window board node thereof | |
CN204510599U (en) | A kind of reinforced composite lead-bearing plate | |
CN207376866U (en) | A kind of steel construction building body and its interior wall connection structure | |
CN206174153U (en) | Bay window insulation construction and plug -in type building body suitable for new building | |
CN204850113U (en) | Modular acoustic celotex board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180119 Termination date: 20181119 |
|
CF01 | Termination of patent right due to non-payment of annual fee |