CN205276567U - Steel construction unit -installment building body and outer wall package girder construction thereof - Google Patents

Steel construction unit -installment building body and outer wall package girder construction thereof Download PDF

Info

Publication number
CN205276567U
CN205276567U CN201521098325.4U CN201521098325U CN205276567U CN 205276567 U CN205276567 U CN 205276567U CN 201521098325 U CN201521098325 U CN 201521098325U CN 205276567 U CN205276567 U CN 205276567U
Authority
CN
China
Prior art keywords
wall body
screw
steel
construction
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521098325.4U
Other languages
Chinese (zh)
Inventor
娄丙君
何剑飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wendeng Landao Construction Engineering Co Ltd
Original Assignee
Wendeng Landao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wendeng Landao Construction Engineering Co Ltd filed Critical Wendeng Landao Construction Engineering Co Ltd
Priority to CN201521098325.4U priority Critical patent/CN205276567U/en
Application granted granted Critical
Publication of CN205276567U publication Critical patent/CN205276567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a steel construction unit -installment building body and outer wall package girder construction thereof, this outer wall package girder construction include upper portion wall body, lower part wall body and set up in the upper portion wall body with H -beam between the wall body of lower part, seted up the mounting hole on the fossil fragments of lower part wall body, the lead screw passes through the mounting hole rigid coupling in fossil fragments, the one end of first angle steel is passed through the lead screw rigid coupling in lower part wall body, the diaphragm of its other end and second angle steel be through first screw connection, the riser and the side cladding plate of second angle steel pass through the second screw connection, the pressure equipment of U type prefab is passed through under the building carrier plate in the upper end of I -steel, the side cladding plate with the curb plate of U type prefab passes through the third screw connection. Like this, adopting this kind of structural style's cladding node, can simplifying the work progress, reduce the construction degree of difficulty, reliability of positioning when having guaranteed the H -beam cladding has simultaneously improved the installation intensity of wall body.

Description

A kind of steel construction entirety Assembled Building body and exterior wall bag girder construction thereof
Technical field
This utility model relates to technical field of building construction, particularly relates to a kind of exterior wall bag girder construction for steel construction entirety Assembled Building body. This utility model further relates to a kind of steel construction entirety Assembled Building body including above-mentioned exterior wall bag girder construction.
Background technology
Along with the raising day by day of living standard, people are increasing for house and the demand doing utilities building. Existing building mostly is reinforced concrete structure, but traditional reinforced concrete structure building course is complex, wastes substantial amounts of manpower and materials; Meanwhile, during the demolishing buildings of reinforced concrete structure, it is necessary to carrying out destructive dismounting, the construction material after dismounting cannot be carried out recycling, the serious waste of the resource caused. Based on this, steel construction entirety Assembled Building body arises at the historic moment, and it can complete building body quickly and easily and build. In assembled-type house system, need first main structural frame is installed after junction be coated with I-beam facade, therefore, a kind of exterior wall bag girder construction is provided, to simplify work progress, reduce difficulty of construction, ensure reliability of positioning during I-beam cladding simultaneously, improve the installation strength of body of wall, just become those skilled in the art's problem demanding prompt solution.
Utility model content
The purpose of this utility model is to provide a kind of exterior wall bag girder construction, in order to simplify work progress, reduces difficulty of construction, ensures reliability of positioning during I-beam cladding simultaneously, improves the installation strength of body of wall. Another object of the present utility model is to provide a kind of steel construction entirety Assembled Building body including above-mentioned exterior wall bag girder construction.
To achieve these goals, this utility model provides a kind of exterior wall bag girder construction for steel construction entirety Assembled Building body, including upper wall body, lower wall body and the I-beam that is arranged between described upper wall body and described lower wall body; The Os Draconis of described lower wall body offer installing hole, screw mandrel is fixed in described Os Draconis by described installing hole, one end of first angle steel is fixed in described lower wall body by described screw mandrel, the transverse slat of its other end and the second angle steel is connected by the first screw, and the riser of described second angle steel is connected by the second screw with side cladding plate; The upper end of described I-steel press-fits under floor support plate by U-shaped prefabricated component, and described side cladding plate is connected by the 3rd screw with the side plate of described U-shaped prefabricated component.
Alternatively, described side cladding plate is provided with flange towards one end of described lower wall body, and described flange is connected by described first screw with the transverse slat of described second angle steel.
Alternatively, described first screw, described second screw and described 3rd screw are sunk screw.
This utility model also provides for a kind of steel construction entirety Assembled Building body, including for exterior wall bag girder construction as above.
The exterior wall bag girder construction that this utility model provides is for steel construction entirety Assembled Building body, and this exterior wall bag girder construction includes upper wall body, lower wall body and the I-beam being arranged between described upper wall body and described lower wall body; The Os Draconis of described lower wall body offer installing hole, screw mandrel is fixed in described Os Draconis by described installing hole, one end of first angle steel is fixed in described lower wall body by described screw mandrel, the transverse slat of its other end and the second angle steel is connected by the first screw, and the riser of described second angle steel is connected by the second screw with side cladding plate; The upper end of described I-steel press-fits under floor support plate by U-shaped prefabricated component, and described side cladding plate is connected by the 3rd screw with the side plate of described U-shaped prefabricated component. So, adopt the cladding node of this kind of version, it is possible to simplify work progress, reduce difficulty of construction, ensure that reliability of positioning when I-beam is coated with simultaneously, improve the installation strength of body of wall.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present application or technical scheme of the prior art, the accompanying drawing used required in embodiment will be briefly described below, apparently, the accompanying drawing that the following describes is only some embodiments recorded in this utility model, for those of ordinary skill in the art, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of exterior wall a kind of detailed description of the invention of bag girder construction provided by the utility model.
Detailed description of the invention
Core of the present utility model is to provide a kind of exterior wall bag girder construction, in order to simplify work progress, reduces difficulty of construction, ensures reliability of positioning during I-beam cladding simultaneously, improves the installation strength of body of wall. Another core of the present utility model is to provide a kind of steel construction entirety Assembled Building body including above-mentioned exterior wall bag girder construction.
In order to make those skilled in the art be more fully understood that the technical solution of the utility model, below in conjunction with accompanying drawing, this utility model is further detailed.
Refer to the structural representation that Fig. 1, Fig. 1 are exterior wall a kind of detailed description of the invention of bag girder construction provided by the utility model.
In a kind of detailed description of the invention, the exterior wall bag girder construction that this utility model provides is for steel construction entirety Assembled Building body, and this exterior wall bag girder construction includes upper wall body 1, lower wall body 2 and the I-beam 3 being arranged between described upper wall body 1 and described lower wall body 2; The Os Draconis of described lower wall body 2 offer installing hole, screw mandrel 4 is fixed in described Os Draconis by described installing hole, one end of first angle steel 5 is fixed in described lower wall body 2 by described screw mandrel 4, the transverse slat of its other end and the second angle steel 6 is connected by the first screw 7, and the riser of described second angle steel 6 is connected by the second screw 9 with side cladding plate 8; The upper end of described I-steel press-fits under floor support plate by U-shaped prefabricated component 10, and described side cladding plate 8 is connected by the 3rd screw 11 with the side plate of described U-shaped prefabricated component 10. So, adopt the cladding node of this kind of version, it is possible to simplify work progress, reduce difficulty of construction, ensure that reliability of positioning when I-beam 3 is coated with simultaneously, improve the installation strength of body of wall.
In order to improve covering property, above-mentioned side cladding plate 8 is provided with flange towards one end of described lower wall body 2, and described flange is connected by described first screw 7 with the transverse slat of described second angle steel 6. Specifically, above-mentioned first screw the 7, second screw 9 and the 3rd screw 11 can be sunk screw, and this sunk screw is self-tapping self-locking type sunk screw, to ensure the exterior quality of exterior wall.
It is pointed out that ordinal numbers such as " first, second " described in literary composition, be the different structure in order to distinguish same names, only for describing conveniently, do not indicate that certain order, more should not be construed as any restriction.
Except above-mentioned exterior wall bag girder construction, this utility model also provides for a kind of steel construction entirety Assembled Building body including above-mentioned exterior wall bag girder construction, and other Each part of this Assembled Building body refer to prior art, does not repeat them here.
Below only some one exemplary embodiment of the present utility model is described by the mode of explanation, undoubtedly, for those of ordinary skill in the art, when not necessarily departing from spirit and scope of the present utility model, it is possible to by various different modes, described embodiment is modified. Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as the restriction to this utility model claims.

Claims (4)

1. the exterior wall bag girder construction for steel construction entirety Assembled Building body, it is characterized in that, including upper wall body (1), lower wall body (2) and the I-beam (3) that is arranged between described upper wall body (1) and described lower wall body (2); The Os Draconis of described lower wall body (2) offer installing hole, screw mandrel (4) is fixed in described Os Draconis by described installing hole, one end of first angle steel (5) is fixed in described lower wall body (2) by described screw mandrel (4), the transverse slat of its other end and the second angle steel (6) is connected by the first screw (7), and the riser of described second angle steel (6) is connected by the second screw (9) with side cladding plate (8); The upper end of described I-steel press-fits under floor support plate by U-shaped prefabricated component (10), and described side cladding plate (8) is connected by the 3rd screw (11) with the side plate of described U-shaped prefabricated component (10).
2. exterior wall bag girder construction according to claim 1, it is characterized in that, described side cladding plate (8) is provided with flange towards one end of described lower wall body (2), and described flange is connected by described first screw (7) with the transverse slat of described second angle steel (6).
3. exterior wall bag girder construction according to claim 2, it is characterised in that described first screw (7), described second screw (9) and described 3rd screw (11) are sunk screw.
4. a steel construction entirety Assembled Building body, it is characterised in that include for the exterior wall bag girder construction as described in any one of claim 1-3.
CN201521098325.4U 2015-12-25 2015-12-25 Steel construction unit -installment building body and outer wall package girder construction thereof Active CN205276567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521098325.4U CN205276567U (en) 2015-12-25 2015-12-25 Steel construction unit -installment building body and outer wall package girder construction thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521098325.4U CN205276567U (en) 2015-12-25 2015-12-25 Steel construction unit -installment building body and outer wall package girder construction thereof

Publications (1)

Publication Number Publication Date
CN205276567U true CN205276567U (en) 2016-06-01

Family

ID=56061151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521098325.4U Active CN205276567U (en) 2015-12-25 2015-12-25 Steel construction unit -installment building body and outer wall package girder construction thereof

Country Status (1)

Country Link
CN (1) CN205276567U (en)

Similar Documents

Publication Publication Date Title
CN107299683B (en) Compound concrete-filled tubular column assembled docks node and connection method
CN206174146U (en) Assembly type structure's assembly node
CN104032840A (en) Prestress assembly type frame joint connecting structure with additionally-arranged steel angles and construction method of prestress assembly type frame joint connecting structure
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN205348393U (en) Steel construction unit -installment wall body and girder steel cladding node thereof
CN206174206U (en) Embedded outer wall suitable for steel house room
CN105545004A (en) Connecting device for additionally arranging elevator on existing building
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN202831626U (en) Double-wall corrugated pipe for collocation structure of cylindrical template
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN205276567U (en) Steel construction unit -installment building body and outer wall package girder construction thereof
CN205348394U (en) Steel construction unit -installment wall body and girder steel cladding node thereof
CN205348395U (en) Steel construction unit -installment wall body and girder steel cladding node thereof
CN206902935U (en) Steel construction overall assembled building body and its northern facade exterior wall and steel girder erection node
CN205171753U (en) Steel construction unit -installment wall body and door frame wall body node thereof
CN205276554U (en) Steel construction unit -installment building body and node is hung with steel column to outer wall thereof
CN205242673U (en) Steel construction unit -installment building body and outer wall window board node thereof
CN205000467U (en) Building body and outer wall connection subassembly thereof
CN106088312A (en) A kind of construction method of the low layer assembled integrated house of steel wood mixing
CN205276555U (en) Steel construction unit -installment building body and outer wall and building carrier plate connected node thereof
CN205421720U (en) Steel construction unit -installment wall body and post cladding node thereof
CN205276485U (en) Steel construction unit -installment building body and node is hung with building carrier plate to outer wall thereof
CN205153189U (en) Steel construction unit -installment building body and wall structure thereof
CN205276509U (en) Steel construction unit -installment building body and outer wall transverse joint structure node thereof
CN205153315U (en) Steel construction unit -installment wall body and post cladding node thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20190613

Granted publication date: 20160601

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20220613

Granted publication date: 20160601

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20220817

Granted publication date: 20160601