CN206902665U - Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument - Google Patents

Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument Download PDF

Info

Publication number
CN206902665U
CN206902665U CN201720561760.9U CN201720561760U CN206902665U CN 206902665 U CN206902665 U CN 206902665U CN 201720561760 U CN201720561760 U CN 201720561760U CN 206902665 U CN206902665 U CN 206902665U
Authority
CN
China
Prior art keywords
shroud
bitumen
end cap
deep hole
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720561760.9U
Other languages
Chinese (zh)
Inventor
彭文成
姜国新
易蓉
谭明生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720561760.9U priority Critical patent/CN206902665U/en
Application granted granted Critical
Publication of CN206902665U publication Critical patent/CN206902665U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hydraulic asphalt concrete coring deep hole integrally to load recovery instrument, and the recovery instrument includes tubular shroud, and one end of the shroud is provided with push pedal, in addition to is arranged at the end cap and holding device of the shroud other end;Also include being used to drive drive device of the push pedal along shroud axis direction to the lateral movement of end cap one;The shroud is more valve fabricated structures, in addition to the more valves for forming shroud are constrained to the restraint device of complete entirety.Methods described is that the bitumen concrete post prepared using the recovery instrument coordinates heated bitumen to backfill coring hole.The filling that this case provides recovers instrument and restoration methods are greatly improved the backfill efficiency of hydraulic asphalt concrete coring deep hole.

Description

Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument
Technical field
Construction fixture technology field is the utility model is related to, it is whole more particularly to a kind of hydraulic asphalt concrete coring deep hole Body, which loads, recovers instrument.
Background technology
With expanding economy, substantial amounts of bitumen concrete has been used as construction material in building field in the prior art. As the important detection means of bitumen concrete quality, in bitumen concrete laying, roll and complete after certain time, it is necessary to using boring and coring Mode, acquired core sample is subjected to such as compacted density, mechanical property and tested to verify the quality of bitumen concrete.
Bitumen concrete lay it is thicker in the case of, such as using bitumen concrete carry out dam construction, due to the depth in coring hole It is deeper, it is contemplated that the stickiness of bitumen concrete, bitumen concrete thickness in monolayer is blocked up, is very easy to cause to roll uncompacted problem, therefore drip Blue or green concrete single backfill depth can not be too deep, and this has resulted in the bitumen concrete deep hole backfilled in the prior art for needs, it is necessary to divide Multistep is backfilled, and the problem of deep hole bitumen concrete hole backfill long construction period be present.
Utility model content
For the bitumen concrete deep hole backfilled in the prior art for needs set forth above, it is necessary to which a point multistep is backfilled, The problem of bitumen concrete coring deep hole backfill long construction period be present, the utility model provides a kind of hydraulic asphalt concrete coring deep hole Overall load recovers instrument, and the filling that this case provides recovers instrument and restoration methods are greatly improved returning for hydraulic asphalt concrete coring deep hole Fill out efficiency.
Hydraulic asphalt concrete coring deep hole provided by the utility model integrally loads recovery instrument and solved by following technical essential Certainly problem:Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument, including tubular shroud, and one end of the shroud is provided with The push pedal that can be moved along shroud axial direction, in addition to the end cap and holding device of the shroud other end are arranged at, it is described to hold out against Device is used to limit end cap and the relative position of shroud between the two, to cause end cap can be as the envelope of the closing shroud other end Plate;
Also include being used to drive drive device of the push pedal along shroud axis direction to the lateral movement of end cap one;
The shroud is more valve fabricated structures, in addition to the more valves for forming shroud are constrained into about getting one's things ready for complete entirety Put.
Specifically, in the shroud, the region between end cap and push pedal is the preparation region of bitumen concrete post, is preparing pitch During concrete post, constraining position of the end cap on shroud by holding device can be as described preparation region one end using end cap Shrouding, shrouding of the push pedal as preparation region opposite side, a lateral movement of the push pedal to end cap is driven by drive device, so, The advance bitumen concrete material being loaded in preparation region under extrusion, can obtain being compacted closely knit bitumen concrete post.In this programme, pass through The holding device realizes the constraint to end cap, it is intended to is easy to convert location status of the end cap relative to shroud, in order to change Behind the position of end cap, bitumen concrete material to be pressed is added into the preparation region.Above holding device can use oil hydraulic cylinder, air pressure Cylinder, threaded rod, bolt etc..Accelerate the filling in coring hole because this programme aims at and recover efficiency, therefore pitch prepared by single Concrete column length is preferably slightly long, such as prepares 25-50cm bitumen concrete post, so, because the bitumen concrete post stickiness of compacting is larger, if will enclose Cylinder is arranged to an entirety, it is necessary to set longer ejecting mechanism to release gained bitumen concrete post, and enclosed for long tubular Cylinder, when being released using ejecting mechanism, not only involved structural volume is larger, while to realize and the stable of shroud is fixed not Easily realize.In this programme, by the way that shroud is arranged into more valve fabricated structures, more valve fabricated structures are to set shroud The form of tangerine flap-type container is set to, i.e. the side of adjacent petals connects to obtain complete shroud;Group is completed by restraint device simultaneously Mutual constraint between each valve of shroud, so, part after the constraint of the restraint device is removed, can be formed to the valve of shroud Peel off or all peel off, you can separated equivalent to from the side of shroud by bitumen concrete post with remaining valve.
To sum up, this recovery instrument is simple in construction, manufacturing cost is low, simple to operate, available for prepare column bitumen concrete post, with When upper bitumen concrete post is used for such as the backfill of dam coring hole, the backfill efficiency for decupling prior art is had five to;Meanwhile this programme In, gained bitumen concrete post and shroud convenient separation.
Integrally loaded as described hydraulic asphalt concrete coring deep hole and recover the further technical scheme of instrument:
Because in this programme, holding device is when push pedal acts, it is only necessary to can bear the extruding that bitumen concrete material is applied Power, while holding device needs the requirement that meets convertible end cap position, it is low, simple to operate as a kind of manufacturing cost Holding device implementation:Also include stand, the stand is door type frame, and the holding device is horizontal to be threadedly connected to door type frame Threaded rod on beam, the end cap are installed on the lower end of threaded rod, and the axis direction of the threaded rod is located at vertical direction.We In case, when preparing bitumen concrete post, it is only necessary to shroud is placed in the lower section of end cap vertically, the lower surface of end cap greater than, equal to, It is slightly less than shroud upper-end inner diameter.So, when needing blowing, rotate threaded rod and drive the upward motion of end cap to add to reserve Material mouth, threaded rod is rotated after the completion of charging and is moved downward, the upper end of shroud is closed using end cap.
Because when being compacted bitumen concrete material to obtain bitumen concrete post, required extruding force is larger, makees if desired for push pedal With the pressure for applying several MPas even tens of MPas on face, as the specific implementation form of drive device, the drive device bag Include oil pump and oil pipe;
Also include being arranged at the bottom plate immediately below crossbeam, oil circuit, the oil pipe and oil circuit phase are additionally provided with the bottom plate Logical, the port of export of oil circuit be located on the upper surface of bottom plate, and when shroud is held between end cap and bottom plate, the port of export and The hollow region of shroud communicates;
The oil pump provides hydraulic oil to push pedal by oil pipe away from the side of end cap, and the hydraulic oil is used to promote push pedal Moved to end cap.In this programme, it is only necessary to shroud is placed on bottom plate, shroud then is fixed on into stand by holding device On, then providing hydraulic oil using oil pump can promote push pedal to extrude bitumen concrete material, then lay down hydraulic oil pressure, you can dismounting Restraint device with take out gained bitumen concrete material.Preferably, also including being used for the collection device for reclaiming leakage hydraulic oil, the above is received Acquisition means can use the oil groove being arranged on bottom plate.
Restraint device that is convenient, being easy to manufacture is installed and removes as a kind of, the restraint device is located on shroud for hoop Hoop body.
As a kind of specific implementation form of shroud, the shroud is two valve fabricated structures, and each valve for forming shroud is equal For the arc that cross section is semicircle.In this programme, shroud splicing is convenient, meanwhile, a valve therein need to only be removed, you can will The half of gained bitumen concrete post, which exposes, to be come, so, you can remove gained bitumen concrete post.Preferably, for convenience of the spelling of shroud Connect, the abutted surface for being arranged to form two valves of shroud is parallel with the axis direction of shroud.
To avoid the edge of when extruding bitumen concrete material bitumen concrete material shroud again from oozing out or reduce seepage discharge, shroud is formed Raised or groove is provided with the both sides side of each valve, the raised or groove penetrates the both sides of the side, forms shroud Each valve cooperate composition shroud entirety when, in the mating surface that the valve of arbitrary neighborhood two complements each other to form, wherein a valve carries For groove, another valve provides projection, and the projection that another valve provides is embedded in the groove of valve offer.This programme In, labyrinth seal is constituted equivalent to the raised cooperation with groove above, so, does not set up other encapsulants on a mating In the case of, using the tacky quality of bitumen concrete material in itself, mode can be agreed with by above-mentioned, realize shroud in the radial direction good Good sealing.
The invention also discloses a kind of hydraulic asphalt concrete coring deep hole integrally to load restoration methods, including bitumen concrete post Preparation process and the filling step of heated bitumen;
The bitumen concrete post preparation process is integrally to be filled out using the hydraulic asphalt concrete coring deep hole of one offer of any of the above Dress recovers instrument and prepares bitumen concrete post;
The filling step of heated bitumen is before bitumen concrete post inserts coring hole or after inserting in coring hole, into coring hole Filling heated bitumen.
In the prior art, for the benefit of consolidation effect, the backfill of coring deep hole typically pass through the side of layered rolling from the bottom to top Formula, i.e., it is bitumen concrete material is filling as rolled step by step in coring hole, and the thickness that individual layer rolls is typically not greater than 5cm, for Dam coring hole deep 50cm is, it is necessary to substantial amounts of time progress coring hole backfill.
The hydraulic asphalt concrete coring deep hole that this programme provides integrally is loaded in restoration methods, recovers instrument scheme institute more than The bitumen concrete post of the compacting obtained, coordinates the heated bitumen poured into coring hole, and above heated bitumen can be used in heating and melting building body The pitch of pitch, i.e. coring hole hole wall, at the same can heating and melting bitumen concrete post side pitch, so, the heated bitumen is suitable Then heat carrier and middle binder are heated, after pitch cooling after hot melt, bitumen concrete post can be achieved and in itself may be used with building body The connection leaned on.
In above method, required bitumen concrete post can be formerly prefabricated, and heated bitumen live can be heated largely, eliminate coring hole Compacting operation during backfill, the bitumen concrete post compacting not only backfilled is reliable, while is not easy larger backfill occur in backfill Hole, the pitch concrete material building body coring holes such as dam being carried out using above method and backfilled, efficiency is five to ten times of prior art, Backfill reliable in quality simultaneously.
The further technical scheme of restoration methods is integrally loaded as above-described hydraulic asphalt concrete coring deep hole, to keep away Exempt from, because bubble is trapped in heated bitumen in discharge process is risen because resistance is excessive, to cause asking for filling bubble occur Topic, is arranged to:Into coring hole, filling heated bitumen process is located at before bitumen concrete post inserted in coring hole.It is first using this method The bitumen concrete post prepared before this does not absorb the heat of heated bitumen in bubble discharge process, to cause the bubble when irrigating heated bitumen Discharge can utilize the preferable mobility of heated bitumen;Meanwhile the runner of flow of fluid is available for when not inserting bitumen concrete post on coring hole For the original size in coring hole, it is not easy to gas being encapsulated in below heated bitumen;Meanwhile after heated bitumen is poured into, insert pitch Concrete post is the process that heated bitumen liquid level rises, and the possibility for now carrying new bubble secretly in heated bitumen substantially reduces.As one kind The way of realization of bitumen concrete post and building body connection reliability itself, the diameter for being arranged to gained bitumen concrete post are less than coring bore dia 5-10mm, the gap between bitumen concrete post and coring hole are filled up by heated bitumen.
The for the benefit of combination effect of bitumen concrete post and building body, in addition to dehumidifying step, the dehumidifying step are to coring Inserted in hole before bitumen concrete post and injection heated bitumen, coring hole is heated.For coring deep hole, heating and dehumidification can use The modes such as flame directly heats, infrared heating, hot air.
As a kind of heated bitumen good fluidity, it is not easy the entrained air bubbles among while carries enough heats for dripping The heated bitumen implementation that blue or green concrete post is combined with building body, asphalt performance is stable, the temperature of the heated bitumen is between 155 DEG C to 165 Between DEG C.
Preferably, after heated bitumen and bitumen concrete post insert coring hole, it is also necessary to certain curing condition, curing condition To recover position progress waterproof and temperature control to loading, the temperature control is so that the temperature of corresponding region is not less than 5 DEG C.
The utility model has the advantages that:
Present solution provides recovery instrument is simple in construction, manufacturing cost is low, simple to operate, the bitumen concrete available for preparation column Post, when above bitumen concrete post is used for such as the backfill of dam coring hole, have five to the backfill efficiency for decupling prior art;Meanwhile In this programme, gained bitumen concrete post and shroud convenient separation.
The hydraulic asphalt concrete coring deep hole that this programme provides integrally is loaded in restoration methods, recovers instrument scheme institute more than The bitumen concrete post of the compacting obtained, coordinates the heated bitumen poured into coring hole, and above heated bitumen can be used in heating and melting building body The pitch of pitch, i.e. coring hole hole wall, at the same can heating and melting bitumen concrete post side pitch, so, the heated bitumen is suitable Then heat carrier and middle binder are heated, after pitch cooling after hot melt, bitumen concrete post can be achieved and in itself may be used with building body The connection leaned on.
In above method, required bitumen concrete post can be formerly prefabricated, and heated bitumen live can be heated largely, eliminate coring hole Compacting operation during backfill, the bitumen concrete post compacting not only backfilled is reliable, while is not easy larger backfill occur in backfill Hole, the pitch concrete material building body coring holes such as dam being carried out using above method and backfilled, efficiency is five to ten times of prior art, Backfill reliable in quality simultaneously.
Brief description of the drawings
Fig. 1 is that hydraulic asphalt concrete coring deep hole described in the utility model integrally loads recovery one specific embodiment of instrument Structural representation, wherein, the structure of shroud part reflection is perspective structure;
Fig. 2 is that hydraulic asphalt concrete coring deep hole described in the utility model integrally loads recovery one specific embodiment of instrument In, reflect shroud structure and shroud and the schematic diagram of restraint device structural relation.
Reference in figure is followed successively by:1st, stand, 2, shroud, 3, end cap, 4, holding device, 5, hoop body, 6, oil pipe, 7, Oil pump, 8, push pedal, 9, bottom plate.
Embodiment
With reference to embodiment, the utility model is described in further detail, but structure of the present utility model is not only It is limited to following examples.
Embodiment 1:
As depicted in figs. 1 and 2, hydraulic asphalt concrete coring deep hole integrally loads recovery instrument, including tubular shroud 2, institute The one end for stating shroud 2 is provided with the push pedal 8 that can be moved along the axial direction of shroud 2, in addition to is arranged at the end of the other end of shroud 2 Lid 3 and holding device 4, the holding device 4 is used to limit end cap 3 and the relative position of shroud 2 between the two, to cause end cap 3 can be as the shrouding of the closing other end of shroud 2;
Also include being used to drive drive device of the push pedal 8 along the axis direction of shroud 2 to the lateral movement of end cap 3 one;
The shroud 2 is more valve fabricated structures, in addition to the more valves for forming shroud 2 are constrained to the constraint of complete entirety Device.
Specifically, in the shroud 2, the region between end cap 3 and push pedal 8 is the preparation region of bitumen concrete post, is being prepared During bitumen concrete post, constraining position of the end cap 3 on shroud 2 by holding device 4 can be as the preparation area using end cap 3 The shrouding of domain one end, push pedal 8 drive push pedal 8 to the side of end cap 3 as the shrouding for preparing region opposite side by drive device Motion, so, be loaded in advance prepare region in bitumen concrete material under extrusion, can obtain being compacted closely knit bitumen concrete post.This In scheme, the constraint to end cap 3 is realized by the holding device 4, it is intended to be easy to convert position of the end cap 3 relative to shroud 2 State, after changing the position of end cap 3, bitumen concrete material to be pressed is added into the preparation region.Above holding device 4 Oil hydraulic cylinder, pneumatic cylinder, threaded rod, bolt etc. can be used.The filling that quickening coring hole is aimed at due to this programme recovers efficiency, Therefore bitumen concrete column length prepared by single is preferably slightly long, such as prepares 25-50cm bitumen concrete post, so, because the bitumen concrete of compacting Post stickiness is larger, if shroud 2 is arranged into an entirety, it is necessary to set longer ejecting mechanism to push away gained bitumen concrete post Go out, and be directed to long tubular shroud 2, when being released using ejecting mechanism, not only involved structural volume is larger, while to realize Stable fixation to shroud 2 is not easy to realize.In this programme, by the way that shroud 2 is arranged into more valve fabricated structures, more valve groups Box-like structure is that shroud 2 is arranged to the form of tangerine flap-type container, i.e. the side of adjacent petals connects to obtain complete shroud 2; The mutual constraint between composition 2 each valve of shroud is completed by restraint device simultaneously, so, the pact of the restraint device can removed Shu Hou, the valve of part composition shroud 2 is peeled off or all peeled off, you can equivalent to from the side of shroud 2 by bitumen concrete post with it is surplus Remaining valve separation.
To sum up, this recovery instrument is simple in construction, manufacturing cost is low, simple to operate, available for prepare column bitumen concrete post, with When upper bitumen concrete post is used for such as the backfill of dam coring hole, the backfill efficiency for decupling prior art is had five to;Meanwhile this programme In, gained bitumen concrete post and the convenient separation of shroud 2.
Embodiment 2:
As depicted in figs. 1 and 2, the present embodiment is further qualified on the basis of embodiment 1:Due in this programme, pushing up Tight device 4 is when push pedal 8 acts, it is only necessary to can bear the extruding force that bitumen concrete material is applied, while holding device 4 needs Meet the requirement of the convertible position of end cap 3, holding device 4 implementation low, simple to operate as a kind of manufacturing cost:Also Including stand 1, the stand 1 is door type frame, and the holding device 4 is the threaded rod being threadedly connected on door type frame crossbeam, institute The lower end that end cap 3 is installed on threaded rod is stated, the axis direction of the threaded rod is located at vertical direction.In this programme, dripped preparing During blue or green concrete post, it is only necessary to shroud 2 is placed in the lower section of end cap 3 vertically, the lower surface of end cap 3 greater than, equal to, be slightly less than shroud 2 upper-end inner diameters.So, when needing blowing, rotate threaded rod and drive end cap 3 to move upwards to reserve charge door, add Threaded rod is rotated after the completion of material to move downward, and the upper end of shroud 2 is closed using end cap 3.
Because when being compacted bitumen concrete material to obtain bitumen concrete post, required extruding force is larger, makees if desired for push pedal 8 With the pressure for applying several MPas even tens of MPas on face, as the specific implementation form of drive device, the drive device bag Include oil pump 7 and oil pipe 6;
Also include being arranged at the bottom plate 9 immediately below crossbeam, oil circuit, the oil pipe 6 and oil circuit are additionally provided with the bottom plate 9 Communicate, the port of export of oil circuit is located on the upper surface of bottom plate 9, and when shroud 2 is held between end cap 3 and bottom plate 9, it is described go out Mouth end communicates with the hollow region of shroud 2;
The oil pump 7 provides hydraulic oil to push pedal 8 by oil pipe 6 away from the side of end cap 3, and the hydraulic oil is used to promote Push pedal 8 is moved to end cap 3.In this programme, it is only necessary to shroud 2 is placed on bottom plate 9, then by holding device 4 by shroud 2 It is fixed in stand 1, then providing hydraulic oil using oil pump 7 can promote push pedal 8 to extrude bitumen concrete material, then lay down hydraulic oil Oil pressure, you can dismantle restraint device to take out gained bitumen concrete material.Preferably, also include being used for the receipts for reclaiming leakage hydraulic oil Acquisition means, above collection device can use the oil groove being arranged on bottom plate 9.
Restraint device that is convenient, being easy to manufacture is installed and removes as a kind of, the restraint device is located on shroud 2 for hoop Hoop body 5.
As a kind of specific implementation form of shroud 2, the shroud 2 is two valve fabricated structures, forms each valve of shroud 2 It is the arc that cross section is semicircle.In this programme, the splicing of shroud 2 is convenient, meanwhile, a valve therein need to only be removed, i.e., The half of gained bitumen concrete post can be exposed and, so, you can remove gained bitumen concrete post.Preferably, for convenience of shroud 2 Splicing, be arranged to form shroud 2 two valves abutted surface it is parallel with the axis direction of shroud 2.
To avoid bitumen concrete material and the edge of shroud 2 when extruding bitumen concrete material from oozing out or reduce seepage discharge, composition shroud 2 Each valve both sides side on be provided with raised or groove, the raised or groove penetrates the both sides of the side, and composition encloses When each valve mutual cooperation composition shroud 2 of cylinder 2 is overall, in the mating surface that the valve of arbitrary neighborhood two complements each other to form, wherein one Valve provides groove, and another valve provides projection, and the projection that another valve provides is embedded in the groove of valve offer.We In case, labyrinth seal is constituted equivalent to the raised cooperation with groove above, so, does not set up other sealing material on a mating In the case of material, using the tacky quality of bitumen concrete material in itself, mode can be agreed with by above-mentioned, realize shroud 2 in the radial direction Excellent sealing.
Embodiment 3:
Present embodiments provide a kind of hydraulic asphalt concrete coring deep hole and integrally load restoration methods, including be prepared by bitumen concrete post Step and the filling step of heated bitumen;
The bitumen concrete post preparation process is any one hydraulic asphalt concrete coring provided using any of the above embodiment Deep hole integrally loads recovery instrument and prepares bitumen concrete post;
The filling step of heated bitumen is before bitumen concrete post inserts coring hole or after inserting in coring hole, into coring hole Filling heated bitumen.
In the prior art, for the benefit of consolidation effect, the backfill of coring deep hole typically pass through the side of layered rolling from the bottom to top Formula, i.e., it is bitumen concrete material is filling as rolled step by step in coring hole, and the thickness that individual layer rolls is typically not greater than 5cm, for Dam coring hole deep 50cm is, it is necessary to substantial amounts of time progress coring hole backfill.
The hydraulic asphalt concrete coring deep hole that this programme provides integrally is loaded in restoration methods, recovers instrument scheme institute more than The bitumen concrete post of the compacting obtained, coordinates the heated bitumen poured into coring hole, and above heated bitumen can be used in heating and melting building body The pitch of pitch, i.e. coring hole hole wall, at the same can heating and melting bitumen concrete post side pitch, so, the heated bitumen is suitable Then heat carrier and middle binder are heated, after pitch cooling after hot melt, bitumen concrete post can be achieved and in itself may be used with building body The connection leaned on.
In above method, required bitumen concrete post can be formerly prefabricated, and heated bitumen live can be heated largely, eliminate coring hole Compacting operation during backfill, the bitumen concrete post compacting not only backfilled is reliable, while is not easy larger backfill occur in backfill Hole, the pitch concrete material building body coring holes such as dam being carried out using above method and backfilled, efficiency is five to ten times of prior art, Backfill reliable in quality simultaneously.
Embodiment 4:
The present embodiment is further qualified on the basis of embodiment 3:To avoid because bubble is in discharge process is risen It is trapped in because resistance is excessive in heated bitumen, causes the problem of filling bubble occur, be arranged to:The filling heat drip into coring hole Young worker's tagmeme is before bitumen concrete post is inserted in coring hole.It is that the bitumen concrete post prepared is discharged in bubble first using this method During do not absorb the heat of heated bitumen, make it that bubble discharge can preferably be flowed using heated bitumen when irrigating heated bitumen Property;Meanwhile be available for when not inserting bitumen concrete post on coring hole flow of fluid runner be coring hole original size, be not easy to by Gas is encapsulated in below heated bitumen;Meanwhile after heated bitumen is poured into, it is the process that heated bitumen liquid level rises to insert bitumen concrete post, The possibility for now carrying new bubble secretly in heated bitumen substantially reduces.As a kind of bitumen concrete post and building body connection reliability itself Way of realization, be arranged to gained bitumen concrete post diameter be less than coring bore dia 5-10mm, between bitumen concrete post and coring hole Gap filled up by heated bitumen.
The for the benefit of combination effect of bitumen concrete post and building body, in addition to dehumidifying step, the dehumidifying step are to coring Inserted in hole before bitumen concrete post and injection heated bitumen, coring hole is heated.For coring deep hole, heating and dehumidification can use The modes such as flame directly heats, infrared heating, hot air.
As a kind of heated bitumen good fluidity, it is not easy the entrained air bubbles among while carries enough heats for dripping The heated bitumen implementation that blue or green concrete post is combined with building body, asphalt performance is stable, the temperature of the heated bitumen is between 155 DEG C to 165 Between DEG C.
Preferably, after heated bitumen and bitumen concrete post insert coring hole, it is also necessary to certain curing condition, curing condition To recover position progress waterproof and temperature control to loading, the temperature control is so that the temperature of corresponding region is not less than 5 DEG C.
Above content is to combine the further description that specific preferred embodiment is made to the utility model, it is impossible to is recognized Determine specific embodiment of the present utility model and be confined to these explanations.For the common skill of the utility model art For art personnel, the other embodiment that is drawn in the case where not departing from the technical solution of the utility model should be included in this practicality In new protection domain.

Claims (6)

1. hydraulic asphalt concrete coring deep hole integrally loads recovery instrument, it is characterised in that including tubular shroud(2), it is described to enclose Cylinder(2)Be provided with can be along shroud for one end(2)The push pedal of axial direction motion(8), in addition to it is arranged at shroud(2)The other end End cap(3)And holding device(4), the holding device(4)For limiting end cap(3)With shroud(2)Between the two relative Position, to cause end cap(3)Closing shroud can be used as(2)The shrouding of the other end;
Also include being used to drive push pedal(8)Along shroud(2)Axis direction is to end cap(3)The drive device of one lateral movement;
The shroud(2)For more valve fabricated structures, in addition to shroud will be formed(2)More valves be constrained to the constraint of complete entirety Device.
2. hydraulic asphalt concrete coring deep hole according to claim 1 integrally loads recovery instrument, it is characterised in that also includes vertical Frame(1), the stand(1)For door type frame, the holding device(4)For the threaded rod being threadedly connected on door type frame crossbeam, institute State end cap(3)The lower end of threaded rod is installed on, the axis direction of the threaded rod is located at vertical direction.
3. hydraulic asphalt concrete coring deep hole according to claim 2 integrally loads recovery instrument, it is characterised in that the driving Device includes oil pump(7)And oil pipe(6);
Also include being arranged at the bottom plate immediately below crossbeam(9), the bottom plate(9)On be additionally provided with oil circuit, the oil pipe(6)With oil Road communicates, and the port of export of oil circuit is located at bottom plate(9)Upper surface on, and shroud(2)It is held in end cap(3)With bottom plate(9)It Between when, the port of export and shroud(2)Hollow region communicate;
The oil pump(7)Pass through oil pipe(6)To push pedal(8)Away from end cap(3)Side hydraulic oil is provided, the hydraulic oil is used for Promote push pedal(8)To end cap(3)Motion.
4. hydraulic asphalt concrete coring deep hole according to claim 1 integrally loads recovery instrument, it is characterised in that the constraint Device is located at shroud for hoop(2)On hoop body(5).
5. hydraulic asphalt concrete coring deep hole according to claim 1 integrally loads recovery instrument, it is characterised in that the shroud (2)For two valve fabricated structures, shroud is formed(2)Each valve be cross section be semicircle arc.
6. hydraulic asphalt concrete coring deep hole according to claim 1 integrally loads recovery instrument, it is characterised in that composition shroud (2)Each valve both sides side on be provided with raised or groove, the raised or groove penetrates the both sides of the side, composition Shroud(2)Each valve cooperate composition shroud(2)When overall, in the mating surface that the valve of arbitrary neighborhood two complements each other to form, A wherein valve provides groove, and another valve provides projection, and the projection that another valve provides is embedded the groove that a valve provides In.
CN201720561760.9U 2017-05-19 2017-05-19 Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument Active CN206902665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720561760.9U CN206902665U (en) 2017-05-19 2017-05-19 Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720561760.9U CN206902665U (en) 2017-05-19 2017-05-19 Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument

Publications (1)

Publication Number Publication Date
CN206902665U true CN206902665U (en) 2018-01-19

Family

ID=61288831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720561760.9U Active CN206902665U (en) 2017-05-19 2017-05-19 Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument

Country Status (1)

Country Link
CN (1) CN206902665U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948312A (en) * 2017-05-19 2017-07-14 彭文成 Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument and restoration methods
CN114541974A (en) * 2022-04-28 2022-05-27 山西省第六地质工程勘察院有限公司 Drilling tool for shallow drilling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948312A (en) * 2017-05-19 2017-07-14 彭文成 Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument and restoration methods
CN114541974A (en) * 2022-04-28 2022-05-27 山西省第六地质工程勘察院有限公司 Drilling tool for shallow drilling
CN114541974B (en) * 2022-04-28 2022-07-12 山西省第六地质工程勘察院有限公司 Drilling tool for shallow drilling

Similar Documents

Publication Publication Date Title
CN206902665U (en) Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument
CN111963118B (en) Two-dimensional visual sand filling experiment model for simulating horizontal well exploitation
CN106989968A (en) The producing device and method of a kind of Seepage-stress coupling experiment three-dimensional fracture rocks test specimen
CN106013098A (en) Miniature steel pipe pile and grouting reinforcement method
CN106814016A (en) The analogy method of slurry filling imitation device
CN106948312A (en) Hydraulic asphalt concrete coring deep hole integrally loads recovery instrument and restoration methods
CN105625149A (en) Equipment and method used for repairing road base damages
WO2021057388A1 (en) Apparatus for fabricating concrete shaft wellbore model and usage method
CN108682261B (en) Experiment teaching aid for simulating coal seam mining in civil engineering
CN205822174U (en) Miniature steel pipe pile
CN110512603B (en) Prestressed anchor rod capable of secondary grouting and method
CN214401356U (en) Crack pouring device for highway bridge construction
CN105926539B (en) A kind of construction method of the vertical sealing swaging die of concrete works deformation joint
CN203353912U (en) Eyebrow pencil refill pressurizing and filling equipment
CN106761625A (en) Underground thermal-arrest temperature-control energy-saving completion integral tubing string and technique
CN104314047B (en) Water-bag type concrete works movement joint sealing swaging die and its manufacture and construction method
JP5896930B2 (en) Joint sealing material for concrete pavement and its construction method
CN107462453A (en) Column production device is filled up in a kind of bitumen concrete coring hole
CN114382186B (en) Low-energy-consumption building foundation heat-insulation bridge heat-insulation structure and construction method
CN110904955B (en) Foundation reinforcing method
CN206270129U (en) A kind of horizontal well chemical flooding physical analogy artificial core model
CN108533239A (en) Utilize viscous fingering method and device in the gravitational effect control surface activating agent displacement of reservoir oil
CN104179527B (en) A kind of colliery connection roadway and its sealing method
CN107700431A (en) One kind backfill part preparation facilities
CN208830931U (en) A kind of casing repairing strengthening agent constructing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant