CN206899170U - A kind of architectural engineering drilling equipment - Google Patents

A kind of architectural engineering drilling equipment Download PDF

Info

Publication number
CN206899170U
CN206899170U CN201720824934.6U CN201720824934U CN206899170U CN 206899170 U CN206899170 U CN 206899170U CN 201720824934 U CN201720824934 U CN 201720824934U CN 206899170 U CN206899170 U CN 206899170U
Authority
CN
China
Prior art keywords
support bar
groove
fixedly connected
rig
drilling equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720824934.6U
Other languages
Chinese (zh)
Inventor
林雪文
金学平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jin Chen Construction Co., Ltd.
Original Assignee
金学平
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 金学平 filed Critical 金学平
Priority to CN201720824934.6U priority Critical patent/CN206899170U/en
Application granted granted Critical
Publication of CN206899170U publication Critical patent/CN206899170U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of architectural engineering drilling equipment, including base and rig, first support bar is fixedly connected with the right side of the upper surface of the base, the inside of the first support bar is provided with the first groove, the inner rotation of first groove is connected with threaded rod, the rear surface fixed cover of the threaded rod is connected to first bevel gear, the inner slide card of first groove is embedded with second support bar, the second support bar is internally threaded groove, the thread groove rotates inlay card with threaded rod by screw thread and connected, motor is fixedly connected with the right side of the first support bar.The architectural engineering is with drilling equipment by pulling draw ring that rig can be made easily to be mounted and dismounted with box body, so as to carry out convenient installing/dismounting and replacing to rig, it can move up and down rig by manipulating forward-reverse switch, the stabilization of rig is kept by base and first support bar, prevent rig from rocking, borehole accuracy can be improved.

Description

A kind of architectural engineering drilling equipment
Technical field
Building engineering equipment technical field is the utility model is related to, specially a kind of architectural engineering drilling equipment.
Background technology
Architectural engineering, refer to by the construction to all kinds of building constructions and its affiliated facility and the circuit supporting with it, pipeline, The engineering entity that the installation activity of equipment is formed.Wherein " building construction ", which refers to, top cover, beam column, wall, basis and can Inner space is formed, meets people's production, lives, learns, the engineering of public activity needs.Architectural engineering is for newly-built, reconstruction Or enlarging building construction and auxiliary construction facility carried out planning, prospecting, design and construction, every technical staff such as completion Work and the engineering entity completed and the circuit supporting with it, the installing engineering of pipeline, equipment.Also various houses, building are referred to Construction engineering, also known as building operation amount.The dynamic material of the necessary emerging work of this part investment, could be realized by construction activities.
Drilling refers to process the operation portalled on solid material with drill bit.Here the drillman in investigation and prospecting is taught Make, and the aid and part emergency measure method of drilling needs.In geological prospecting work, using drilling equipment to The larger column circular hole of the smaller depth of diameter that underground is drilled to, also known as drilling well.The brill to drill for oil with natural gas and underground water Bore dia is more larger.Bore diameter and depth size, depending on geological and mineral buried depth and the purposes of drilling.
Artificial taking rig is generally to realize drilling, so in boring procedure in boring procedure during existing building It is middle to cause easily to rock in boring procedure because drilling resistance is big, influence the precision to drill.
Utility model content
The purpose of this utility model is to provide a kind of architectural engineering drilling equipment, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of architectural engineering drilling equipment, including Base and rig, the upper surface right side of the base are fixedly connected with first support bar, and the inside of the first support bar is provided with First groove, motor is fixedly connected with the right side of the first support bar, the motor is fixedly connected with rotating by wire Switch, the upper surface left side of the base are fixedly connected with the 3rd support bar, and one end of the rig is provided with the second fixed block, institute The inner rotation for stating the first groove is connected with threaded rod, and the rear surface fixed cover of the threaded rod is connected to first bevel gear, institute The inner slide card for stating the first groove is embedded with second support bar, and the second support bar is internally threaded groove, the screw thread Groove rotates inlay card with threaded rod by screw thread and connected, and the upper end of the second support bar is fixedly connected with fixed plate, the fixation The lower surface of plate is fixedly connected with box body, and the first fixed block has been fixedly connected with left and right sides of the box body, and described first is solid The inside for determining block is provided with the 3rd groove, and the inside of the 3rd groove is provided with the first rod member, and the first rod member surface is provided with the One is raised, and the surface of first rod member is socketed with the first spring, and the both ends of first spring are raised and the with first respectively Three grooves are fixedly connected, and one end of first rod member is fixedly connected with draw ring.
Preferably, output shaft one end of the motor and the first groove rotate socket, and output shaft one end of the motor is consolidated Surely second bevel gear, first bevel gear and second bevel gear the engagement connection are connected with.
Preferably, the inside of the 3rd support bar is provided with the second groove, and the inside of second groove is fixedly connected with Second spring, the upper end of the second spring are fixedly connected with the 4th support bar, the upper end of the 4th support bar and fixed plate It is fixedly connected, the lower end of the 4th support bar is provided with the second projection.
Preferably, second fixed block connects with box body inlay card, and the inside of second fixed block is provided with through hole, described Through hole and the first rod member slide inlay card connection.
Preferably, the middle part of the base is provided with groove.
Compared with prior art, the beneficial effects of the utility model are:The architectural engineering drilling equipment is drawn by pulling Ring can be such that rig is easily mounted and dismounted with box body, so as to the convenient installing/dismounting of rig progress and more Change, can move up and down rig by manipulating forward-reverse switch, the steady of rig is kept by base and first support bar It is fixed, prevent rig from rocking, borehole accuracy can be improved.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is the enlarged diagram at A in Fig. 1 of the present utility model.
In figure:1 base, 11 grooves, 12 forward-reverse switches, 13 motors, 2 first support bars, 21 first grooves, 22 screw threads Bar, 23 first bevel gears, 24 second bevel gears, 3 second support bars, 31 thread grooves, 4 fixed plates, 5 box bodys, 6 rigs, 7 the 3rd Strut, 71 second grooves, 72 second springs, 73 the 4th support bars, 731 second projections, 8 second fixed blocks, 81 through holes, 9 first Fixed block, 91 the 3rd grooves, 92 first rod members, 93 first springs, 94 first raised, 95 draw rings.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of architectural engineering drilling equipment, including bottom Seat 1 and rig 6, the middle part of base 1 are provided with groove 11, and the upper surface right side of base 1 is fixedly connected with first support bar 2, and first The inside of support bar 2 is provided with the first groove 21, and the inner rotation of the first groove 21 is connected with threaded rod 22, the lower end of threaded rod 22 Surface fixed cover is connected to first bevel gear 23, and the inner slide card of the first groove 21 is embedded with second support bar 3, second support bar 3 Be internally threaded groove 31, thread groove 31 rotates inlay card with threaded rod 22 by screw thread and connected, and the upper end of second support bar 3 is consolidated Surely fixed plate 4 is connected with, the lower surface of fixed plate 4 is fixedly connected with box body 5, and the left and right sides of box body 5 has been fixedly connected with One fixed block 9, the inside of the first fixed block 9 are provided with the 3rd groove 91, and the inside of the 3rd groove 91 is provided with the first rod member 92, and first The surface of rod member 92 is provided with the first projection 94, and the surface of the first rod member 92 is socketed with the first spring 93, the both ends point of the first spring 93 It is not fixedly connected with the first projection 94 and the 3rd groove 91, one end of the first rod member 92 is fixedly connected with draw ring 95, the first support The right side of bar 2 is fixedly connected with motor 13, the model PKP244U12A-L of motor 13, and motor 13 is fixedly connected with by wire Forward-reverse switch 12, motor 13 and forward-reverse switch 12 are connected by wire and external power source, output shaft one end of motor 13 and First groove 21 rotates socket, and output shaft one end of motor 13 is fixedly connected with second bevel gear 24, first bevel gear 23 and the The engagement connection of two bevel gears 24, the upper surface left side of base 1 are fixedly connected with the 3rd support bar 7, and the inside of the 3rd support bar 7 is set There is the second groove 71, the inside of the second groove 71 is fixedly connected with second spring 72, and the one side of second spring 72 plays support Effect, it on the other hand can reduce rig 6 and work caused vibrations, the upper end of second spring 72 is fixedly connected with the 4th support Bar 73, the upper end of the 4th support bar 73 are fixedly connected with fixed plate 4, and the lower end of the 4th support bar 73 is provided with the second projection 731, the Two projections 731 are used for preventing the 4th support bar 73 from from the inside of the second groove 71 departing from, so as to indirectly prevent the second support 3 from The inside of first groove departs from, and one end of rig 6 is provided with the second fixed block 8, and the second fixed block 8 connects with the inlay card of box body 5, and second The inside of fixed block 8 is provided with through hole 81, and through hole 81 slides inlay card with the first rod member 92 and connected.
The utility model is in the specific implementation:Motor 13 is powered using forward-reverse switch 12, motor 13 drives the Two bevel gears 24 rotate, and second bevel gear 24 drives first bevel gear 23 to be rotated, and first bevel gear 23 drives threaded rod 22 Rotated, threaded rod 22, which rotates, moves up and down the surface of the threadingly bar 22 of second support bar 3, the band of second support bar 3 Dynamic fixed plate 4 and rig 6 move up and down;Pull draw ring 95 that one end of the first rod member 92 can be made to take in the 3rd groove 91 inside, the second fixed block 8 can insert the inside of box body 5 at this moment, by the position of the rod member 92 of through hole 81 and first to its, Draw ring 95 is unclamped again, the first rod member 92 is inserted through hole 81, now the second fixed block 8 is fixedly connected with box body 5, to again will Second fixed block 8 departs from box body 5, only draw ring 95 need to be pulled the first rod member 92 is taken in inside the 3rd groove 91 again.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of architectural engineering drilling equipment, including base(1)And rig(6), it is characterised in that:The base(1)It is upper First support bar is fixedly connected with the right side of surface(2), the first support bar(2)Inside be provided with the first groove(21), it is described First support bar(2)Right side be fixedly connected with motor(13), the motor(13)Positive and negative turn on is fixedly connected with by wire Close(12), the base(1)Upper surface on the left of be fixedly connected with the 3rd support bar(7), the rig(6)One end be provided with the Two fixed blocks(8), first groove(21)Inner rotation be connected with threaded rod(22), the threaded rod(22)Lower end table Face fixed cover is connected to first bevel gear(23), first groove(21)Inner slide card be embedded with second support bar(3), it is described Second support bar(3)Be internally threaded groove(31), the thread groove(31)Pass through screw thread and threaded rod(22)Rotate inlay card Connection, the second support bar(3)Upper end be fixedly connected with fixed plate(4), the fixed plate(4)Lower surface be fixedly connected There is box body(5), the box body(5)The left and right sides be fixedly connected with the first fixed block(9), first fixed block(9)'s Inside is provided with the 3rd groove(91), the 3rd groove(91)Inside be provided with the first rod member(92), first rod member(92) It is raised that surface is provided with first(94), first rod member(92)Surface be socketed with the first spring(93), first spring (93)Both ends it is raised with first respectively(94)With the 3rd groove(91)It is fixedly connected, first rod member(92)One end fix It is connected with draw ring(95).
A kind of 2. architectural engineering drilling equipment according to claim 1, it is characterised in that:The motor(13)Output Axle one end and the first groove(21)Rotate socket, the motor(13)Output shaft one end be fixedly connected with second bevel gear (24), the first bevel gear(23)And second bevel gear(24)Engagement connection.
A kind of 3. architectural engineering drilling equipment according to claim 1, it is characterised in that:3rd support bar(7) Inside be provided with the second groove(71), second groove(71)Inside be fixedly connected with second spring(72), described second Spring(72)Upper end be fixedly connected with the 4th support bar(73), the 4th support bar(73)Upper end and fixed plate(4)Gu Fixed connection, the 4th support bar(73)To be provided with second raised for lower end(731).
A kind of 4. architectural engineering drilling equipment according to claim 1, it is characterised in that:Second fixed block(8) And box body(5)Inlay card connects, second fixed block(8)Inside be provided with through hole(81), the through hole(81)With the first rod member (92)Slide inlay card connection.
A kind of 5. architectural engineering drilling equipment according to claim 1, it is characterised in that:The base(1)Middle part Provided with groove(11).
CN201720824934.6U 2017-07-07 2017-07-07 A kind of architectural engineering drilling equipment Expired - Fee Related CN206899170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720824934.6U CN206899170U (en) 2017-07-07 2017-07-07 A kind of architectural engineering drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720824934.6U CN206899170U (en) 2017-07-07 2017-07-07 A kind of architectural engineering drilling equipment

Publications (1)

Publication Number Publication Date
CN206899170U true CN206899170U (en) 2018-01-19

Family

ID=61293356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720824934.6U Expired - Fee Related CN206899170U (en) 2017-07-07 2017-07-07 A kind of architectural engineering drilling equipment

Country Status (1)

Country Link
CN (1) CN206899170U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108907280A (en) * 2018-07-18 2018-11-30 合肥连森裕腾新材料科技开发有限公司 Drilling equipment is used in a kind of processing of high performance composites

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108907280A (en) * 2018-07-18 2018-11-30 合肥连森裕腾新材料科技开发有限公司 Drilling equipment is used in a kind of processing of high performance composites

Similar Documents

Publication Publication Date Title
CN110440117B (en) Building engineering cost on-site mapping device based on BIM technology
CN108468509B (en) A kind of ground construction high stable type drilling equipment
CN207701075U (en) A kind of geotechnical engineering investigation drilling rig
CN108049822A (en) A kind of horizontal directional drilling machine of the raising Drilling Precision based on Internet of Things
CN206899170U (en) A kind of architectural engineering drilling equipment
CN109471200A (en) A kind of geological exploration exploration device of adjusting drilling well depth
CN102758588B (en) Vibrator for coaxial type audio frequency physical exploring drill
CN104420462A (en) Super three-axis cement mixing pile device
CN205558811U (en) Drilling equipment for engineering
CN108756736B (en) Slope drilling device convenient for shale gas exploitation
CN207660562U (en) A kind of drilling well steel pipe clamping device
CN204960836U (en) Novel simple and easy workover rig
CN206562912U (en) A kind of civil engineering work positioning rig
CN206351260U (en) A kind of many drill bit synchronization rigs
CN207660540U (en) Novel hydraulic geological core drilling machine
CN207332757U (en) A kind of road construction drilling equipment
CN213654759U (en) Excavating device for civil engineering vertical foundation pit
CN203114173U (en) Inverted plumb line hole constructing device
CN214248913U (en) Frame for surveying and mapping engineering
CN206722752U (en) Perforating device for water conservancy construction
CN210375180U (en) Logging-while-drilling instrument support
CN210858594U (en) Coal mine underground transverse moving type hydraulic jacking pressurization type jumbolter
CN107262767A (en) The puncher that a kind of movable type is quickly positioned
CN211230229U (en) Tunnel surrounding rock drilling vehicle
CN203374200U (en) Air distribution device for power-head drilling rig and rotary-table drilling rig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180412

Address after: 317500 building 11 building, No. 818, No. 818, Wanchang Road, east of Chengdong street, Wenling City, Zhejiang

Patentee after: Zhejiang Jin Chen Construction Co., Ltd.

Address before: Taizhou City, Zhejiang province 317500 Wenling City Taiping Street Street Lane 3

Patentee before: Jin Xueping

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20180707