CN206892180U - A kind of configurable type novel high-pressure electric energy meter - Google Patents

A kind of configurable type novel high-pressure electric energy meter Download PDF

Info

Publication number
CN206892180U
CN206892180U CN201720555308.1U CN201720555308U CN206892180U CN 206892180 U CN206892180 U CN 206892180U CN 201720555308 U CN201720555308 U CN 201720555308U CN 206892180 U CN206892180 U CN 206892180U
Authority
CN
China
Prior art keywords
functional module
module
box
electric energy
mounting groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720555308.1U
Other languages
Chinese (zh)
Inventor
朱亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI KEHUI ELECTRIC APPARATUS CO Ltd
Original Assignee
ZHUHAI KEHUI ELECTRIC APPARATUS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI KEHUI ELECTRIC APPARATUS CO Ltd filed Critical ZHUHAI KEHUI ELECTRIC APPARATUS CO Ltd
Priority to CN201720555308.1U priority Critical patent/CN206892180U/en
Application granted granted Critical
Publication of CN206892180U publication Critical patent/CN206892180U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model aims to provide a kind of novel high-pressure electric energy meter that voltage x current collection metering and the configurable difference in functionality that high-voltage electric energy meter periodic calibration can be completed under non-power down mode are completed in high-pressure side.The utility model includes base(1), be arranged on the base(1)The voltage x current sampling module of upside(2)Be arranged at the base(1)Downside and carry chamber door(20)Cabinet(3), in the cabinet(3)Inside it is provided with bus and control panel(4), the bus and control panel(4)On be provided with least one bus port socket(5), functional module mounting groove is provided with the bus port socket(6), under non-power down mode, functional module box is combined with pluggablely in the functional module mounting groove(7), in all functional module boxes coordinated in the functional module mounting groove, at least one piece of functional module box is metering module.The utility model is applied to electric energy measuring equipment field.

Description

A kind of configurable type novel high-pressure electric energy meter
Technical field
The utility model is related to electric energy measuring equipment field, it is more particularly to a kind of suitable for 10KV or more it is configurable not The novel high-pressure electric energy meter of congenerous.
Background technology
With carrying out in a deep going way for State Grid's reform, generate electricity, transmit electricity, distribution separation has been determined as a basic orientation, height Press electric energy meter as transmission unit and huge with an indispensable metering device between electric unit, its development potentiality.But because being related to Trade settlement between two sides, its degree of accuracy, long-term working stability are significant.High-voltage electric energy meter is a kind of using high electricity Pressure, the metering device of the straight access way of high current.Because high-voltage electric energy meter is directly accessed high-pressure system, except directly being counted in high-pressure side Outside the basic function for measuring electric energy, also have the following advantages that:
1st, electricity stealing is prevented.Because in general stealing process occurs in low-pressure side, i.e., in secondary line, high-pressure side is moved Trick can risk sizable risk, jeopardize its personal safety.
2nd, sample transformer and metering module is integrated, avoid the secondary voltage drop phenomenon occurred in secondary measurement mode, count Accuracy of measurement is high.
3rd, sample transformer and metering module is integrated, the wiring for avoiding occurring in secondary measurement mode is complicated, safeguards not The problems such as facilitating, reduce job costs, reduce failure odds.
Even so, but at present high-voltage electric energy meter on the market there is a problem in that:
1st, according to national measurement method relevant regulations, the measurement instrument to being related to trade settlement, it is necessary to which timing carries out cycle inspection It is fixed, it is ensured that its function is normal, precision is in acceptability limit.If identified every year high-voltage electric energy meter, must just have a power failure into OK, for user, frequently have a power failure, it is difficult to receive.
2nd, high-voltage electric energy meter if there is technical failure or needs to carry out technology upgrading, it is also necessary to which to have a power failure can be real Apply, it is very inconvenient.
Problem above, especially first point, it have impact on the effective popularization and application of high-voltage electric energy meter.It is so most of at present Or high pressure side joint voltage/current transformer is used, high voltage, high current are changed into low-voltage, low current, then connect secondary meter The mode that amount instrument is measured.As described above, this mode still occurs that stealing, secondary voltage drop influence measuring accuracy etc. Phenomenon.
Utility model content
Technical problem to be solved in the utility model is overcome the deficiencies in the prior art, there is provided a kind of to be in high-pressure side Metering is gathered into voltage x current and the configurable difference in functionality of metering module periodic calibration can be completed under non-power down mode Novel high-pressure electric energy meter.
Technical scheme is used by the utility model:The utility model includes base, is arranged on the upside of the base Voltage x current sampling module and be arranged at the Its lower side and with chamber door cabinet, be provided with the cabinet bus and Control panel, at least one bus port socket is provided with the bus and control panel, is provided with the bus port socket Functional module mounting groove, under non-power down mode, it is combined with pluggablely with different work(in the functional module mounting groove Can functional module box, in all functional module boxes coordinated in the functional module mounting groove, at least one piece of institute It is metering module to state functional module box.
Such scheme is visible, sets voltage x current sampling module to be electrically connected with high pressure on base, is set on the downside of base Put cabinet, bus and control panel be set in cabinet, functional module mounting groove is set on the bus port socket of bus and control panel, And functional module box of the configuration with difference in functionality in functional module mounting groove, wherein at least one functional module box are meter Module is measured, to measure power consumption, the function mould can be connected in real time after by functional module box insertions function module mounting groove Block box and the bus port socket in bus and control panel, realization is connected with bus port socket, in bus and control panel MCU can the type of functional module box inserted of automatic identification, and carry out corresponding circuit connection, control of the metering module in MCU Under system, its sample circuit is connected with voltage x current sampling module, and then obtains the information such as high side voltage, electric current, phase, most Required energy measurement information is obtained afterwards;In addition, under non-power down mode, in the functional module mounting groove pluggablely Coordinate the functional module box with difference in functionality, metering module therein can also plug under non-power down mode, in the re-testing periods The interior calibrating that metering module can be achieved without having a power failure is changed and safeguarded, had both been solved and existing has at present been passed through in low-pressure side Change metering line carry out stealing the problem of, and without have a power failure, high-pressure side i.e. complete voltage x current collection metering;Work as progress During periodic calibration, without having a power failure, the standby metering module of an assay approval is first inserted, the MCU's in bus and control panel The lower function of completing the module identification original metering module of rear tube of control, then original metering module is removed examined and determine, complete Band is electrically interposed in again after into key top, under the control of the MCU in bus and control panel, substitutes the function of measuring of standby metering module simultaneously Complete continuous data to exchange, then remove standby metering module;Or inserted with the metering module of another piece of assay approval Enter in cabinet in any functional module mounting groove, under the control of the MCU in bus and control panel, and original metering in cabinet Module carries out data comparison operation, you can is informed in the measuring accuracy of the metering module used in electric energy meter.
Further, circuit board, the golden finger integral with the circuit board are provided with every piece of functional module box, is set If put some lock projections on the outside of the box body of the functional module box, be arranged on the outside of the box body of the functional module box The buckle of the dry box body outer end for being oriented to fin and being arranged on the functional module box, the golden finger are exposed to the function mould The box portion outside of block box, the functional module box are quickly inserted by a high-voltage insulating rod and the functional module mounting groove Pull out, have clamping device in the end set of the high-voltage insulating rod, the clamping device is engaged with the buckle, the clamping Device be rapidly caught in the buckle and support the functional module box be quickly inserted in the functional module mounting groove or from Extracted in the functional module mounting groove.
Such scheme is visible, is pushed up or pulled downward on the function mould using the clamping device set on high-voltage insulating rod Block box is to realize connection of the functional module with bus port socket with separating, and realization obtains on high-tension side voltage x current number immediately According to without personnel close to without power failure operation, both having solved existing at present in low-pressure side by changing metering line to enter Commit theft electricity the problem of, and without have a power failure, high-pressure side i.e. complete voltage x current collection metering;When carrying out periodic calibration, without Have a power failure, first insert the standby metering module of an assay approval, module identification is completed under the MCU controls in bus and control panel The function of the original metering module of rear tube, then original metering module is removed and examined and determine, after the completion of again band be electrically interposed in, total Under the control of MCU on line and control panel, substitute the function of measuring of standby metering module and complete continuous data exchange, Ran Houqu Under standby metering module;Or any functional module has been installed in the metering module insertion cabinet of assay approval with another piece In groove, under the control of the MCU in bus and control panel, and original metering module carries out data comparison operation in cabinet, real The in-line calibration of existing high-voltage electric energy meter, has greatly facilitated testing person.
Yet further, guide part is provided with the notch of the functional module mounting groove, the guide part is in outer imperial palace Small shape, some locking grooves and some guide grooves, the locking groove are provided with the inwall of the functional module mounting groove For arcuation groove, after the functional module box inserts the functional module mounting groove, the locking groove and the locking are convex Phase snap-fit is played, the guide groove is mutually oriented to cooperation with the guiding fin.
Such scheme is visible, because the length of high-voltage insulating rod is longer, the lower end of functional module mounting groove is set and is oriented to Portion, it can be easy to functional module box promptly to find accurately and be quickly inserted into functional module mounting groove, greatly facilitate work Make the operation of personnel, also reduce labor intensity;The pairing for locking groove and lock projection is set, and enables to functional module box Stably coordinate in functional module mounting groove, the phenomenon for avoiding functional module box from dropping occurs, and ensures stabilization of equipment performance and peace Quan Xing;In addition, the setting of guide groove and guiding fin so that the accurate smooth rapidly alignment of golden finger on functional module box is total Bus port socket on line and control panel, the validity of both connections is realized, also ensure that the service life of equipment.
Yet further, be additionally provided with the bus and control panel MCU, power module, transformer on-line checking module, Display module and bluetooth communication, the power module, from high-pressure side power taking, are exported by the voltage x current sampling module DC12V, DC5V, DC3.3V voltage, it is that other modules and the bus port socket are powered.Such scheme is visible, this practicality It is new using the module set in bus and control panel, realize the visualization of voltage and current measurement and entered using bluetooth communication The transmission of row data, detected without personnel to scene, ensure that the safety of staff.
Again yet further, the number of the bus port socket and the functional module mounting groove is disposed as four, Metering module, remote communication module and remote communication interface module have been respectively cooperating with the functional module mounting groove, it is described remote Journey communication module includes but is not limited to GPRS module, micro power radio module, infrared copy meter module or carrier communication module, described Remote communication interface module includes but is not limited to fiber optic cable communications interface, network interface or RS485 interfaces.
Such scheme is visible, and the number of the bus port socket and the functional module mounting groove can be according to actual conditions Depending on, four are not limited to, the setting of remote communication module and remote communication interface, energy data remote transmission can be realized And measurement, without artificial progress of showing up, greatly reduce measurement cost.
In addition, the bus port socket is insertion slot type socket.Using the golden hand on insertion slot type socket and functional module box Refer to the accuracy and stability for being engaged and can greatly improving functional module grafting.
Yet further, the chamber door is sealed by electronic lead sealing with the cabinet and coordinated.And electronic lead sealing is in order to anti- The only device of the unpacking operation of unrelated person, when carrying out the plug of functional module box, it is necessary to obtain corresponding authority, then triggering is electric Sub- lead sealing, chamber door can be opened and carry out corresponding operating, so as to further improve security.
In addition, the clamping device includes the support slot being adapted with the box body of the functional module box and is oppositely disposed In two clampings nail of the support trench bottom, each clamping nail is provided with cylinder inclined-plane, spring sleeved part and termination, Activity coordinates at the cinclides opened up in the support slot bottom sidewall two relative clamping nails respectively, the termination dew Go out at the support slot bottom periphery, the spring sleeved part and be arranged with spring, one end of the spring is against the cylinder At the cylindrical end on inclined-plane, the other end is against the side-walls of the support trench bottom, and the spring is in compressive state, described in pulling During termination, the clamping nail is displaced outwardly.
Such scheme is visible, and the buckle on functional module box is fastened using the two clampings nail being oppositely arranged, and will block When buckling into, the cylinder inclined-plane of clamping nail is towards buckle, and under the thrust of buckle, clamping nail is displaced outwardly, functional module Box is buckled into support slot and follows closely clamping by the clamping, you can functional module box is left behind from functional module mounting groove;As general Functional module box is caught in after functional module mounting groove when needing to remove the high-voltage insulating rod, and the cylinder inclined-plane of clamping nail is towards high Press the pull direction of insulating bar, when firmly pulling high-voltage insulating rod, buckle from clamping follow closely in deviate from, so as to by functional module box Separated with high-voltage insulating rod, its is simple in construction, easy to operate, when buckling into or taking out functional module box, it is only necessary to which clamping is followed closely The angle of 180 ° of rotation.
Further, the high-voltage insulating rod is the expansion link being arranged successively with the more piece body of rod.Made using expansion link Make high-voltage insulating rod, it is easy to the length for shortening whole bar, improves its portability.
Brief description of the drawings
Fig. 1 is the easy structure schematic diagram at the visual angle of the utility model first;
Fig. 2 is the easy structure schematic diagram at the visual angle of the utility model second;
Fig. 3 is the easy structure schematic diagram at the visual angle of the utility model the 3rd;
Fig. 4 is the easy structure schematic diagram of the high-voltage insulating rod;
Fig. 5 is the easy structure schematic diagram of the clamping device;
Fig. 6 is the easy structure schematic diagram of the clamping nail part in the clamping device;
Fig. 7 is the easy structure schematic diagram at the visual angle of functional module box first;
Fig. 8 is the easy structure schematic diagram at the visual angle of functional module box second;
Fig. 9 is the easy structure schematic diagram at the visual angle of functional module mounting groove first;
Figure 10 is the easy structure schematic diagram at the visual angle of functional module mounting groove second;
Figure 11 is schematic block circuit diagram of the present utility model;
Figure 12 is the circuit theory diagrams of the voltage transformer part in voltage x current sampling module;
Figure 13 is the circuit theory diagrams of the current transformer part in voltage x current sampling module;
Figure 14 is the circuit theory diagrams of the externally fed power unit in voltage x current sampling module;
Figure 15 is the circuit theory diagrams of the AD signal conversion parts point in the metering module;
The circuit theory diagrams of part A in Figure 16 Figure 15;
The circuit theory diagrams of part B in Figure 17 Figure 15;
Figure 18 is the circuit theory diagrams of the slot interface of the bus port socket;
Figure 19 is the circuit theory diagrams of the control section in the metering module;
Figure 20 is the circuit theory diagrams of power unit in the metering module;
Figure 21 is the circuit theory diagrams of 485 interfaces in the metering module;
Figure 22 is 485 signal isolation circuit schematic diagrams in the metering module;
Figure 23 is the circuit theory diagrams of the MCU control sections on the bus and control panel;
Figure 24 is the circuit theory diagrams of the CAN communication part on the bus and control panel;
Figure 25 is the circuit theory diagrams of the CAN control section on the bus and control panel;
Figure 26 is the circuit theory diagrams of the power unit of the bus and control panel;
Figure 27 is the circuit theory diagrams for the infrared receiver and emitting portion being connected with the bus and control panel;
Figure 28 is the electronic lead sealing(RFID)Partial circuit theory diagrams;
Figure 29 is the bus and control panel and the circuit theory diagrams of the voltage x current sampling module coupling part;
Figure 30 is the display module(LCD)Circuit theory diagrams;
Figure 31 is that the signal on the bus and control panel is cut between bus port socket by slot optical coupling relay The circuit theory diagrams for wherein three parts changed;
Figure 32 is that the signal on the bus and control panel is cut between bus port socket by slot optical coupling relay The circuit theory diagrams for two other part changed;
Figure 33 is the schematic diagram of the relay switching electric current circuit part in Figure 31;
Figure 34 is the schematic diagram of the relay switching electric current circuit part in Figure 32;
Figure 35 is the circuit theory diagrams of the slot in three bus port sockets;
Figure 36 is the circuit theory diagrams of the slot in two other bus port socket.
Embodiment
As shown in Fig. 1 to Figure 36, the utility model includes base 1, is arranged on the voltage x current sampling of the upside of base 1 Module 2, it is arranged at the downside of base 1 and carries the cabinet 3 of chamber door 20, the chamber door 20 passes through electronics lead with the cabinet 3 The sealing of envelope 13 coordinates.Bus and control panel 4 are provided with the cabinet 3, be additionally provided with the bus and control panel 4 MCU, Power module 9, transformer on-line checking module 10, display module 11 and bluetooth communication 12, the power module 9 is by described For voltage x current sampling module 2 from high-pressure side power taking, output DC12V, DC5V, DC3.3V voltage are other modules and described total Line end mouth socket 5 is powered;The transformer on-line checking module 10 carries out periodically essence to sampled voltage and current transformer online Degree detection, and testing result is sent in bus, receive request of data at any time;The display module 11 shows high-voltage electric energy meter Metric results;The continuous data, port status, online information of high-voltage electric energy meter are sent to outer by the bluetooth communication 12 Enclose in terminal.At least one bus port socket 5 is additionally provided with the bus and control panel 4, the bus port socket 5 is Insertion slot type socket.Functional module mounting groove 6 is provided with the bus port socket 5, under non-power down mode, in the function Functional module box 7 is combined with module mounting groove 6 pluggablely, what is coordinated in the functional module mounting groove 6 is all described In functional module box 7, at least one piece of functional module box 7 is metering module.In the present embodiment, the bus port is inserted The number of seat 5 and the functional module mounting groove 6 is disposed as four(Certainly, the setting of this number can be according to actual conditions Depending on, when needing to use more functional module box, its quantity set can correspondingly increase, and such as use less function mould During block box, then the number of bus port socket 5 and the functional module mounting groove 6 is correspondingly reduced), four functional modules Two metering modules, remote communication module and remote communication interface module, the telecommunication mould have been respectively cooperating with mounting groove 6 Block includes but is not limited to GPRS module, micro power radio module, infrared copy meter module or carrier communication module, the telecommunication Interface module includes but is not limited to fiber optic cable communications interface, network interface or RS485 interfaces.Set on every piece of functional module box 7 It is equipped with circuit board, the golden finger 71 integral with the circuit board, some locks being arranged on the outside of the box body of the functional module box 7 Tight projection 72, some guiding fins 73 being arranged on the outside of the box body of the functional module box 7 and it is arranged on the function mould The buckle 74 of the box body outer end of block box 7, the golden finger 71 are exposed to the box portion outside of the functional module box 7.
The functional module box 7 carries out fast insert-pull, institute by a high-voltage insulating rod 8 with the functional module mounting groove 6 It is the expansion link being arranged successively with the more piece body of rod to state high-voltage insulating rod 8.There is clamping in the end set of the high-voltage insulating rod 8 Device, the clamping device include the support slot 14 being adapted with the box body of the functional module box 7 and are oppositely disposed at institute Two clampings nail 15 of the bottom of support slot 14 is stated, each clamping nail 15 is provided with cylinder inclined-plane 151, spring sleeved part 152 And termination 153, activity coordinates what is opened up in the bottom sidewall of support slot 14 to relative two clamping nails 15 respectively At cinclides, the termination 153 is exposed is arranged with spring 16 at the bottom periphery of support slot 14, the spring sleeved part 152, One end of the spring 16 is against at the cylindrical end on the cylinder inclined-plane 151, and the other end is against the side of the bottom of support slot 14 At wall, the spring 16 is in compressive state, and when pulling the termination 153, the clamping nail 15 is displaced outwardly.The clamping dress Put and be engaged with the buckle 74, the clamping device is rapidly caught in the buckle 74 and supports the functional module box 7 fast Insert in the functional module mounting groove 6 or extracted out of described functional module mounting groove 6 fastly.
Guide part 61 is provided with the notch of the functional module mounting groove 6, the guide part 61 is in the small shape of outer imperial palace, i.e., In bell mouth shape, as shown in Figure 9 and Figure 10.Some locking grooves 62 are provided with the inwall of the functional module mounting groove 6 With some guide grooves 63, the locking groove 62 is arcuation groove, and the functional module installation is inserted in the functional module box 7 It is described to lock groove 62 and the phase snap-fit of lock projection 72, the guide groove 63 and the guiding phase of fin 73 after groove 6 It is oriented to and coordinates.
The utility model is typically mounted on high-voltage wire pole, in the case where not having a power failure, opens cabinet, plug function mould The operations such as block box must be carried out by means of high-voltage insulating rod, and high-voltage insulating rod is a kind of telescopic handheld tool, is mainly being closed High voltage isolator is closed or pulled open, assembles and disassembles Portable ground wire, and measure and used when testing.Bus in cabinet and Set bus and control section, bus and control section to be judged automatically on control panel, select one piece of function normal and after Metering module of the metering module of insertion as this high-voltage electric energy meter.To having damaged or unnecessary metering module, its work can be disconnected Make power supply, off voltage collection signal, short circuit current collection signal, and provide state instruction, realize the basic function of electric energy meter. In the present embodiment, the chamber door of cabinet is down, convenient to open, close, plugging functional module box.Certainly, in low-lying land Electric pole, when people station when with the electric energy meter almost identical height, also chamber door can be opened in side, be easy in level The plug operation of functional module box is carried out on position.The module type of bus and control panel meeting automatic decision access bus, and provide State instruction.High-voltage electric energy meter described in the utility model can be communicated by the modes such as GPRS, optical cable and main website, by institute of main website Various information are needed to upload.High-voltage electric energy meter described in the utility model can be logical by micro power radio module, far infrared, RS485 etc. Letter mode and site operation personnel interact communication, to realize the function such as on-site maintenance and instant meter reading.The utility model institute State the various continuous datas of high-voltage electric energy meter, each functional module working condition can be sent to handheld terminal by bluetooth module On.Voltage x current sampling module 2 is made up of voltage transformer pt and Current Transmit, a side joint AC10kV, and secondary terminals are defeated Alternating voltage, the current signal gone out required for metering module.Bus and control panel are by bus marco chip, clock circuit, various Control and protection circuit, main control board composition, mainly complete following functions:Clock signal is provided for each bus port socket; The state of each bus port socket, the protection and access of control electric current transformer CT output protection circuits are detected at any time, it is ensured that When not having metering module insertion or metering module failure, Current Transmit output is in short-circuit condition;Detect at any time The state of each bus port socket, when there is module insertion, identification module type simultaneously provides corresponding state instruction indicator lamp and carried Show and auditory tone cues.Bus port socket (1-n) therein:For the n STD bus with identical structure, identical digit Socket, support hot plug.Each port of bus is including but not limited to signals below:
DC12V, DC5V, DC3.3V, GND, signal ground;AB phase voltage Uab, BC phase voltages Ubc, A phase current exports IAout, A phase current input IAin, C phase current output ICout, C phase current input ICin, ground wire N;Module insertion identification letter Number;Serial ports sends signal TX, serial ports reception signal RX;Clock signal.
The utility model is applied to electric energy measuring equipment field.

Claims (9)

1. a kind of configurable type novel high-pressure electric energy meter, including base(1), be arranged on the base(1)The voltage x current of upside Sampling module(2)Be arranged at the base(1)Downside and carry chamber door(20)Cabinet(3), it is characterised in that:In the machine Case(3)Inside it is provided with bus and control panel(4), the bus and control panel(4)On be provided with least one bus port socket (5), the bus port socket(5)On be provided with functional module mounting groove(6), under non-power down mode, in the function mould Block mounting groove(6)The interior functional module box being combined with pluggablely with difference in functionality(7), in the functional module mounting groove (6)All functional module boxes of interior cooperation(7)In, at least one piece of functional module box(7)For metering module.
A kind of 2. configurable type novel high-pressure electric energy meter according to claim 1, it is characterised in that:Every piece of function mould Block box(7)On be provided with circuit board, with the circuit board one golden finger(71), be arranged on the functional module box(7)'s Some lock projections on the outside of box body(72), be arranged at the functional module box(7)Box body on the outside of some guiding fins (73)And it is arranged on the functional module box(7)Box body outer end buckle(74), the golden finger(71)It is exposed to described Functional module box(7)Box portion outside, the functional module box(7)Pass through a high-voltage insulating rod(8)Pacify with the functional module Tankage(6)Fast insert-pull is carried out, in the high-voltage insulating rod(8)End set have clamping device, the clamping device and institute State buckle(74)It is engaged, the clamping device is rapidly caught in the buckle(74)And support the functional module box(7)It hurry up The functional module mounting groove is inserted fastly(6)It is interior or from the functional module mounting groove(6)Interior extraction.
A kind of 3. configurable type novel high-pressure electric energy meter according to claim 2, it is characterised in that:The functional module peace Tankage(6)Notch at be provided with guide part(61), the guide part(61)In the small shape of outer imperial palace, installed in the functional module Groove(6)Inwall on be provided with some locking grooves(62)With some guide grooves(63), the locking groove(62)It is recessed for arcuation Groove, in the functional module box(7)Insert the functional module mounting groove(6)Afterwards, the locking groove(62)With the locking It is raised(72)Phase snap-fit, the guide groove(63)With the guiding fin(73)Mutually it is oriented to and coordinates.
A kind of 4. configurable type novel high-pressure electric energy meter according to any one of claims 1 to 3, it is characterised in that:It is described Bus and control panel(4)On be additionally provided with MCU, power module(9), transformer on-line checking module(10), display module(11) And bluetooth communication(12),
The power module(9)By the voltage x current sampling module(2)From high-pressure side power taking, output DC12V, DC5V, DC3.3V voltage, it is other modules and the bus port socket(5)Power supply.
A kind of 5. configurable type novel high-pressure electric energy meter according to claim 1, it is characterised in that:The bus port is inserted Seat(5)With the functional module mounting groove(6)Number be disposed as four, the functional module mounting groove(6)Inside match somebody with somebody respectively Conjunction has metering module, remote communication module and remote communication interface module, and the remote communication module includes but is not limited to GPRS Module, micro power radio module, infrared copy meter module or carrier communication module, the remote communication interface module include but unlimited In fiber optic cable communications interface, network interface or RS485 interfaces.
A kind of 6. configurable type novel high-pressure electric energy meter according to claim 1, it is characterised in that:The bus port is inserted Seat(5)For insertion slot type socket.
A kind of 7. configurable type novel high-pressure electric energy meter according to claim 1, it is characterised in that:The chamber door(20)With The cabinet(3)Pass through electronic lead sealing(13)Sealing coordinates.
A kind of 8. configurable type novel high-pressure electric energy meter according to claim 2, it is characterised in that:The clamping device bag Include and the functional module box(7)The support slot that is adapted of box body(14)And it is oppositely disposed at the support slot(14)Bottom Two clampings nail(15), each clamping nail(15)It is provided with cylinder inclined-plane(151), spring sleeved part(152)And end Head(153), relative two clampings nails(15)Activity coordinates in the support slot respectively(14)Opened up in bottom sidewall At cinclides, the termination(153)Expose in the support slot(14)Bottom periphery, the spring sleeved part(152)Place is arranged with Spring(16), the spring(16)One end be against the cylinder inclined-plane(151)Cylindrical end at, the other end is against the support Groove(14)The side-walls of bottom, the spring(16)In compressive state, the termination is pulled(153)When, the clamping nail (15)It is displaced outwardly.
A kind of 9. configurable type novel high-pressure electric energy meter according to claim 2, it is characterised in that:The high-voltage insulating rod (8)For the expansion link being arranged successively with the more piece body of rod.
CN201720555308.1U 2017-05-18 2017-05-18 A kind of configurable type novel high-pressure electric energy meter Active CN206892180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720555308.1U CN206892180U (en) 2017-05-18 2017-05-18 A kind of configurable type novel high-pressure electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720555308.1U CN206892180U (en) 2017-05-18 2017-05-18 A kind of configurable type novel high-pressure electric energy meter

Publications (1)

Publication Number Publication Date
CN206892180U true CN206892180U (en) 2018-01-16

Family

ID=61342430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720555308.1U Active CN206892180U (en) 2017-05-18 2017-05-18 A kind of configurable type novel high-pressure electric energy meter

Country Status (1)

Country Link
CN (1) CN206892180U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959387A (en) * 2017-05-18 2017-07-18 珠海市科荟电器有限公司 A kind of configurable type novel high-pressure electric energy meter
CN110441569A (en) * 2019-08-30 2019-11-12 陈劲游 It is a kind of can charged for replacement high-voltage electric energy meter and its application
CN110554224A (en) * 2019-08-30 2019-12-10 陈劲游 Light and small high-voltage electric energy meter capable of being replaced in electrified mode and application thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959387A (en) * 2017-05-18 2017-07-18 珠海市科荟电器有限公司 A kind of configurable type novel high-pressure electric energy meter
WO2018209804A1 (en) * 2017-05-18 2018-11-22 珠海市科荟电器有限公司 Configurable novel high voltage electricity meter
CN110441569A (en) * 2019-08-30 2019-11-12 陈劲游 It is a kind of can charged for replacement high-voltage electric energy meter and its application
CN110554224A (en) * 2019-08-30 2019-12-10 陈劲游 Light and small high-voltage electric energy meter capable of being replaced in electrified mode and application thereof

Similar Documents

Publication Publication Date Title
CN206892180U (en) A kind of configurable type novel high-pressure electric energy meter
CN103698733B (en) A kind of test connection terminal assemblies for electric energy metrical
CN207051383U (en) A kind of intelligent apparatus for avoiding electricity fraudulent
CN107333288A (en) A kind of power information acquisition system field apparatus communication fault detection method and device
CN106959387A (en) A kind of configurable type novel high-pressure electric energy meter
CN109375043A (en) One kind is visited one house after another detection system and its application method
CN207742282U (en) A kind of Portable mutual inductor polarity and measurent wiring differentiate wireless test instrument
CN203443993U (en) Electric energy metering wiring apparatus
CN107271757A (en) Low-voltage cable testing current recorder
CN109470961A (en) A kind of omnipotent detection station of power equipment quality based on modularized design
CN109254183A (en) A kind of metering system for ring network cabinet
CN2700890Y (en) Nuclear phase instrument
CN204374299U (en) A kind of carrier wave guide rail electric meter and case member thereof
CN214750698U (en) Mountain area 10kV post-mounted intelligent switch opening calibration device
CN205539435U (en) On --spot check gauge of multi -functional electric energy meter
CN209446991U (en) A kind of signal control device for measurement verification system
CN209417170U (en) A kind of omnipotent detection station of power equipment quality based on modularized design
CN206585388U (en) Intelligent substation telemechanical comprehensive tester
CN209496133U (en) Detection device of electric energy meter, system and power grid maintenance equipment
CN206892162U (en) A kind of buckle-type transformer based on MCU controllers
CN208537633U (en) A kind of phasing tester
CN205720485U (en) A kind of handheld-type intelligent relay protection check instrument based on radio communication
CN205880184U (en) Calibration equipment is synthesized to portable arrester discharge counter
CN206876776U (en) The nuclear phase instrument of transmission line of electricity nuclear phase accuracy can be improved
CN205898192U (en) Electric instrument of physical measurement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant