CN206891149U - A kind of fixed aluminium melting furnace - Google Patents

A kind of fixed aluminium melting furnace Download PDF

Info

Publication number
CN206891149U
CN206891149U CN201720625433.5U CN201720625433U CN206891149U CN 206891149 U CN206891149 U CN 206891149U CN 201720625433 U CN201720625433 U CN 201720625433U CN 206891149 U CN206891149 U CN 206891149U
Authority
CN
China
Prior art keywords
melting furnace
waste material
furnace body
bracket
aluminum melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720625433.5U
Other languages
Chinese (zh)
Inventor
徐佐南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Nanhai Weiao Machinery Co Ltd
Original Assignee
Foshan Nanhai Weiao Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Nanhai Weiao Machinery Co Ltd filed Critical Foshan Nanhai Weiao Machinery Co Ltd
Priority to CN201720625433.5U priority Critical patent/CN206891149U/en
Application granted granted Critical
Publication of CN206891149U publication Critical patent/CN206891149U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model discloses a kind of fixed aluminium melting furnace, including aluminum melting furnace body, the bottom of the aluminum melting furnace body is provided with burner, the inside of the aluminum melting furnace body is respectively equipped with the first waste material bracket, second waste material bracket and three wastes material torr frame, the both ends of the first waste material bracket are fixedly connected with the inwall of aluminum melting furnace body, the both ends of the second waste material bracket are fixedly connected with the inwall of aluminum melting furnace body, the both ends of the three wastes material torr frame are fixedly connected with the inwall of aluminum melting furnace body, the second waste material bracket is between the first waste material bracket and three wastes material torr frame, first waste material bracket is located at the upside of the second waste material bracket.The fixed aluminium melting furnace, the cost of material can be reduced, low cost, there is good heating effect, the operating efficiency of aluminum melting furnace body is improved, it is easy to use, beneficial to promoting the use of, solve existing aluminium melting furnace, inconvenient for use, efficiency is low, and material cost is higher, the problem of being unfavorable for promoting the use of.

Description

A kind of fixed aluminium melting furnace
Technical field
Aluminum melting technical field is the utility model is related to, specially a kind of fixed aluminium melting furnace.
Background technology
Aluminium melting furnace is mainly resistant to temperature and can reach 1000 by national standard steel and special refractory brick, refractory material composition, burner hearth Degree Celsius, aluminium melting furnace is a kind of novel high-efficiency and energy-saving stove developed according to aluminium smelting technology, and it can meet aluminium melting well In technique:Alloy composition requirement is tight, and production is discontinuous, and larger wait of single heat size requires, has reached reduction consumption, has reduced scaling loss, Product quality is improved, labor intensity is reduced, the effect of improving working conditions and improve production efficiency, suitable for batch operation, matches somebody with somebody Melting more than alloy and foundry returns.
At present, existing aluminium melting furnace, inconvenient for use, efficiency is low, and material cost is higher, is unfavorable for promoting the use of.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of fixed aluminium melting furnace, solves existing aluminum melting Stove, inconvenient for use, efficiency is low, and material cost is higher, the problem of being unfavorable for promoting the use of.
(2) technical scheme
To realize object above, the utility model is achieved by the following technical programs:A kind of fixed aluminium melting furnace, bag Aluminum melting furnace body is included, the bottom of the aluminum melting furnace body is provided with burner, and the inside of the aluminum melting furnace body is respectively equipped with first Waste material bracket, the second waste material bracket and three wastes material torr frame, the both ends of the first waste material bracket are fixedly connected with aluminium melting furnace On the inwall of body, the both ends of the second waste material bracket are fixedly connected with the inwall of aluminum melting furnace body, the three wastes The both ends of material torr frame are fixedly connected with the inwall of aluminum melting furnace body, the second waste material bracket be located at the first waste material bracket and Between three wastes material torr frame, the first waste material bracket is located at the upside of the second waste material bracket, and the three wastes material torr frame is located at The downside of second waste material bracket, the downside of the three wastes material torr frame are provided with aluminium ingot bracket, and the both ends of the aluminium ingot bracket are solid Surely it is connected on the inwall of aluminum melting furnace body, the top of the aluminum melting furnace body is provided with waste material charge door, the aluminum melting furnace body Bottom be provided with aluminium ingot charge door, the top of the aluminum melting furnace body is provided with gas outlet, and the both sides of gas outlet are fixedly connected with There is support, top cover is fixedly connected with the support.
Preferably, the first waste material bracket, the second waste material bracket and three wastes material torr frame are parallel to each other between any two, and The distance between the distance between first waste material bracket and the second waste material bracket and the second waste material bracket and three wastes material torr frame phase Deng.
Preferably, the downside of the waste material charge door is provided with L-type Antileaking plate.
Preferably, the burner is oil burner or gas burner.
Preferably, the aluminium melting furnace body outer surface is fixedly connected with the first fixed plate, and the two sides of the burner are equal The second fixed plate is fixedly connected with, is bolted between first fixed plate and the second fixed plate connected.
Preferably, the bottom of the burner is fixedly connected with bottom plate, and the lower surface of bottom plate is provided with antiskid thread.
Preferably, the aluminum melting furnace body is shaft furnace shape.
(3) beneficial effect
The utility model provides a kind of fixed aluminium melting furnace, possesses following beneficial effect:
(1), fixed aluminium melting furnace, on the one hand, the first waste material bracket, second are respectively equipped with the inside of aluminum melting furnace body Waste material bracket and three wastes material torr frame, and the top of aluminum melting furnace body is provided with waste material charge door, is given up in the first waste material bracket, second On material torr frame and three wastes material torr frame can placing waste, reduce the cost of material with this, low cost, on the other hand, the three wastes The downside of material torr frame is provided with aluminium ingot bracket, and the bottom of aluminum melting furnace body is provided with aluminium ingot charge door, can place aluminium on aluminium ingot bracket Ingot, secondly, the bottom of aluminum melting furnace body is provided with burner, has good heating effect, improves the work effect of aluminum melting furnace body Rate, in addition, aluminium melting furnace body outer surface is fixedly connected with the first fixed plate, the two sides of burner have been fixedly connected with second and consolidated Fixed board, is bolted connected between the first fixed plate and the second fixed plate, using screw fixation method, can be dismantled, It is easy to use, beneficial to promoting the use of, solve existing aluminium melting furnace, inconvenient for use, efficiency is low, and material cost is higher, unfavorable In promote the use of the problem of.
(2), fixed aluminium melting furnace, on the one hand, the top of aluminum melting furnace body is provided with gas outlet, and the both sides of gas outlet are equal Support is fixedly connected with, top cover is fixedly connected with support, there is waterproof action, on the other hand, is set on the downside of waste material charge door There is L-type Antileaking plate, there is good leakproof effect, secondly, aluminium ingot charge door uses inclined design, adds aluminium ingot material convenient, in addition, The bottom of burner is fixedly connected with bottom plate, and the lower surface of bottom plate is provided with antiskid thread, has good anti-skidding effect, is beneficial to Promote the use of.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1 aluminum melting furnace body, 2 burners, 3 first waste material brackets, 4 second waste material brackets, 5 three wastes material torr framves, 6 Aluminium ingot bracket, 7 waste material charge doors, 8 aluminium ingot charge doors, 9 gas outlets, 10 supports, 11 top covers, 12 L-type Antileaking plates, 13 first are consolidated Fixed board, 14 second fixed plates, 15 bolts, 16 bottom plates.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of technical scheme:A kind of fixed aluminium melting furnace, including aluminum melting furnace body 1, aluminum melting furnace body 1 is shaft furnace shape, and the bottom of aluminum melting furnace body 1 is provided with burner 2, and burner 2 is to make fuel and air with one Determine mode and spray the device of mixed combustion to be referred to as, burner 2 is oil burner or gas burner, aluminum melting furnace body 1 it is interior Portion is respectively equipped with the first waste material bracket 3, the second waste material bracket 4 and three wastes material torr frame 5, and the both ends of the first waste material bracket 3 are solid Surely it is connected on the inwall of aluminum melting furnace body 1, the both ends of the second waste material bracket 4 are fixedly connected with the inwall in aluminum melting furnace body 1 On, the both ends of three wastes material torr frame 5 are fixedly connected with the inwall of aluminum melting furnace body 1, and the second waste material bracket 4 is useless positioned at first Between material torr frame 3 and three wastes material torr frame 5, the first waste material bracket 3 is located at the upside of the second waste material bracket 4, three wastes material torr frame 5 Positioned at the downside of the second waste material bracket 4, the first waste material bracket 3, the second waste material bracket 4 and three wastes material torr frame 5 phase between any two It is mutually parallel, and the distance between the first waste material bracket 3 and the second waste material bracket 4 and the second waste material bracket 4 and three wastes material torr frame 5 The distance between it is equal, the downside of three wastes material torr frame 5 is provided with aluminium ingot bracket 6, the first waste material bracket 3, the and of the second waste material bracket 4 Three wastes material torr frame 5 and aluminium ingot bracket 6 are the compound golden bracket of ventilative heat resistant type, and the both ends of aluminium ingot bracket 6 are fixedly connected with On the inwall of aluminum melting furnace body 1, the top of aluminum melting furnace body 1 is provided with waste material charge door 7, and the downside of waste material charge door 7 is provided with L Type Antileaking plate 12, the bottom of aluminum melting furnace body 1 are provided with aluminium ingot charge door 8, and the top of aluminum melting furnace body 1 is provided with gas outlet 9, and goes out The both sides of gas port 9 have been fixedly connected with support 10, and top cover 11 is fixedly connected with support 10, and the outer surface of aluminum melting furnace body 1 is fixed The first fixed plate 13 is connected with, the two sides of burner 2 have been fixedly connected with the second fixed plate 14, the first fixed plate 13 and second It is fixedly linked between fixed plate 14 by bolt 15, the bottom of burner 2 is fixedly connected with bottom plate 16, and the lower surface of bottom plate 16 Provided with antiskid thread.
In summary, fixed aluminium melting furnace, on the one hand, the first waste material support is respectively equipped with the inside of aluminum melting furnace body 1 Frame 3, the second waste material bracket 4 and three wastes material torr frame 5, and the top of aluminum melting furnace body 1 is provided with waste material charge door 7, it is useless first On material torr frame 3, the second waste material bracket 4 and three wastes material torr frame 5 can placing waste, reduce the cost of material with this, low cost, On the other hand, the downside of three wastes material torr frame 5 is provided with aluminium ingot bracket 6, and the bottom of aluminum melting furnace body 1 is provided with aluminium ingot charge door 8, can Aluminium ingot is placed on aluminium ingot bracket 6, secondly, the bottom of aluminum melting furnace body 1 is provided with burner 2, has good heating effect, carries The operating efficiency of high aluminum melting furnace body 1, in addition, the outer surface of aluminum melting furnace body 1 is fixedly connected with the first fixed plate 13, burner 2 Two sides be fixedly connected with the second fixed plate 14, fixed between the first fixed plate 13 and the second fixed plate 14 by bolt 15 It is connected, using screw fixation method, can be dismantled, it is easy to use, beneficial to promoting the use of, solve existing aluminium melting furnace, make With inconvenience, efficiency is low, and material cost is higher, the problem of being unfavorable for promoting the use of.
And, on the one hand, the top of aluminum melting furnace body 1 is provided with gas outlet 9, and the both sides of gas outlet 9 have been fixedly connected with Support 10, top cover 11 being fixedly connected with support 10, there is waterproof action, on the other hand, the downside of waste material charge door 7 is provided with L Type Antileaking plate 12, there is good leakproof effect, secondly, aluminium ingot charge door 8 uses inclined design, adds aluminium ingot material convenient, in addition, The bottom of burner 2 is fixedly connected with bottom plate 16, and the lower surface of bottom plate 16 is provided with antiskid thread, has good anti-skidding work With beneficial to promoting the use of.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that Other identical element in the process including the key element, method, article or equipment also be present ".
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of fixed aluminium melting furnace, including aluminum melting furnace body (1), it is characterised in that:The bottom of the aluminum melting furnace body (1) is set Have a burner (2), the inside of the aluminum melting furnace body (1) be respectively equipped with the first waste material bracket (3), the second waste material bracket (4) and Three wastes material torr frame (5), the both ends of the first waste material bracket (3) are fixedly connected with the inwall of aluminum melting furnace body (1), institute The both ends for stating the second waste material bracket (4) are fixedly connected with the inwall of aluminum melting furnace body (1), the three wastes material torr frame (5) Both ends be fixedly connected with the inwall of aluminum melting furnace body (1), the second waste material bracket (4) is located at the first waste material bracket (3) between three wastes material torr frame (5), the first waste material bracket (3) is located at the upside of the second waste material bracket (4), and described Three wastes material torr frame (5) is located at the downside of the second waste material bracket (4), and the downside of the three wastes material torr frame (5) is provided with aluminium ingot bracket (6), the both ends of the aluminium ingot bracket (6) are fixedly connected with the inwall of aluminum melting furnace body (1), the aluminum melting furnace body (1) Top be provided with waste material charge door (7), the bottom of the aluminum melting furnace body (1) is provided with aluminium ingot charge door (8), the aluminium melting furnace sheet The top of body (1) is provided with gas outlet (9), and the both sides of gas outlet (9) have been fixedly connected with support (10), on the support (10) It is fixedly connected with top cover (11).
A kind of 2. fixed aluminium melting furnace according to claim 1, it is characterised in that:The first waste material bracket (3), second Waste material bracket (4) and three wastes material torr frame (5) are parallel to each other between any two, and the first waste material bracket (3) and the second waste material bracket The distance between (4) the distance between the second waste material bracket (4) and three wastes material torr frame (5) are equal.
A kind of 3. fixed aluminium melting furnace according to claim 1, it is characterised in that:The downside of the waste material charge door (7) Provided with L-type Antileaking plate (12).
A kind of 4. fixed aluminium melting furnace according to claim 1, it is characterised in that:The burner (2) is burnt for fuel oil Device or gas burner.
A kind of 5. fixed aluminium melting furnace according to claim 1, it is characterised in that:Aluminum melting furnace body (1) outer surface The first fixed plate (13) is fixedly connected with, the two sides of the burner (2) have been fixedly connected with the second fixed plate (14), described It is fixedly linked between first fixed plate (13) and the second fixed plate (14) by bolt (15).
A kind of 6. fixed aluminium melting furnace according to claim 1, it is characterised in that:The bottom of the burner (2) is fixed Bottom plate (16) is connected with, and the lower surface of bottom plate (16) is provided with antiskid thread.
A kind of 7. fixed aluminium melting furnace according to claim 1, it is characterised in that:The aluminum melting furnace body (1) is shaft furnace Shape.
CN201720625433.5U 2017-06-01 2017-06-01 A kind of fixed aluminium melting furnace Active CN206891149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720625433.5U CN206891149U (en) 2017-06-01 2017-06-01 A kind of fixed aluminium melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720625433.5U CN206891149U (en) 2017-06-01 2017-06-01 A kind of fixed aluminium melting furnace

Publications (1)

Publication Number Publication Date
CN206891149U true CN206891149U (en) 2018-01-16

Family

ID=61320067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720625433.5U Active CN206891149U (en) 2017-06-01 2017-06-01 A kind of fixed aluminium melting furnace

Country Status (1)

Country Link
CN (1) CN206891149U (en)

Similar Documents

Publication Publication Date Title
CN201138137Y (en) Can-type calcine furnace
CN206891149U (en) A kind of fixed aluminium melting furnace
CN206146182U (en) Energy -saving aluminum alloy melting device
CN201915153U (en) Tank liner structure beneficial to heat preservation of aluminium electrolytic cell
CN212620061U (en) Multi-functional frequency conversion response aluminum alloy smelting furnace of large capacity
CN208802838U (en) A kind of metallic silicon purification furnace of environment-friendly high-efficiency
CN206862105U (en) A kind of phosphate dihydrate iron rotary furnace
CN202938633U (en) Biomass burning aluminum smelting all-in-one machine
CN101054257B (en) Energy-saving quartz continuous melting furnace, energy-saving method and method for adjusting tube pulling specification
CN105624786B (en) A kind of melting method of artificial mica synthesis oversize monocrystalline
CN205065182U (en) Vacuum structure high temperature thermal insulation board
CN208606591U (en) A kind of industry double chamber furance inner lining refractory structure
CN201678743U (en) Heating-free front furnace device of electric heating holding furnace for siphon aluminum inlet
CN205980740U (en) A popped stove of high temperature for producing glass bead
CN207294823U (en) The iron ore smelting system of dual AC power Combination Smelting stove
CN206143167U (en) Portable gas formula high performance wine pot
CN205903944U (en) A breaker for being able to bear or endure firebrick retrieves
CN206037701U (en) Living beings melt aluminium stove
CN2431270Y (en) Vertical electric stove for continuously producing graphitizing coke
CN2274191Y (en) Directional crystallizer for production of finished aluminium
CN206680549U (en) Intermediate frequency smelts aluminium lime reducing agent removing impurities at initial stage device
CN221122985U (en) Energy-saving metal silicon smelting device
CN206755865U (en) A kind of shaft furnace closing device being easily installed
CN214009918U (en) Aluminum melting furnace for processing aluminum frame profile
CN215628221U (en) Be used for energy-efficient apparatus for producing of manganese silicon alloy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 528200, No. 54, Hong Gang Road, Li Shui Road, Lishui Town, Nanhai District, Foshan, Guangdong (residence declaration)

Patentee after: FOSHAN NANHAI WEIAO MACHINERY CO., LTD.

Address before: 528200 8-C, South Industrial Avenue, Hong Kong Industrial Zone, Lishui Town, Nanhai District, Foshan, Guangdong

Patentee before: FOSHAN NANHAI WEIAO MACHINERY CO., LTD.