CN206889981U - Pre-embedded anchoring bolts adjustment, fixing device for installing - Google Patents
Pre-embedded anchoring bolts adjustment, fixing device for installing Download PDFInfo
- Publication number
- CN206889981U CN206889981U CN201720844214.6U CN201720844214U CN206889981U CN 206889981 U CN206889981 U CN 206889981U CN 201720844214 U CN201720844214 U CN 201720844214U CN 206889981 U CN206889981 U CN 206889981U
- Authority
- CN
- China
- Prior art keywords
- cross
- adjustment
- screw mandrel
- anchoring bolts
- embedded anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/40—Solar thermal energy, e.g. solar towers
- Y02E10/47—Mountings or tracking
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of adjustment of pre-embedded anchoring bolts, fixing device for installing, adjustment and installation for pre-embedded anchoring bolts, including two cross-arms be arrangeding in parallel, the both ends of the cross-arm are separately provided for adjusting the regulation screw mandrel of elevation, and the bottom of the regulation screw mandrel is provided with support base;Elevation location device is provided between the regulation screw mandrel and the cross-arm, locking bracing means is provided between the regulation screw mandrel and the support base;Adjustment template is provided between the middle part of two cross-arms, pre-embedded anchoring bolts hole is correspondingly offered on the adjustment template and the cross-arm.The utility model not only adjusts, it is quick and convenient to position, and can effectively control pre-embedded anchoring bolts installation quality, and can recycle, beneficial to saving construction cost and improve efficiency of construction.
Description
Technical field
The utility model belongs to equipment mounting technique field, and in particular to a kind of pre-embedded anchoring bolts adjustment, installation are fixed
Device.
Background technology
In wide core Delingha photo-thermal project be China's seat of honour photo-thermal power generation project, by receiving solar energy offer heat,
The heat collector installation accuracy for being used to collect solar energy in this project requires very high, and then to the precision of collector bracket column
It is required that also very high, the foundation bolt for being used to fix heat collector in this engineering is designed as pre-buried form, is brought for construction certain
Difficulty, while in whole engineering pre-embedded anchoring bolts quantities it is very big, because this engineering is domestic seat of honour comercial operation
Photo-thermal power generation project, so can temporarily be followed without past construction experiences.
Utility model content
Technical problem to be solved in the utility model is to provide one kind and is able to ensure that embedding anchor bolts precision and is beneficial to
Improve pre-embedded anchoring bolts adjustment, the fixing device for installing of efficiency of construction.
In order to solve the above technical problems, the technical solution of the utility model is:Pre-embedded anchoring bolts adjustment, the fixed dress of installation
Put, set respectively for the adjustment and installation of pre-embedded anchoring bolts, including two cross-arms be arrangeding in parallel, the both ends of the cross-arm
There is the regulation screw mandrel for adjusting elevation, the bottom of the regulation screw mandrel is provided with support base;The regulation screw mandrel and the horizontal stroke
Elevation location device is provided between load, locking bracing means is provided between the regulation screw mandrel and the support base;Two
Adjustment template is provided between the middle part of the cross-arm, pre-buried lower margin spiral shell is correspondingly offered on the adjustment template and the cross-arm
Keyhole.
As preferable technical scheme, the elevation location device is sheathed on for two on the regulation screw mandrel and difference position
Location nut at the upper and lower surface of the cross-arm.
As preferable technical scheme, it is described locking bracing means include be arranged on the support base and with the regulation
The adapter sleeve of the bottom socket of screw mandrel, in the side wall of the adapter sleeve connection be provided with lock sleeve, be equipped with the lock sleeve
There is puller bolt.
As preferable technical scheme, the adjustment template and the cross-arm riveting.
As preferable technical scheme, the top of the regulation screw mandrel is provided with screw on nut.
By adopting the above-described technical solution, the utility model has the advantages that:By consolidating with foundation bolt
Technology is determined, not only in quick adjustment, positioning, effectively control installation quality etc. significant effect, and the present apparatus can circulate
Use, resource is saved beneficial in artificial, material, machinery etc., beneficial to saving construction cost and improve efficiency of construction.
Brief description of the drawings
The following drawings is only intended to, in doing the utility model schematic illustration and explanation, not limit model of the present utility model
Enclose.Wherein:
Fig. 1 is the main structure diagram of the utility model embodiment;
Fig. 2 is the overlooking the structure diagram of the utility model embodiment;
Fig. 3 is the Construction State reference chart of the utility model embodiment.
In figure:1- pre-embedded anchoring bolts;2- cross-arms;3- adjusts screw mandrel;4- support bases;5- elevation location devices;51- is positioned
Nut;6- locks bracing means;61- adapter sleeves;62- lock sleeves;63- puller bolts;7- adjusts template;8- pre-embedded anchoring bolts
Hole;9- screw on nut.
Embodiment
With reference to the accompanying drawings and examples, the utility model is expanded on further.In the following detailed description, only pass through
Bright mode describes some one exemplary embodiments of the present utility model.Undoubtedly, one of ordinary skill in the art can be with
Recognize, can be with a variety of modes to described in the case of without departing from spirit and scope of the present utility model
Embodiment is modified.Therefore, accompanying drawing and description are inherently illustrative, rather than for limiting the protection of claim
Scope.
As shown in Figure 1 to Figure 3, pre-embedded anchoring bolts adjustment, fixing device for installing, the adjustment for pre-embedded anchoring bolts 1
With installation, including two cross-arms 2 be arrangeding in parallel, cross-arm 2 can use square tube depending on project situation in the present embodiment;
The both ends of the cross-arm 2 are separately provided for adjusting the regulation screw mandrel 3 of the elevation of pre-embedded anchoring bolts 1, the regulation screw mandrel 3
Top is welded with screw on nut 9, in order to rotate regulation screw mandrel;The bottom of the regulation screw mandrel 3 is provided with support base 4;It is described
Elevation location device 5 is provided between regulation screw mandrel 4 and the cross-arm 2, is set between the regulation screw mandrel 3 and the support base 4
It is equipped with locking bracing means 6;Adjustment template 7, the adjustment template 7 and described are provided between the middle part of two cross-arms 2
Pre-embedded anchoring bolts hole 8 is correspondingly offered on cross-arm 2, spacing can be designed not according to collector bracket pre-embedded anchoring bolts
Together, it is pre-buried come the size for determining the length of cross-arm and adjusting pre-embedded anchoring bolts hole 8 in template 7 (using mach method)
Anchor (bolt) hole 8 uses mach method, first finds out center line in length and breadth and midpoint on adjustment template, is then rushed using sample
Pound out sample dotting punch, convenient adjustment.
With reference to figure 1, in the present embodiment, the elevation location device 5 is two and is sheathed on the regulation screw mandrel 4 and respectively
Location nut 51 at the upper and lower surface of the cross-arm 2, prevent from adjusting existing after screw mandrel supports by location nut and rock.
Referring again to Fig. 1, in the present embodiment, the locking bracing means 6 include being arranged on the support base 4 and with it is described
The adapter sleeve 61 of the bottom socket of screw mandrel 3 is adjusted, is connected in the side wall of the adapter sleeve 61 and is provided with lock sleeve 62, the lock sleeve
Puller bolt 63 is equipped with 62, after regulation screw mandrel 4 inserts adapter sleeve 61, is held out against by puller bolt 63, prevents screw mandrel
Displacement.
, so can be with addition, adjustment template and the cross-arm preferably by rivet, forbids use to be welded to connect
Pre- anti-welding deformation, avoid adjusting template top and bottom injustice and influenceing installation accuracy.
With reference to figure 3, during pre-embedded anchoring bolts, the bearing height of cross-arm 2 is adjusted by adjusting screw mandrel 4, so as to adjust
The height of pre-embedded anchoring bolts 1, realize that the pre-buried precision of pre-embedded anchoring bolts 1 positions by adjusting template 7, not only adjust, be fixed
Position is quick and convenient, can effectively control installation quality, and the present apparatus can recycle, beneficial in artificial, material, machinery etc.
Aspect saves resource, beneficial to saving construction cost and improves efficiency of construction.
The schematical embodiment of the utility model is the foregoing is only, is not limited to model of the present utility model
Enclose.Any those skilled in the art, the made equivalent change on the premise of design of the present utility model and principle is not departed from
Change and change, the scope of the utility model protection all should be belonged to.
Claims (5)
1. pre-embedded anchoring bolts adjustment, fixing device for installing, adjustment and installation for pre-embedded anchoring bolts, it is characterised in that:
Including two cross-arms be arrangeding in parallel, the both ends of the cross-arm are separately provided for adjusting the regulation screw mandrel of elevation, the tune
The bottom of section screw mandrel is provided with support base;Elevation location device, the tune are provided between the regulation screw mandrel and the cross-arm
Locking bracing means is provided between section screw mandrel and the support base;Adjustment mould is provided between the middle part of two cross-arms
Plate, described adjust correspondingly offer pre-embedded anchoring bolts hole on template and the cross-arm.
2. pre-embedded anchoring bolts adjustment as claimed in claim 1, fixing device for installing, it is characterised in that:The elevation location
Device is two and is sheathed on the location nut being located on the regulation screw mandrel and respectively at the upper and lower surface of the cross-arm.
3. pre-embedded anchoring bolts adjustment as claimed in claim 1, fixing device for installing, it is characterised in that:The locking is reinforced
The adapter sleeve that device includes being arranged on the support base and is socketed with the bottom for adjusting screw mandrel, the side wall of the adapter sleeve
Upper connection is provided with lock sleeve, and puller bolt is equipped with the lock sleeve.
4. pre-embedded anchoring bolts adjustment as claimed in claim 1, fixing device for installing, it is characterised in that:The adjustment template
With the cross-arm riveting.
5. the pre-embedded anchoring bolts adjustment as described in any one of Claims 1-4, fixing device for installing, it is characterised in that:It is described
The top of regulation screw mandrel is provided with screw on nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720844214.6U CN206889981U (en) | 2017-07-12 | 2017-07-12 | Pre-embedded anchoring bolts adjustment, fixing device for installing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720844214.6U CN206889981U (en) | 2017-07-12 | 2017-07-12 | Pre-embedded anchoring bolts adjustment, fixing device for installing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206889981U true CN206889981U (en) | 2018-01-16 |
Family
ID=61297093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720844214.6U Active CN206889981U (en) | 2017-07-12 | 2017-07-12 | Pre-embedded anchoring bolts adjustment, fixing device for installing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206889981U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643220A (en) * | 2018-06-29 | 2018-10-12 | 中铁十四局集团第四工程有限公司 | A kind of contact net basic foundation bolt positioning device |
CN112663651A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool suitable for assembled building embedded part |
CN112663658A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool for embedded part of assembly type building |
-
2017
- 2017-07-12 CN CN201720844214.6U patent/CN206889981U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643220A (en) * | 2018-06-29 | 2018-10-12 | 中铁十四局集团第四工程有限公司 | A kind of contact net basic foundation bolt positioning device |
CN112663651A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool suitable for assembled building embedded part |
CN112663658A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool for embedded part of assembly type building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206889981U (en) | Pre-embedded anchoring bolts adjustment, fixing device for installing | |
CN104141318B (en) | A kind of Large-diameter Steel tubing string suspension column construction method of installation | |
CN104631338B (en) | A kind of steel lifted trunk and positioning construction method | |
CN206581626U (en) | A kind of adjustable assembled supporting construction | |
CN204001428U (en) | A kind of Large-diameter Steel tubing string suspension column is installed pre-buried location structure and suspension column structure thereof | |
CN108999208A (en) | A kind of blower foundation anchor component construction method of installation | |
CN103031892B (en) | Steel truss brace and manufacturing method for steel truss platform | |
CN203096756U (en) | Fan base grouting construction structure with high-strength grouting materials | |
CN104594317A (en) | Working platform, single pile foundation, offshore working platform and installing method of offshore working platform | |
CN215055273U (en) | A assembled template for installing support bracket embedded box | |
CN206530077U (en) | A kind of support frame | |
CN208603629U (en) | A kind of fixed device of basis installation of embedded parts | |
CN210122761U (en) | Super high-rise steel pipe concrete column base | |
CN114075871A (en) | Triangular overhanging support base for slip form | |
CN203008232U (en) | Steel truss strut | |
CN102352607A (en) | Full water stopping side wall template system | |
CN216840636U (en) | Building engineering template strutting arrangement | |
CN201548085U (en) | Support frame for condensing device | |
CN219298831U (en) | Positioning device convenient to adjust and used for installing inclined column steel structure | |
CN219910056U (en) | Rod piece foundation error correction structure | |
CN216516828U (en) | Triangular overhanging support base for slip form | |
CN220080090U (en) | Cantilever type retaining wall shaping die carrier structure | |
CN210724638U (en) | Device convenient to solar panel roof installation | |
CN110468871B (en) | Transformer foundation stepless height-adjusting steel support and construction process thereof | |
CN220976393U (en) | Pre-buried assembly for tower crane, tower body and tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250102 Hanyu Jingu A3-3 Building, Jinan High-tech Zone, Shandong Province Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250102 Hanyu Jingu A3-3 Building, Jinan High-tech Zone, Shandong Province Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. |
|
CP01 | Change in the name or title of a patent holder |