CN206888496U - A kind of overhanging scaffold embedded part structure - Google Patents

A kind of overhanging scaffold embedded part structure Download PDF

Info

Publication number
CN206888496U
CN206888496U CN201720330564.0U CN201720330564U CN206888496U CN 206888496 U CN206888496 U CN 206888496U CN 201720330564 U CN201720330564 U CN 201720330564U CN 206888496 U CN206888496 U CN 206888496U
Authority
CN
China
Prior art keywords
girder steel
shaped board
part structure
embedded part
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720330564.0U
Other languages
Chinese (zh)
Inventor
吴书义
朱思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN201720330564.0U priority Critical patent/CN206888496U/en
Application granted granted Critical
Publication of CN206888496U publication Critical patent/CN206888496U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to assembly for scaffold field, a kind of more particularly to overhanging scaffold embedded part structure, including U-shaped board, connecting plate, girder steel I and girder steel II, the both ends of the girder steel I and girder steel II are respectively equipped with connecting plate, girder steel I is bolted with girder steel II, U-shaped board is provided between two girder steels I, U-shaped board also is provided between two girder steels II, groove is provided among the girder steel I and girder steel II, both ends are respectively equipped with anchor (bolt) hole, and described girder steel I, girder steel II and U-shaped board are bolted the isosceles triangle shape of composition closure respectively;Whole embedded part structure is connected by foundation bolt with floor, and counterweight is pressed with embedded part structure, and counterweight is arranged in the groove of girder steel I and girder steel II;The utility model advantage is contact area by increasing built-in fitting and floor and using counterweight, and both combine the stability for enhancing built-in fitting, more stable basis is provided to scaffold, adds load capacity, eliminates potential safety hazard.

Description

A kind of overhanging scaffold embedded part structure
Technical field
It the utility model is related to assembly for scaffold field, more particularly to a kind of overhanging scaffold embedded part structure.
Background technology
With the construction of increasing high-rise, overhanging scaffold is compared to traditional console mode scaffold in height The architectural application of layer has the advantages of more, saves lot of materials and time, therefore the application of overhanging scaffold is also got over Come wider, but overhanging scaffold generally requires the scaffold basis more stablized when in use due to hanging.
Chinese Application No.:201610627625.X patent disclose a kind of superimposed sheet builder's jack I-steel can week Turn built-in fitting, the superimposed sheet builder's jack I-steel can have enough to meet the need built-in fitting and is mainly made up of built-in fitting, fastener and backing plate. The built-in fitting is highly useful when needing the scaffold that sets up not high or needing the weight that carries little, but with building more Come it is higher, it is necessary to load capacity it is also increasing in the case of, such a built-in fitting after a long time use, its pre-buried lower margin spiral shell Crack often occurs at bolt, causes building also crack do not occur using then floor, the situation of quality dissatisfaction, and once Security incident occur, then injures and deaths are huge, therefore this built-in fitting can not provide reliable scaffold basis.
Utility model content
The situation for cracks on floor slab occur and safe and reliable scaffold basis can not being provided is used for above-mentioned built-in fitting, this Utility model provides a kind of overhanging scaffold embedded part structure, by the contact area and the use that increase built-in fitting and floor Counterweight, both combine the stability for enhancing built-in fitting, more stable basis are provided to scaffold, add carrying weight Amount, eliminates potential safety hazard.
The utility model is realized by following technology:A kind of overhanging scaffold embedded part structure, including U-shaped board, Connecting plate, girder steel I and girder steel II, the both ends of the girder steel I and girder steel II are respectively equipped with connecting plate, and girder steel I passes through with girder steel II Bolt connection, U-shaped board is provided between two girder steels I, also is provided with U-shaped board between two girder steels II, in the girder steel I and girder steel II Between be provided with groove, both ends are respectively equipped with anchor (bolt) hole, and described girder steel I, girder steel II and U-shaped board are bolted group respectively Into the isosceles triangle shape of closure;Whole embedded part structure is connected by foundation bolt with floor, is pressed with embedded part structure Counterweight, counterweight are arranged in the groove of girder steel I and girder steel II.
Further, the U-shaped board bottom is provided with bolt hole, bolt is inserted in bolt hole, the crown of bolt one is in work On word steel, the I-steel of various height, the girder steel I and the groove location on girder steel II of U-shaped board the same side are more easily fixed In the same horizontal line.
Further, the bottom of described U-shaped board, connecting plate, girder steel I and girder steel II is in same horizontal line.
Further, the girder steel is reinforced beam or ladle beams of concrete.The outer layer of ladle beams of concrete structure For steel case, steel case inside filling concrete.
Further, the counterweight is cement block, reinforced concrete block or iron block.
The utility model is compared with prior art:
A kind of overhanging scaffold embedded part structure described in the utility model, by outside I-steel set U-shaped board, The parts such as connecting plate, girder steel I and girder steel II increase the contact area of built-in fitting and floor, in addition on girder steel I and girder steel II Counterweight is set, and both combine the stability for enhancing built-in fitting, add load capacity, and the setting height(from bottom) for scaffold of contributing carries More stable base has been supplied, has avoided and occurs crack at the foundation bolt of floor, has eliminated potential safety hazard, has been worthy to be popularized.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the scheme of installation of the utility model embodiment one;
Fig. 3 is the structural representation of girder steel I in embodiment one;
Fig. 4 is the structural representation of girder steel II in embodiment one;
Fig. 5 is the structural representation of the utility model embodiment two.
In figure, 1, U-shaped board, 2, girder steel I, 3, girder steel II, 4, connecting plate, 5, I-steel, 6, counterweight.
Embodiment
The present embodiment, which is, to be further illustrated, it is necessary to which explanation is to the utility model with embodiment below in conjunction with the accompanying drawings Descriptive, it is not limited, it is impossible to thus limit the scope of protection of the utility model.
Embodiment one
As Figure 1-4:
A kind of overhanging scaffold embedded part structure that the utility model uses, including U-shaped board 1, connecting plate 4, girder steel I 2 With girder steel II 3, the both ends of the girder steel I and girder steel II are respectively equipped with connecting plate, and girder steel I is bolted with girder steel II, and two U-shaped board is provided between individual girder steel I, U-shaped board also is provided between two girder steels II, groove is provided among the girder steel I and girder steel II, Both ends are respectively equipped with anchor (bolt) hole, described girder steel I, girder steel II and U-shaped board be bolted respectively composition closure etc. Lumbar triangle shape shape;Whole embedded part structure is connected by foundation bolt with floor, and counterweight 6, counterweight are pressed with embedded part structure In the groove of girder steel I and girder steel II.
Preferably, the U-shaped board bottom is provided with bolt hole, bolt is inserted in bolt hole, the crown of bolt one is in I-shaped On steel, the I-steel 5 of various height is more easily fixed, the girder steel I and the groove location on girder steel II of U-shaped board the same side exist In same horizontal line.
Preferably, the bottom of described U-shaped board, connecting plate, girder steel I and girder steel II is in same horizontal line.
Preferably, the girder steel is reinforced beam or ladle beams of concrete.The outer layer of ladle beams of concrete structure is Steel case, steel case inside filling concrete.
Preferably, the counterweight is cement block, reinforced concrete block or iron block.
The above-mentioned all prefabricated components of component, when mounted, first by U-shaped board, girder steel I and girder steel II, connected by bolt Be connected together the isosceles triangle shape that composition is closed, and I-steel is fixed in the groove of U-shaped board by regulating bolt afterwards, The embedded part structure assembled is fixed on floor by default foundation bolt, counterweight is finally arranged on girder steel I and steel In the groove of beam II, embedded part structure installation.
Embodiment two
As shown in Figure 5:
Preferably, described girder steel I, girder steel II and U-shaped board are bolted the rectangular shape of composition closure respectively.Its It is the same as embodiment one.
It should be pointed out that for those skilled in the art, before the utility model principle is not departed from Put, some improvement can also be made, these improvement also should be regarded as the scope of protection of the utility model;It is unknown in present embodiment The available prior art of true each part is realized.

Claims (4)

  1. A kind of 1. overhanging scaffold embedded part structure, it is characterised in that including U-shaped board (1), connecting plate (4), girder steel I (2) and The both ends of girder steel II (3), the girder steel I (2) and girder steel II (3) are respectively equipped with connecting plate (4), girder steel I (2) and girder steel II (3) It is bolted, U-shaped board (1) is provided between two girder steels I (2), U-shaped board (1), institute also are provided between two girder steels II (3) State and be provided with groove among girder steel I (2) and girder steel II (3), both ends are respectively equipped with anchor (bolt) hole, described girder steel I (2), girder steel II (3) and U-shaped board (1) are bolted the isosceles triangle shape of composition closure respectively;Whole embedded part structure passes through ground Foot bolt is connected with floor, is pressed with counterweight (6) on embedded part structure, and counterweight (6) is arranged on the recessed of girder steel I (2) and girder steel II (3) In groove.
  2. A kind of 2. overhanging scaffold embedded part structure according to claim 1, it is characterised in that U-shaped board (1) bottom Portion is provided with bolt hole, the girder steel I (2) of U-shaped board (1) the same side with the groove location on girder steel II (3) in the same horizontal line.
  3. A kind of 3. overhanging scaffold embedded part structure according to claim 1, it is characterised in that the girder steel I (2) with Girder steel II (3) is reinforced beam or ladle beams of concrete.
  4. 4. a kind of overhanging scaffold embedded part structure according to claim 1, it is characterised in that the counterweight (6) is water Clod, reinforced concrete block or iron block.
CN201720330564.0U 2017-03-31 2017-03-31 A kind of overhanging scaffold embedded part structure Expired - Fee Related CN206888496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720330564.0U CN206888496U (en) 2017-03-31 2017-03-31 A kind of overhanging scaffold embedded part structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720330564.0U CN206888496U (en) 2017-03-31 2017-03-31 A kind of overhanging scaffold embedded part structure

Publications (1)

Publication Number Publication Date
CN206888496U true CN206888496U (en) 2018-01-16

Family

ID=61327379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720330564.0U Expired - Fee Related CN206888496U (en) 2017-03-31 2017-03-31 A kind of overhanging scaffold embedded part structure

Country Status (1)

Country Link
CN (1) CN206888496U (en)

Similar Documents

Publication Publication Date Title
CN109629810A (en) Closed builder's jack system and construction method
CN108331158A (en) A kind of joint connection in site method of precast reinforced concrete beam column
CN105781099A (en) Movable combined type one-sided large template structure and construction method thereof
CN104264594B (en) A kind of self-balancing tied arch system for improving PSC continuous box girder bridge bearing ability and the method using it to reinforce
CN105715068B (en) Existing brick mix structure shock isolating pedestal underpinning structure and its construction method
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN105862597B (en) A kind of multiple-piece composite beam bridge top and the bottom monolithic construction construction method
CN106088657A (en) The ruggedized construction of a kind of rowlock wall body and construction method thereof
CN107882234A (en) A kind of connecting node between the vertical member and floor of plate-column structure
CN108060789A (en) A kind of wall support and change method of existing masonry structure base isolation reinforcement
CN201254731Y (en) Steel cross beam type dismountable stupa base
CN208235575U (en) A kind of assembly concrete retaining wall having enough to meet the need
CN106499211B (en) Newly-increased outrigger frame Baogang anchor daraf(reciprocal of farad) structure
CN206888496U (en) A kind of overhanging scaffold embedded part structure
CN203924656U (en) A kind of high-altitude overlength cable-stayed type shaped steel job platform structure
CN208965581U (en) A kind of non-console mode tower crane platform
CN208830464U (en) A kind of girder steel and concrete small column rigid joint
CN102888855A (en) Combined balance weight retaining wall
CN109356190A (en) A kind of lattice column piers and abutments concrete tower crane foundation and its construction method
CN205669166U (en) A kind of cable-stayed bridge main-beam section structure using rotator construction
CN209369359U (en) A kind of material distributing machine and steel platform connection structure of climbing
CN211523761U (en) Ribbed light steel beam with novel connection mode
CN206591803U (en) A kind of overhanging scaffold supporting construction
CN206667082U (en) A kind of steel box-girder splice plate more changing device
CN209353365U (en) A kind of lattice column piers and abutments concrete tower crane foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20190331