CN206887934U - Pin diaphram wall is hung in a kind of deep light weathered granite - Google Patents

Pin diaphram wall is hung in a kind of deep light weathered granite Download PDF

Info

Publication number
CN206887934U
CN206887934U CN201720480114.XU CN201720480114U CN206887934U CN 206887934 U CN206887934 U CN 206887934U CN 201720480114 U CN201720480114 U CN 201720480114U CN 206887934 U CN206887934 U CN 206887934U
Authority
CN
China
Prior art keywords
wall
diaphram wall
rock stratum
diaphram
steel bushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720480114.XU
Other languages
Chinese (zh)
Inventor
梁永国
赵鑫
殷文博
张堪培
李小破
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Sui Foundation Engineering Co
Original Assignee
Guangdong Sui Foundation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Sui Foundation Engineering Co filed Critical Guangdong Sui Foundation Engineering Co
Priority to CN201720480114.XU priority Critical patent/CN206887934U/en
Application granted granted Critical
Publication of CN206887934U publication Critical patent/CN206887934U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses hang pin diaphram wall in a kind of deep light weathered granite,Including the diaphram wall wall being arranged on above rock stratum,The reinforced anchor bolt of multiple bottom insertion rock stratum preset distances is interval with the underground continuous wall body,Outside the reinforced anchor bolt steel bushing is cased with rock stratum,The steel bushing is in underground continuous wall body,Hung in this deep light weathered granite in pin diaphram wall,Steel bushing and reinforced anchor bolt are set in diaphram wall,Strengthen connection and the globality of wall,And,The embedded rock stratum certain depth of reinforced anchor bolt,On the premise of ensureing diaphram wall body as supporting construction,Diaphram wall body is avoided to be embedded in rock stratum,Because diaphram wall need not enter rock,So as to save the duration,Save punching cost,Reduce mechanical loss,Reduce punching and enter influence of the rock to periphery.

Description

Pin diaphram wall is hung in a kind of deep light weathered granite
Technical field
Diaphragm Wall field is the utility model is related to, in more particularly to a kind of deep light weathered granite with hanging pin Lower diaphragm wall.
Background technology
Diaphram wall makees the building enclosure of deep basal pit, have construction when it is with small vibration, noise is low, take up an area less, wall stiffness Greatly, the advantages that barrier performance is good, it is used widely in underground support engineering.
In continuous wall trench underground work progress, when rock stratum is shallower, when encountering the sials such as gentle breeze, it is difficult to kata-rocks Stone, cause construction speed slow, the problems such as serious is lost in equipment.It is commonly designed that to require that diaphragm wall has below foundation ditch bottom certain Building-in depth, cause wall bottom enter rock depth big, reinforcing bar and concrete amount be big, pore-forming card hammer frequently, perpendicularity deviation it is larger, into The problems such as this is high, long in time limit.
Utility model content
Technical problem to be solved in the utility model is to provide that a kind of to construct that convenient, cost is low, stability is strong deep Pin diaphram wall is hung in light weathered granite.
Technical scheme used by solve above-mentioned technical problem:It is continuous that pin underground is hung in a kind of deep light weathered granite Wall, including the diaphram wall wall above rock stratum is arranged on, it is interval with multiple bottoms in the underground continuous wall body The reinforced anchor bolt of embedded rock stratum preset distance, it is located at outside the reinforced anchor bolt on rock stratum and is cased with steel bushing, at the steel bushing In in underground continuous wall body.
Further, with being flushed at the top of diaphram wall wall at the top of the steel bushing.
Further, the reinforced anchor bolt top is higher than rock stratum at least 2m.
Further, the foundation in the diaphram wall wall is provided with the prestressed anchor of the embedded soil body and soil nailing sprays anchor Go along with sb. to guard him.
Beneficial effect:Hung in this deep light weathered granite in pin diaphram wall, steel bushing is set in diaphram wall And reinforced anchor bolt, connection and the globality of wall are strengthened, moreover, reinforced anchor bolt is embedded in rock stratum certain depth, is ensureing underground On the premise of continuous wall is as supporting construction, diaphram wall body is avoided to be embedded in rock stratum, because diaphram wall need not enter rock, So as to save the duration, save punching cost, reduce mechanical loss, reduce punching and enter influence of the rock to periphery.
Brief description of the drawings
The utility model is described further with reference to the accompanying drawings and examples;
Fig. 1 is the side view of the utility model embodiment;
Fig. 2 is the top view of the utility model embodiment.
Embodiment
Referring to Figures 1 and 2, pin diaphram wall is hung in a kind of deep light weathered granite of the utility model, including is set Diaphram wall wall 1 above rock stratum, multiple bottom insertion pre- spacings in rock stratum are interval with diaphram wall wall 1 From reinforced anchor bolt 3, the top of reinforced anchor bolt 3 is higher than rock stratum at least 2m, and steel bushing is cased with rock stratum outside reinforced anchor bolt 3 2, steel bushing 2 is in diaphram wall wall 1, and the top of steel bushing 2 flushes with the top of diaphram wall wall 1.
Wherein, due to setting steel bushing 2 and reinforced anchor bolt 3 in diaphram wall wall 1, the connection of wall and whole is strengthened Body, moreover, the embedded rock stratum certain depth of reinforced anchor bolt 3, is ensureing premise of the diaphram wall wall 1 as supporting construction Under, avoid diaphram wall wall 1 from being embedded in rock stratum, moreover, reinforced anchor bolt 3 plays a part of shearing the tip, increase diaphram wall Overall endurance and stiffness, improve the stability of diaphram wall.
Preferably, diaphram wall foundation is provided with the prestressed anchor 4 of the embedded soil body and the soil nailing spray anchor of embedded rock stratum 5 are gone along with sb. to guard him, prestressed anchor 4 and soil nailing spray anchor go along with sb. to guard him 5 effects for possessing protection underground continuous wall body 1, make diaphram wall Structure remained stable, risk caused by due to hanging pin is reduced, while extend groundwater seepage path, play sealing effect.
Embodiment of the present utility model is explained in detail above in conjunction with accompanying drawing, but the utility model is not limited to Embodiment is stated, in the technical field those of ordinary skill possessed knowledge, this practicality can also not departed from Various changes can be made on the premise of new objective.

Claims (4)

1. hang pin diaphram wall in a kind of deep light weathered granite, it is characterised in that:Including the ground being arranged on above rock stratum Lower diaphragm wall wall, the reinforcing bar anchor of multiple bottom insertion rock stratum preset distances is interval with the underground continuous wall body Bar, steel bushing is cased with rock stratum outside the reinforced anchor bolt, the steel bushing is in underground continuous wall body.
2. hang pin diaphram wall in deep light weathered granite according to claim 1, it is characterised in that:The steel bushing Cylinder top at the top of diaphram wall wall with flushing.
3. hang pin diaphram wall in deep light weathered granite according to claim 1, it is characterised in that:The reinforcing bar Anchor pole top is higher than rock stratum at least 2m.
4. hang pin diaphram wall in deep light weathered granite according to claim 1, it is characterised in that:Described The foundation of lower diaphragm wall wall is provided with the prestressed anchor of the embedded soil body and soil nailing spray anchor is gone along with sb. to guard him.
CN201720480114.XU 2017-05-02 2017-05-02 Pin diaphram wall is hung in a kind of deep light weathered granite Expired - Fee Related CN206887934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720480114.XU CN206887934U (en) 2017-05-02 2017-05-02 Pin diaphram wall is hung in a kind of deep light weathered granite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720480114.XU CN206887934U (en) 2017-05-02 2017-05-02 Pin diaphram wall is hung in a kind of deep light weathered granite

Publications (1)

Publication Number Publication Date
CN206887934U true CN206887934U (en) 2018-01-16

Family

ID=61340821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720480114.XU Expired - Fee Related CN206887934U (en) 2017-05-02 2017-05-02 Pin diaphram wall is hung in a kind of deep light weathered granite

Country Status (1)

Country Link
CN (1) CN206887934U (en)

Similar Documents

Publication Publication Date Title
CN202323962U (en) Composite supporting structure of drainage pipe pile and soil nailing wall
CN105155548A (en) Cable double-row pile (wall) supporting structure
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN206887934U (en) Pin diaphram wall is hung in a kind of deep light weathered granite
CN202090352U (en) Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods
CN205188976U (en) Drag -line double row pile supporting construction
CN204827213U (en) Double dynamical head digs rig soon
CN203905044U (en) Overhead deep foundation pit crossing construction elevator beam plate type base structure
CN206015511U (en) One implant post steel pipe column
CN202543946U (en) Supporting structure for drainage type fender posts in soft soil area
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN204646109U (en) Circular bore expands drill with ferrule tool
CN204456182U (en) Vertical anchorage pile retaining wall
CN209323528U (en) A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure
CN203924043U (en) A kind of bamboo concrete stake
CN204738326U (en) Dam foundation abrupt slope position fault replacement structure
CN202298627U (en) Foundation pit supporting structure
CN102677679A (en) Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN201172826Y (en) Deep base pit enclosure wall earth-blocking reinforced structure
CN206693248U (en) A kind of slope retaining structure in interim middle-size and small-size landslide control engineering
CN205171540U (en) A stock combination rock foundation builds in for transmission tower
CN204728341U (en) The circular deep foundation ditch space enclosing structure of a kind of discreteness pile body supporting
CN219508614U (en) Slope protection net and slope fixing mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116