CN206879484U - Orange collection support frame - Google Patents

Orange collection support frame Download PDF

Info

Publication number
CN206879484U
CN206879484U CN201720238661.7U CN201720238661U CN206879484U CN 206879484 U CN206879484 U CN 206879484U CN 201720238661 U CN201720238661 U CN 201720238661U CN 206879484 U CN206879484 U CN 206879484U
Authority
CN
China
Prior art keywords
orange
support frame
large bamboo
wicker basket
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720238661.7U
Other languages
Chinese (zh)
Inventor
姜喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beaming With Joy Huaning County Fruit And Vegetable Farmer Cooperatives
Original Assignee
Beaming With Joy Huaning County Fruit And Vegetable Farmer Cooperatives
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beaming With Joy Huaning County Fruit And Vegetable Farmer Cooperatives filed Critical Beaming With Joy Huaning County Fruit And Vegetable Farmer Cooperatives
Priority to CN201720238661.7U priority Critical patent/CN206879484U/en
Application granted granted Critical
Publication of CN206879484U publication Critical patent/CN206879484U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model provides a kind of orange collection support frame, belong to fruit picking technical field, including carrier, elevating mechanism and large bamboo or wicker basket, carrier includes two subframes being oppositely arranged, the top of two subframes is hinged, and subframe includes two main framings being oppositely arranged and the more connecting rods between two main framings.Elevating mechanism includes the first hydraulic jack, slide rail and pulley, and chute is provided with main framing, and the cylinder body of the first hydraulic jack is arranged on subframe.The First piston bar of first hydraulic jack is arranged on slide rail, and slide rail is provided with pulley, and slide rail is located in chute, and pulley is walked in chute.Large bamboo or wicker basket is arranged on slide rail, and the opening of large bamboo or wicker basket is towards the top of carrier.Orange collection support frame simple operation in use, operator can be easy to operate during harvesting close to the orange on orange tree using carrier, the orange of harvesting is directly placed into large bamboo or wicker basket, it is convenient to place, and does not need operator to climb tree, and reduces danger.

Description

Orange collection support frame
Technical field
Fruit picking technical field is the utility model is related to, in particular to a kind of orange collection support frame.
Background technology
During existing orange maturation, general to be plucked using artificial climb on tree, such Softening is not easy time-consuming Arduously, efficiency is low, meanwhile, the dangerous situation that picker drops from tree also easily occurs, security is poor.Often climb on tree and carry out The harvesting of orange, it is also possible to cause the damage to trees, influence the growth of trees.
Utility model content
The purpose of this utility model is to provide a kind of orange collection support frame, time-consuming with the orange harvesting for improving traditional Arduously, the problem of security difference.
What embodiment of the present utility model was realized in:
Based on above-mentioned first purpose, the utility model provides a kind of orange collection support frame, including carrier, lifting Mechanism and large bamboo or wicker basket, the carrier include two subframes being oppositely arranged, and the top of two subframes is hinged, Mei Gesuo Stating subframe includes two main framings being oppositely arranged and the more connecting rods between two main framings, described in every Connecting rod is fixedly connected with two main framings;The elevating mechanism includes the first hydraulic jack, slide rail and pulley, described It is provided with chute on main framing, the length direction extension of the length direction of the chute along the main framing, first hydraulic pressure The cylinder body of oil cylinder is arranged on the subframe, and the First piston bar of first hydraulic jack is arranged on the slide rail, described The pulley is provided with slide rail, the slide rail is located in the chute, and the pulley is walked in the chute, and described One piston rod stretching motion drives length direction of the slide rail along the chute to move back and forth, and the large bamboo or wicker basket is arranged on the cunning On rail, the opening of the large bamboo or wicker basket is towards the top of the carrier.
In the utility model preferred embodiment, the large bamboo or wicker basket is provided with two, and two large bamboo or wicker baskets are separately mounted to On two subframes, and each large bamboo or wicker basket is located at the outside of the corresponding subframe.
In the utility model preferred embodiment, the orange collection also includes connection component, the company with support frame Connected components include fix bar and the second hydraulic jack, and one end of the fix bar is arranged in the connecting rod, its other end The bottom of the large bamboo or wicker basket is hinged on, second hydraulic jack is arranged on the subframe, and the second of second hydraulic jack Piston rod is hinged on the bottom of the large bamboo or wicker basket, and the second piston bar stretching motion drives the large bamboo or wicker basket past around the fix bar Physical pendulum moves.
In the utility model preferred embodiment, the fix bar is provided with two, and two fix bars are along institute The length direction for stating connecting rod is arranged at intervals, and the second piston bar is between two fix bars, and the close square-bottomed bamboo basket The side of the remote subframe of basket.
In the utility model preferred embodiment, the connecting rod is arranged to cylindrical rod, the outer peripheral face of the connecting rod It is provided with anti-slip veins.
In the utility model preferred embodiment, the cross sectional shape perpendicular to its length direction of the connecting rod is square Shape, the anti-slip veins are provided with least one rectangle sides of the connecting rod.
In the utility model preferred embodiment, the anti-slip veins include a plurality of groove being staggered.
In the utility model preferred embodiment, the orange collection also includes walking wheel assembly with support frame, described Wheel assembly of walking is arranged on the bottom of two subframes.
The beneficial effect of the utility model embodiment is:
In summary, the utility model embodiment provides a kind of orange collection support frame, and its is simple and reasonable, just Process, installed with easy to use in manufacture, meanwhile, orange collection support frame simple operation in use, operator Can be easy to operate during harvesting close to the orange on orange tree using carrier, the orange of harvesting is directly placed into large bamboo or wicker basket, put Put conveniently, and do not need operator to climb tree, reduce danger.It is specific as follows:
The orange collection support frame that the present embodiment provides, including carrier and large bamboo or wicker basket, large bamboo or wicker basket is arranged on carrier, During use, after carrier is placed on into correct position, that is, need below the orange tree plucked, then, operator is by holding Carrier realizes load-bearing and keeps balancing, and the harvesting of orange is carried out on carrier, the orange that harvesting is completed is put into large bamboo or wicker basket, whole It is easy to operate during individual, it is not necessary to orange tree is climbed up, more time saving and energy saving, efficiency high, and be not susceptible to from carrier On situation about dropping, do not climb up trees, trees will not be damaged.Carrier includes two subframes, and two subframes are hinged, can Relatively rotate, and then be easy to more actual conditions adjustment position, operation is more flexible, and picking process is more convenient.Orange In gatherer process, the height of large bamboo or wicker basket can be adjusted on demand, that is, controls elevating mechanism to realize the adjustment of large bamboo or wicker basket position, and large bamboo or wicker basket can be with Rise or decline, operation flexibly and fast, and after orange harvesting, can control elevating mechanism to drive large bamboo or wicker basket to decline, be easy to The taking-up of orange in large bamboo or wicker basket.
Brief description of the drawings
Fig. 1 is the structural representation of the orange collection support frame of the utility model embodiment;
Fig. 2 is the distressed structure schematic diagram of the orange collection support frame of the utility model embodiment;
Fig. 3 is the structural representation of the subframe of the orange collection support frame of the utility model embodiment;
Fig. 4 is the structural representation of the connecting rod of the orange collection support frame of the utility model embodiment;
Fig. 5 be the utility model embodiment orange collection support frame slide rail and main framing attachment structure section view Figure.
Icon:Carrier 100;Subframe 110;Main framing 111;Connecting rod 112;Anti-slip veins 113;Chute 114;Large bamboo or wicker basket 200; Connection component 300;Fix bar 310;Second hydraulic jack 320;Walking wheel assembly 400;Elevating mechanism 500;First hydraulic jack 510;First piston bar 511;Slide rail 520;Pulley 530.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, it is with reference to embodiments and attached The utility model is specifically described figure, it is necessary to, it is noted that following examples are used only for carrying out the utility model Explanation and illustration, it is not used to limit the utility model.Made according to the above some non-of those skilled in the art The modifications and adaptations of matter, still fall within the scope of protection of the utility model.
In description of the present utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, Or it is integrally connected;Can be mechanical connection or electrical connection;Can be joined directly together, intermediary can also be passed through It is indirectly connected, can is the connection of two element internals.For the ordinary skill in the art, can be managed with concrete condition Solve concrete meaning of the above-mentioned term in the utility model.
Fig. 1-Fig. 5 is referred to, present embodiments provides a kind of orange collection support frame, operator can stand or sit The harvesting of orange is completed on carrier 100, it is easy to operate, securely and reliably.
Orange collection support frame, including carrier 100 and large bamboo or wicker basket 200, carrier 100 include two be oppositely arranged Individual subframe 110, the top of two subframes 110 are hinged, and each subframe 110 includes two main framings 111 and the position being oppositely arranged The more connecting rods 112 between two main framings 111, every connecting rod 112 are fixedly connected with two main framings 111;Lifting Mechanism 500 includes the first hydraulic jack 510, slide rail 520 and pulley 530, and chute 114, chute 114 are provided with main framing 11 Length direction extension of the length direction along main framing 111, the cylinder body of the first hydraulic jack 510 is arranged on subframe 110, first The First piston bar 511 of hydraulic jack 510 is arranged on slide rail 520, pulley 530 is provided with slide rail 520, slide rail 520 is located at In chute 114, and pulley 530 is walked in chute 114, and the stretching motion of First piston bar 511 drives slide rail 520 along chute 114 Length direction move back and forth, large bamboo or wicker basket 200 is arranged on slide rail 520, and the opening of large bamboo or wicker basket 200 is towards the top of carrier 100.
The orange collection support frame that the present embodiment provides, includes carrier 100 and large bamboo or wicker basket 200, large bamboo or wicker basket 200 is arranged on On carrier 100, during use, after carrier 100 is placed on into correct position, that is, need below the orange tree plucked, so Afterwards, operator realizes load-bearing by carrier 100 and keeps balancing, and the harvesting of orange is carried out on carrier 100, will have been plucked Into orange be put into large bamboo or wicker basket 200, it is easy to operate in whole process, it is not necessary to climb up orange tree, it is more time saving and energy saving, effect Rate is high, and is not susceptible to situation about being dropped from carrier 100, does not climb up trees, will not damage trees.Carrier 100 wraps Two subframes 110 are included, two subframes 110 are be hinged, can relatively rotate, and then are easy to more actual conditions adjustment position, grasp Work is more flexible, and picking process is more convenient.In orange gatherer process, the height of large bamboo or wicker basket 200 can be adjusted on demand, that is, is controlled Elevating mechanism 500 processed realizes the adjustment of the position of large bamboo or wicker basket 200, and large bamboo or wicker basket 200 can rise or decline, operation flexibly and fast, and After orange is plucked, elevating mechanism 500 can be controlled to drive large bamboo or wicker basket 200 to decline, be easy to the taking-up of orange in large bamboo or wicker basket 200.
In order to improve the cooperation fastness of slide rail 520 and chute 114, referring to Fig. 5, it is T-shaped that chute 114, which is arranged to section, Slot structure, meanwhile, the cross section of slide rail 520 is in the T-shaped structure being engaged with T-slot.
During actual processing, large bamboo or wicker basket 200 is provided with two, and two large bamboo or wicker baskets 200 are separately mounted on two subframes 110, and often Individual large bamboo or wicker basket 200 is located at the outside of corresponding subframe 110, is easy to people that orange is placed in different large bamboo or wicker baskets 200 after plucking orange It is interior and selectively big during operation, more flexibly.
Be preferably arranged to after the completion of orange harvesting, it is necessary to be collected processing to orange, orange collection with support frame also Including connection component 300, connection component 300 includes the hydraulic jack 320 of fix bar 310 and second, one end peace of fix bar 310 In connecting rod 112, its other end is hinged on the bottom of large bamboo or wicker basket 200, and the second hydraulic jack 320 is arranged on subframe 110, the The second piston bar of two hydraulic jacks 320 is hinged on the bottom of large bamboo or wicker basket 200, second piston bar stretching motion drive large bamboo or wicker basket 200 around The reciprocally swinging of fix bar 310.After orange contains certain amount in large bamboo or wicker basket 200, the second hydraulic jack 320 is operated, second lives Stopper rod corresponds to reduction campaign, in the present embodiment, second piston bar recovery, drives large bamboo or wicker basket 200 to be rotated around fix bar 310, large bamboo or wicker basket 200 are tilted, and orange is poured out, is easy to collect.Two are provided with order to improve balance and stability, fix bar 310, two fixations Length direction of the bar 310 along connecting rod 112 is arranged at intervals, and second piston bar is between two fix bars 310, and close square-bottomed bamboo basket The side of the remote subframe 110 of basket 200.
During practical operation, it is necessary to step down in higher when operator steps down in connecting rod 112 and needs to pluck the orange of higher height In connecting rod 112, in order to improve security, connecting rod 112 is arranged to cylindrical rod, and the outer peripheral face of connecting rod 112 is provided with anti-skidding Line 113, it is not easy to skid.Further, the cross sectional shape perpendicular to its length direction of connecting rod 112 is rectangle, connecting rod 112 At least one rectangle sides on be provided with anti-slip veins 113, be easy to fabricate, and rectangular surfaces can increase contact area, increase Big frictional force.
It is preferably arranged to, anti-slip veins 113 include a plurality of groove being staggered.
For the ease of the movement of whole equipment, orange collection also includes walking wheel assembly 400 with support frame, wheel assembly of walking 400 are arranged on the bottom of two subframes 110.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.

Claims (8)

  1. A kind of 1. orange collection support frame, it is characterised in that including carrier, elevating mechanism and large bamboo or wicker basket, the carrier Include two subframes being oppositely arranged, the top of two subframes is hinged, and each subframe includes two be oppositely arranged Root main framing and the more connecting rods between two main framings, the every connecting rod and two main framings It is fixedly connected;The elevating mechanism includes the first hydraulic jack, slide rail and pulley, is provided with chute on the main framing, institute Length direction extension of the length direction of chute along the main framing is stated, the cylinder body of first hydraulic jack is arranged on the pair On frame, the First piston bar of first hydraulic jack is arranged on the slide rail, and the pulley, institute are provided with the slide rail Slide rail is stated to be located in the chute, and the pulley is walked in the chute, the First piston bar stretching motion drives institute State length direction of the slide rail along the chute to move back and forth, the large bamboo or wicker basket is arranged on the slide rail, the opening court of the large bamboo or wicker basket To the top of the carrier.
  2. 2. orange collection support frame according to claim 1, it is characterised in that the large bamboo or wicker basket is provided with two, two The large bamboo or wicker basket is separately mounted on two subframes, and each large bamboo or wicker basket is located at the outside of the corresponding subframe.
  3. 3. the orange collection support frame according to claims 1 or 2, it is characterised in that the orange collection support Frame also includes connection component, and the connection component includes fix bar and the second hydraulic jack, one end installation of the fix bar In the connecting rod, its other end is hinged on the bottom of the large bamboo or wicker basket, and second hydraulic jack is arranged on the subframe, The second piston bar of second hydraulic jack is hinged on the bottom of the large bamboo or wicker basket, and the second piston bar stretching motion drives institute Large bamboo or wicker basket is stated around the fix bar reciprocally swinging.
  4. 4. orange collection support frame according to claim 3, it is characterised in that the fix bar is provided with two, and two Length direction of the fix bar described in root along the connecting rod is arranged at intervals, and the second piston bar is located at two fix bars Between, and the side of the remote subframe close to the large bamboo or wicker basket.
  5. 5. orange collection support frame according to claim 1, it is characterised in that the connecting rod is arranged to cylindrical rod, The outer peripheral face of the connecting rod is provided with anti-slip veins.
  6. 6. orange collection support frame according to claim 5, it is characterised in that the connecting rod perpendicular to its length The cross sectional shape in direction is rectangle, and the anti-slip veins are provided with least one rectangle sides of the connecting rod.
  7. 7. orange collection support frame according to claim 6, it is characterised in that the anti-slip veins include what is be staggered A plurality of groove.
  8. 8. orange collection support frame according to claim 1, it is characterised in that the orange collection is also wrapped with support frame Walking wheel assembly is included, the walking wheel assembly is arranged on the bottom of two subframes.
CN201720238661.7U 2017-03-13 2017-03-13 Orange collection support frame Expired - Fee Related CN206879484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720238661.7U CN206879484U (en) 2017-03-13 2017-03-13 Orange collection support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720238661.7U CN206879484U (en) 2017-03-13 2017-03-13 Orange collection support frame

Publications (1)

Publication Number Publication Date
CN206879484U true CN206879484U (en) 2018-01-16

Family

ID=61328389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720238661.7U Expired - Fee Related CN206879484U (en) 2017-03-13 2017-03-13 Orange collection support frame

Country Status (1)

Country Link
CN (1) CN206879484U (en)

Similar Documents

Publication Publication Date Title
CN103771196A (en) Cable coiling, uncoiling and cleaning integrated device
CN108745850B (en) Device of supplementary artifical ware of picking of fruit
CN104067780A (en) Leveling hillside orchard picking platform
CN106348180A (en) Hoisting frame with buffering effect
CN208675804U (en) One kind being convenient for Chinese olive tree picking fruit device
CN203575115U (en) Movable basket hanging frame
CN206879484U (en) Orange collection support frame
CN105917860A (en) Convenient fruit picking device
CN203120578U (en) Seedling hanging and placing device
CN209677328U (en) A kind of upper and lower a heatable brick bed device of electric hydaulic flue-cured tobacco
CN208597343U (en) A kind of apple-picking device
CN207703518U (en) A kind of forestry pests & diseases detection branches of tall trees sampler
CN206575858U (en) Orange seed harvester
CN106105565A (en) A kind of grape harvest device and picking
CN205824569U (en) A kind of electric quantity data acquisition device
CN206344858U (en) A kind of efficient fruit picking stores car
CN211909822U (en) Facility fence frame type fruit and vegetable vine and fruit-bearing regulation and control device
CN212544654U (en) Coconut picking device
CN204031843U (en) Spring grape Hanging Basket frame
CN205913193U (en) Flowerpot rack
CN204110085U (en) Fruit collecting cart
CN207574424U (en) The drying device of Jinhua ham
CN209002382U (en) A kind of picker convenient for picking pear
CN111201922A (en) Facility fence frame type fruit and vegetable vine and fruit-bearing regulation and control device
CN207543995U (en) A kind of livestock-raising security fence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20210313

CF01 Termination of patent right due to non-payment of annual fee