CN206874852U - Jack concrete filled steel tube stop valve - Google Patents

Jack concrete filled steel tube stop valve Download PDF

Info

Publication number
CN206874852U
CN206874852U CN201720526801.0U CN201720526801U CN206874852U CN 206874852 U CN206874852 U CN 206874852U CN 201720526801 U CN201720526801 U CN 201720526801U CN 206874852 U CN206874852 U CN 206874852U
Authority
CN
China
Prior art keywords
steel plate
concrete
pieces
fixation
fixation steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720526801.0U
Other languages
Chinese (zh)
Inventor
庄国强
傅珺
赵余夫
陈洁
鲍廉梵
袁醒神
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongrun Construction Group Co Ltd
Original Assignee
Hongrun Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongrun Construction Group Co Ltd filed Critical Hongrun Construction Group Co Ltd
Priority to CN201720526801.0U priority Critical patent/CN206874852U/en
Application granted granted Critical
Publication of CN206874852U publication Critical patent/CN206874852U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of jacking concrete filled steel tube stop valve, including:One block of big steel plate is as movable steel plate, and the steel plate small using two pieces is as fixation steel plate, and in the side of two pieces of fixation steel plates, respectively a piece concrete pump pipe of welding, one end with of concrete pump pipe have the cuff of concrete pump pipe connection.Slightly expanded concrete is continuously pumped into tubular arch and steel pipe column by short tube of the pump pressure by delivery pipe and with stop valve, until concrete is filled in pipe, after filling concrete terminates, it is only necessary to twitch activity steel plate, it is possible to prevent outside concrete effuser.The utility model can be saved manually, and accelerating construction progress is cost-effective, meet the requirement of intensity, rigidity, stability and globality.

Description

Jack concrete filled steel tube stop valve
Technical field
It the utility model is related to the visual plant device used on town road bridge and house construction engineering, suitable steel pipe column With tubular arch pumping concrete construction.
Background technology
In town road bridge and house construction engineering are built, steel pipe column or tubular arch slightly expanded concrete i.e. in steel pipe column or Filling slightly expanded concrete, the composite construction that two kinds of combinations of materials of different nature are integrally formed in tubular arch.The spy of steel Property be that intensity is high, there is elastoplasticity;Concrete has preferable anti-compression property, but tensile property is poor.The two is combined, and can make coagulation Soil is in lateral spacing pressured state, and its compression strength can significantly improve, simultaneously because the effect of fill concrete, it is steady to improve tube wall Qualitative and resistance to overturning, so as to substantially increase the bearing capacity of structure, impact resistance ability, the Confinement effect of steel pipe carries significantly The high plastic property of concrete so that the weakness of concrete, particularly Brittleness of High Strength Concrete is overcome.Steel pipe is in itself again Template and support can not be just needed substantially as the template of resistance to side pressure, during construction.
Steel pipe inner concrete filling using from arch springing to vault or from post bottom to capital continuously be pumped jacking pour in down a chimney apply Work technique, opened exactly in the arch springing side wall of tubular arch or on Steel Pipe Column downside wall one it is more bigger than concrete delivery pipe caliber Charging aperture, tubular arch across top set steam vent, with the short tube with stop valve by the outlet and charging of concrete pump Mouth connection, slightly expanded concrete are continuously pumped into tubular arch and steel pipe column by being pumped by delivery pipe, until being filled in pipe mixed Solidifying soil.Therefore a short tube with stop valve must be designed.
Utility model content
Technical problem to be solved in the utility model is:Using simple several pieces of steel plates, steel pipes, socket building bolt and set Hoop, is assembled into a simple delivering concrete stop valve.Ensure to destroy under concrete pumping pressure, will not Unstability and deformation.To consider simultaneously also will not unstability and deformation when carrying.Assembly welding is simple simultaneously, and weight is light and handy, rises To the effect for preventing concrete from flowing back.
Technical scheme is used by the utility model solves above-mentioned technical problem:The steel plate big using one piece is used as movable steel Plate, the steel plate small using two pieces weld 4 block welding plates, two pieces of fixations as fixation steel plate between two pieces of small fixation steel plates Steel plate welds together, and certain hole is stayed between two pieces of small fixation steel plates, may be inserted into big movable steel plate.In two pieces of fixations Diameter 145mm circular hole is opened on steel plate, internal diameter 125mm concrete pump pipe is respectively welded in the side of two pieces of fixation steel plates, One end with of concrete pump pipe has the cuff of concrete pump pipe connection.Respectively opened on two pieces of small fixation steel plates two long 320mm, wide 20mm groove, the depth of groove are the thickness of fixation steel plate.Diameter 135mm circular hole and 4 is provided with movable steel plate Individual diameter 20mm bolt hole.Movable steel plate may be inserted between two pieces of small fixation steel plates, the bolt hole on movable steel plate The groove being aligned on fixation steel plate, then movable steel plate and fixation steel plate are connected with 4 diameter 18mm socket bolt and nut Pick up and, when the circular hole of diameter 135mm on movable steel plate is directed at the pump line hole on fixation steel plate, tighten 4 a diameter of 18mm The nut for socketing bolt, make nut compressing fixation steel plate using the pulling force of bolt, be to socket bolt to move, so as to ensure Slip will not be produced between movable steel plate and two pieces of fixation steel plates.Now can utilizes concrete stop valve short tube pumped concrete Soil.After filling concrete terminates, unscrew the nut of 4 bolts, manually movable steel plate pull out distance 135mm with On, it is possible to the passage of pump line inner concrete is blocked, plays a part of ending concrete, then withdraws pump truck, wait concrete hard Can be with dismantling concrete stop valve after change.
Compared with prior art, the utility model has the advantage of:Using traditional stop valve, two rows are opened on pump line Hole, 3 holes are often arranged, after filling concrete terminates, insertion steel carves son in each hole, and this device can not prevent concrete stream completely Outside outlet pipe, while 6 holes are provided with pump line, concrete easily overflows from 6 holes in pump concrete.And this practicality is new Type device, a short tube with stop valve, microdilatancy are welded into using simple several blocks of steel plates, several bolts and concrete pump pipe Concrete is continuously pumped into tubular arch and steel pipe column by short tube of the pump pressure by delivery pipe and with stop valve, until being filled in pipe Concrete, after filling concrete terminates, it is only necessary to twitch activity steel plate, it is possible to prevent outside concrete effuser.This invention dress Putting can save manually, and accelerating construction progress is cost-effective.This invention device is used for multiple times by Practical Project, it was demonstrated that can be with Meet the requirement of intensity, rigidity, stability and globality.
Brief description of the drawings
Fig. 1 structural plan schematic diagrames of the present utility model.
Fig. 2 structural facades schematic diagrames of the present utility model.
Fig. 3 fixation steel plate floor map of the present utility model.
Fig. 4 movable steel plate floor map of the present utility model.
Embodiment
Concrete lift-up construction process:Processing and fabricating stop valve → jacking mouth cleaning → in jacking mouth position installation stop valve → connection concrete delivery pump pipe → reinforcing → jacking steel pipe inner concrete → closing stop valve → dismantling concrete delivery pump pipe → concrete curing → concrete cuts stop valve → former material steel plate welding closure after reaching design strength.
The utility model is described in further detail below in conjunction with drawing.
Fig. 1 structural plan schematic diagrames of the present utility model.The steel plate big using one piece is small with two pieces as movable steel plate (A) Steel plate as fixation steel plate (B), 4 block welding plates (C) are welded between two pieces of small fixation steel plates, two pieces of fixation steel plates are welded It is connected together, certain hole is stayed between two pieces of small fixation steel plates, may be inserted into big movable steel plate.On two pieces of fixation steel plates Diameter 145mm circular hole is opened, internal diameter 125mm concrete pump pipe, concrete are respectively welded in the side of two pieces of fixation steel plates One end with of pump line has the cuff of concrete pump pipe connection.Two long 320mm, width are respectively opened on two pieces of small fixation steel plates 20mm groove, the depth of groove are the thickness of fixation steel plate.Diameter 135mm circular hole and 4 diameters are provided with movable steel plate 20mm bolt hole.Movable steel plate may be inserted between two pieces of small fixation steel plates, and the bolt hole alignment on movable steel plate is solid Determine the groove on steel plate, then movable steel plate has been connected with fixation steel plate with nut with the 4 diameter 18mm bolt (D) that sockets Come, when the circular hole of diameter 135mm on movable steel plate is directed at the pump line hole on fixation steel plate, tighten 4 a diameter of 18mm drawing The nut of connecting bolt, make nut compressing fixation steel plate using the pulling force of bolt, be to socket bolt to move, so as to guarantee activity Slip will not be produced between steel plate and two pieces of fixation steel plates.Now can utilizes concrete stop valve short tube pump concrete. After filling concrete terminates, unscrew the nut of 4 bolts, manually movable steel plate is pulled out more than distance 135mm, just The passage of pump line inner concrete can be blocked, plays a part of ending concrete, then withdraws pump truck, waiting can after concrete hardening With dismantling concrete stop valve.
Fig. 2 structural facades schematic diagrames of the present utility model.The steel plate big using one piece is small with two pieces as movable steel plate (A) Steel plate as fixation steel plate (B), 4 block welding plates (C) are welded between two pieces of small fixation steel plates, two pieces of fixation steel plates are welded It is connected together, certain hole is stayed between two pieces of small fixation steel plates, may be inserted into big movable steel plate.On two pieces of fixation steel plates Diameter 145mm circular hole is opened, internal diameter 125mm concrete pump pipe, concrete are respectively welded in the side of two pieces of fixation steel plates One end with of pump line has the cuff (E) of concrete pump pipe connection.Be provided with movable steel plate diameter 135mm circular hole and 4 Diameter 20mm bolt hole.Movable steel plate may be inserted between two pieces of small fixation steel plates, as diameter 135mm on movable steel plate Circular hole alignment fixation steel plate on pump line hole when, tighten the 4 a diameter of 18mm nut for socketing bolt (D), utilize bolt Pulling force make nut compressing fixation steel plate, be to socket bolt to move, so as to guarantee activity steel plate and two pieces of fixation steel plates it Between will not produce slip.
Fig. 3 fixation steel plate floor map of the present utility model.The size of fixation steel plate is 400mm × 250mm × 20mm. Two long 320mm, wide 20mm groove are respectively opened on small fixation steel plate, the depth of groove is the thickness of fixation steel plate.In fixed steel Diameter 145mm circular hole is provided with plate.
Fig. 4 movable steel plate floor map of the present utility model.The size of movable steel plate is 560mm × 240mm × 20mm. Diameter 135mm circular hole and 4 diameter 20mm bolt hole (F) are provided with movable steel plate.Movable steel plate may be inserted into two Between the small fixation steel plate of block, the groove on bolt hole on movable steel plate alignment fixation steel plate, then with 4 diameter 18mm's Socket bolt and nut to connect movable steel plate and fixation steel plate, when the circular hole alignment of diameter 135mm on movable steel plate is solid When determining the pump line hole on steel plate, the 4 a diameter of 18mm nut for socketing bolt is tightened, makes nut compressing using the pulling force of bolt Fixation steel plate, it is to socket bolt to move, so as to which slip will not be produced between guarantee activity steel plate and two pieces of fixation steel plates.

Claims (3)

1. one kind jacking concrete filled steel tube stop valve, it is characterised in that:One block of big steel plate as movable steel plate, two pieces small Steel plate welds 4 block welding plates between two pieces of small fixation steel plates, two pieces of fixation steel plates is welded on one as fixation steel plate Rise, stay certain hole between two pieces of small fixation steel plates, insert big movable steel plate.
2. jacking concrete filled steel tube stop valve according to claim 1, it is characterised in that:Opened on two pieces of fixation steel plates Diameter 145mm circular hole, internal diameter 125mm concrete pump pipe, concrete pump are respectively welded in the side of two pieces of fixation steel plates One end with of pipe has the cuff of concrete pump pipe connection, and two long 320mm, wide 20mm groove are respectively opened on fixation steel plate, groove Depth is the thickness of fixation steel plate.
3. jacking concrete filled steel tube stop valve according to claim 1, it is characterised in that:Diameter is provided with movable steel plate The bolt hole of 135mm circular hole and 4 diameter 20mm, movable steel plate are inserted between two pieces of small fixation steel plates, movable steel plate On bolt hole alignment fixation steel plate on groove, then with 4 diameter 18mm socket bolt and nut movable steel plate with Fixation steel plate connects.
CN201720526801.0U 2017-05-12 2017-05-12 Jack concrete filled steel tube stop valve Active CN206874852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720526801.0U CN206874852U (en) 2017-05-12 2017-05-12 Jack concrete filled steel tube stop valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720526801.0U CN206874852U (en) 2017-05-12 2017-05-12 Jack concrete filled steel tube stop valve

Publications (1)

Publication Number Publication Date
CN206874852U true CN206874852U (en) 2018-01-12

Family

ID=61339933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720526801.0U Active CN206874852U (en) 2017-05-12 2017-05-12 Jack concrete filled steel tube stop valve

Country Status (1)

Country Link
CN (1) CN206874852U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469329A (en) * 2018-10-30 2019-03-15 浙江中南建设集团有限公司 One kind can have enough to meet the need steel pipe column pumping Lifting Equipment and jacking interface construction method
CN109505250A (en) * 2018-12-07 2019-03-22 中铁局集团厦门建设工程有限公司 A kind of filling concrete method of steel tube arch rib
CN114109042A (en) * 2022-01-12 2022-03-01 山东三箭建设工程股份有限公司 Check valve for construction of concrete filled steel tubular column by jacking method and application method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469329A (en) * 2018-10-30 2019-03-15 浙江中南建设集团有限公司 One kind can have enough to meet the need steel pipe column pumping Lifting Equipment and jacking interface construction method
CN109469329B (en) * 2018-10-30 2021-04-23 浙江中南建设集团有限公司 Recyclable steel pipe column pumping jacking equipment and jacking interface construction method
CN109505250A (en) * 2018-12-07 2019-03-22 中铁局集团厦门建设工程有限公司 A kind of filling concrete method of steel tube arch rib
CN114109042A (en) * 2022-01-12 2022-03-01 山东三箭建设工程股份有限公司 Check valve for construction of concrete filled steel tubular column by jacking method and application method thereof

Similar Documents

Publication Publication Date Title
CN206874852U (en) Jack concrete filled steel tube stop valve
CN103556624B (en) Adapter sleeve, to produce and method of attachment containing the prefabricated units of this adapter sleeve and prefabricated units
WO2017107960A1 (en) Connection device for use in vertical uplift resistance load of pre-buried foundation pile
CN106351401B (en) Half assembled super-high strength steel pipe slip casting overlaps rod structure and production method
CN106150060A (en) Based on assembled wall-connecting piece exterior wall scaffold system and construction method
CN106988455A (en) Steel plate concrete shear wall scene splicing node and its construction method
CN203905485U (en) Form for reservation of water service pipe channel in cast-in-place concrete wall
CN206426071U (en) A kind of tunneling shield section of jurisdiction storing unit
CN209775994U (en) High strength sculpture structure
CN103882994B (en) Ring beam steel bar connecting structure and ring beam construction method
CN204024068U (en) A kind of hoisting steel pipe pillar concrete connection control device
CN107447975A (en) Exterior wall scaffold tapered cup nut wall-connecting piece
CN207308898U (en) A kind of coated sand core shooting machine adds sand system
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN202359553U (en) Pure mechanical connection structure between piles
KR100916672B1 (en) Mast fixation of construction lift embed anchor and spatial-temporal method
CN104153464A (en) Steel pipe concrete jacking inserting plate type control device and method for connecting steel pipe concrete jacking inserting plate type control device to steel pipe column
CN205116685U (en) Can dismantle shaped steel of encorbelmenting platform of unloading
CN202559746U (en) Continuing device for upper-lower-layer shear wall during pouring
CN104099870B (en) Roller type prefabricated box girder internal mold demoulding device as well as manufacturing, construction and operation method thereof
CN206158011U (en) Strong steel pipe slip casting coincide post structure of half -assembled formula superelevation
CN204140090U (en) A kind of Novel circular steel pipe concrete bracket link
CN206707283U (en) A kind of unidirectional fishbolt fixed form root device of built-in type
CN206346188U (en) A kind of steel reinforcement cage
CN206607586U (en) A kind of self-balancing grouting under pressure steel tube for soil-nail structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant