CN206874025U - Steel fitting collection heatable adobe sleeping platform - Google Patents
Steel fitting collection heatable adobe sleeping platform Download PDFInfo
- Publication number
- CN206874025U CN206874025U CN201720585242.0U CN201720585242U CN206874025U CN 206874025 U CN206874025 U CN 206874025U CN 201720585242 U CN201720585242 U CN 201720585242U CN 206874025 U CN206874025 U CN 206874025U
- Authority
- CN
- China
- Prior art keywords
- sleeping platform
- adobe sleeping
- heatable adobe
- steel
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of steel fitting collection heatable adobe sleeping platform, including:Using hot rolled steel plate as the bottom plate of collection heatable adobe sleeping platform, side plate, baffle plate, connector, support of putting more energy into;Using hot-rolled steel channel as perpendicular support and stull;Using bolt as the fastener between component, assembly welding is into steel fitting collection heatable adobe sleeping platform.Advantage is that the construction material shaped steel and its accessory, material source commonly used on utilizing works are wide, make simply, it is convenient to pass in and out soil application work with armored concrete collection heatable adobe sleeping platform ratio, it is less likely to be damaged, effect on environment is small, equipment can be used as to preserve, can be long-term use of, it can set on the ground, subsurface can also be embedded in, can also half on the ground, half is in subsurface.
Description
Technical field
It the utility model is related to the important temporary facility used on city track traffic engineering, suitable Subway Tunnel shield
It is unearthed and constructs.
Background technology
In Construction of Urban Rail Traffic, most of running tunnels use shield construction, are needed during shield driving
A ring is promoted, goes out the earth volume of an endless tube piece.For the construction period, construction task is completed as early as possible, while for shield driving mistake
Safety in journey, it in addition to about 4 hours one day maintain, must ceaselessly promote within remaining 20 hours and segment assembly, be pushed away in shield
During entering, the earthwork can not be deposited in running tunnel temporarily, it is necessary to synchronous with shield driving that ground is transported in the earthwork.Subway is applied
Work does not often allow unit in charge of construction to be unearthed daytime in city proper, heavy traffic on daytime, vehicle supervision department, it is necessary to utilizes night
It is unearthed when traffic is not busy, therefore temporary construction facility collection heatable adobe sleeping platform is must be provided with shield-tunneling construction scene.
Collection heatable adobe sleeping platform can use armored concrete collection heatable adobe sleeping platform, can also use steel construction collection heatable adobe sleeping platform, can be arranged on ground
On, subsurface can also be arranged on, can with half set on the ground, half be arranged on subsurface.
Utility model content
Technical problem to be solved in the utility model is:With different shaped steel and connector, assembling is fabricated to one can
To accommodate the steel fitting collection heatable adobe sleeping platform of 435 cubic metres of earthwork.
Technical scheme is used by the utility model solves above-mentioned technical problem:Using the thick hot rolled steel plate conducts of 16mm
The bottom plate of collection heatable adobe sleeping platform, side plate, baffle plate, connector, support of putting more energy into;Using 200mm hot-rolled steel channels as perpendicular support and stull;Using
M16 bolts as the fastener between component, assembly welding into a high 2500mm, long 26000mm, wide 6700mm steel fitting
Collect heatable adobe sleeping platform.
Compared with prior art, the utility model has the advantage of:On utilizing works commonly use construction material shaped steel and its
Accessory, material source is wide, makes simply, convenient to pass in and out soil application work, it is not easy to damage, to ring with armored concrete collection heatable adobe sleeping platform ratio
Border influence is small, equipment can be used as to preserve, can be long-term use of, can set on the ground, can also be embedded in subsurface,
Can be with half on the ground, half is in subsurface.
This utility model device can be saved manually, and accelerating construction progress is cost-effective.This utility model device is by real
Border engineering is used for multiple times, it was demonstrated that can meet the requirement of intensity, rigidity, stability and globality.
Brief description of the drawings
Fig. 1 elevational schematic views of the present utility model.
Fig. 2 floor map of the present utility model.
Fig. 3 schematic cross-sections of the present utility model.
Fig. 4 end views of the present utility model.
Fig. 5-1. A connection details of the present utility model.
Fig. 5-2. B node detail drawings of the present utility model.
Fig. 5-3. C connection details of the present utility model.
Fig. 5-4. D connection details of the present utility model.
Fig. 5-5. E connection details of the present utility model.
Embodiment
Steel plate seam is using 20a channel-section steels and M16 bolts (add stagnant move back packing ring) connection;Channel-section steel stull requires with Shu Cheng lap-joints
Full weld, with M16 bolts (add stagnant move back packing ring) connection between channel-section steel and steel plate, erect staybolt spacing 300mm, stull pitch of bolts
400mm, steel plate seam crossing bolt are double, and non-seam crossing bolt is single;Triangle connection element spacing 300mm;Collect heatable adobe sleeping platform bottom plate
Steel plate connection uses intermittent weld, interval 200mm welding 100mm weld seams;Collection heatable adobe sleeping platform steel plate uses 16mm (1800 × 9000) steel
Plate;Intermediate connecting rod uses 20a channel-section steels, is connected after end socket with bolt with collection heatable adobe sleeping platform side plate, intermediate connecting rod Gong She tri-;Corner connects
Plate is monoblock type, need to process four altogether.
The utility model is described in further detail below in conjunction with drawing.
Fig. 1 elevational schematic views of the present utility model.Collect heatable adobe sleeping platform length 26000mm, high 2500mm, stull up and down totally two,
Cheng Gong 13 is erected in facade position.The side plate of one facade is spliced by 7 pieces, and seam is in stull and perpendicular support position.Every two
Between the perpendicular support of root, one piece of baffle plate is set in the bottom of collection heatable adobe sleeping platform side plate, the side of baffle plate is welded with put more energy into support, baffle plate and side plate
Between be connected by screw bolts.
Fig. 2 floor map of the present utility model.Integrate the length of heatable adobe sleeping platform as 26000mm, width 6700mm, bottom plate is by 12
Block plate assembly is welded.Collection heatable adobe sleeping platform surrounding using 200mm channel-section steels as stull and perpendicular support, support totally 13 facade position is perpendicular
Road.Between every two perpendicular supports, one piece of baffle plate is set in the bottom of collection heatable adobe sleeping platform side plate, the side of baffle plate is welded with support of putting more energy into,
It is connected by screw bolts between baffle plate and side plate.The centre of collection heatable adobe sleeping platform is provided with three intermediate connecting rods (1).
Fig. 3 schematic cross-sections of the present utility model.Collect heatable adobe sleeping platform length 26000mm, high 2500mm, stull up and down totally two,
Cheng Gong 13 is erected in facade position.The side plate of one facade is spliced by 7 pieces, and seam is in stull and perpendicular support position.Every two
Between the perpendicular support of root, one piece of baffle plate is set in the bottom of collection heatable adobe sleeping platform side plate, the side of baffle plate is welded with put more energy into support, baffle plate and side plate
Between be connected by screw bolts.
Fig. 4 end views of the present utility model.Integrate the width of heatable adobe sleeping platform as 6700mm, endface position stull up and down totally two
Road, erect support totally 4.The side plate of one end face is spliced by 2 pieces, and seam is in stull position.Between every two perpendicular supports, collecting
The bottom of heatable adobe sleeping platform end plate sets one piece of baffle plate, and the side of baffle plate is welded with support of putting more energy into, and is connected between baffle plate and end plate using bolt
Connect.
Fig. 5-1,5-2,5-3,5-4,5-5 are collection heatable adobe sleeping platform drawing of the present utility model.
Fig. 5-1 is A connection details of the present utility model, to collect the corner of heatable adobe sleeping platform, by comer gusset panels (2), channel-section steel stull
(3), the perpendicular support (4) of channel-section steel, M16 bolts (5), connector (7), support (8) of putting more energy into, side plate (9) assembly are welded.
Fig. 5-2 is B node detail drawing of the present utility model, using 16mm steel plate as side plate (6) and bottom plate (10), is adopted
As stull (3) and support reinforcement is erected by the use of 20a channel-section steels, by being welded to connect between stull (3) and perpendicular support, between stull and side plate
By M16 bolt connections, by being welded to connect between side plate and bottom plate.
Fig. 5-3 is C connection details of the present utility model, among two perpendicular supports, side plate bottom, has baffle plate to pass through three M16
Bolt (5) is connected with side plate (6), and two pieces are welded with baffle plate and strengthens support (8), and it is 400mm to strengthen support (8) spacing, from gear
Plate termination 300mm, M16 bolt (5) spacing is 400mm, is 100mm from baffle plate termination, 20a channel-section steels stull (3) is in the upper of baffle plate
Face, side plate (6) thickness are 16mm.
Fig. 5-4 is D connection details of the present utility model, for the corner of collection heatable adobe sleeping platform bottom plate position, by comer gusset panels (2),
Channel-section steel stull (3), the perpendicular support (4) of channel-section steel, M16 bolts (5), baffle plate, connector (7), support (8) of putting more energy into, side plate (6), bottom plate
(10) assembly is welded, connector (7) and the plate-side plate welding of both sides.
Fig. 5-5 is E connection details of the present utility model, and steel plate seam (is added stagnant using 20a channel-section steels (3) (4) and M16 bolts
Move back packing ring) connection;Channel-section steel stull (3) and perpendicular support (4) lap-joint full weld, steel plate seam crossing bolt is double, spacing 100mm,
Side plate splicing seams are 50mm, diameter of bolt hole 18mm in the centre position of channel-section steel, the centre distance from bolt hole.
Claims (2)
- A kind of 1. steel fitting collection heatable adobe sleeping platform, it is characterised in that:Using hot rolled steel plate thick 16mm as collect the bottom plate of heatable adobe sleeping platform, side plate, Baffle plate, connector, support of putting more energy into;Using 200mm hot-rolled steel channels as perpendicular support and stull;Using M16 bolts as between component Fastener, assembly welding into a high 2500mm, long 26000mm, wide 6700mm steel fitting collection heatable adobe sleeping platform.
- 2. steel fitting collection heatable adobe sleeping platform according to claim 1, it is characterised in that:Steel plate seam uses 20a channel-section steels and M16 bolts Connection;M16 bolt connections are used between channel-section steel and steel plate, erect staybolt spacing 300mm, stull pitch of bolts 400mm row;Triangle joint Part spacing 300mm;The steel plate of baseplate connection of collection heatable adobe sleeping platform uses intermittent weld, interval 200mm welding 100mm weld seams;Collection heatable adobe sleeping platform steel plate is adopted With 16mm steel plates;Intermediate connecting rod uses 20a channel-section steels, is connected after end socket with bolt with collection heatable adobe sleeping platform side plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720585242.0U CN206874025U (en) | 2017-05-24 | 2017-05-24 | Steel fitting collection heatable adobe sleeping platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720585242.0U CN206874025U (en) | 2017-05-24 | 2017-05-24 | Steel fitting collection heatable adobe sleeping platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206874025U true CN206874025U (en) | 2018-01-12 |
Family
ID=61340575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720585242.0U Active CN206874025U (en) | 2017-05-24 | 2017-05-24 | Steel fitting collection heatable adobe sleeping platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206874025U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630074A (en) * | 2019-08-30 | 2019-12-31 | 上海市基础工程集团有限公司 | Prefabricated assembled soil collection box for shield tunnel engineering construction |
-
2017
- 2017-05-24 CN CN201720585242.0U patent/CN206874025U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630074A (en) * | 2019-08-30 | 2019-12-31 | 上海市基础工程集团有限公司 | Prefabricated assembled soil collection box for shield tunnel engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2516667C2 (en) | Device and system of pipeline installation | |
CN207109795U (en) | A kind of recyclable HC engineering methods steel diaphram wall | |
CN102060199B (en) | Transportation method for constructing high mountain building | |
CN206874025U (en) | Steel fitting collection heatable adobe sleeping platform | |
CN205242440U (en) | Steel city utility tunnel | |
CN105041348B (en) | A kind of underground space tunneling construction method of use compound roof | |
KR101202182B1 (en) | pipe roof structures and its construction method | |
CN108729931B (en) | Tunnel inverted arch repairing secondary lining reinforcing structure and construction method | |
CN208845183U (en) | Assembled tube coupling | |
CN115110973B (en) | Connecting channel pipe jacking construction backrest system and using method thereof | |
CN206816278U (en) | The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel | |
CN207017133U (en) | A kind of segmented large span steel beam | |
CN206800446U (en) | Assembled underground one corridor | |
CN205154191U (en) | Tunnel preliminary bracing steel pipe concrete steelframe | |
CN207986477U (en) | A kind of side slope protection construction material transport system | |
CN103982076A (en) | Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower | |
CN203271764U (en) | Pipe piece and pipe piece ring for model shield tunneling machine indoor tunneling experiment | |
CN210117733U (en) | Assembled underground pipe gallery with variable bin | |
CN108661080A (en) | The manufacturing method in assembled underground one corridor | |
CN205776356U (en) | Plug-in Pipe rack | |
CN207376821U (en) | A kind of electronic rain shade suitable on Metro station excavation | |
CN207032299U (en) | Prefabricated pipe gallery | |
CN208136705U (en) | A kind of make-shift bridge device | |
CN206829183U (en) | A kind of city piping lane using porous pre-buried channel flow mounting system | |
JP6445478B2 (en) | Construction method for underground structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |