CN206874025U - Steel fitting collection heatable adobe sleeping platform - Google Patents

Steel fitting collection heatable adobe sleeping platform Download PDF

Info

Publication number
CN206874025U
CN206874025U CN201720585242.0U CN201720585242U CN206874025U CN 206874025 U CN206874025 U CN 206874025U CN 201720585242 U CN201720585242 U CN 201720585242U CN 206874025 U CN206874025 U CN 206874025U
Authority
CN
China
Prior art keywords
sleeping platform
adobe sleeping
heatable adobe
steel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720585242.0U
Other languages
Chinese (zh)
Inventor
庄国强
赵余夫
傅珺
鲍廉梵
陈洁
袁醒神
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongrun Construction Group Co Ltd
Original Assignee
Hongrun Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongrun Construction Group Co Ltd filed Critical Hongrun Construction Group Co Ltd
Priority to CN201720585242.0U priority Critical patent/CN206874025U/en
Application granted granted Critical
Publication of CN206874025U publication Critical patent/CN206874025U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of steel fitting collection heatable adobe sleeping platform, including:Using hot rolled steel plate as the bottom plate of collection heatable adobe sleeping platform, side plate, baffle plate, connector, support of putting more energy into;Using hot-rolled steel channel as perpendicular support and stull;Using bolt as the fastener between component, assembly welding is into steel fitting collection heatable adobe sleeping platform.Advantage is that the construction material shaped steel and its accessory, material source commonly used on utilizing works are wide, make simply, it is convenient to pass in and out soil application work with armored concrete collection heatable adobe sleeping platform ratio, it is less likely to be damaged, effect on environment is small, equipment can be used as to preserve, can be long-term use of, it can set on the ground, subsurface can also be embedded in, can also half on the ground, half is in subsurface.

Description

Steel fitting collection heatable adobe sleeping platform
Technical field
It the utility model is related to the important temporary facility used on city track traffic engineering, suitable Subway Tunnel shield It is unearthed and constructs.
Background technology
In Construction of Urban Rail Traffic, most of running tunnels use shield construction, are needed during shield driving A ring is promoted, goes out the earth volume of an endless tube piece.For the construction period, construction task is completed as early as possible, while for shield driving mistake Safety in journey, it in addition to about 4 hours one day maintain, must ceaselessly promote within remaining 20 hours and segment assembly, be pushed away in shield During entering, the earthwork can not be deposited in running tunnel temporarily, it is necessary to synchronous with shield driving that ground is transported in the earthwork.Subway is applied Work does not often allow unit in charge of construction to be unearthed daytime in city proper, heavy traffic on daytime, vehicle supervision department, it is necessary to utilizes night It is unearthed when traffic is not busy, therefore temporary construction facility collection heatable adobe sleeping platform is must be provided with shield-tunneling construction scene.
Collection heatable adobe sleeping platform can use armored concrete collection heatable adobe sleeping platform, can also use steel construction collection heatable adobe sleeping platform, can be arranged on ground On, subsurface can also be arranged on, can with half set on the ground, half be arranged on subsurface.
Utility model content
Technical problem to be solved in the utility model is:With different shaped steel and connector, assembling is fabricated to one can To accommodate the steel fitting collection heatable adobe sleeping platform of 435 cubic metres of earthwork.
Technical scheme is used by the utility model solves above-mentioned technical problem:Using the thick hot rolled steel plate conducts of 16mm The bottom plate of collection heatable adobe sleeping platform, side plate, baffle plate, connector, support of putting more energy into;Using 200mm hot-rolled steel channels as perpendicular support and stull;Using M16 bolts as the fastener between component, assembly welding into a high 2500mm, long 26000mm, wide 6700mm steel fitting Collect heatable adobe sleeping platform.
Compared with prior art, the utility model has the advantage of:On utilizing works commonly use construction material shaped steel and its Accessory, material source is wide, makes simply, convenient to pass in and out soil application work, it is not easy to damage, to ring with armored concrete collection heatable adobe sleeping platform ratio Border influence is small, equipment can be used as to preserve, can be long-term use of, can set on the ground, can also be embedded in subsurface, Can be with half on the ground, half is in subsurface.
This utility model device can be saved manually, and accelerating construction progress is cost-effective.This utility model device is by real Border engineering is used for multiple times, it was demonstrated that can meet the requirement of intensity, rigidity, stability and globality.
Brief description of the drawings
Fig. 1 elevational schematic views of the present utility model.
Fig. 2 floor map of the present utility model.
Fig. 3 schematic cross-sections of the present utility model.
Fig. 4 end views of the present utility model.
Fig. 5-1. A connection details of the present utility model.
Fig. 5-2. B node detail drawings of the present utility model.
Fig. 5-3. C connection details of the present utility model.
Fig. 5-4. D connection details of the present utility model.
Fig. 5-5. E connection details of the present utility model.
Embodiment
Steel plate seam is using 20a channel-section steels and M16 bolts (add stagnant move back packing ring) connection;Channel-section steel stull requires with Shu Cheng lap-joints Full weld, with M16 bolts (add stagnant move back packing ring) connection between channel-section steel and steel plate, erect staybolt spacing 300mm, stull pitch of bolts 400mm, steel plate seam crossing bolt are double, and non-seam crossing bolt is single;Triangle connection element spacing 300mm;Collect heatable adobe sleeping platform bottom plate Steel plate connection uses intermittent weld, interval 200mm welding 100mm weld seams;Collection heatable adobe sleeping platform steel plate uses 16mm (1800 × 9000) steel Plate;Intermediate connecting rod uses 20a channel-section steels, is connected after end socket with bolt with collection heatable adobe sleeping platform side plate, intermediate connecting rod Gong She tri-;Corner connects Plate is monoblock type, need to process four altogether.
The utility model is described in further detail below in conjunction with drawing.
Fig. 1 elevational schematic views of the present utility model.Collect heatable adobe sleeping platform length 26000mm, high 2500mm, stull up and down totally two, Cheng Gong 13 is erected in facade position.The side plate of one facade is spliced by 7 pieces, and seam is in stull and perpendicular support position.Every two Between the perpendicular support of root, one piece of baffle plate is set in the bottom of collection heatable adobe sleeping platform side plate, the side of baffle plate is welded with put more energy into support, baffle plate and side plate Between be connected by screw bolts.
Fig. 2 floor map of the present utility model.Integrate the length of heatable adobe sleeping platform as 26000mm, width 6700mm, bottom plate is by 12 Block plate assembly is welded.Collection heatable adobe sleeping platform surrounding using 200mm channel-section steels as stull and perpendicular support, support totally 13 facade position is perpendicular Road.Between every two perpendicular supports, one piece of baffle plate is set in the bottom of collection heatable adobe sleeping platform side plate, the side of baffle plate is welded with support of putting more energy into, It is connected by screw bolts between baffle plate and side plate.The centre of collection heatable adobe sleeping platform is provided with three intermediate connecting rods (1).
Fig. 3 schematic cross-sections of the present utility model.Collect heatable adobe sleeping platform length 26000mm, high 2500mm, stull up and down totally two, Cheng Gong 13 is erected in facade position.The side plate of one facade is spliced by 7 pieces, and seam is in stull and perpendicular support position.Every two Between the perpendicular support of root, one piece of baffle plate is set in the bottom of collection heatable adobe sleeping platform side plate, the side of baffle plate is welded with put more energy into support, baffle plate and side plate Between be connected by screw bolts.
Fig. 4 end views of the present utility model.Integrate the width of heatable adobe sleeping platform as 6700mm, endface position stull up and down totally two Road, erect support totally 4.The side plate of one end face is spliced by 2 pieces, and seam is in stull position.Between every two perpendicular supports, collecting The bottom of heatable adobe sleeping platform end plate sets one piece of baffle plate, and the side of baffle plate is welded with support of putting more energy into, and is connected between baffle plate and end plate using bolt Connect.
Fig. 5-1,5-2,5-3,5-4,5-5 are collection heatable adobe sleeping platform drawing of the present utility model.
Fig. 5-1 is A connection details of the present utility model, to collect the corner of heatable adobe sleeping platform, by comer gusset panels (2), channel-section steel stull (3), the perpendicular support (4) of channel-section steel, M16 bolts (5), connector (7), support (8) of putting more energy into, side plate (9) assembly are welded.
Fig. 5-2 is B node detail drawing of the present utility model, using 16mm steel plate as side plate (6) and bottom plate (10), is adopted As stull (3) and support reinforcement is erected by the use of 20a channel-section steels, by being welded to connect between stull (3) and perpendicular support, between stull and side plate By M16 bolt connections, by being welded to connect between side plate and bottom plate.
Fig. 5-3 is C connection details of the present utility model, among two perpendicular supports, side plate bottom, has baffle plate to pass through three M16 Bolt (5) is connected with side plate (6), and two pieces are welded with baffle plate and strengthens support (8), and it is 400mm to strengthen support (8) spacing, from gear Plate termination 300mm, M16 bolt (5) spacing is 400mm, is 100mm from baffle plate termination, 20a channel-section steels stull (3) is in the upper of baffle plate Face, side plate (6) thickness are 16mm.
Fig. 5-4 is D connection details of the present utility model, for the corner of collection heatable adobe sleeping platform bottom plate position, by comer gusset panels (2), Channel-section steel stull (3), the perpendicular support (4) of channel-section steel, M16 bolts (5), baffle plate, connector (7), support (8) of putting more energy into, side plate (6), bottom plate (10) assembly is welded, connector (7) and the plate-side plate welding of both sides.
Fig. 5-5 is E connection details of the present utility model, and steel plate seam (is added stagnant using 20a channel-section steels (3) (4) and M16 bolts Move back packing ring) connection;Channel-section steel stull (3) and perpendicular support (4) lap-joint full weld, steel plate seam crossing bolt is double, spacing 100mm, Side plate splicing seams are 50mm, diameter of bolt hole 18mm in the centre position of channel-section steel, the centre distance from bolt hole.

Claims (2)

  1. A kind of 1. steel fitting collection heatable adobe sleeping platform, it is characterised in that:Using hot rolled steel plate thick 16mm as collect the bottom plate of heatable adobe sleeping platform, side plate, Baffle plate, connector, support of putting more energy into;Using 200mm hot-rolled steel channels as perpendicular support and stull;Using M16 bolts as between component Fastener, assembly welding into a high 2500mm, long 26000mm, wide 6700mm steel fitting collection heatable adobe sleeping platform.
  2. 2. steel fitting collection heatable adobe sleeping platform according to claim 1, it is characterised in that:Steel plate seam uses 20a channel-section steels and M16 bolts Connection;M16 bolt connections are used between channel-section steel and steel plate, erect staybolt spacing 300mm, stull pitch of bolts 400mm row;Triangle joint Part spacing 300mm;The steel plate of baseplate connection of collection heatable adobe sleeping platform uses intermittent weld, interval 200mm welding 100mm weld seams;Collection heatable adobe sleeping platform steel plate is adopted With 16mm steel plates;Intermediate connecting rod uses 20a channel-section steels, is connected after end socket with bolt with collection heatable adobe sleeping platform side plate.
CN201720585242.0U 2017-05-24 2017-05-24 Steel fitting collection heatable adobe sleeping platform Active CN206874025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720585242.0U CN206874025U (en) 2017-05-24 2017-05-24 Steel fitting collection heatable adobe sleeping platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720585242.0U CN206874025U (en) 2017-05-24 2017-05-24 Steel fitting collection heatable adobe sleeping platform

Publications (1)

Publication Number Publication Date
CN206874025U true CN206874025U (en) 2018-01-12

Family

ID=61340575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720585242.0U Active CN206874025U (en) 2017-05-24 2017-05-24 Steel fitting collection heatable adobe sleeping platform

Country Status (1)

Country Link
CN (1) CN206874025U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630074A (en) * 2019-08-30 2019-12-31 上海市基础工程集团有限公司 Prefabricated assembled soil collection box for shield tunnel engineering construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630074A (en) * 2019-08-30 2019-12-31 上海市基础工程集团有限公司 Prefabricated assembled soil collection box for shield tunnel engineering construction

Similar Documents

Publication Publication Date Title
RU2516667C2 (en) Device and system of pipeline installation
CN207109795U (en) A kind of recyclable HC engineering methods steel diaphram wall
CN102060199B (en) Transportation method for constructing high mountain building
CN206874025U (en) Steel fitting collection heatable adobe sleeping platform
CN205242440U (en) Steel city utility tunnel
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
KR101202182B1 (en) pipe roof structures and its construction method
CN108729931B (en) Tunnel inverted arch repairing secondary lining reinforcing structure and construction method
CN208845183U (en) Assembled tube coupling
CN115110973B (en) Connecting channel pipe jacking construction backrest system and using method thereof
CN206816278U (en) The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel
CN207017133U (en) A kind of segmented large span steel beam
CN206800446U (en) Assembled underground one corridor
CN205154191U (en) Tunnel preliminary bracing steel pipe concrete steelframe
CN207986477U (en) A kind of side slope protection construction material transport system
CN103982076A (en) Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower
CN203271764U (en) Pipe piece and pipe piece ring for model shield tunneling machine indoor tunneling experiment
CN210117733U (en) Assembled underground pipe gallery with variable bin
CN108661080A (en) The manufacturing method in assembled underground one corridor
CN205776356U (en) Plug-in Pipe rack
CN207376821U (en) A kind of electronic rain shade suitable on Metro station excavation
CN207032299U (en) Prefabricated pipe gallery
CN208136705U (en) A kind of make-shift bridge device
CN206829183U (en) A kind of city piping lane using porous pre-buried channel flow mounting system
JP6445478B2 (en) Construction method for underground structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant