CN206873518U - One kind repairs blower foundation cracking pre-buried grouted anchor bar, system - Google Patents

One kind repairs blower foundation cracking pre-buried grouted anchor bar, system Download PDF

Info

Publication number
CN206873518U
CN206873518U CN201621409495.4U CN201621409495U CN206873518U CN 206873518 U CN206873518 U CN 206873518U CN 201621409495 U CN201621409495 U CN 201621409495U CN 206873518 U CN206873518 U CN 206873518U
Authority
CN
China
Prior art keywords
anchor bar
slip casting
grouted anchor
foundation
grouted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621409495.4U
Other languages
Chinese (zh)
Inventor
张国伟
陈江平
王子月
崔东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongche Wind Power Co Ltd
Original Assignee
Shandong Zhongche Wind Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongche Wind Power Co Ltd filed Critical Shandong Zhongche Wind Power Co Ltd
Priority to CN201621409495.4U priority Critical patent/CN206873518U/en
Application granted granted Critical
Publication of CN206873518U publication Critical patent/CN206873518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of blower foundation of repairing is the utility model is related to ftracture with pre-buried grouted anchor bar, system, including foundation slip casting anchor pole, foundation slip casting machine, foundation slip casting liquid, anchor rod bolt and pad, foundation slip casting anchor pole is made up of inside and outside two hollow steel tubes, lateral opening hole, inside and outside grouted anchor bar is coordinated by screw thread to be installed, ensure that slip casting is unobstructed during the injected hole alignment of two bars, staggeredly when ensure that slurries can not flow into internal layer grouted anchor bar, inside and outside grouted anchor bar requires high intensity and high pressure resistance;Foundation slip casting anchor pole is uniformly embedded in draught fan tower barrel base ring border, injects foundation slip casting liquid reparation by foundation slip casting machine when blower foundation ftractures.The utility model can it is easy, efficiently, comprehensively repair blower foundation, can effectively solve the problem that blower foundation problem of Cracking.

Description

One kind repairs blower foundation cracking pre-buried grouted anchor bar, system
Technical field
A kind of reparation blower foundation cracking pre-buried grouted anchor bar, system and method are the utility model is related to, belongs to wind-force Technical field of power generation.
Background technology
With developing rapidly for China's wind-powered electricity generation industry, wind generating technology is widely used, and blower fan installation amount is also Increase year by year.For blower foundation as blower fan and unique load bearing component on ground, the stability of its structure is blower fan long-term safety work One of key factor of work.With fan operation, crack and wind-force are to wind existing for blower foundation concrete structure itself The load of machine make it is cracked near foundation ring, cause rainwater with gap penetrate into basic internal, corrode basic ring cylinder and flange, Huge potential safety hazard is produced to blower fan.When there is this problem in blower foundation, prior art be at gap again Lay concrete.The program can not repair to basic internal crack, and repairing intensity deficiency is easy to ftracture again.
Utility model content
The purpose of this utility model is that solve the repairing of blower foundation internal fissure, is proposed a kind of simple in construction, easy to operate And repairing effect significantly repairs blower foundation cracking with pre-buried grouted anchor bar and the system including the anchor pole;Noted including basis Anchor pole, foundation slip casting machine, foundation slip casting liquid, anchor rod bolt and pad are starched, foundation slip casting anchor pole is by inside and outside two hollow steel tube groups Into lateral opening hole, inside and outside grouted anchor bar is coordinated by screw thread to be installed, and is ensured that slip casting is unobstructed when the injected hole of two bars aligns, is handed over Stagger the time and ensure that slurries can not flow into internal layer grouted anchor bar, inside and outside grouted anchor bar requires high intensity and high pressure resistance;Foundation slip casting anchor Bar is uniformly embedded in draught fan tower barrel base ring border, injects foundation slip casting liquid by foundation slip casting machine when blower foundation ftractures and repaiies It is multiple.The utility model can it is easy, efficiently, comprehensively repair blower foundation, can effectively solve the problem that blower foundation problem of Cracking.
To achieve the above object, the utility model adopts the following technical scheme that:
One kind repairs blower foundation cracking pre-buried grouted anchor bar, including the internal grouting blot being set in together and outer slip casting Anchor pole, and two anchor poles are connected through a screw thread, one end of described internal grouting blot is alignd with outer grouted anchor bar, other end extension To one hollow nut structure of outer connection of outer grouted anchor bar, described nut structure centre, which is provided with, to be used to install anchor rod bolt Screw thread, controlled by nut structure inside and outside layer grouted anchor bar injected hole staggeredly and alignment thereof.
The injected hole of internal grouting blot and outer grouted anchor bar align when ensure slip casting it is unobstructed, staggeredly when ensure slurries can not flow Enter internal layer grouted anchor bar, inside and outside grouted anchor bar requires high intensity and high pressure resistance.
Further, described outer layer grouted anchor bar is the female hollow steel tube in one end, on described hollow steel tube Offer multiple injected hole I.
Further, described injected hole I is that outside is big, and the small taper hole in inner side, multiple injected hole I are evenly spaced in outer layer On the grouted anchor bar body of rod.
Further, described internal layer grouted anchor bar is the hollow steel tube that one end is provided with nut structure, described hollow Multiple injected hole II are offered on steel pipe, multiple injected hole II are evenly spaced on the internal layer grouted anchor bar body of rod.
When injected hole I, injected hole II align ensure slip casting it is unobstructed, staggeredly when ensure slurries can not flow into internal layer slip casting anchor Bar, inside and outside grouted anchor bar require high intensity and high pressure resistance.
A kind of repair system for repairing blower foundation cracking, including the pre-buried slip casting of described reparation blower foundation cracking Anchor pole.
Further, the repair system for repairing blower foundation cracking also includes slip casting machine, described slip casting machine for pair Described grouted anchor bar slip casting.
The method repaired using the repair system of described reparation blower foundation cracking, when blower foundation is constructed, In the uniform embedded foundation grouted anchor bar in blower foundation ring border;By controlling internal layer grouted anchor bar bolt arrangement, ensure internal layer note Starch bolt grouting hole with outer layer grouted anchor bar injected hole staggeredly to coordinate, ensure that slurries can not flow into internal layer grouted anchor bar;Pass through control Internal layer grouted anchor bar bolt arrangement processed, ensure that internal layer grouted anchor bar injected hole aligns cooperation with outer layer grouted anchor bar injected hole, guarantor Demonstrate,prove slurries and crack is injected by internal layer grouted anchor bar.It is specific as follows:
When blower foundation is constructed, in the uniform pre-buried grouted anchor bar in blower foundation ring border, construction, ensure inside and outside slip casting The injected hole of anchor pole staggeredly coordinates, and ensures that slurries can not flow into internal layer grouted anchor bar;
After laying fan foundation structure by design requirement, ensure that internal layer grouted anchor bar nut structure is exposed at concrete structure Outside, anchor rod bolt and pad are installed;
In fan operation as found blower foundation cracking, anchor rod bolt and pad are unloaded, internal layer grouted anchor bar is rotated, makes Inside and outside layer grouted anchor bar injected hole alignment, is connected slip casting machine with foundation slip casting anchor pole, the injection slurry being stirred is passed through slip casting Machine injects grouted anchor bar, and controls certain grouting pressure and injection speed, when foundation slip casting liquid at crack by flowing out Stop slip casting;Anchor rod bolt and pad are installed again after concrete setting.
Further, described grouted anchor bar is uniformly embedded in draught fan tower barrel base ring border.
The beneficial effects of the utility model are as follows:
The utility model is a kind of to repair blower foundation cracking pre-buried grouted anchor bar, system, passes through embedded foundation slip casting anchor Bar, when blower foundation ftractures, foundation slip casting liquid it is intact imported into basic internal, led because foundation slip casting anchor pole is good Tropism and crushing resistance, foundation slip casting liquid is penetrated into crack by the pressurization of foundation slip casting machine, completed to basic tiny crack With the reparation of larger crackle.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are these Some embodiments of utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to these accompanying drawings.
Fig. 1 is the utility model structure diagram;
Grouted anchor bar structural representation based on Fig. 2;
Fig. 3 is internal layer grouted anchor bar structural representation;
Fig. 4, Fig. 5 are outer layer grouted anchor bar structural representation;
Fig. 6 is the implementation steps schematic diagram that utility model repairs blower foundation cracking with pre-buried grouted anchor bar;
Wherein:1st, grouted anchor bar 2, foundation ring, 3, concrete structure, 4, slip casting machine, 5, injection slurry, 6, internal layer slip casting anchor Bar, 7, outer layer grouted anchor bar, 8, anchor rod bolt, 9, pad, 10, internal layer grouted anchor bar injected hole, 11, outer layer grouted anchor bar slip casting Hole.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
As shown in Figure 2,3, 4, it is a kind of to repair blower foundation cracking pre-buried grouted anchor bar, including the interior note being set in together Anchor pole 6 and outer grouted anchor bar 7 are starched, and two anchor poles are connected through a screw thread, one end of described internal grouting blot 6 and outer slip casting anchor Bar 7 aligns, and the other end extends to one hollow nut structure of outer connection of outer grouted anchor bar 7, among described nut structure Provided with the screw thread for installing anchor rod bolt 8, controlled by nut structure inside and outside layer grouted anchor bar injected hole staggeredly with it is right Neat mode.
The injected hole of internal grouting blot and outer grouted anchor bar align when ensure slip casting it is unobstructed, staggeredly when ensure slurries can not flow Enter internal layer grouted anchor bar, inside and outside grouted anchor bar requires high intensity and high pressure resistance.
Further, described outer layer grouted anchor bar is the female hollow steel tube in one end, on described hollow steel tube Offer multiple injected hole I (outer layer grouted anchor bar injected hole 11).
Further, described injected hole I is that outside is big, and the small taper hole in inner side, multiple injected hole I are evenly spaced in outer layer On the grouted anchor bar body of rod;Outside described here refers to the side directly contacted with drilling;Inner side only refers to adjacent with internal grouting blot Side;It is specific as shown in Figure 5;
After concrete structure 3 is constructed, concrete can enter the taper injected hole of outer layer slip casting anchor 7, when basis is ftractureed When taper injected hole extended to due to the vibration factor of blower fan, the hole Hui Shi cracks of taper, final foundation slip casting liquid 5 passes through taper Complete slip casting in injected hole gap.
Further, described internal layer grouted anchor bar is the hollow steel tube that one end is provided with nut structure, described hollow Multiple injected hole II (internal layer grouted anchor bar injected hole 10) are offered on steel pipe, multiple injected hole II are evenly spaced in internal layer slip casting On anchor rod body.
When injected hole I, injected hole II align ensure slip casting it is unobstructed, staggeredly when ensure slurries can not flow into internal layer slip casting anchor Bar, inside and outside grouted anchor bar require high intensity and high pressure resistance.
When blower foundation is constructed, in the uniform embedded foundation grouted anchor bar 1 in the border of blower foundation ring 2.By controlling internal layer to note Anchor rod bolt structure 6 is starched, ensures that internal layer grouted anchor bar injected hole 10 staggeredly coordinates with outer layer grouted anchor bar injected hole 11, ensures slurry Liquid can not flow into internal layer grouted anchor bar 6;By controlling internal layer grouted anchor bar bolt arrangement 6, ensure internal layer grouted anchor bar injected hole 10 align cooperation with outer layer grouted anchor bar injected hole 11, ensure that slurries inject crack by internal layer grouted anchor bar 6.
As shown in figure 1, the system repaired using pre-buried grouted anchor bar to blower foundation crack, including above-mentioned slip casting Anchor pole, slip casting machine, injection slurry, anchor rod bolt and pad;
Grouted anchor bar is uniformly embedded in draught fan tower barrel base ring border, and described foundation slip casting machine is used for foundation slip casting anchor pole Slip casting, the foundation slip casting liquid are used to inject basic internal reparation crack.Described anchor rod bolt and pad are used to protect basis The upside slurry-feeding hole of grouted anchor bar.Foundation slip casting liquid is that blower foundation is special, has preferable permeability and rapid-drying properties.
Described anchor rod bolt 8 and pad 9 is installed on when blower foundation is constructed at the nut structure of internal layer grouted anchor bar 6, For protecting the slip casting passage of basic grouted anchor bar 1, unloaded when blower foundation ftractures, make slip casting machine and internal layer grouted anchor bar 6 Connection.
Inside and outside grouted anchor bar 6,7 is coordinated by screw thread to be installed, and ensures that slip casting is unobstructed during the alignment of two bar injected holes, staggeredly when Ensure that slurries can not flow into internal layer grouted anchor bar, inside and outside grouted anchor bar 6,7 requires high intensity and high pressure resistance.
The method constructed using said system:
As shown in figure 1, when blower foundation is constructed, on the uniform embedded foundation grouted anchor bar 1 in the border of blower foundation ring 2, basis It is at regular intervals between grouted anchor bar 1 and foundation ring 2, by controlling internal layer grouted anchor bar bolt arrangement 6, ensure internal layer slip casting anchor Bar injected hole 10 staggeredly coordinates with outer layer grouted anchor bar injected hole 11, ensures that slurries can not flow into internal layer grouted anchor bar 6.Blower fan base After the completion of plinth concrete structure 3 is laid, ensure that internal layer grouted anchor bar bolt arrangement 6 is exposed at outside concrete structure 3, anchor pole is installed Bolt 8 and pad 9.
As shown in figure 5, as found, blower foundation has crack during fan operation, can be repaired by pre-buried grouted anchor bar, Specific implementation method is:Anchor rod bolt 8 and pad 9 are unloaded, by controlling internal layer grouted anchor bar bolt arrangement 6, ensures internal layer note Slurry bolt grouting hole 10 is alignd cooperation with outer layer grouted anchor bar injected hole 11, and foundation slip casting machine 4 and foundation slip casting anchor pole 1 are connected Connect, the foundation slip casting liquid 5 being stirred injected foundation slip casting anchor pole 1 by foundation slip casting machine 4, control certain grouting pressure with Injection speed, when have foundation slip casting liquid 5 by crack flow out can stop slip casting.Installation anchor rod bolt 8 and pad after to be solidified Piece 9.
Foundation slip casting anchor pole 1 two hollow steel tubes, lateral opening hole, inside and outside grouted anchor bar 6,7 for inside and outside are coordinated by screw thread Installation, ensure that slip casting is unobstructed during the injected hole alignment of two bars, staggeredly when ensure that slurries can not flow into internal layer grouted anchor bar, it is inside and outside Grouted anchor bar 6,7 requires high intensity and high pressure resistance.Described foundation slip casting liquid 5 by cement, water and additive by a certain percentage Configuration, has preferable permeability and rapid-drying properties.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model Within enclosing.

Claims (6)

1. one kind repairs the pre-buried grouted anchor bar of blower foundation cracking, it is characterised in that including the interior slip casting anchor being set in together Bar and outer grouted anchor bar, and two anchor poles are connected through a screw thread, one end of described internal grouting blot is alignd with outer grouted anchor bar, The other end extends to one hollow nut structure of outer connection of outer grouted anchor bar, is provided among described nut structure and is used to pacify Fill anchor rod bolt screw thread, controlled by nut structure inside and outside grouted anchor bar injected hole staggeredly and alignment thereof.
2. the pre-buried grouted anchor bar of blower foundation cracking is repaired as claimed in claim 1, it is characterised in that described outer slip casting Anchor pole is the female hollow steel tube in one end, and multiple injected hole I are offered on described hollow steel tube.
3. the pre-buried grouted anchor bar of blower foundation cracking is repaired as claimed in claim 2, it is characterised in that described injected hole I is that outside is big, and the small taper hole in inner side, multiple injected hole I are evenly spaced on the outer grouted anchor bar body of rod.
4. the pre-buried grouted anchor bar of blower foundation cracking is repaired as claimed in claim 1, it is characterised in that described interior slip casting Anchor pole is the hollow steel tube that one end is provided with nut structure, and multiple injected hole II are offered on described hollow steel tube.
5. a kind of repair system for repairing blower foundation cracking, it is characterised in that repair including claim 1-4 is any described The pre-buried grouted anchor bar of multiple blower foundation cracking.
6. the repair system of blower foundation cracking is repaired as claimed in claim 5, it is characterised in that also including slip casting machine, Described slip casting machine is used for described grouted anchor bar slip casting.
CN201621409495.4U 2016-12-21 2016-12-21 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system Active CN206873518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621409495.4U CN206873518U (en) 2016-12-21 2016-12-21 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621409495.4U CN206873518U (en) 2016-12-21 2016-12-21 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system

Publications (1)

Publication Number Publication Date
CN206873518U true CN206873518U (en) 2018-01-12

Family

ID=61325864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621409495.4U Active CN206873518U (en) 2016-12-21 2016-12-21 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system

Country Status (1)

Country Link
CN (1) CN206873518U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759560A (en) * 2016-12-21 2017-05-31 山东中车风电有限公司 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system and method
CN108193693A (en) * 2018-03-16 2018-06-22 沈阳建筑大学 A kind of orientation given layer grouting sleeve valve pipe and grouting method
CN112796807A (en) * 2021-02-09 2021-05-14 山东大学 Radial single-end double-expansion grouting anchor rod for broken rock stratum tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759560A (en) * 2016-12-21 2017-05-31 山东中车风电有限公司 One kind repairs blower foundation cracking pre-buried grouted anchor bar, system and method
CN106759560B (en) * 2016-12-21 2019-02-26 山东中车风电有限公司 A kind of reparation blower foundation cracking pre-buried grouted anchor bar, system and method
CN108193693A (en) * 2018-03-16 2018-06-22 沈阳建筑大学 A kind of orientation given layer grouting sleeve valve pipe and grouting method
CN112796807A (en) * 2021-02-09 2021-05-14 山东大学 Radial single-end double-expansion grouting anchor rod for broken rock stratum tunnel

Similar Documents

Publication Publication Date Title
CN206873518U (en) One kind repairs blower foundation cracking pre-buried grouted anchor bar, system
CN104594348A (en) Expanded head capsule type anchor rod and construction method thereof
CN108166517B (en) Well sealing method and well sealing device for super high-rise high-water pressure deep well dewatering well
CN204300520U (en) A kind of cable penetration sleeve structure
CN203160240U (en) Prestress self-generated and self-adjusted anchor cable anchoring device
CN202730656U (en) Double-beam-clamp triangular bracket for construction of highway bridge single-column pier bent cap
CN106759560B (en) A kind of reparation blower foundation cracking pre-buried grouted anchor bar, system and method
CN204592560U (en) A kind of adjustable cable crane span structure support supported for curved wall
CN104032713B (en) A kind of pressure diversion tunnel composite lining concrete anti-seepage structure and construction technology thereof
CN205875188U (en) Pressure -bearing precipitation well plugging device
CN203855937U (en) Composite lining concrete impervious structure of pressure water diversion tunnel
CN107740497B (en) Construction method for embedding foundation bolts on overflow surface of hydraulic building
CN204343286U (en) A kind of steel pipe pile support
CN205934864U (en) Induced seam grout platform structure of arch dam
CN206220114U (en) A kind of eight High-Rise Pile Cap Foundations
CN205100992U (en) Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously
CN106638731A (en) Method for repairing foundation crack of fan by utilizing grouting anchor rods
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN103994278B (en) A kind of push pipe circulating type grouting device
CN205130101U (en) A water jet equipment for highway roof beam is recuperated and is protected
CN203716117U (en) Well bore drainage structure of pressure regulating well
CN205857237U (en) A kind of rock anchor base structure being applicable to mountain region photovoltaic module
CN206706771U (en) A kind of combined support structure of sealing basis interpolation pile tube and rectangular pile
CN207989434U (en) A kind of material distributing machine jacking oil circuit connection device and concrete spreader
CN205134321U (en) Fixed ground tackle of stock static pressure stake machine base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant