CN206873443U - Carbon steel coil stake - Google Patents

Carbon steel coil stake Download PDF

Info

Publication number
CN206873443U
CN206873443U CN201720667936.9U CN201720667936U CN206873443U CN 206873443 U CN206873443 U CN 206873443U CN 201720667936 U CN201720667936 U CN 201720667936U CN 206873443 U CN206873443 U CN 206873443U
Authority
CN
China
Prior art keywords
straight type
guide pipe
extension tube
carbon steel
steel coil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720667936.9U
Other languages
Chinese (zh)
Inventor
于佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Simmles (Dalian) Technology Co.,Ltd.
Original Assignee
Sim Les (dalian) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sim Les (dalian) Technology Co Ltd filed Critical Sim Les (dalian) Technology Co Ltd
Priority to CN201720667936.9U priority Critical patent/CN206873443U/en
Application granted granted Critical
Publication of CN206873443U publication Critical patent/CN206873443U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of carbon steel coil stake, including guide pipe, the lower end of the guide pipe has ramp type wedge angle, and at least two rotors are sequentially provided with along the axis of the guide pipe, using welding or bolt connection between the rotor and the guide pipe;The guide pipe is straight type guide pipe;The carbon steel coil stake also includes at least one straight type extension tube, and the lower end of the straight type extension tube is provided with straight type adapter sleeve, and the lower end of the straight type adapter sleeve has bellmouth, and the upper end of the straight type extension tube has socket.Due to rotor many bigger than the cross sectional dimensions of guide pipe, the contact area with soil is added, strengthens bearing capacity of the present utility model;Fixing soil between two rotors, play a part of stable carbon steel screw pile, therefore, bearing capacity and uplift force ratio of the present utility model is high with the existing foundation pile of size.

Description

Carbon steel coil stake
Technical field
It the utility model is related to a kind of basic pile pipe, specifically a kind of carbon steel coil stake with rotor.
Background technology
At present, the basic species of engineering field is a lot, mainly there is concrete foundation and prefabricated pile basis.Concrete foundation one As ground excavated using large area, then make reinforced concrete foundation, spend substantial amounts of man power and material, and construction period and The concrete curing phase is all longer;Prefabricated pile basis includes concrete-pile and piling bar, is directly hammered onto it using special piling machine In soil, although this method short construction period, the engineering equipment used is huge, destruction during construction to surrounding environment compared with Greatly, noise caused by piling is very big, and the current whole society is to environmental requirement more and more higher, the side for prefabricated pile of being constructed using piling machine Method gradually decreases.
In order to solve the difficult difficulty with cycle length of the foundation construction of engineering field, rotation mode is employed by foundation pile spinning To soil, ground surface environment is not destroyed, does not produce construction noise, have obvious progress than traditional paddle type mill.In order to meet The demand of engineering field foundation construction, draws the experience of external rotating basis stake, and we are carried out on the basis of existing foundation pile Improve, it is preferably satisfied with the form of construction work of rotation.
Utility model content
According to technical problem set forth above, and provide a kind of carbon steel coil stake.
The technological means that the utility model uses is as follows:
A kind of carbon steel coil stake, it is characterised in that:Including guide pipe, the lower end of the guide pipe has ramp type wedge angle, At least two rotors are sequentially provided with along the axis of the guide pipe, using welding or bolt between the rotor and the guide pipe Connection;
The guide pipe is straight type guide pipe;
The carbon steel coil stake also includes at least one straight type extension tube, and the lower end of the straight type extension tube connects provided with straight type Female connector, the lower end of the straight type adapter sleeve have bellmouth, and the upper end of the straight type extension tube has socket;
When the number of the straight type extension tube is equal to 1, the straight type guide pipe upper end is held with the straight type adapter sleeve Mouth connection, and by bolt conjunction;
When the number of the straight type extension tube is more than 1, straight type extension tube lower end is saved in the straight type guide pipe upper end with first Straight type adapter sleeve bellmouth connection, and by bolt closing, by the straight type extension positioned at bottom between adjacent straight type extension tube The socket of pipe is connected with the bellmouth of the straight type adapter sleeve of superposed straight type extension tube lower end, and by bolt conjunction.
It is more than or equal to positioned at distance of the straight uppermost rotor of type guide pipe apart from the straight type guide pipe upper end 3500mm;Positioned at the straight nethermost rotor of type guide pipe apart from the end of the ramp type wedge angle be guide pipe external diameter+ 150mm。
The total length of the carbon steel coil stake is 1500-30000mm;
The straight type guide pipe and the external diameter of the straight type extension tube are 70-1200mm, and length is 3000- 9000mm, wall thickness are 4-20mm;
The length of the straight type adapter sleeve is 400-800mm, wall thickness 4-20mm;
The excircle configuration face of the rotor is higher 100-600mm than the outer wall of the straight type guide pipe, the thickness of the rotor For 8-30mm;
The rotor helically rises shape, and spiral number of turns are 1 circle.
The straight type extension tube is welded with the straight type adapter sleeve.
Equipment or structure are used as by carbon steel coil stake spinning to soil, carbon steel coil stake stays in using engineering equipment in soil The basis of part, realizes mechanized construction.In work progress, the head of engineering equipment drives carbon steel coil stake to rotate, while to Carbon steel coil stake applies downward pressure, and rotor gives birth to downward thrust in soil transfer movable property, and carbon steel coil stake is in pressure and spiral shell Under the collective effect for revolving thrust, carbon steel coil stake runs downwards in soil, progressed into soil.
Engineering equipment installation detecting device, during carbon steel coil pile driving construction, pass through detection arrangement monitors rotation torque Numerical value, the size of carbon steel coil pile bearing capacity is extrapolated according to the change of torque value.
According to the size of foundation bearing capacity, based on the single-column carbon steel coil stake being relatively large in diameter;Also may be selected by Based on the branched less carbon steel coil stake composition clump of piles of diameter;It also may be selected to be relatively large in diameter carbon steel coil stake and diameter be smaller Carbon steel coil stake composition an assorted size clump of piles based on.
After the completion of the stake of single-column carbon steel coil or construction of pile groups, pile body of the height not less than 300mm will be left on ground, is exceeded Pile body cutting it is smooth, pile body is welded on basic chassis, basic chassis reception device or component;Or utilize carbon steel coil stake Top pile body makes small-size concrete basis, for setting foundation bolt.
Different according to the Impact direction of equipment or component, carbon steel coil stake can be constructed into ground into required angle Degree.
Compared with prior art, due to rotor many bigger than the cross sectional dimensions of guide pipe, the contact with soil is added Area, strengthen bearing capacity of the present utility model;Fixing soil between two rotors, play a part of stable carbon steel screw pile, Therefore, bearing capacity and uplift force ratio of the present utility model is high with the existing foundation pile of size.
Based on carbon steel coil stake is entered its spinning in soil by engineering equipment, such as power Transmission shaft tower, street lamp And the basis such as Sign Board bar, solar components bar, line holder, factory chimney support and cable trough support, especially apply in spy Different sensitizing range, such as can not large area excavate regional, narrow and small construction area and pond waters, the frozen soil layer in winter use carbon steel It is with the obvious advantage based on screw pile.
The utility model can be widely popularized in fields such as Building technologies for the foregoing reasons.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is done simply to introduce in description of the prior art, it should be apparent that, drawings in the following description are Some embodiments of the utility model, for those of ordinary skill in the art, do not paying the premise of creative labor Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the space structure schematic diagram of specific embodiment of the present utility model medium carbon steel screw pile.
Fig. 2 is the front view of specific embodiment of the present utility model medium carbon steel screw pile.
Fig. 3 is Fig. 2 top view.
Fig. 4 is the front view of straight type extension tube in specific embodiment of the present utility model.
Fig. 5 is Fig. 4 top view.
Fig. 6 is the front view of rotor in specific embodiment of the present utility model.
Fig. 7 is Fig. 6 top view.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Accompanying drawing in type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, rather than whole embodiments.Based on the implementation in the utility model Example, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, is belonged to The scope of the utility model protection.
Example:Application of the carbon steel coil stake on national grid power tower foundation.
As shown in figs. 1-7, the newly-built three bases 220KV double backs high tension electric tower engineering of national grid, electric 30 meters of tower height degree, Mei Ge electricity Tower includes 4 column foots, it is necessary to make 4 column foot bases, and engineering makes 12 identical column foot bases altogether.
Engineering includes column foot foundation construction, the electric tower of assembling and sets up wire etc., if using concrete foundation construction technology, Excavate, compile the needs such as reinforcing bar, casting cement and health at least 30 days, will be unable to complete this engineering on schedule by this progress.
If, according to screw pile job specfication, prepared from carbon steel coil stake as electric tower foundation before constructing, engineering equipment Debugging and pile body construction, the duration only needs 8 days, fully meets national grid construction period, and can also save substantial amounts of manpower and Material resources.
According to both the above foundation construction project plan comparison, we finally select carbon steel coil stake and make electric tower foundation.
According to the requirement of the bearing capacity of electric tower foundation and uplift force, we by the basic engineering into single-column carbon steel coil stake, Carbon steel coil stake total length 10.7m, straight type extension tube 3 is saved by straight 1, three rotor 2 and one of type guide pipe of a section and formed, straight type is led External diameter to pipe 1 and straight type extension tube 3 is 324mm.
The place plane of ramp type wedge angle 4 of the straight lower end of type guide pipe 1 and the angle of the axis of straight type guide pipe 1 are in 45 °;Three The number of turns of individual rotor 2 is 1 circle, and the top 21 of rotor 2 and the difference in height of terminal 22 are 150mm, positioned at the straight type guide pipe 1 most Apart from the end 474mm of the ramp type wedge angle 4, the spacing of two neighboring rotor 2 is at the top 21 of following rotor 2 2743mm, rotor 2 are welded on straight type guide pipe 1;The lower end of straight type extension tube 3 is provided with straight type adapter sleeve 5, and the straight type extends Pipe 3 welds with the straight type adapter sleeve 5.
Directly the material of type guide pipe 1, straight type extension tube 3, straight type adapter sleeve 5 and rotor 2 is made from Q275 steel plates, table Face carries out galvanizing anti-corrosion.
Carbon steel coil stake key dimension is as follows:
Straight type guide pipe 1:External diameter 324mm, wall thickness 13mm, length 6100mm, quantity 12;
Straight type extension tube 3:External diameter 324mm, wall thickness 13mm, length 5233mm, quantity 12;
Straight type adapter sleeve 5:External diameter 355mm, wall thickness 13mm, length 673mm, quantity 12;
Rotor 2:External diameter 960mm, wall thickness 19mm, internal diameter 324mm, quantity 36.
Bolt 6:M64 × 370mm, 6.8 grades of galvanized bolts, 52 sets of quantity.
A diameter of 67mm of straight type guide pipe 1 and the upper bolt hole 7 of straight type adapter sleeve 5.
Geological prospecting, depth of exploration 20m are carried out to job site first.The disclosed stratum of drilling is to banket except top Outside, the predominantly the 4th is that Holocene series rushes diluvial formation, and 5 engineering geology layers are divided altogether from top to bottom by Characteristics of Geotechnical Engineering, existing Division from top to bottom:
1st laminin is banketed (Q4ml), 0.30~1.20m of thickness.
2nd layer of silty clay (Q4al), 1.90~6.30m of thickness.
3rd layer of silty clay (Q4al), 0.50~5.00m of thickness.
4th layer of round gravel (Q3al+pl), 10.10~14.50m of thickness.
5th layer of severely-weathered migmatitic granite (Ar), maximum gauge 1.20m.
Result explanation is surveyed, the geological conditions is adapted to the construction of carbon steel coil stake.
It is about 12-18 rice to survey soil thickness, is below lithosphere, according to bearing capacity and uplift force requirement, every carbon steel Screw pile needs to squeeze into subsurface 9-10 rice depth.
In work progress, it is not less than 45t, this equipment using similar to the same engineering equipment of excavator, equipment self-weight Carbon steel coil stake rotation and can be allowed to apply pressure to carbon steel coil stake.Engineering equipment installation detecting device, in carbon steel coil stake In work progress, by detection arrangement monitors rotation torque numerical value, carbon steel coil pile is extrapolated according to the change of torque value Carry the size of power.
Straight type guide pipe 1 is inserted in the rotating head of engineering equipment first, is fixed with 4 M64 bolts 6, is rotated Head uses fluid motor-driven, drives straight type guide pipe 1 to rotate, when straight type guide pipe 1 is spun to subsurface 5m, ground Upper remaining 1m is more, and now screen display pile body carrying is inadequate.In order to increase the bearing capacity of pile body and uplift force, it is necessary to which straight type is oriented to Pipe 1 is connected with straight type extension tube 3, increases the total length of carbon steel coil stake.By the straight upper end of type guide pipe 1 and straight type adapter sleeve 5 Bellmouth connects, and is formed a whole with 4 connections of M64 bolts 6, now by the upper end insertion rotating head of straight type extension tube 3 Blending bolt 6 is fixed, then is driven by rotating head, and pile body continues to be spun in soil, until computer shows that torque value meets Untill fundamental importance, illustrate the requirement for bearing capacity that this branch carbon steel coil stake has reached, now pile body there remains 0.9m on the ground.
The ground remainder of pile body is cut into height 0.3m from the ground with instrument, then welded pile body and sole plate It is connected together, such lower margin basis completes.
4 lower margin bases are made with same method, complete the basis of a base electricity tower.
Other two bases electric tower foundation is made with same procedure, so far three base electric tower foundations are fully completed.
After after testing, the bearing capacity on the lower margin basis of this three bases electricity tower reaches design requirement.
Electric tower lower margin is installed in carbon steel coil pile foundation, continues to assemble electric tower and stringing.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (4)

  1. A kind of 1. carbon steel coil stake, it is characterised in that:Including guide pipe, the lower end of the guide pipe has ramp type wedge angle, edge The axis of the guide pipe is sequentially provided with least two rotors, is connected between the rotor and the guide pipe using welding or bolt Connect;
    The guide pipe is straight type guide pipe;
    The carbon steel coil stake also includes at least one straight type extension tube, and the lower end of the straight type extension tube connects provided with straight type Set, the lower end of the straight type adapter sleeve have bellmouth, and the upper end of the straight type extension tube has socket;
    When the number of the straight type extension tube is equal to 1, the straight type guide pipe upper end and the bellmouth of the straight type adapter sleeve connect Connect, and by bolt conjunction;
    When the number of the straight type extension tube is more than 1, the straight of straight type extension tube lower end is saved in the straight type guide pipe upper end with first The bellmouth connection of type adapter sleeve, and by bolt closing, by the straight type extension tube positioned at bottom between adjacent straight type extension tube Socket is connected with the bellmouth of the straight type adapter sleeve of superposed straight type extension tube lower end, and by bolt conjunction.
  2. 2. carbon steel coil stake according to claim 1, it is characterised in that:Positioned at the uppermost rotor of the straight type guide pipe Distance apart from the straight type guide pipe upper end is more than or equal to 3500mm;Positioned at the nethermost rotor distance of the straight type guide pipe The end of the ramp type wedge angle is guide pipe external diameter+150mm.
  3. 3. carbon steel coil stake according to claim 1 or 2, it is characterised in that the total length of the carbon steel coil stake is 1500-30000mm;
    The straight type guide pipe and the external diameter of the straight type extension tube are 70-1200mm, and length is 3000-9000mm, wall Thickness is 4-20mm;
    The length of the straight type adapter sleeve is 400-800mm, wall thickness 4-20mm;
    The excircle configuration face of the rotor is higher 100-600mm than the outer wall of the straight type guide pipe, and the thickness of the rotor is 8- 30mm;
    The rotor helically rises shape, and spiral number of turns are 1 circle.
  4. 4. carbon steel coil stake according to claim 3, it is characterised in that the straight type extension tube and the straight type adapter sleeve Welding.
CN201720667936.9U 2017-06-09 2017-06-09 Carbon steel coil stake Active CN206873443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720667936.9U CN206873443U (en) 2017-06-09 2017-06-09 Carbon steel coil stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720667936.9U CN206873443U (en) 2017-06-09 2017-06-09 Carbon steel coil stake

Publications (1)

Publication Number Publication Date
CN206873443U true CN206873443U (en) 2018-01-12

Family

ID=61338649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720667936.9U Active CN206873443U (en) 2017-06-09 2017-06-09 Carbon steel coil stake

Country Status (1)

Country Link
CN (1) CN206873443U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012859A (en) * 2017-06-09 2017-08-04 希姆莱斯(大连)科技有限公司 Carbon steel coil stake

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012859A (en) * 2017-06-09 2017-08-04 希姆莱斯(大连)科技有限公司 Carbon steel coil stake

Similar Documents

Publication Publication Date Title
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN110004919B (en) Foundation pit enclosure construction method used in pipeline influence range
CN107130592A (en) A kind of long screw auger and impact drill two-shipper is combined pore-creating filling pile construction
CN110820765A (en) Prefabricated enclosure structure for narrow deep foundation pit and construction method
CN108842764B (en) Rotary stirring type anchor pipe construction method
CN104762937A (en) Pumped-storage hydroelectric plant applied to ecological reservoir and sewage treatment method
CN216948343U (en) Pipeline underground structure in weak soil texture area
CN211646449U (en) Combined single-pile foundation of offshore wind turbine
CN107012859A (en) Carbon steel coil stake
CN206873443U (en) Carbon steel coil stake
CN110984212A (en) Offshore wind turbine combined single-pile foundation and construction method
CN207331746U (en) A kind of underground pipe gallery
CN207660353U (en) A kind of upright bar bracing means in earth excavation
CN105926660A (en) Construction method of wind power low pile bearing platform foundation in intertidal zone
CN203383209U (en) Six-shaft cement mixing pile machine
CN201250401Y (en) Embedded pipe in a pile of a geothermal heat pump
CN115467360A (en) Construction method for iron tower foundation in marsh or muddy area
CN212294728U (en) Pile foundation structure is revolved to jacket
CN1514073A (en) Supporitng structure of breast wall
CN206752447U (en) A kind of dado structure for being used to build diaphram wall
TW202204733A (en) Geological improvement method of soft and weak cohesive soil capable of saving manpower, material resources and costs, and applicable to medium and small areas
CN101550699A (en) Construction method for large-diameter pipe protection around deep pit
CN214738132U (en) Large-area backfill uniform settlement device
CN111364496A (en) Jacket spinning pile foundation structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yu Yifei

Inventor before: Yu Pei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180521

Address after: 116000 4-1-901, B3, Xinghai Plaza, Shahekou District, Dalian, Liaoning.

Patentee after: Yu Yifei

Address before: 116000 room 506, three three building, 929 south-west mouth, Shahekou District, Liaoning, China

Patentee before: Sim Les (Dalian) Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210115

Address after: 116039 xinzhaizi street, daxinzhaizi village, xinzhaizi Town, Ganjingzi District, Dalian City, Liaoning Province

Patentee after: Simmles (Dalian) Technology Co.,Ltd.

Address before: 116000 4-1-901, B3, Xinghai Plaza, Shahekou District, Dalian, Liaoning.

Patentee before: Yu Yifei