CN206860612U - A kind of adjustable pipe fixing holder - Google Patents

A kind of adjustable pipe fixing holder Download PDF

Info

Publication number
CN206860612U
CN206860612U CN201720683436.4U CN201720683436U CN206860612U CN 206860612 U CN206860612 U CN 206860612U CN 201720683436 U CN201720683436 U CN 201720683436U CN 206860612 U CN206860612 U CN 206860612U
Authority
CN
China
Prior art keywords
clip
screw rod
metal derby
pipe fixing
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720683436.4U
Other languages
Chinese (zh)
Inventor
邱童
魏强
刘迎新
刘增威
于兆磊
于洋
林茂青
王晓琴
闫宏刚
朱骞
李康
杨海江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqing Jianan Construction Group Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Original Assignee
Qingdao Zhongjia Construction Group Co Ltd
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Zhongjia Construction Group Co Ltd, Qingdao Jianan Construction Group Co Ltd filed Critical Qingdao Zhongjia Construction Group Co Ltd
Priority to CN201720683436.4U priority Critical patent/CN206860612U/en
Application granted granted Critical
Publication of CN206860612U publication Critical patent/CN206860612U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of adjustable pipe fixing holder, including peg, the inner chamber bottom of the peg is provided with metal derby, and the front of the metal derby is provided with connecting rod, the connecting rod is connected by the first bolt with metal derby, and the bottom of the connecting rod is welded with channel-steel base.The adjustable pipe fixing holder, by promotion channel-steel base before and after loosening the second bolt metal derby can be made to be rotated in peg, by loosening the first bolt left-right rotation channel-steel base connecting rod can be made to be rotated on metal derby, the first clip and the second clip can be driven to adjust the angle of pipeline, by promoting the first clip and the second clip inside and outside, tightening nut fixes screw rod after the spacing between the first clip and the second clip can be adjusted, screw rod can be twisted with clockwise shearing laborsaving bar into fixed seat, so as to which the first clip and the second clip are firmly fixed together, can be with the different pipeline of fixed size.

Description

A kind of adjustable pipe fixing holder
Technical field
Building auxiliary equipment technical field is the utility model is related to, specially a kind of adjustable pipe fixing holder.
Background technology
With the progress of Building technology, China's Steel Structure Industry enters science, the new situation of spanning development, all kinds of using pipe The building of truss Steel Structure is more and more, and steel-tube construction has good resistance to compression, counter-bending bearing capacity and greater stiffness, and It is more easy to construct all kinds of complex curves and moulding, thus it is large-scale public on industrial premises, gymnasium, conference and exhibition center, station, airport etc. It is used widely in building, has reached structure safety and the effect of good appearance, large-scale tube truss structure building is most Using glass curtain wall or aluminium sheet roofing, and area and the gradient are larger, for ensure smoothly to draw rain water on roof in the rainy day it is lower, it is necessary to Uniformly rainwater pipeline is arranged in laying at regular intervals on the tubular truss of building facade, in cranky, complicated tubular truss Upper fixed rainwater pipeline is a complexity, difficult engineering, and the fixture of rainwater pipeline is mostly using welding method and pipe at present Truss structure welds together, and such a way have impact on the structural strength and rigidity of steel pipe to a certain extent, easily cause knot Structure corrodes and later stage rainwater pipeline maintainance is extremely inconvenient, while the pipeline that different fixed sizes are different, use limitation compared with Greatly.
Utility model content
The purpose of this utility model is to provide a kind of adjustable pipe fixing holder, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of adjustable pipe fixing holder, including Peg, the inner chamber bottom of the peg are provided with metal derby, and the peg is connected by the second bolt with metal derby, the metal The front of block is provided with connecting rod, and the connecting rod is connected by the first bolt with metal derby, the bottom welding of the connecting rod There is channel-steel base, the upper surface of the channel-steel base is provided with screw rod chute, is respectively mounted at left and right sides of the bottom of the channel-steel base There are the first clip and the second clip, the top of first clip and the second clip is mounted on the first screw rod, first spiral shell Bar runs through screw rod chute, nut is socketed with the outer wall of first screw rod, first screw rod is connected with nut thread, described Pipeline is installed, the bottom of first clip is provided with connecting plate, the connecting plate on the inside of the first clip and the second clip Left side the second screw rod is installed, the connecting plate is connected with the second screw flight, and province is welded with the left of second screw rod Power bar, the bottom of second clip are provided with fixed seat, and second screw rod is connected with fixed seat screw thread.
Preferably, the right side bottom of first clip is provided with rectangular block, the left side bottom end surface of second clip Provided with neck, the neck matches with rectangular block.
Preferably, it is mounted on handle on the outside of first clip and the second clip.
Preferably, the inner surface of first clip and the second clip is fitted with rubber slab.
Preferably, the junction of the connecting rod and channel-steel base is provided with securing plate.
Compared with prior art, the beneficial effects of the utility model are:The adjustable pipe fixing holder, by loosening the Two bolts are front and rear to promote channel-steel base metal derby can be made to be rotated in peg, by loosening the first bolt left-right rotation channel-section steel base Seat can be such that connecting rod is rotated on metal derby, and the first clip and the second clip can be driven to adjust the angle of pipeline, constructed During conveniently pipeline can be fixed on steel building, do not moved towards locally to be limited by building tubular truss, The flexible arrangement of pipeline is realized, by promoting the first clip and the second clip inside and outside, the first clip and second can be made Clip drives screw rod to be slided in screw rod chute, and tightening nut will after can adjusting the spacing between the first clip and the second clip Screw rod is fixed, and is connected by screw rod with connecting plate and fixed seat screw thread, can be turned round screw rod with the laborsaving bar of clockwise shearing Move into fixed seat, so that the first clip and the second clip are firmly fixed together, can with the different pipeline of fixed size, It is smaller to use limitation, can meet to use needs.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is screw rod sliding groove structure schematic diagram of the present utility model.
In figure:1st, peg, the 2, first bolt, 3, securing plate, the 4, first screw rod, 5, channel-steel base, 6, handle, 7, first Clip, 8, pipeline, 9, rectangular block, 10, laborsaving bar, the 11, second screw rod, 12, connecting plate, 13, fixed seat, 14, neck, 15, rubber Offset plate, the 16, second clip, 17, nut, 18, connecting rod, the 19, second bolt, 20, metal derby, 21, screw rod chute.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of adjustable pipe fixing holder, including hang Bar 1, the inner chamber bottom of peg 1 are provided with metal derby 20, and peg 1 is connected by the second bolt 19 with metal derby 20, passes through loosening Second bolt, 19 front and rear promotion channel-steel base 5 can be such that metal derby 20 is rotated in peg 1, and the front of metal derby 20 is provided with Connecting rod 18, connecting rod 18 are connected by the first bolt 2 with metal derby 20, by loosening the left-right rotation channel-section steel base of the first bolt 2 Seat 5 can be such that connecting rod 18 is rotated on metal derby 20, and the first clip 7 and the second clip 16 can be driven to adjust the angle of pipeline 8 Degree, the bottom of connecting rod 18 are welded with channel-steel base 5, and connecting rod 18 and the junction of channel-steel base 5 are provided with securing plate 3, led to The connection of connecting rod 18 and channel-steel base 5 can be strengthened by crossing securing plate 3, and the upper surface of channel-steel base 5 is provided with screw rod chute 21, groove Be mounted on the first clip 7 and the second clip 16 at left and right sides of the bottom of base steel seat 5, the first clip 7 and the second clip 16 it is interior Side surface is fitted with rubber slab 15, can prevent the first clip 7 and the second clip 16 from wearing pipeline 8 by rubber slab 15, the The outside of one clip 7 and the second clip 16 is mounted on handle 6, and the first clip 7 and can be more easily pulled by handle 6 The top of two clips 16, the first clip 7 and the second clip 16 is mounted on the first screw rod 4, and the first screw rod 4 runs through screw rod chute 21, nut 17 is socketed with the outer wall of the first screw rod 4, and the first screw rod 4 is connected with the screw thread of nut 17, by being promoted inside and outside First clip 7 and the second clip 16, the first clip 7 and the second clip 16 can be made to drive the first screw rod 4 in screw rod chute 21 Sliding, tightening nut 17 fixes the second screw rod 11 after can adjusting the spacing between the first clip 7 and the second clip 16, the The inner side of one clip 7 and the second clip 16 is provided with pipeline 8, and the bottom of the first clip 7 is provided with connecting plate 12, connecting plate 12 Left side is provided with the second screw rod 11, and connecting plate 12 is connected with the screw thread of the second screw rod 11, and the left side of the second screw rod 11 is welded with laborsaving Bar 10, the bottom of the second clip 16 are provided with fixed seat 13, and the second screw rod 11 is connected with the screw thread of fixed seat 13, passes through the second screw rod 11 are connected with connecting plate 12 and the screw thread of fixed seat 13, the second screw rod 11 can be twisted with the laborsaving bar 10 of clockwise shearing into , can be with the different pipeline of fixed size so as to which the first clip 7 and the second clip 16 are firmly fixed together in fixed seat 13 8, the right side bottom of the first clip 7 is provided with rectangular block 9, and the left side bottom end surface of the second clip 16 is provided with neck 14, neck 14 Match with rectangular block 9, when the first clip 7 and the second clip 16 link together, rectangular block 9 can be made to enter neck 14 It is interior, strengthen the first clip 7 and the second clip 16 connects.
Loosening 19 front and rear promotion channel-steel base 5 of the second bolt can be such that metal derby 20 is rotated in peg 1, loosen the first spiral shell The left-right rotation channel-steel base 5 of bolt 2 can be such that connecting rod 18 is rotated on metal derby 20, can drive the first clip 7 and the second card Pipeline 8, can conveniently be fixed on steel building, pass through by the angle of the regulation pipeline 8 of folder 16 in work progress The first clip 7 and the second clip 16 are promoted inside and outside, the first clip 7 and the second clip 16 can be made to drive the first screw rod 4 Slide in the screw rod chute 21, tightening nut 17 can be adjusted after the spacing between the first clip 7 and the second clip 16 by second Screw rod 11 is fixed, and can be twisted the second screw rod 11 into fixed seat 13 with the laborsaving bar 10 of clockwise shearing, so as to by the One clip 7 and the second clip 16 are firmly fixed together, can be with the different pipeline 8 of fixed size.
In description of the present utility model, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " in Portion ", " other end ", " on ", " side ", " top ", " interior ", " front portion ", " center ", the orientation of the instruction such as " both ends " or position close It is to be described based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplifying, rather than Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore can not It is interpreted as to limitation of the present utility model.
In addition, term " first ", " second ", " the 3rd ", " the 4th " are only used for describing purpose, and it is not intended that instruction or Relative importance or the implicit quantity for indicating indicated technical characteristic are implied, thus, defines " first ", " second ", " the Three ", at least one this feature can be expressed or be implicitly included to the feature of " the 4th ".
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu Calmly ", the term such as " spinning " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally; Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be with It is connection or the interaction relationship of two elements of two element internals, is limited unless otherwise clear and definite, for this area For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

  1. A kind of 1. adjustable pipe fixing holder, it is characterised in that:Including peg (1), the inner chamber bottom installation of the peg (1) There is metal derby (20), the peg (1) is connected by the second bolt (19) with metal derby (20), the front of the metal derby (20) Connecting rod (18) is installed, the connecting rod (18) is connected by the first bolt (2) with metal derby (20), the connecting rod (18) Bottom be welded with channel-steel base (5), the upper surface of the channel-steel base (5) is provided with screw rod chute (21), the channel-steel base (5) the first clip (7) and the second clip (16), first clip (7) and the second clip are mounted at left and right sides of bottom (16) top is mounted on the first screw rod (4), and first screw rod (4) runs through screw rod chute (21), first screw rod (4) Outer wall on be socketed with nut (17), first screw rod (4) is connected with nut (17) screw thread, first clip (7) and Pipeline (8) is installed, the bottom of first clip (7) is provided with connecting plate (12), the connection on the inside of two clips (16) Second screw rod (11) is installed on the left of plate (12), the connecting plate (12) is connected with the second screw rod (11) screw thread, and described second It is welded with laborsaving bar (10) on the left of screw rod (11), the bottom of second clip (16) is provided with fixed seat (13), and described Two screw rods (11) are connected with fixed seat (13) screw thread.
  2. A kind of 2. adjustable pipe fixing holder according to claim 1, it is characterised in that:First clip (7) Right side bottom is provided with rectangular block (9), and the left side bottom end surface of second clip (16) is provided with neck (14), the neck (14) match with rectangular block (9).
  3. A kind of 3. adjustable pipe fixing holder according to claim 1, it is characterised in that:First clip (7) and Handle (6) is mounted on the outside of second clip (16).
  4. A kind of 4. adjustable pipe fixing holder according to claim 1, it is characterised in that:First clip (7) and The inner surface of second clip (16) is fitted with rubber slab (15).
  5. A kind of 5. adjustable pipe fixing holder according to claim 1, it is characterised in that:The connecting rod (18) and groove The junction of base steel seat (5) is provided with securing plate (3).
CN201720683436.4U 2017-06-13 2017-06-13 A kind of adjustable pipe fixing holder Expired - Fee Related CN206860612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720683436.4U CN206860612U (en) 2017-06-13 2017-06-13 A kind of adjustable pipe fixing holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720683436.4U CN206860612U (en) 2017-06-13 2017-06-13 A kind of adjustable pipe fixing holder

Publications (1)

Publication Number Publication Date
CN206860612U true CN206860612U (en) 2018-01-09

Family

ID=60831950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720683436.4U Expired - Fee Related CN206860612U (en) 2017-06-13 2017-06-13 A kind of adjustable pipe fixing holder

Country Status (1)

Country Link
CN (1) CN206860612U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108761149A (en) * 2018-08-24 2018-11-06 湖北仪天成电力设备有限公司 A kind of electrified tester for zinc oxide arrester

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108761149A (en) * 2018-08-24 2018-11-06 湖北仪天成电力设备有限公司 A kind of electrified tester for zinc oxide arrester

Similar Documents

Publication Publication Date Title
CN206785793U (en) A kind of multi-angle pipe fixing holder
CN206769395U (en) A kind of inner corner trim support meanss of concrete blinding support
CN205888478U (en) Steel pipe automatic welding production line removes welding slag device
CN206449303U (en) A kind of special plug-in type pipe-hanger support of subway
CN213453971U (en) Air conditioner installing support with adjustable length
CN203603452U (en) Folded plate small space formwork assembly
CN206860612U (en) A kind of adjustable pipe fixing holder
CN206376527U (en) A kind of aluminum alloy pattern plate back cord component
CN202509837U (en) Multi-functional adjustable concrete rod reinforcing device
CN205276614U (en) But angle regulation's glass attaches frame device
CN208749101U (en) A kind of assembled superimposed sheet die fixture
CN208528436U (en) A kind of automatic turning platform of manual welding elbow
CN216098741U (en) Quick screwing device for adjustable bracket for jacking and flat supporting of disc-buckle type scaffold
CN206815540U (en) A kind of positioner for concrete structure built-in fitting
CN209614904U (en) Cutting means are used in a kind of processing of seamless steel pipe
CN209309480U (en) A kind of combined anti-seismic suspension and support
CN207048371U (en) A kind of road bridge construction support meanss
CN210658684U (en) Assembled steel structure
CN202032778U (en) Solar water heater bracket
CN110529708A (en) A kind of solar energy traffic monitoring bar of adjustable angle
CN206904363U (en) A kind of novel multiple angle pipeline fixing device
CN214889657U (en) Electromechanical pipeline PVC screw rod composite module and spacing support
CN111946142A (en) Rail guard that construction outer wall was used
CN206903567U (en) A kind of electric power overhaul engineering frame
CN215101548U (en) Adjustable diagonal draw bar device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 302, room 29, No. 171, Jinshui Road, Licang District, Qingdao, Shandong

Co-patentee after: ZHONGQING JIANAN CONSTRUCTION GROUP Co.,Ltd.

Patentee after: QINGDAO ZHONGJIA CONSTRUCTION GROUP Co.,Ltd.

Address before: Room 302, room 29, No. 171, Jinshui Road, Licang District, Qingdao, Shandong

Co-patentee before: QINGDAO JIANAN CONSTRUCTION GROUP Co.,Ltd.

Patentee before: QINGDAO ZHONGJIA CONSTRUCTION GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180109