CN206858987U - A kind of asphalt pavement structure suitable for high temperature difference area - Google Patents

A kind of asphalt pavement structure suitable for high temperature difference area Download PDF

Info

Publication number
CN206858987U
CN206858987U CN201720741627.1U CN201720741627U CN206858987U CN 206858987 U CN206858987 U CN 206858987U CN 201720741627 U CN201720741627 U CN 201720741627U CN 206858987 U CN206858987 U CN 206858987U
Authority
CN
China
Prior art keywords
basic unit
layer
cutting optimal
high temperature
temperature difference
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720741627.1U
Other languages
Chinese (zh)
Inventor
朱校军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Lushun Environment Construction Co Ltd
Original Assignee
Hangzhou Lushun Environment Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Lushun Environment Construction Co Ltd filed Critical Hangzhou Lushun Environment Construction Co Ltd
Priority to CN201720741627.1U priority Critical patent/CN206858987U/en
Application granted granted Critical
Publication of CN206858987U publication Critical patent/CN206858987U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

It the utility model is related to road engineering technical field,Especially a kind of asphalt pavement structure suitable for high temperature difference area,Including roadbed,The top of the roadbed is disposed with concrete layer from the bottom to top,Basic unit and surface layer,The bottom gone to a grassroots level is fixed on the upper surface of concrete layer,Brace has been equidistantly positioned in the adhesive linkage,The both ends of the brace are fixedly connected through the middle part of fixed plate with being arranged on the through hole of fixed plate with fixed block,The upper basic unit and go to a grassroots level and upper equidistant be provided with preset clearance,The top of the upper basic unit is fixedly installed cutting optimal,Gap filler is provided with the collapsible tube,The top of the cutting optimal is provided with waterproof layer,One side of the waterproof layer away from cutting optimal is provided with upper layer,The utility model is simple in construction,It is easy to make,Road surface is avoided to be affected by temperature,Effectively raise the service life of bituminous paving,The security performance of driving is improved simultaneously.

Description

A kind of asphalt pavement structure suitable for high temperature difference area
Technical field
It the utility model is related to road engineering technical field, more particularly to a kind of bituminous paving suitable for high temperature difference area Structure.
Background technology
Bituminous paving due to its have the characteristics that preferable road-ability, be easy to repair, low cost at initial stage gradually pushed away Wide application, but Pavement Low crack, high temperature rut disease are never effectively solved, the high temperature of bituminous paving, Low temperature damage problem is mainly related to traffic loading, environment temperature and pavement structure and material.Xinjiang of China, Qinghai, Shaanxi The areas such as the north, North of Shanxi, summer in the winter temperature difference is big, and day and night temperature is big, especially in some areas winter summer temperature difference up to 80 DEG C, winter Day and night temperature is up to 20~25 DEG C.Summer high temperature is easily caused asphalt pavement rut disease, and winter low temperature easily causes bituminous paving to be received Contracting cracking, and then trigger rainy season summer in autumn road surface Moisture Damage, cause road surface generating function to destroy.
In road engineering research process, environment temperature belongs to unmanageable factor, under the influence of environment temperature, when Cause pavement structure to decline under the repeat function of traffic load, purt mud phenomenon occur, the asphalt material of crack both sides is damaged, therewith There is pit-hole, it will be apparent that reduce traffic safety performance, Pavement Performance in Distress and life cycle cause the shadow that can not be estimated Ring, greatly reduce the service life of bituminous paving.
Utility model content
The purpose of this utility model is easily to be affected by temperature thermal boundary shrinkage to solve to exist in the prior art road surface, when Bituminous paving is easily damaged when vehicle passes through, and service life is low, poor safety performance, influences using effect, and the one kind proposed is fitted Asphalt pavement structure for high temperature difference area.
To achieve these goals, the utility model employs following technical scheme:
Design a kind of asphalt pavement structure suitable for high temperature difference area, including roadbed, the top of the roadbed by it is lower extremely On be disposed with concrete layer, basic unit and surface layer, the both sides of the roadbed are fixedly installed fixed plate, two pieces of fixations The middle part of plate is equidistant to offer through hole, and side of the fixed plate away from roadbed is provided with fixed block, and the basic unit includes upper base Layer and go to a grassroots level, the bottom gone to a grassroots level is fixed on the upper surface of concrete layer, and the upper surface gone to a grassroots level passes through bonding Layer is connected with the lower surface of upper basic unit, brace has been equidistantly positioned in the adhesive linkage, the both ends of the brace are run through The middle part of fixed plate is fixedly connected with being arranged on the through hole of fixed plate with fixed block, the upper basic unit and upper equidistant set of going to a grassroots level Preset clearance is equipped with, the preset clearance is vertically arranged with brace, and the top of the upper basic unit is fixedly installed cutting optimal, institute The collapsible tube being provided with cutting optimal with being connected at the top of preset clearance is stated, gap filler is provided with the collapsible tube, it is described following The top of layer is provided with waterproof layer, and one side of the waterproof layer away from cutting optimal is provided with upper layer.
Preferably, the upper layer is SMA asphalts, and the cutting optimal is AC asphalts.
Preferably, the top of the preset clearance and the upper surface flush of upper basic unit, the bottom of the preset clearance is with The lower surface of basic unit flushes.
Preferably, the waterproof layer is FRP waterproof clothes, and the two sides of FRP waterproof clothes by asphalt adhesive respectively with above Layer, cutting optimal connection.
Preferably, the upper basic unit is OGFC asphalts with going to a grassroots level.
The utility model proposes a kind of asphalt pavement structure suitable for high temperature difference area, beneficial effect is:Pass through Collapsible tube is set in layer below, preset clearance is set in upper basic unit and on going to a grassroots level, and preset clearance is connected with collapsible tube, Influence of the temperature to bituminous paving can be reduced, improve bituminous paving benefits from the life-span, solid by being set in the both sides of roadbed Fixed board, and connected two fixed plates by brace, it can prevent the shrinkage of bituminous paving heat expansion from deforming, the utility model structure Simply, it is easy to make, avoid road surface from being affected by temperature, effectively raise the service life of bituminous paving, while improve row The security performance of car.
Brief description of the drawings
Fig. 1 be the utility model proposes it is a kind of suitable for high temperature difference area asphalt pavement structure structural representation.
In figure:Fixed plate 1, upper layer 2, waterproof layer 3, cutting optimal 4, upper basic unit 5, preset clearance 6, adhesive linkage 7, collapsible tube 8th, fixed block 9, brace 10,11, concrete layer 12 of going to a grassroots level, roadbed 13.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.
Reference picture 1, a kind of asphalt pavement structure suitable for high temperature difference area, including roadbed 13, the top of roadbed 13 by Under it is supreme be disposed with concrete layer 12, basic unit and surface layer, the both sides of roadbed 13 are fixedly installed fixed plate 1, and two pieces are solid The middle part of fixed board 1 is equidistant to offer through hole, and side of the fixed plate 1 away from roadbed 13 is provided with fixed block 9, and basic unit includes upper Basic unit 5 and go to a grassroots level 11, upper basic unit 5 and to go to a grassroots level 11 be OGFC asphalts, 11 bottom of going to a grassroots level is fixed on coagulation The upper surface of soil layer 12,11 upper surface of going to a grassroots level are connected by adhesive linkage 7 with the lower surface of upper basic unit 5, equidistant in adhesive linkage 7 From brace 10 is provided with, the both ends of brace 10 are through the middle part of fixed plate 1 and the through hole and the fixation that are arranged on fixed plate 1 Block 9 is fixedly connected, and upper basic unit 5 and is gone to a grassroots level and equidistant on 11 is provided with preset clearance 6, the top of preset clearance 6 and upper basic unit 5 Upper surface flush, the bottom of preset clearance 6 flushed with 11 lower surface of going to a grassroots level, and preset clearance 6 is vertical with brace 10 to be set Put, the top of upper basic unit 5 is fixedly installed cutting optimal 4, and the collapsible tube being connected with the top of preset clearance 6 is provided with cutting optimal 4 8, gap filler is provided with collapsible tube 8, and the top of cutting optimal 4 is provided with waterproof layer 3, and waterproof layer 3 is FRP waterproof clothes, and FRP prevents The two sides of water cloth is connected with upper layer 2, cutting optimal 4 respectively by asphalt adhesive, and one side of the waterproof layer 3 away from cutting optimal 4 is set There is upper layer 2, upper layer 2 is SMA asphalts, and cutting optimal 4 is AC asphalts.
Workflow:The utility model in use, when the temperature is too low, the upper basic unit 5 of bituminous paving and lower base 11 shrinkage of layer, preset clearance 6 become big, and the gap filler in collapsible tube 8, which is extruded, to be filled into preset clearance 6, is sealed against, is drawn simultaneously Strengthening tendons 10 tenses the fixed plate 1 of both sides, can prevent bituminous paving from deforming, when temperature is too high, the upper basic unit 5 of bituminous paving Expand, preset clearance 6 is diminished, gap filler is pushed back collapsible tube 8 by preset clearance 6 in the presence of high-temperature with going to a grassroots level 11 It is interior, temperature can be avoided to influence road surface.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (5)

1. a kind of asphalt pavement structure suitable for high temperature difference area, including roadbed(13), the roadbed(13)Top under It is supreme to be disposed with concrete layer(12), basic unit and surface layer, it is characterised in that:The roadbed(13)Both sides be fixedly installed There is fixed plate(1), two pieces of fixed plates(1)Middle part equidistant offer through hole, and fixed plate(1)Away from roadbed(13)'s Side is provided with fixed block(9), the basic unit includes upper basic unit(5)With go to a grassroots level(11), it is described to go to a grassroots level(11)Bottom consolidate It is scheduled on concrete layer(12)Upper surface, it is described to go to a grassroots level(11)Upper surface pass through adhesive linkage(7)With upper basic unit(5)Following table Face connects, the adhesive linkage(7)Inside it has been equidistantly positioned brace(10), the brace(10)Both ends run through fixed plate (1)Middle part and be arranged on fixed plate(1)Through hole and fixed block(9)It is fixedly connected, the upper basic unit(5)With going to a grassroots level(11) It is above equidistant to be provided with preset clearance(6), the preset clearance(6)With brace(10)It is vertically arranged, the upper basic unit(5)'s Top is fixedly installed cutting optimal(4), the cutting optimal(4)Inside it is provided with and preset clearance(6)The connected collapsible tube in top (8), the collapsible tube(8)Inside it is provided with gap filler, the cutting optimal(4)Top be provided with waterproof layer(3), the waterproof layer (3)Away from cutting optimal(4)One side be provided with upper layer(2).
A kind of 2. asphalt pavement structure suitable for high temperature difference area according to claim 1, it is characterised in that:On described Surface layer(2)For SMA asphalts, the cutting optimal(4)For AC asphalts.
A kind of 3. asphalt pavement structure suitable for high temperature difference area according to claim 1, it is characterised in that:It is described pre- Stay gap(6)Top and upper basic unit(5)Upper surface flush, the preset clearance(6)Bottom with going to a grassroots level(11)Under Surface flushes.
A kind of 4. asphalt pavement structure suitable for high temperature difference area according to claim 1, it is characterised in that:It is described anti- Water layer(3)For FRP waterproof clothes, and the two sides of FRP waterproof clothes by asphalt adhesive respectively with upper layer(2), cutting optimal(4)Even Connect.
A kind of 5. asphalt pavement structure suitable for high temperature difference area according to claim 1, it is characterised in that:On described Basic unit(5)With going to a grassroots level(11)It is OGFC asphalts.
CN201720741627.1U 2017-06-23 2017-06-23 A kind of asphalt pavement structure suitable for high temperature difference area Active CN206858987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720741627.1U CN206858987U (en) 2017-06-23 2017-06-23 A kind of asphalt pavement structure suitable for high temperature difference area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720741627.1U CN206858987U (en) 2017-06-23 2017-06-23 A kind of asphalt pavement structure suitable for high temperature difference area

Publications (1)

Publication Number Publication Date
CN206858987U true CN206858987U (en) 2018-01-09

Family

ID=60827774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720741627.1U Active CN206858987U (en) 2017-06-23 2017-06-23 A kind of asphalt pavement structure suitable for high temperature difference area

Country Status (1)

Country Link
CN (1) CN206858987U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396886A (en) * 2019-07-06 2019-11-01 广东宏骏建筑工程有限公司 A kind of reinforced asphalt pavement construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396886A (en) * 2019-07-06 2019-11-01 广东宏骏建筑工程有限公司 A kind of reinforced asphalt pavement construction method

Similar Documents

Publication Publication Date Title
CN203960710U (en) Sidewalk solar pavement
CN205368928U (en) A bituminous pavement structure for cement concrete pavement reforms transform
CN107059534B (en) A kind of solar energy Highway Pavement Structures
CN202347385U (en) Novel asphalt overlaying structure of cement concrete pavement
CN102251454B (en) Process for quickly repairing semi-rigid substrate damage of asphalt pavement
CN204212019U (en) Phase transformation cooling asphalt pavement structure
CN206109917U (en) Municipal administration road protection road surface
CN204608547U (en) A kind of Permafrost Area is for spreading the ventilation curb of flexible pavement heat
CN207031945U (en) A kind of composite pavement structure
CN204940041U (en) Concrete dynamic modulus cooling asphalt pavement structure
CN206858987U (en) A kind of asphalt pavement structure suitable for high temperature difference area
CN201574343U (en) Road surface structure lifted from old road surface
CN107268378A (en) A kind of asphalt pavement structure
CN204940043U (en) A kind of asphalt pavement structure being applicable to hot area
CN205557220U (en) Wind amasss husky berm frozen soil roadbed structure
CN208038953U (en) Novel pavement structure in subsidence area
CN105603846A (en) Dual-layer glass fiber concrete pavement structure applicable to city roads
CN206858986U (en) Town road bituminous paving
CN204162965U (en) A kind of asphalt pavement structure being applicable to high temperature difference area
CN205874895U (en) Be used for overpass pitch layer snow melt thawing apparatus of mating formation
CN203668782U (en) Structural layer for building frozen soil road
CN205223822U (en) Bituminous pavement maintenance heating device
CN105735077B (en) A kind of continuous reinforced concrete pavement structure suitable for urban road
CN105780625B (en) It is applicable the double layer reinforced concrete pavement structure of area of heavy rainfull urban road
CN105735078B (en) A kind of double layer continuous reinforced concrete pavement structure suitable for area of heavy rainfull

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant