CN207031945U - A kind of composite pavement structure - Google Patents

A kind of composite pavement structure Download PDF

Info

Publication number
CN207031945U
CN207031945U CN201720740104.5U CN201720740104U CN207031945U CN 207031945 U CN207031945 U CN 207031945U CN 201720740104 U CN201720740104 U CN 201720740104U CN 207031945 U CN207031945 U CN 207031945U
Authority
CN
China
Prior art keywords
layer
composite
pavement structure
basic unit
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720740104.5U
Other languages
Chinese (zh)
Inventor
吴佑平
范雪强
朱如武
楼伟鑫
朱军光
方俊杰
吴小敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Interchange International Engineering Co Ltd
Original Assignee
Zhejiang Jiaogong Qianchao Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiaogong Qianchao Construction Co Ltd filed Critical Zhejiang Jiaogong Qianchao Construction Co Ltd
Priority to CN201720740104.5U priority Critical patent/CN207031945U/en
Application granted granted Critical
Publication of CN207031945U publication Critical patent/CN207031945U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to highway engineering technical field, there is provided a kind of composite pavement structure, including roadbed, is also included in from bottom to top set on roadbed anti-and is impregnated with back-up coat, basic unit, suppression parting, water-proof tack coat, stress absorbing layer and surface layer;Prevent that it is composite geo-membrane to be impregnated with back-up coat, basic unit uses cement stabilized macadam base or two grey basic units, suppression parting is steel plastic compount GSZ, water-proof tack coat uses water-base epoxy asphalt waterproofing tack coat, stress absorbing layer uses SBS modified asphalt macadams layer or rubber asphalt metalling, and surface layer is modified asphalt layer.The utility model improves usage capability of road; avoid the generation of base course crack and reflection cracking in a pavement phenomenon; reduce the influence of loading stress; realize effective protection of road surface structare layer; extend service life of road surface; and it is not required to frequently conserve so that the cost of highway engineering cost substantially reduces.

Description

A kind of composite pavement structure
Technical field
It the utility model is related to highway engineering technical field, and in particular to a kind of composite pavement structure.
Background technology
At present, in domestic road construction, using cement stabilized macadam, this semi-rigid structure makees sub-surface, but cement more Obvious defect in road construction be present in this semi-rigid property structure of stabilization gravel:1st, due to the influence expanded with heat and contract with cold, water Cement-stabilizing broken stone basic unit can produce shrinkage cracking, and then cause Reflection Cracks Produced in Asphalt Pavement, and road conditions quality is impacted, Road table water enters basic unit and road bed sub-base with crack, accelerates regional destroy of basic unit and reduces pavement life significantly;2nd, water Cement-stabilizing broken stone structural strength is low, and bearing capacity is limited, the well damage under the repeated stock of heavy-duty vehicle, produces pit, rut Deng, be influence pavement life an important factor for one of so that the average life span of domestic road is substantially reduced, and frequently road is supported Shield, not only wastes time and energy, and cost is higher.
Composite pavement is the road surface that surface layer is combined by the structure sheaf of two layers of different materials type and mechanical property, energy The respective performance advantage of flexible pavement and rigid pavement is enough given full play to, realizes flexible pavement and the effective and reasonable knot in rigid pavement Close, compare the pavement structure of cement stabilized macadam semi-rigid type base and traditional asphalt layer, not only increase road performance and driving Comfortableness, Road Service Life is extended, and compare the complete thick formula Grazing condition asphalt pavement structure of foreign countries, greatly reduce engineering Cost, the large area road construction in suitable China are promoted the use of.
Utility model content
For in the prior art the defects of, the utility model provides a kind of composite pavement structure, improves road performance, The problems such as pavement destruction is serious, maintenance costs is high is avoided, extends Road Service Life.
The utility model provides a kind of composite pavement structure, including roadbed, and the roadbed is the ground of compacting, is also wrapped Include in from bottom to top set on the roadbed it is anti-be impregnated with back-up coat, basic unit, suppression parting, water-proof tack coat, stress absorbing layer and Surface layer, described to prevent that it is composite geo-membrane to be impregnated with back-up coat, the suppression parting is steel plastic compount GSZ, and the surface layer is modification Bitumen layer.
As an improvement scheme, the composite geo-membrane using chopped fiber needle-punched composite geo-membrane or PFY it is compound Geomembrane, and filled out between the composite geo-membrane and the basic unit and be covered with medium coarse sand gravel.
As an improvement scheme, the basic unit uses cement stabilized macadam base or two grey basic units.
As an improvement scheme, the water-proof tack coat uses water-base epoxy asphalt waterproofing tack coat.
As an improvement scheme, the stress absorbing layer uses SBS modified asphalt macadams layer or rubber asphalt rubble Layer.
As an improvement scheme, the modified asphalt layer is AC-13 modified asphalt mixtures or AC-16 modified pitch The upper and lower surface layer of mating formation of compound or AC-13 modified asphalt mixtures and AC-16 modified asphalt mixtures.
As an improvement scheme, the thickness of the basic unit is 16-20cm, and the thickness of the water-proof tack coat is 1- 1.5cm, the thickness of the stress absorbing layer is 1.5-2.5cm, and the thickness of the modified asphalt layer is 4-6cm.
Due to using above technical scheme, the utility model has the advantages that;
1st, the composite geo-membrane being provided between roadbed of the present utility model and basic unit, can road pavement structure play certain journey The reinforcement effect of degree so that the bearing capacity of the composite road surface structure increases compared with conventional pav structure, meanwhile, what is be provided with should Composite geo-membrane can prevent road table water from penetrating into the calving disaggregation to rammed subgrade roadbed when shrinkage cracking occurs in basic unit, rise To the protective effect to roadbed.
2nd, mat formation on basic unit of the present utility model the steel plastic compount GSZ having, can effectively avoid base course crack and The generation and extension of surface layer reflection crack, play a part of protectiveness elastic membrane, extend the service life on road surface;On the one hand, energy The stress that load is applied in basic unit is enough effective against, prevents the generation in crack;On the other hand, after crack produces, can press down Continue to extend in crack processed;In addition, steel plastic compount GSZ cost is low, construction technology is simple and convenient.
3rd, the utility model is mated formation the water-proof tack coat having, the effective bonding for realizing basic unit between surface layer of mating formation, use Water-base epoxy asphalt waterproofing tack coat, avoids influence of the rainwater to basic unit, and with excellent low temperature flexibility and heat resistance, resistance to Long property, is easy to engineering construction.
4th, the SBS modified asphalt macadams layer or rubber asphalt metalling mated formation under the utility model surface layer make stress absorption Layer, reduce influences caused by loading stress road pavement structure, while also has prevention, delays or even prevent surface layer reflection crack Formation and development, and waterproof, the effect of joint filling.
5th, the modified asphalt layer that the utility model uses, while road-ability is ensured, enhances the wear-resisting of road surface Property, the antiskid performance on road surface is improved, driving load can be effectively reduced to the percussion of basic unit etc., avoids pit, rut Phenomena such as generation, be not required to frequently conserve.
6th, the medium coarse sand gravel of paving is filled out in the utility model, between composite geo-membrane and basic unit, can effectively prevent geomembrane quilt Sharp stone punctures the generation of phenomenon, plays the protective effect to composite geo-membrane.
In summary, the utility model improves usage capability of road, avoids base course crack and reflection cracking in a pavement The generation of phenomenon, the influence of loading stress is reduced, realizes effective protection of road surface structare layer, extend service life of road surface, And it is not required to frequently conserve so that the cost of highway engineering cost substantially reduces.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art.In all of the figs, it is similar Element or part are typically identified by similar reference.In accompanying drawing, each element or part might not be according to the ratios of reality Draw.
Fig. 1 is structural representation of the present utility model;
Reference:1- roadbeds;2- is anti-to be impregnated with back-up coat;3- basic units;4- presses down parting;5- water-proof tack coats;6- stress is inhaled Receive layer;7- surface layers.
Embodiment
The embodiment of technical solutions of the utility model is described in detail below in conjunction with accompanying drawing.Following examples are only For clearly illustrating the technical solution of the utility model, therefore example is only used as, and this practicality can not be limited with this New protection domain.
As shown in figure 1, the utility model provides a kind of composite pavement structure, including roadbed 1, also it is included in roadbed 1 On from bottom to top set anti-be impregnated with back-up coat 2, basic unit 3, suppression parting 4, water-proof tack coat 5, stress absorbing layer 6 and surface layer 7, road Base 1 is the ground of compacting, and to ensure the strength performance of composite road surface structure, the compactness of roadbed 1 is more than 94%.
Anti- to be impregnated with back-up coat 2 be composite geo-membrane, to realize effective reinforcing of roadbed 1 and impermeable, in the present embodiment, is answered Close geomembrane and use chopped fiber needle-punched composite geo-membrane or polyester filament composite geotechnical film, the composite earth of mating formation on the roadbed 1 of compacting Work film, can road pavement structure play a certain degree of reinforcement effect so that the bearing capacity of the composite road surface structure is more traditional Pavement structure increases, meanwhile, the composite geo-membrane being provided with can prevent road table water when shrinkage cracking occurs in basic unit 3 The calving disaggregation to rammed subgrade roadbed 1 is penetrated into, plays the protective effect to roadbed 1;Certainly, it is that can effectively prevent geomembrane The generation of phenomenon is punctured by sharp stone, plays the protective effect to composite geo-membrane, is filled out between composite geo-membrane and basic unit 3 thick in being covered with Gravel.
As the supporting course of whole road, stable road surface is played a part of by basic unit 3, to cause the quality on road surface and usability Effective guarantee can be obtained, in the present embodiment, basic unit 3 is existed using the grey basic unit 3 of cement stabilized macadam base 3 or two, its laying depth Between 16-20cm.
Mat formation on basic unit 3 the suppression parting 4 having, be steel plastic compount GSZ, can effectively avoid basic unit 3 from ftractureing and face The generation and extension of 7 reflection crack of layer, play a part of protectiveness elastic membrane, extend the service life on road surface;On the one hand, can The stress that load is applied in basic unit 3 is effective against, prevents the generation in crack;On the other hand, after crack produces, can suppress Continue to extend in crack;In addition, steel plastic compount GSZ cost is low, construction technology is simple and convenient.
For the effective bonding for realizing basic unit 3 between surface layer 7 of mating formation, press down on parting 4 and be equipped with water-proof tack coat 5, this reality Apply in example, water-proof tack coat 5 is using water-base epoxy asphalt waterproofing tack coat 5, and pavement thickness is 1-1.5cm, use it is water-based Bituminous epoxy water-proof tack coat 5 can avoid influence of the rainwater to basic unit 3, and with excellent low temperature flexibility and heat resistance, Durability, it is easy to engineering construction.
To reduce the influence of heavy-duty vehicle load road pavement repeated stock, mat formation to have between water-proof tack coat 5 and surface layer 7 and answer Power absorbed layer 6, in the present embodiment, stress absorbing layer 6 makees stress suction using SBS modified asphalt macadams layer or rubber asphalt metalling Receive layer 6, pavement thickness 1.5-2.5cm, while decrease loading stress road pavement structure has an impact, it may have prevention, Delay or even prevent the formation and development of the reflection crack of surface layer 7, and waterproof, the effect of joint filling.
Surface layer 7 is modified asphalt layer, and the modified asphalt layer of use compares traditional bitumen layer pavement structure, is ensureing to drive a vehicle While comfortableness, the wearability on road surface is enhanced, improves the antiskid performance on road surface, driving load can be effectively reduced to base The percussion of 3 grade of layer, the generation for phenomena such as avoiding pit, rut, is not required to frequently conserve;In the present embodiment, modified pitch Layer pavement thickness is 4-6cm, using AC-13 modified asphalt mixtures or AC-16 modified asphalt mixtures, to cause pavement structure Performance more preferably, using AC-13 modified asphalt mixtures and the paving structure up and down of AC-16 modified asphalt mixtures, pavement thickness For 10-12cm, certainly, it can also increase AC-20 modified asphalt mixtures of mating formation, pavement thickness under AC-16 modified asphalt mixtures For 8cm or so, with significantly more efficient raising Pavement Condition.
In specification of the present utility model, numerous specific details are set forth, it is to be appreciated, however, that reality of the present utility model Applying example can put into practice in the case of these no details.In some instances, known method, knot is not been shown in detail Structure and technology, so as not to obscure the understanding of this description.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type, it all should cover among claim of the present utility model and the scope of specification.

Claims (7)

1. a kind of composite pavement structure, including roadbed, the roadbed is the ground of compacting, it is characterised in that:Also it is included in institute State from bottom to top set on roadbed anti-and be impregnated with back-up coat, basic unit, suppression parting, water-proof tack coat, stress absorbing layer and surface layer;Institute State and prevent that it is composite geo-membrane to be impregnated with back-up coat, the suppression parting is steel plastic compount GSZ, and the surface layer is modified asphalt layer.
2. composite pavement structure according to claim 1, it is characterised in that:The composite geo-membrane is using chopped fiber needle-punched Composite geo-membrane or polyester filament composite geotechnical film, and filled out between the composite geo-membrane and the basic unit and be covered with medium coarse sand gravel.
3. composite pavement structure according to claim 1, it is characterised in that:The basic unit uses cement stabilized macadam base Ceng Huoerhui basic units.
4. composite pavement structure according to claim 1, it is characterised in that:The water-proof tack coat uses water-base epoxy Asphalt waterproofing tack coat.
5. composite pavement structure according to claim 1, it is characterised in that:The stress absorbing layer is modified using SBS Bituminous macadam or rubber asphalt metalling.
6. composite pavement structure according to claim 1, it is characterised in that:The modified asphalt layer is modified for AC-13 Asphalt or AC-16 modified asphalt mixtures or AC-13 modified asphalt mixtures and AC-16 modified asphalt mixtures it is upper Under mat formation surface layer.
7. according to the composite pavement structure described in claim any one of 1-6, it is characterised in that:The thickness of the basic unit is 16-20cm, the thickness of the water-proof tack coat is 1-1.5cm, and the thickness of the stress absorbing layer is 1.5-2.5cm, described to change The thickness of property bitumen layer is 4-6cm.
CN201720740104.5U 2017-06-23 2017-06-23 A kind of composite pavement structure Expired - Fee Related CN207031945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720740104.5U CN207031945U (en) 2017-06-23 2017-06-23 A kind of composite pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720740104.5U CN207031945U (en) 2017-06-23 2017-06-23 A kind of composite pavement structure

Publications (1)

Publication Number Publication Date
CN207031945U true CN207031945U (en) 2018-02-23

Family

ID=61468849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720740104.5U Expired - Fee Related CN207031945U (en) 2017-06-23 2017-06-23 A kind of composite pavement structure

Country Status (1)

Country Link
CN (1) CN207031945U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130174A (en) * 2019-05-27 2019-08-16 中国港湾工程有限责任公司 The laying method of the bituminous pavement of Rut resistance
CN110904851A (en) * 2019-12-17 2020-03-24 中交路桥建设有限公司 Bridge deck pavement method
CN112144397A (en) * 2019-06-28 2020-12-29 中国市政工程中南设计研究总院有限公司 Cement concrete bridge deck pavement structure with anti rut and waterproof function
CN113774748A (en) * 2021-08-20 2021-12-10 山东高速集团有限公司 High-toughness grid reinforced asphalt pavement and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130174A (en) * 2019-05-27 2019-08-16 中国港湾工程有限责任公司 The laying method of the bituminous pavement of Rut resistance
CN112144397A (en) * 2019-06-28 2020-12-29 中国市政工程中南设计研究总院有限公司 Cement concrete bridge deck pavement structure with anti rut and waterproof function
CN110904851A (en) * 2019-12-17 2020-03-24 中交路桥建设有限公司 Bridge deck pavement method
CN113774748A (en) * 2021-08-20 2021-12-10 山东高速集团有限公司 High-toughness grid reinforced asphalt pavement and construction method thereof

Similar Documents

Publication Publication Date Title
CN207031945U (en) A kind of composite pavement structure
US7621693B2 (en) Asphalt fiber panels for pavement construction and repair
CN204825551U (en) Waterproof crack control bituminous paving structure
CN103215875B (en) A kind of anti-fatigue asphalt pavement based on differential settlement
CN206512547U (en) A kind of repairing type bituminous paving
CN205368926U (en) Garden way supercrust structure that water permeability is strong
CN216663672U (en) Road structure capable of reducing reflection crack diseases
CN111455768A (en) Flexible roadbed asphalt concrete structure and construction method thereof
US8858115B2 (en) Pothole and utility cut repair overlay and method of installation
CN106522056A (en) Design method of rigid-flexible composite basecourse road section based on asphalt pavement
CN103541287B (en) Pavement structure with comprehensive waterproof reinforced roadbed as well as construction method of pavement structure
CN205741814U (en) A kind of asphalt pavement structure
CN210657855U (en) Filling type large-particle-size cement stabilized base asphalt pavement structure
CN104499397A (en) Asphalt pavement structure based on coordination of deformation of subgrade and pavement
CN205062611U (en) Garden way pavement layer structure
CN109033714B (en) Design method for controlling coordinated deformation of roadbed and pavement
CN210086044U (en) Bridge deck pavement structure for assembled bridge
CN211872455U (en) A road structure and theme park for theme park
CN206090645U (en) Waterproof construction of underground sump pit elevartor shaft
CN219586485U (en) Energy-saving environment-friendly cold recycling pavement structure
CN210031374U (en) V-shaped groove repairing structure for embankment
CN217438600U (en) Anti-reflection crack modified asphalt pavement structure
CN216141824U (en) Cracking-proof composite pavement structure
CN219490570U (en) Noise-reducing anti-cracking asphalt pavement structure
CN218643104U (en) Cement concrete pavement structure laid on urban road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310000 15-16 floor, Qianjiang building, 2031 Jiangling Road, Hangzhou, Zhejiang, Binjiang District

Patentee after: Zhejiang interchange International Engineering Co., Ltd.

Address before: 310000 15-16 floor, Qianjiang building, 2031 Jiangling Road, Hangzhou, Zhejiang, Binjiang District

Patentee before: Zhejiang Jiaogong Qianchao Construction Co. Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20210623