CN206858905U - The control system of big quantity of steam flatiron - Google Patents

The control system of big quantity of steam flatiron Download PDF

Info

Publication number
CN206858905U
CN206858905U CN201720818291.4U CN201720818291U CN206858905U CN 206858905 U CN206858905 U CN 206858905U CN 201720818291 U CN201720818291 U CN 201720818291U CN 206858905 U CN206858905 U CN 206858905U
Authority
CN
China
Prior art keywords
controller
water pump
timer
cistern assembly
iron assemblies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720818291.4U
Other languages
Chinese (zh)
Inventor
姚能宜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO HEIGER ELECTRICAL APPLIANCES CO Ltd
Original Assignee
NINGBO HEIGER ELECTRICAL APPLIANCES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO HEIGER ELECTRICAL APPLIANCES CO Ltd filed Critical NINGBO HEIGER ELECTRICAL APPLIANCES CO Ltd
Priority to CN201720818291.4U priority Critical patent/CN206858905U/en
Application granted granted Critical
Publication of CN206858905U publication Critical patent/CN206858905U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses a kind of control system of big quantity of steam flatiron, cistern assembly including iron assemblies and outside iron assemblies, the top of the cistern assembly is provided with filler, bottom is provided with delivery port, the bottom of the iron assemblies is provided with heating bottom plate, inside is provided with pipeline, the pipeline communicates with heating bottom plate, flexible pipe is connected between the iron assemblies and cistern assembly, one end of the flexible pipe is connected with the delivery port of cistern assembly, the other end is connected with the pipeline of iron assemblies, simultaneously water pump is provided with the centre of flexible pipe, timer and controller are provided with water pump, the controller is to control pump house every the controller for be all turned on process and part unlatching process, the timer is for setting interval time and prompting controller to carry out the water pump timer spaced apart for opening process according to interval time.The utility model will not also produce by controlling pump house every be all turned on process and process is opened in part, while so as to ensure big steam to drip.

Description

The control system of big quantity of steam flatiron
Technical field
It the utility model is related to a kind of vapour iron, the control system of particularly big quantity of steam flatiron.
Background technology
User misses potter big quantity of steam flatiron when pressing thick and heavy ramie cotton fabric using flatiron.Realize big quantity of steam Conventional method be increase soleplate power, increase bottom plate aluminium material thickness.The consumption of electric energy can accordingly be increased by increasing power, The energy is wasted, is unfavorable for environmental protection.Increase bottom plate aluminium material thickness, increase material cost.
A steam station flatiron of present market popularity, its principle is to be directly pumped flatiron bottom with the water of pump handle water tank Plate, after absorbing bottom plate heat, chemical conversion steam sprays from bottom plate hole.Increase the flow that quantity of steam namely increases water pump, water pump Because vaporization needs more heats after increased flow capacity, bottom plate must increase power or thicken bottom plate aluminium material to store more heat Amount, which just can guarantee that, to be completely vaporized, and otherwise can be produced and be dripped because heat supply is not upper.
Utility model content
The purpose of this utility model is to provide a kind of big quantity of steam flatiron to solve above-mentioned the deficiencies in the prior art Control system, it can ensure also produce while big steam and drip.
To achieve these goals, the control system of the big quantity of steam flatiron designed by the utility model, including flatiron group Part and the cistern assembly outside iron assemblies, the top of the cistern assembly are provided with filler, and bottom is provided with delivery port, The bottom of the iron assemblies is provided with heating bottom plate, and inside is provided with pipeline, and the pipeline communicates with heating bottom plate, the iron assemblies Flexible pipe is connected between cistern assembly, one end of the flexible pipe is connected with the delivery port of cistern assembly, the other end and iron assemblies Pipeline be connected, while be provided with water pump in the centre of flexible pipe, timer and controller be provided with water pump, the controller is control Pump house processed is to be used to set interval time every the controller for be all turned on process and part unlatching process, the timer And controller is prompted to carry out the water pump timer spaced apart for opening process according to interval time.
The controller is to control pump house every the controller for carrying out 100% unlatching process and 10%-80% unlatching processes.
Preferably, the interval time set on the timer is 5s.
During specifically used, when pressing steam cock, the water in pump handle cistern assembly is extracted into iron assemblies Heat in bottom plate, directly heat generation steam by heating soleplate, wherein controller and timer controls water pump each When drawing water, draw water according to 100% flow within first 5 seconds, drawn water after 5 seconds according to 50% flow.For example preceding 5 second flow is 100g/ Min, 50g/min is dropped to after 5 seconds.
Its operation principle is that bottom plate fully heated and stores heat at first 5 seconds, so 100g/min at the beginning Water, which can completely vaporize, to drip, but because the heat of bottom plate storage has consumed after 5 seconds, if continue by According to 100g/min flow, in the case where electric heating tube power is not done greatly, water can not completely vaporize, and can produce and drip, therefore 5 The flow of water pump is dropped into 50g/min after second, can now cause bottom plate to carry out heat storage, is ensured when continuously putting steam not Drip.
The control system for the big quantity of steam flatiron that the utility model obtains, compared to the big quantity of steam flatiron of routine, pass through control Pump house processed will not also produce every be all turned on process and process is opened in part, while so as to ensure big steam to drip.
Brief description of the drawings
Fig. 1 is the structural representation of the control system of the big quantity of steam flatiron of embodiment 1;
Fig. 2 is the current waveform figure of the control system of the big quantity of steam flatiron of embodiment 1 and conventional flatiron control system Current waveform figure comparison diagram.
In figure:Iron assemblies 1, cistern assembly 2, filler 3, delivery port 4, heating bottom plate 5, pipeline 6, flexible pipe 7, water pump 8, Controller 9, timer 10.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1:
As shown in figure 1, the present embodiment provide a kind of big quantity of steam flatiron control system, including iron assemblies 1 and Cistern assembly 2 positioned at the outside of iron assemblies 1, the top of the cistern assembly 2 are provided with filler 3, and bottom is provided with delivery port 4, The bottom of the iron assemblies 1 is provided with heating bottom plate 5, and inside is provided with pipeline 6, and the pipeline 6 communicates with heating bottom plate 5, described to press Flexible pipe 7 is connected between bucket component 1 and cistern assembly 2, one end of the flexible pipe 7 is connected with the delivery port 4 of cistern assembly 2, another End is connected with the pipeline 6 of iron assemblies 1, while is provided with water pump 8 in the centre of flexible pipe 7, and controller 9 and meter are provided with water pump 8 When device 10, the controller 9 is to control water pump 8 to be spaced be all turned on process and the controller 9 of process is opened in part, described Timer 10 is to be spaced by setting interval time and prompting controller 9 to carry out water pump 8 according to interval time based on unlatching process When device 10.
The controller 9 is to control the interval of water pump 8 to carry out 100% controller 9 for opening process and 10%-80% unlatching processes.
Preferably, the interval time set on the timer 10 is 5s.
As shown in Fig. 2 conventional water pump is into semisinusoidal waveform when 100% flow works commercial power rectification, i.e., it is every 0.2 second 10 half-waves.And the present embodiment provide a kind of big quantity of steam flatiron control system when steam cock is connected before 5 seconds, water pump Flow for flow be 100% flow, output current be mains frequency 0.2 second 10 half-wave;The flow of water pump after 5 seconds It is 50% flow for flow, output current is 0.2 second 5 half-wave of mains frequency.
During specifically used, when pressing steam cock, the water in cistern assembly 2 is extracted into iron assemblies 1 by water pump 8 Heating bottom plate 5 in, directly heat generation steam by heating bottom plate 5.Wherein controller 9 and timer 10 control water pump 8 to exist When drawing water every time, draw water according to 100% flow within first 5 seconds, drawn water after 5 seconds according to 50% flow.For example preceding 5 second flow is 100g/min, 50g/min is dropped to after 5 seconds.

Claims (3)

1. a kind of control system of big quantity of steam flatiron, including iron assemblies(1)And positioned at iron assemblies(1)The water tank of outside Component(2), the cistern assembly(2)Top be provided with filler(3), bottom is provided with delivery port(4), the iron assemblies(1) Bottom be provided with heating bottom plate(5), inside is provided with pipeline(6), the pipeline(6)With heating bottom plate(5)Communicate, it is characterised in that: The iron assemblies(1)With cistern assembly(2)Between be connected with flexible pipe(7), the flexible pipe(7)One end and cistern assembly(2)'s Delivery port(4)It is connected, the other end and iron assemblies(1)Pipeline(6)It is connected, while in flexible pipe(7)Centre be provided with water pump (8), in water pump(8)It is provided with controller(9)And timer(10), the controller(9)It is control water pump(8)Interval carries out complete Process is opened in portion and the controller of process is opened in part(9), the timer(10)It is to be used to set interval time and prompt to control Device processed(9)Water pump is carried out according to interval time(8)Open the timer of process in interval(10).
2. the control system of big quantity of steam flatiron according to claim 1, it is characterised in that:The controller(9)It is control Water pump processed(8)Interval carries out 100% controller for opening process and 10%-80% unlatching processes(9).
3. the control system of big quantity of steam flatiron according to claim 1, it is characterised in that:The timer(10)On set Fixed interval time is 5s.
CN201720818291.4U 2017-07-07 2017-07-07 The control system of big quantity of steam flatiron Active CN206858905U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720818291.4U CN206858905U (en) 2017-07-07 2017-07-07 The control system of big quantity of steam flatiron

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720818291.4U CN206858905U (en) 2017-07-07 2017-07-07 The control system of big quantity of steam flatiron

Publications (1)

Publication Number Publication Date
CN206858905U true CN206858905U (en) 2018-01-09

Family

ID=60832168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720818291.4U Active CN206858905U (en) 2017-07-07 2017-07-07 The control system of big quantity of steam flatiron

Country Status (1)

Country Link
CN (1) CN206858905U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109082866A (en) * 2018-10-21 2018-12-25 佛山市麦尔电器有限公司 A kind of miniature garment steamer
WO2020124336A1 (en) * 2018-12-17 2020-06-25 苏州市格美纳电器有限公司 System for externally connecting water storage container to ironing machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109082866A (en) * 2018-10-21 2018-12-25 佛山市麦尔电器有限公司 A kind of miniature garment steamer
WO2020124336A1 (en) * 2018-12-17 2020-06-25 苏州市格美纳电器有限公司 System for externally connecting water storage container to ironing machine

Similar Documents

Publication Publication Date Title
CN206858905U (en) The control system of big quantity of steam flatiron
CN204373231U (en) A kind of multifunctional solar water heater
CN210463072U (en) Boiler flue heat recovery device
CN106122916B (en) Electromagnetic heating steam generating means
CN201175260Y (en) Temperature-adjustment pump instant heating type electric water boiling device
CN203116289U (en) Steam water heater
CN206037678U (en) Drying device
CN207698409U (en) A kind of chemical barrel attemperator
CN207509402U (en) A kind of man-made board hot-pressing machine tail carbonated drink retracting device
CN206319173U (en) Go out steam unit and turnover plate type presses up and down
CN206210931U (en) A kind of intelligent feeding system for alcohol water fuel cell
CN204943935U (en) Photovoltaic generation wireless remote control solar energy control water system
CN205156401U (en) Water tank of solar water heater
CN208397692U (en) A kind of liquid nitrogen vaporizer
CN208850354U (en) A kind of green wall sprinkling system
CN207180394U (en) A kind of calcium silicon furnace stove madial wall heat energy recycle device
CN207196792U (en) A kind of humidifier
CN210095460U (en) Steam generator and heat preservation device and heating device thereof
CN214038968U (en) Small-sized electric heating heat-preserving water storage device
CN209782965U (en) Intelligent solar water heater
CN203575634U (en) Hot fog moisture regaining humidifying machine
CN202064212U (en) Steam hanging ironing machine
CN215506220U (en) Activated carbon adsorption vacuum negative pressure desorption steam auxiliary heating system
CN203704608U (en) Protective gas heating device for drying lithium ion phosphate material
CN214964558U (en) Portable drinking and sterilizing integrated machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant