CN206850393U - 一种电力建设用电缆铺设安装装置 - Google Patents
一种电力建设用电缆铺设安装装置 Download PDFInfo
- Publication number
- CN206850393U CN206850393U CN201720576549.4U CN201720576549U CN206850393U CN 206850393 U CN206850393 U CN 206850393U CN 201720576549 U CN201720576549 U CN 201720576549U CN 206850393 U CN206850393 U CN 206850393U
- Authority
- CN
- China
- Prior art keywords
- built
- pipe
- cable laying
- power construction
- erecting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 238000001514 detection method Methods 0.000 claims abstract description 24
- 238000012544 monitoring process Methods 0.000 claims abstract description 8
- 239000000203 mixture Substances 0.000 claims abstract description 4
- 239000011521 glass Substances 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 2
- 238000007689 inspection Methods 0.000 claims description 2
- 238000007789 sealing Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 description 3
- 239000003673 groundwater Substances 0.000 description 3
- 230000008595 infiltration Effects 0.000 description 3
- 238000001764 infiltration Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720576549.4U CN206850393U (zh) | 2017-05-23 | 2017-05-23 | 一种电力建设用电缆铺设安装装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720576549.4U CN206850393U (zh) | 2017-05-23 | 2017-05-23 | 一种电力建设用电缆铺设安装装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206850393U true CN206850393U (zh) | 2018-01-05 |
Family
ID=60796720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720576549.4U Expired - Fee Related CN206850393U (zh) | 2017-05-23 | 2017-05-23 | 一种电力建设用电缆铺设安装装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206850393U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111064113A (zh) * | 2019-10-23 | 2020-04-24 | 中船第九设计研究院工程有限公司 | 一种建筑施工预埋管施工方法 |
-
2017
- 2017-05-23 CN CN201720576549.4U patent/CN206850393U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111064113A (zh) * | 2019-10-23 | 2020-04-24 | 中船第九设计研究院工程有限公司 | 一种建筑施工预埋管施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204925040U (zh) | 一种天然气管道在线腐蚀监测装置 | |
CN206850393U (zh) | 一种电力建设用电缆铺设安装装置 | |
CN204300520U (zh) | 一种电缆穿墙套管结构 | |
CN103558090B (zh) | 大直径承压管道单个接缝处水压试验装置及水压试验方法 | |
CN205617425U (zh) | 一种地下综合管廊预制拼装结构 | |
CN204611354U (zh) | 一种管网检测装置 | |
CN204898781U (zh) | 给水管道放空防冻胀装置 | |
CN204062245U (zh) | 一种埋地排水管玻璃钢卡箍接头 | |
CN208487343U (zh) | 一种室内暗埋燃气管道防腐蚀结构 | |
CN205244643U (zh) | 一种市政用具有防腐蚀作用的排水管道 | |
CN205558822U (zh) | 一种玻璃钢井下套管 | |
CN206311259U (zh) | 一种便携式自来水管线压力测量装置 | |
CN102392256A (zh) | 埋地钢质管道风光电互补网络式防腐系统 | |
CN208703399U (zh) | 一种燃气工程用管道封堵装置 | |
CN204185933U (zh) | 检查井管道橡胶密封装置 | |
CN206920083U (zh) | 一种超高压电缆金属护套气密性检验装置 | |
CN207381933U (zh) | 一种新型电力建设用电缆管 | |
CN207814692U (zh) | 新型建筑暖通管道连接装置 | |
CN112325006A (zh) | 一种便于快速安装的环保直埋保温管及其使用方法 | |
CN206875017U (zh) | 一种石油管道应急封堵分流设备 | |
CN206432640U (zh) | 一种hgco中空电缆保护管 | |
CN201716166U (zh) | 新型塑料管材接口密闭性检测装置 | |
CN206540634U (zh) | 一种回水温度检测装置 | |
CN202401132U (zh) | 埋地钢质管道风光电互补网络式防腐系统 | |
CN205348220U (zh) | 湿陷性黄土地区塑料双管与塑料井检漏设施 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Gu Wei Inventor before: Li Shengjiu Inventor before: Gu Li |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180413 Address after: 510630 room 1003, 6 Cui Hu Street, Tianhe District, Guangzhou, Guangdong. Patentee after: Gu Wei Address before: 610065 1-2, 3, 93 Kan street, Jinjiang District, Chengdu, Sichuan. Patentee before: SICHUAN XINNENG ELECTRIC POWER CO.,LTD. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180502 Address after: 610065 1-2, 3, 93 Kan street, Jinjiang District, Chengdu, Sichuan. Patentee after: SICHUAN XINNENG ELECTRIC POWER CO.,LTD. Address before: 621053 No. 1, unit 19, Yuejin Road 131, Fucheng District, Mianyang, Sichuan 11 Patentee before: Li Shengjiu Effective date of registration: 20180502 Address after: 621053 No. 1, unit 19, Yuejin Road 131, Fucheng District, Mianyang, Sichuan 11 Patentee after: Li Shengjiu Address before: 510630 room 1003, 6 Cui Hu Street, Tianhe District, Guangzhou, Guangdong. Patentee before: Gu Wei |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 Termination date: 20180523 |
|
CF01 | Termination of patent right due to non-payment of annual fee |