CN206847403U - A kind of fast cooling vacuum electric furnace - Google Patents

A kind of fast cooling vacuum electric furnace Download PDF

Info

Publication number
CN206847403U
CN206847403U CN201720518741.8U CN201720518741U CN206847403U CN 206847403 U CN206847403 U CN 206847403U CN 201720518741 U CN201720518741 U CN 201720518741U CN 206847403 U CN206847403 U CN 206847403U
Authority
CN
China
Prior art keywords
arc
burner hearth
housing
electric furnace
fast cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720518741.8U
Other languages
Chinese (zh)
Inventor
王建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongda Pioneer Metals Corp Qingyuan County
Original Assignee
Hongda Pioneer Metals Corp Qingyuan County
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongda Pioneer Metals Corp Qingyuan County filed Critical Hongda Pioneer Metals Corp Qingyuan County
Priority to CN201720518741.8U priority Critical patent/CN206847403U/en
Application granted granted Critical
Publication of CN206847403U publication Critical patent/CN206847403U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to vacuum drying oven technical field, a kind of fast cooling vacuum electric furnace proposed, including housing, burner hearth is provided with housing, having heaters and air jet pipe are set in burner hearth, and burner hearth is connected with housing by connector, burner hearth includes being connected with each other the first arc and the second arc, the first arc are connected by connector with housing, and the second arc is connected by cylinder with housing, air jet pipe is arranged on the first arc, and the joint face of the first arc and the second arc is stepped;Connector includes the T-shaped part and contiguous block being connected respectively with burner hearth and housing, is provided with T-shaped slideway in contiguous block, T-shaped part is arranged in T-shaped slideway;The first elastic sealing gasket and the second elastic sealing gasket are respectively arranged with the contact surface of first arc and the second arc.Cooling rate is slow when the utility model solves cooling in the prior art, long processing time, and can not meet the technical problem of the requirement of some material needs fast coolings.

Description

A kind of fast cooling vacuum electric furnace
Technical field
The utility model belongs to vacuum drying oven technical field, is related to a kind of fast cooling vacuum electric furnace.
Background technology
Vacuum drying oven is the equipment heated in vacuum environment to material, and maximum temperature is up to 3000 DEG C or so.Mainly For ceramic firing, vacuum metling, the degasification of electrovacuum part, annealing, the soldering of metalwork, and Ceramic-to-metal seal etc..Very Empty stove is typically by transport vehicle outside main frame, burner hearth, electric calorifie installation, sealing furnace shell, vacuum system, electric power system, temperature-controlling system and stove Deng composition, but current chamber structure is simple, and cooling rate is slow during cooling, long processing time, and can not meet some material need Want the requirement of fast cooling.
Utility model content
The utility model proposes a kind of fast cooling vacuum electric furnace, and cooling rate is slow when solving cooling in the prior art, Long processing time, and the technical problem of the requirement of some material needs fast coolings can not be met.
What the technical solution of the utility model was realized in:
A kind of fast cooling vacuum electric furnace, including housing, be provided with burner hearth in the housing, be provided with the burner hearth plus Hot device and air jet pipe, and the burner hearth is connected with the housing by connector,
The burner hearth includes being connected with each other the first arc and the second arc, first arc pass through the connection Part is connected with the housing, and second arc is connected by cylinder with the housing,
The air jet pipe is arranged on first arc,
The joint face of first arc and second arc is stepped.
As further technical scheme, the connector is T-shaped including being connected respectively with the burner hearth and the housing Part and contiguous block, T-shaped slideway are provided with the contiguous block, the T-shaped part is arranged in the T-shaped slideway.
As further technical scheme, set respectively on the contact surface of first arc and second arc There are the first elastic sealing gasket and the second elastic sealing gasket.
As further technical scheme, fluted, second elastic packing is set on first elastic sealing gasket Projection is provided with pad, the projection is arranged in the groove.
As further technical scheme, second arc is 2~3, is arranged between the air jet pipe.
As further technical scheme, the volume ratio of first arc and second arc is 5:1.
The utility model use principle and have the beneficial effect that:
1st, the utility model changes the natural mode that traditional vacuum electric furnace uses single cartridge type burner hearth, and burner hearth sidewall is set The form that the first arc and the second arc are staggered has been set to, and the second arc has been connected by cylinder with housing, , can be by controlling the arc of cylinder second to be separated with the first arc during cooling, and then realize the fast of burner hearth cavity gas Speed discharge, and then realizes the fast cooling of material, shortens processing duration, while can also be by controlling the cylinder operation of varying number Realize the adjustment of burner hearth open amount (the second arc opens quantity), the cooling rate of control device, it is ensured that different size produces The heat treatment requirements of product.Wherein, air jet pipe is arranged on the first arc, air jet pipe and burner hearth relative position when ensure that use Stability, ensure that the stability of heat sink (air jet pipe) service behaviour, ensure that the longer service life of equipment.First The joint face of arc and the second arc is stepped, effectively reduces the hot-fluid vector in burner hearth heating process, avoids Equipment energy loss unnecessary when using.
2nd, the setting of T-shaped part and contiguous block realizes being detachably connected for burner hearth and housing in the utility model, is easy to stove Maintenance when thorax or housing failure, while use T-shaped part to ensure that the stability of burner hearth and housing annexation, reduce burner hearth The risk to fall, set scientific and reasonable.
The setting of first elastic sealing gasket and the second elastic sealing gasket adds the first arc and the connection of the second arc Compactness, reduce further the hot-fluid vector in burner hearth heating process, avoid unnecessary energy when equipment uses and damage Consumption, meet its requirement, set scientific and reasonable.
Projection further increases the compactness that the first arc and the second arc connect with the setting of groove, reduces Hot-fluid vector in burner hearth heating process, avoid energy loss unnecessary when equipment uses.
3rd, the second arc is multiple and is evenly distributed between air jet pipe in the utility model, realizes the second arc Plate and air jet pipe being uniformly distributed on inboard wall of burner hearth, are easy to the quick discharge of different zones gas in burner hearth, further improve The cooldown rate of equipment, shortens process time, meets the use demand of special material fast cooling.
First arc occupies most of region of burner hearth sidewall compared to the second arc, and this setting both ensure that Relatively low energy is excessive in equipment heating process, in turn ensure that fast cooling during cooling, sets scientific and reasonable.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the utility model structure diagram;
Fig. 2 is the structural representation of the second arc in the utility model;
In figure:1- housings, 2- burner hearths, the arcs of 21- first, the arcs of 22- second, 3- heaters, 4- air jet pipes, 5- connect Fitting, 51-T type parts, 52- contiguous blocks, 53-T type slideways, 6- cylinders.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in Fig. 1~2, the utility model proposes a kind of fast cooling vacuum electric furnace, including housing 1, set in housing 1 Burner hearth 2 is equipped with, having heaters 3 and air jet pipe 4 are set in burner hearth 2, and burner hearth 2 is connected with housing 1 by connector 5,
Burner hearth 2 includes being connected with each other the first arc 21 and the second arc 22, the first arc 21 by connector 5 with Housing 1 is connected, and the second arc 22 is connected by cylinder 6 with housing 1,
Air jet pipe 4 is arranged on the first arc 21,
The joint face of first arc 21 and the second arc 22 is stepped.
The utility model changes the natural mode that traditional vacuum electric furnace uses single cartridge type burner hearth, and burner hearth sidewall is set The form being staggered into the first arc 21 and the second arc 22, and the second arc 22 is passed through into cylinder 6 and housing 1 Connection, can be by controlling the arc 22 of cylinder 6 second to be separated with the first arc 21 during cooling, and then realizes in burner hearth 2 The quick discharge of chamber gas, and then the fast cooling of material is realized, shorten processing duration, while can also be by controlling varying number Cylinder 6 work and realize the adjustment of the open amount of burner hearth 2 (the second arc 22 open quantity), the cooling rate of control device, Ensure the heat treatment requirements of products of different specifications.Wherein, air jet pipe 4 is arranged on the first arc 21, is sprayed when ensure that use Tracheae 4 and the stability of the relative position of burner hearth 2, ensure that the stability of heat sink (air jet pipe 4) service behaviour, ensure that and set Standby longer service life.The joint face of first arc 21 and the second arc 22 is stepped, effectively reduces burner hearth 2 and adds Hot-fluid vector in thermal process, avoid energy loss unnecessary when equipment uses.
Further, connector 5 includes the T-shaped part 51 and contiguous block 52 being connected respectively with burner hearth 2 and housing 1, contiguous block 52 T-shaped slideway 53 is inside provided with, T-shaped part 51 is arranged in T-shaped slideway 53.
The setting of T-shaped part 51 and contiguous block 52 realizes being detachably connected for burner hearth 2 and housing 1, is easy to burner hearth or housing Maintenance during failure, while use T-shaped part 51 to ensure that the stability of burner hearth 2 and the annexation of housing 1, reduce burner hearth 2 and send out The risk fallen is given birth to, is set scientific and reasonable.
Further, be respectively arranged with the contact surface of the first arc 21 and the second arc 22 first elastic sealing gasket and Second elastic sealing gasket.
The setting of first elastic sealing gasket and the second elastic sealing gasket adds the first arc 21 and the second arc 22 The compactness of connection, the hot-fluid vector in the heating process of burner hearth 2 is reduce further, avoid energy unnecessary when equipment uses Amount loss, meets its requirement, sets scientific and reasonable.
Further, set fluted on the first elastic sealing gasket, be provided with projection on the second elastic sealing gasket, projection is set In groove.
Raised and groove setting further increases the compactness of the first arc 21 and the connection of the second arc 22, drop Hot-fluid vector in the low heating process of burner hearth 2, avoid energy loss unnecessary when equipment uses.
Further, the second arc 22 is 2~3, is arranged between air jet pipe 4.
Second arc 22 is multiple and is evenly distributed between air jet pipe 4, realizes the second arc 22 and jet Being uniformly distributed on the inwall of burner hearth 2 of pipe 4, is easy to the quick discharge of different zones gas in burner hearth 2, further increases equipment Cooldown rate, shorten process time, meet the use demand of special material fast cooling.
Further, the volume ratio of the first arc 21 and the second arc 22 is 5:1.
First arc 21 occupies most of region of the side wall of burner hearth 2 compared to the second arc 22, and this setting was both It ensure that energy relatively low in equipment heating process is excessive, in turn ensure that fast cooling during cooling, set scientific and reasonable.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (6)

  1. A kind of 1. fast cooling vacuum electric furnace, it is characterised in that including housing (1), burner hearth (2) is provided with the housing (1), Having heaters (3) and air jet pipe (4) are set in the burner hearth (2), and the burner hearth (2) passes through connector with the housing (1) (5) connect,
    The burner hearth (2) includes being connected with each other the first arc (21) and the second arc (22), first arc (21) It is connected by the connector (5) with the housing (1), second arc (22) passes through cylinder (6) and the housing (1) Connection,
    The air jet pipe (4) is arranged on first arc (21),
    The joint face of first arc (21) and second arc (22) is stepped.
  2. 2. a kind of fast cooling vacuum electric furnace according to claim 1, it is characterised in that the connector (5) includes dividing The T-shaped part (51) and contiguous block (52) not being connected with the burner hearth (2) and the housing (1), the contiguous block (52) is interior to be set There is T-shaped slideway (53), the T-shaped part (51) is arranged in the T-shaped slideway (53).
  3. A kind of 3. fast cooling vacuum electric furnace according to claim 2, it is characterised in that first arc (21) and The first elastic sealing gasket and the second elastic sealing gasket are respectively arranged with the contact surface of second arc (22).
  4. 4. a kind of fast cooling vacuum electric furnace according to claim 3, it is characterised in that on first elastic sealing gasket Set fluted, projection is provided with second elastic sealing gasket, the projection is arranged in the groove.
  5. 5. a kind of fast cooling vacuum electric furnace according to claim 4, it is characterised in that second arc (22) is 2~3, it is arranged between the air jet pipe (4).
  6. A kind of 6. fast cooling vacuum electric furnace according to any one of Claims 1 to 5, it is characterised in that first arc The volume ratio of shape plate (21) and second arc (22) is 5:1.
CN201720518741.8U 2017-05-11 2017-05-11 A kind of fast cooling vacuum electric furnace Expired - Fee Related CN206847403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720518741.8U CN206847403U (en) 2017-05-11 2017-05-11 A kind of fast cooling vacuum electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720518741.8U CN206847403U (en) 2017-05-11 2017-05-11 A kind of fast cooling vacuum electric furnace

Publications (1)

Publication Number Publication Date
CN206847403U true CN206847403U (en) 2018-01-05

Family

ID=60795225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720518741.8U Expired - Fee Related CN206847403U (en) 2017-05-11 2017-05-11 A kind of fast cooling vacuum electric furnace

Country Status (1)

Country Link
CN (1) CN206847403U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108462328A (en) * 2018-02-24 2018-08-28 王刚 A kind of cooling means of the electric machine casing with deceleration device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108462328A (en) * 2018-02-24 2018-08-28 王刚 A kind of cooling means of the electric machine casing with deceleration device
CN108462328B (en) * 2018-02-24 2020-11-13 江苏卓燃工程咨询有限公司 Cooling method for motor shell with speed reducer

Similar Documents

Publication Publication Date Title
CN103398577A (en) Samarium cobalt permanent magnet vacuum sintering furnace
CN201289290Y (en) Rapid cooling type intermediate frequency induction sintering furnace
CN206847403U (en) A kind of fast cooling vacuum electric furnace
CN106052451B (en) A kind of graphite sensible heat transfer device and its heat-exchange method
CN209082015U (en) A kind of copper foil warpage annealing device
CN202350548U (en) Residual heat recovery device of kiln
CN205192161U (en) Pottery blank drying device
CN209960963U (en) Heat treatment kiln
CN104018010A (en) Reduction distillation furnace for sponge titanium production
CN205482318U (en) Hydrogen sintering stove heat energy cyclic utilization device
CN205316969U (en) Multistage continuous vacuum furnace of interior hot type
CN205090784U (en) Balanced energy -conserving formula oven
CN212299743U (en) Quantitative microwave hot air coupling drying oven
CN210481213U (en) Electric lime kiln
CN204329615U (en) A kind of Novel electric kiln
CN209334716U (en) A kind of powder metallurgy sintered device of clean type
CN203798152U (en) Negative pressure pump system of elevator furnace
CN107478058A (en) The energy-saving shuttle kiln of one kind commutation
CN102853666A (en) Box-type microwave high-temperature sintering furnace
CN204824212U (en) Aluminum sulfate amine decomposes device of preparation aluminium oxide
CN202442583U (en) Manganese zinc ferrite sintering furnace
CN207622550U (en) A kind of metallurgical furnace kiln waste heat recycle device
CN207105868U (en) A kind of PCB energy-saving baking ovens
CN104534860A (en) Efficient insulation box wall of impregnated paper drying box
CN206512252U (en) A kind of annealing furnace and annealing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105

Termination date: 20210511

CF01 Termination of patent right due to non-payment of annual fee