CN206844609U - People's passage on a kind of assembly scaffold - Google Patents
People's passage on a kind of assembly scaffold Download PDFInfo
- Publication number
- CN206844609U CN206844609U CN201720254206.6U CN201720254206U CN206844609U CN 206844609 U CN206844609 U CN 206844609U CN 201720254206 U CN201720254206 U CN 201720254206U CN 206844609 U CN206844609 U CN 206844609U
- Authority
- CN
- China
- Prior art keywords
- stair
- people
- passage
- assembly scaffold
- framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses people's passage on a kind of assembly scaffold, its apparent size is 3800mm × 2350mm × 2700mm, is made up of framework, stair, peripheral protecting wire net and interlayer lattice door, wherein:Framework is made up of 8 angle steel of longitudinal direction 75 and 8 angle steel of transverse direction 63;Stair are made up of stair step, landing and stair railing;Stair step and landing material are all 2.5mm thickness checkered steel plates;Stair railing is molded by diameter 50mm steel pipe manufacturings;Interlayer lattice door is separately positioned on the front and rear place of people's passage;Interlayer lattice door is the portable fence door that diameter 50mm steel pipe manufacturings form;Peripheral protecting wire net is welded by the zinc-plated mesh sheet of 4 × 4cm;Multigroup upper people's passage can be set according to foundation depth and story height, people's passage on each two assembly scaffold, linked together with high-strength bolt by bolt hole.The utility model has easy installation and removal, and safety net covers comprehensively, and safety coefficient is high;Component is firm, is hardly damaged, and maintenance cost is low;It can be recycled, the advantages of meeting Green civilization construction reference.
Description
Technical field
A kind of upper people's passage, more particularly to people's passage on a kind of assembly scaffold are the utility model is related to, applied to building
Build the outer eaves scaffold of engineering and temporarily upper people's passage of deep basal pit underground engineering scaffolding work.
Technical background
Scaffold refers to job site as operation and solves vertically and horizontally to transport the various supports set up.Architecture field
Generic term, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height be used on construction site, be constructor
Member is worked up and down or perimeter security net is safeguarded and the component of high-altitude installation.In order that construction personnel apply on the landing stage of scaffold
Work industry, and convenience in transport and storage construction material, it is necessary on the landing stage of scaffold set up set on people's passage.Scaffold
Upper people's passage is that the outer eaves of architectural engineering is filled with and deep basal pit underground engineering increasingly compels highly necessary to solve the problems, such as.
In the last few years, the research and development work that architectural engineering industry engineers and technicians people's passage on scaffold has conveniently been done
Make, and disclosed by following patent documents:
1st, Chinese utility model patent, Authorization Notice No. CN203755717U, the authorized announcement date " depth on the 06th of August in 2014
Walkway above and below foundation ditch assembled " discloses a kind of deep basal pit assembled walkway up and down, including:Led to respectively by four sides
Column erects the left fixed mount to be formed and right fixed mount by four vertex positions of rectangle, and left fixed mount and right fixed mount are vertical
It is respectively separated on direction and multi-layer stair platform is distributed with, and left fixed mount landing and right fixed mount landing is in height
Interval is staggered, and landing side passes through the stair being obliquely installed with the last layer landing positioned at opposite side fixed mount
Stepped plate is connected, and landing opposite side is connected with lower first floor ladder platform by the stairway step plate being obliquely installed.
Its advantage:Middle walkway employs fabricated construction, and the logical column in side forms two relative fixed mounts of left and right,
Be easy to assemble stairway step plate between two relative fixed mounts, disassembly process is simple, saving of labor, saves trouble, can repeated disassembled and assembled repeat to make
With waste of material is small, enhances the practicality, security, reusing attractive in appearance and material of upper and lower walkway.
Its weak point:
1) just for deep-foundation pit engineering, coverage is narrow and small, is not suitable for outer eaves scaffolding work on the ground;2) it is left and right solid
Determine frame, landing and stairway step plate to still need to form to scene, it is relatively time-consuming;
3) steel wire is only set at landing, and covering is not comprehensive, and safety coefficient is not high;
4) setup of entrances and exits is not fixed, and is unable to reach standardization, is unfavorable for recycling.
Utility model content
The purpose of this utility model, be for solve prior art existing for technical problem, adopted the technical scheme that:
People's passage on a kind of assembly scaffold, including landing, it is characterised in that:People on the assembly scaffold
Passage, its apparent size are:3800mm × 2350mm × 2700mm, its structure is by framework, stair, peripheral protecting wire net and interlayer fence
Four parts of door composition, wherein:
Framework, it is made up of 8 angle steel of longitudinal direction 75 and 8 angle steel of transverse direction 63, it is arranged on surrounding on the inside of peripheral protecting wire net,
Peripheral protecting wire net, it is welded using the zinc-plated mesh sheet of 4 × 4cm, it is arranged on frame peripheral border,
Interlayer lattice door, the front and rear place of people's passage dextral platform on assembly scaffold is separately positioned on,
Stair, set on framework, among peripheral protecting wire net.
The stair, it is parallel double race stair, is made up of stair step, landing and stair railing, the stair are stepped on
Step, landing and stair railing all make shaping using checkered steel plate thick 2.5mm, and wherein stair step is positioned at centre, building
Terraced platform is located at the left and right sides, the stair railing, is molded using diameter 50mm steel pipe manufacturing, positioned at stair step side.
Described, interlayer lattice door is the portable fence door that diameter 50mm steel pipe manufacturing forms, as disengaging building
Passage, width 1000mm, it is highly 2000mm.
People's passage on the assembly scaffold, multigroup upper people's passage can be set according to foundation depth and story height,
People's passage on each two assembly scaffold, linked together with high-strength bolt by bolt hole.
The utility model advantage
Compared with prior art, the utility model has following
1) single is standard component, can according to depth of building up and down combine, can right and left mutually changing place, so as to change gateway
Direction;
2) easy installation and removal, it is simple to operate, quick, save the duration;
3) safety net covers comprehensively, and safety coefficient is high;
4) component is firm, is hardly damaged, and maintenance cost is low, can be recycled, and meets Green civilization construction reference.
Brief description of the drawings
Fig. 1 is the utility model structural facades schematic diagram;
Fig. 2 is Fig. 1 diagrammatic cross-section;
Fig. 3 is 2 framework elevational schematic views in Fig. 1;
Fig. 4 is 2 frame plane schematic diagrames in Fig. 1;
Fig. 5 is the staircase structure schematic diagram in Fig. 1.
In Fig. 1:People's passage on 1 assembly scaffold;2 frameworks;3 stair;4 peripheral protecting wire nets;5 interlayer lattice doors.
In Fig. 2:2 frameworks;4 peripheral protecting wire nets;5 interlayer lattice doors;8 stair steps;9 landings;10 stair railings.
In Fig. 3:6 75 angle steel of longitudinal direction;7 horizontal 63.
In Fig. 4:6 75 angle steel of longitudinal direction;7 horizontal 63 angle steel.
In Fig. 5:8 stair steps;9 landings;10 stair railings.
Embodiment
Below in conjunction with the accompanying drawings and preferred embodiment describes specific embodiment of the present utility model in detail.
Embodiment
Refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, people's passage on a kind of assembly scaffold, the assembly scaffold
Upper people's passage 1, its apparent size are:3800mm × 2350mm × 2700mm, its structure is by framework 2), stair 3, peripheral protecting wire net 4
Formed with the part of interlayer lattice door 5 four, wherein:
Framework 2, it is made up of 8 angle steel 6 of longitudinal direction 75 and 8 angle steel 7 of transverse direction 63, it is arranged on the peripheral inner side surrounding of protecting wire net 4
Side,
Peripheral protecting wire net 4 is welded using the zinc-plated mesh sheet of 4 × 4cm, and it is arranged on 2 peripheral border of framework,
Interlayer lattice door 5 is separately positioned on the front and rear place of the dextral platform of people's passage 1 on assembly scaffold,
Stair 3, set on framework 2, among peripheral protecting wire net 4.
The stair 3, it is parallel double race stair, is made up of stair step 8, landing 9 and stair railing 10, the building
Ladder rung 8, landing 9 and stair railing 10 all make shaping, wherein stair step 8 using checkered steel plate thick 2.5mm
In centre, landing 9 is located at the left and right sides, the stair railing 10, is molded using diameter 50mm steel pipe manufacturing, positioned at building
Ladder rung side.
Described, interlayer lattice door 5 is the portable fence door that diameter 50mm steel pipe manufacturing forms, as disengaging building
Passage, width 1000mm, it is highly 2000mm.
People's passage 1 on the assembly scaffold, multigroup upper people's passage can be set according to foundation depth and story height
1, people's passage 1 on each two assembly scaffold, linked together with high-strength bolt by bolt hole.
It is described above, only it is preferred embodiment of the present utility model, not structure of the present utility model is made any
Formal limitation.Every any simple modification made according to the technical essence of the utility model to above example, it is equal
Change and modification, in the range of still falling within the technical solution of the utility model.
Claims (4)
1. people's passage on a kind of assembly scaffold, including landing, it is characterised in that:People is led on the assembly scaffold
Road (1), its apparent size are:3800mm × 2350mm × 2700mm, its structure is by framework (2), stair (3), peripheral protecting wire net (4)
Formed with the part of interlayer lattice door (5) four, wherein:
Framework (2) is made up of 8 angle steel of longitudinal direction 75 (6) and 8 angle steel of transverse direction 63 (7), and it is arranged on four on the inside of peripheral protecting wire net (4)
Periphery,
Peripheral protecting wire net (4) is welded using the zinc-plated mesh sheet of 4 × 4cm, and it is arranged on framework (2) peripheral border,
Interlayer lattice door (5) is separately positioned on the front and rear place of people's passage (1) dextral platform on assembly scaffold,
Stair (3), set on framework (2), among peripheral protecting wire net (4).
2. people's passage on assembly scaffold according to claim 1, it is characterised in that:The stair (3), for parallel double races
Stair, it is made up of stair step (8), landing (9) and stair railing (10), the stair step (8), landing (9)
Shaping is all made using checkered steel plate thick 2.5mm with stair railing (10), wherein stair step (8) is put down positioned at centre, stair
Platform (9) is located at the left and right sides, the stair railing (10), is molded using diameter 50mm steel pipe manufacturing, positioned at stair step side
Side.
3. people's passage on assembly scaffold according to claim 1, it is characterised in that:Described, interlayer lattice door (5) is straight
The portable fence door that footpath 50mm steel pipe manufacturing forms, as the passage of disengaging building, width 1000mm, highly it is
2000mm。
4. people's passage on assembly scaffold according to claim 1, it is characterised in that:People is led on the assembly scaffold
Road (1), multigroup upper people's passage (1) can be set according to foundation depth and story height, people is led on each two assembly scaffold
Road (1), linked together with high-strength bolt by bolt hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720254206.6U CN206844609U (en) | 2017-03-16 | 2017-03-16 | People's passage on a kind of assembly scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720254206.6U CN206844609U (en) | 2017-03-16 | 2017-03-16 | People's passage on a kind of assembly scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206844609U true CN206844609U (en) | 2018-01-05 |
Family
ID=60790354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720254206.6U Active CN206844609U (en) | 2017-03-16 | 2017-03-16 | People's passage on a kind of assembly scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206844609U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590143A (en) * | 2018-05-30 | 2018-09-28 | 五冶集团上海有限公司 | Superelevation console mode external scaffolding people's row chute erection method |
CN109736596A (en) * | 2019-01-11 | 2019-05-10 | 中国五冶集团有限公司 | Upper people channel for large steel structure installation |
-
2017
- 2017-03-16 CN CN201720254206.6U patent/CN206844609U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590143A (en) * | 2018-05-30 | 2018-09-28 | 五冶集团上海有限公司 | Superelevation console mode external scaffolding people's row chute erection method |
CN109736596A (en) * | 2019-01-11 | 2019-05-10 | 中国五冶集团有限公司 | Upper people channel for large steel structure installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100944463B1 (en) | Composite cage for construction | |
CN201250038Y (en) | Wall-attached elevator hoistway | |
CN104131688B (en) | The special external hanging type job platform of assembled architecture and method of operating thereof | |
CA3118407C (en) | Modular stairwell and elevator shaft system and method | |
CN102913002B (en) | Integral steel structure prefabricated house and mounting method thereof | |
US20230014744A1 (en) | Method of Construction | |
CN206844609U (en) | People's passage on a kind of assembly scaffold | |
CN204001653U (en) | The special-purpose external hanging type job platform of assembled architecture | |
US20210324642A1 (en) | Method of erecting a multi-storey structure and facade | |
KR20110094720A (en) | Composite cage for construction | |
CN205857563U (en) | Assembled architecture escalator tool-type traffic stair | |
CN107023079A (en) | A kind of building structure | |
CN205653885U (en) | Reinforced concrete prefabricated house integrates | |
CN112681792A (en) | Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway | |
CN216713958U (en) | Assembled safety ladder cage | |
CN206071080U (en) | A kind of scalable faces side protection tool | |
CN219386796U (en) | High-altitude large-span unit-type hanging honeycomb aluminum plate curtain wall | |
CN214006718U (en) | Novel steel structure type fire-fighting training tower | |
CN215717033U (en) | A operation platform that is used for indoor large-span to face limit entrance to a cave fitment construction | |
CN219012075U (en) | Building construction safety ladder cage convenient to assemble | |
CN212507124U (en) | Steel assembled stair | |
CN214498580U (en) | Novel fourth generation building house structure system | |
CN215670931U (en) | Operating platform for steel structure elevator | |
CN220036073U (en) | Assembled stairwell construction is with operation steel platform | |
CN203755717U (en) | Assembly type up and down pedestrian path for deep foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |