CN109736596A - Upper people channel for large steel structure installation - Google Patents
Upper people channel for large steel structure installation Download PDFInfo
- Publication number
- CN109736596A CN109736596A CN201910026506.2A CN201910026506A CN109736596A CN 109736596 A CN109736596 A CN 109736596A CN 201910026506 A CN201910026506 A CN 201910026506A CN 109736596 A CN109736596 A CN 109736596A
- Authority
- CN
- China
- Prior art keywords
- channel
- people
- mounting rack
- main
- steel structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- General Factory Administration (AREA)
Abstract
The invention discloses the upper people channel for large steel structure installation, solve the problems, such as that upper people low efficiency of prior art during large steel structure installation, safety of workers coefficient is not high and installation operating efficiency is low.The present invention includes Your Majesty people channel, interface channel, the first secondary upper people channel and the second secondary upper people channel, and Your Majesty people channel includes main pedal mounting rack, main pedal, main channel supporting leg and main railing;First secondary upper people channel includes the stull of people channel and the first secondary railing in the first secondary pedal mounting rack, the first secondary pedal, pair;Second secondary upper people channel includes the second secondary pedal mounting rack, the second secondary pedal, the second subaisle supporting leg and the second secondary railing.The configuration of the present invention is simple, design is scientific and reasonable, easy to use, can effectively improve the safety coefficient of upper the people's efficiency and worker during large steel structure installation, while can also improve the installation operating efficiency of worker.
Description
Technical field
The present invention relates to the upper people channels for large steel structure installation.
Background technique
During large steel structure installation, inevitably installer is needed to climb to large-scale steel structure, existing skill
During the installation process, installer generally passes through lifting rope and lifts to installation place progress installation art, lifts low efficiency, Gong Renshi
There is hanging operation, safety guarantee coefficient is low, meanwhile, worker's lifting operation also limits the installation effectiveness of worker.Therefore, one is designed
Money is used for the upper people channel of large steel structure installation, to improve the peace of upper people's efficiency and worker during large steel structure installation
Overall coefficient, while the installation operating efficiency of worker is improved, become skilled artisan's technical problem urgently to be resolved.
Summary of the invention
The technical problem to be solved by the present invention is providing the upper people channel for being used for large steel structure installation, existing skill is solved
Upper people low efficiency of art during large steel structure installation, safety of workers coefficient be not high and installation operating efficiency is low asks
Topic.
To achieve the above object, The technical solution adopted by the invention is as follows:
For the upper people channel of large steel structure installation, including the Your Majesty people channel, even being mounted on large-scale steel structure
Road, the first secondary upper people channel and the second secondary upper people channel are connected, the Your Majesty people channel includes main pedal mounting rack, is mounted equidistant
In on the main pedal mounting rack several main pedals, equidistantly be set to the main pedal mounting rack bottom surface several pairs of main channels
Supporting leg and two main railings for being respectively arranged on the main pedal installation top of support two sides, the Your Majesty people channel passes through institute
Main channel supporting leg is stated to be installed on large-scale steel structure;
Described first secondary upper people channel is connect by the interface channel with a middle side part in the Your Majesty people channel, described
First secondary upper people channel include the first secondary pedal mounting rack, be mounted equidistant on the described first secondary pedal mounting rack several the
The secondary upper people channel stulls of one secondary pedal, the two or more for being laterally set to the described first secondary pedal mounting rack bottom and it is set to institute
The first secondary railing on the outside of the first secondary pedal installation top of support is stated, the described first secondary upper people channel is horizontal by the secondary upper people channel
Support is installed on large-scale steel structure;
Described second secondary upper people channel is connected in the middle part of the other side in the Your Majesty people channel, the described second secondary upper people channel
Including the second secondary pedal mounting rack, it is mounted equidistant in several second secondary pedals, equidistant on the described second secondary pedal mounting rack
Set on the several to the second subaisle supporting leg and set on the described second secondary pedal peace of the described second secondary pedal mounting rack bottom surface
The second secondary railing on the outside of top surface is shelved, the described second secondary upper people channel is installed on large size by the second subaisle supporting leg
On steel construction.
Further, the main pedal mounting rack is respectively in two main channel supporting legs in the supporting leg of a pair of of main channel
The two sides of bottom surface.
Further, the described first secondary upper people channel and the second secondary upper people channel are distributed in the Your Majesty people channel
Two sides.
Further, the top of the interface channel is connect with a middle side part in the Your Majesty people channel, and the connection is logical
The bottom end in road is connect with the top in the described first secondary upper people channel, and the interface channel includes connection pedal mounting rack, equidistant peace
Loaded on described several connection pedals connected on pedal mounting rack, equidistantly it is set to the several of the connection pedal mounting rack bottom surface
It is logical to interface channel supporting leg and the connection railing on the outside of the connection pedal installation top of support, the interface channel
The interface channel supporting leg is crossed to be installed on large-scale steel structure.
Further, a master is respectively equipped on length direction of the top of each main railing along the main railing
Life rope.
Further, the top of the described first secondary railing is equipped with one piece the along the length direction of the described first secondary railing
One secondary life rope.
Further, the top of the described second secondary railing is equipped with one piece the along the length direction of the described second secondary railing
Second mate's life rope.
Further, the top of the connection railing is equipped with a connection life along the length direction of the connection railing
Life rope.
Compared with prior art, the invention has the following advantages:
The configuration of the present invention is simple, design is scientific and reasonable, easy to use, during can effectively improving large steel structure installation
The safety coefficient of upper people's efficiency and worker, while the installation operating efficiency of worker can also be improved.
The present invention includes being set to the Your Majesty people channel on large-scale steel structure, interface channel, the first secondary upper people channel and the
The upper people channel of second mate, the first secondary upper people channel are connect by interface channel with a middle side part in Your Majesty people channel, and in the second pair
It is connect in the middle part of people channel and the other side in Your Majesty people channel, when worker installs heavy steel member, master can be passed through respectively
Upper people channel, the first secondary upper people channel and the second secondary upper people channel carry out people, can effectively improve people's efficiency, and then improve work
The installation operating efficiency of people;
Your Majesty people channel of the present invention includes main channel supporting leg, main pedal, main railing, main life rope and the installation of main pedal
Frame, the first secondary upper people channel include secondary upper people channel stull, the first secondary pedal mounting rack, the first secondary pedal, the first secondary life rope
With the first secondary railing, the second secondary upper people channel includes the second secondary life rope, the second secondary pedal mounting rack, the second secondary pedal, second
Subaisle supporting leg and the second secondary railing, interface channel include connection life rope, connection pedal mounting rack, connection pedal, connection
Channel support leg and connection railing, total is solid and reliable, and worker can step on pedal, help railing and grasp life rope
On Your Majesty people channel, interface channel, the first secondary upper people channel and the second secondary upper people channel freely up and down, not only upper servant's efficiency
Height, and the safety coefficient of servant can also be effectively improved by life rope.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is partial enlarged view at interface channel of the present invention.
Fig. 3 is Your Majesty people channel of the present invention side view.
Fig. 4 is Your Majesty people's channel end surface view of the present invention (wherein, a indicates large-scale steel structure outer contour).
Fig. 5 is Your Majesty people's channel end surface side view of the present invention (wherein, a indicates large-scale steel structure outer contour).
Fig. 6 is main pedal schematic diagram in Your Majesty people channel of the present invention.
Wherein, the corresponding title of appended drawing reference are as follows:
1- Your Majesty people channel, the secondary upper people channel 2- first, 3- second secondary upper people channel, 4- interface channel, the main channel 11- branch
The main pedal of support leg, 12-, the main railing of 13-, the main life rope of 14-, the main pedal mounting rack of 15-, the stull of people channel, 22- in 21- pair
One secondary pedal mounting rack, the secondary pedal of 23- first, the secondary life rope of 24- first, the secondary railing of 25- first, the secondary life rope of 31- second,
The secondary pedal mounting rack of 32- second, the secondary pedal of 33- second, the second subaisle of 34- supporting leg, the secondary railing of 35- second, 41- connection life
Order rope, 42- connection pedal mounting rack, 43- connection pedal, 44- interface channel supporting leg, 45- connection railing.
Specific embodiment
The invention will be further described with embodiment for explanation with reference to the accompanying drawing, and mode of the invention includes but not only limits
In following embodiment.
As shown in figures 1 to 6, provided by the present invention for the upper people channel of large steel structure installation, structure is simple, design department
It learns rationally, it is easy to use, the safety coefficient of upper the people's efficiency and worker during large steel structure installation can be effectively improved, simultaneously
The installation operating efficiency of worker can also be improved.The present invention includes the Your Majesty people channel 1 being mounted on large-scale steel structure, connects and lead to
The secondary upper people channel 2 in road 4, first and the second secondary upper people channel 3, the described first secondary upper people channel 2 and the second secondary upper people channel 3
It is distributed in the two sides in the Your Majesty people channel 1.The Your Majesty people channel 1 includes main pedal mounting rack 15, is mounted equidistant in described
Several main pedals 12 on main pedal mounting rack 15, several pairs of main channels for being equidistantly set to main 15 bottom surface of pedal mounting rack
Supporting leg 11 and two main railings 13 for being respectively arranged on the 15 top surface two sides of main pedal mounting rack, the Your Majesty people channel 1
It is installed on large-scale steel structure by the main channel supporting leg 11, with two main channels support in the supporting leg of a pair of main channel
Leg is respectively in the two sides of main 15 bottom surface of pedal mounting rack, and the top of each main railing 13 is along the main railing 13
A main life rope 14 is respectively equipped on length direction.
The middle side part that of the present invention first secondary upper people channel 2 passes through the interface channel 4 and the Your Majesty people channel 1
Connection, the described first secondary upper people channel 2 include the first secondary pedal mounting rack 22, are mounted equidistant in the described first secondary pedal mounting rack
Several first secondary pedals 23 on 22, the secondary upper people of two or more laterally set on the described first secondary 22 bottom of pedal mounting rack are led to
Road stull 21 and the first secondary railing 25 on the outside of the described first secondary 22 top surface of pedal mounting rack, the described first secondary upper people
Channel 2 is installed on large-scale steel structure by the secondary upper people channel stull 21, and the top of the described first secondary railing 25 is along institute
The length direction for stating the first secondary railing 25 is equipped with one first secondary life rope 24.
Of the present invention second secondary upper people channel 3 is connected in the middle part of the other side in the Your Majesty people channel 1, and described second is secondary
Upper people channel 3 include the second secondary pedal mounting rack 32, be mounted equidistant on the described second secondary pedal mounting rack 32 several the
Second mate's pedal 33, be equidistantly set to the described second secondary 32 bottom surface of pedal mounting rack it is several to the second subaisle supporting leg 34 and
The second secondary railing 35 on the outside of the described second secondary 32 top surface of pedal mounting rack, the described second secondary upper people channel 3 pass through described
Second subaisle supporting leg 34 is installed on large-scale steel structure, and the top of the described second secondary railing 35 is along the described second secondary railing
35 length direction is equipped with one second secondary life rope 31.
The top of interface channel 4 of the present invention is connect with a middle side part in the Your Majesty people channel 1, the interface channel
4 bottom end connect with the top in the described first secondary upper people channel 2, and the interface channel 4 includes connection pedal mounting rack 42, equidistantly
Several being installed on the connection pedal mounting rack 42 connect pedals 43, are equidistantly set to 42 bottom of connection pedal mounting rack
Several pairs of interface channel supporting legs 44 in face and the connection railing 45 on the outside of connection 42 top surface of pedal mounting rack,
The interface channel 4 is installed on large-scale steel structure by the interface channel supporting leg 44, the top of the connection railing 45
A connection life rope 41 is equipped with along the length direction of the connection railing 45.
The present invention includes being set to the Your Majesty people channel on large-scale steel structure, interface channel, the first secondary upper people channel and the
The upper people channel of second mate, the first secondary upper people channel are connect by interface channel with a middle side part in Your Majesty people channel, and in the second pair
It is connect in the middle part of people channel and the other side in Your Majesty people channel, when worker installs heavy steel member, master can be passed through respectively
Upper people channel, the first secondary upper people channel and the second secondary upper people channel carry out people, can effectively improve people's efficiency, and then improve work
The installation operating efficiency of people;
Your Majesty people channel of the present invention includes main channel supporting leg, main pedal, main railing, main life rope and the installation of main pedal
Frame, the first secondary upper people channel include secondary upper people channel stull, the first secondary pedal mounting rack, the first secondary pedal, the first secondary life rope
With the first secondary railing, the second secondary upper people channel includes the second secondary life rope, the second secondary pedal mounting rack, the second secondary pedal, second
Subaisle supporting leg and the second secondary railing, interface channel include connection life rope, connection pedal mounting rack, connection pedal, connection
Channel support leg and connection railing, total is solid and reliable, and worker can step on pedal, help railing and grasp life rope
On Your Majesty people channel, interface channel, the first secondary upper people channel and the second secondary upper people channel freely up and down, not only upper servant's efficiency
Height, and the safety coefficient of servant can also be effectively improved by life rope.
Above-described embodiment is only one of the preferred embodiment of the present invention, should not be taken to limit protection model of the invention
It encloses, as long as that in body design thought of the invention and mentally makes has no the change of essential meaning or polishing, is solved
The technical issues of it is still consistent with the present invention, should all be included within protection scope of the present invention.
Claims (8)
1. being used for the upper people channel of large steel structure installation, it is characterised in that: including the Your Majesty being mounted on large-scale steel structure
People channel (1), interface channel (4), first secondary upper people channel (2) and second secondary upper people channel (3), the Your Majesty people channel (1)
Including main pedal mounting rack (15), it is mounted equidistant in several main pedals (12), equidistant on the main pedal mounting rack (15)
Set on main pedal mounting rack (15) bottom surface several pairs of main channel supporting legs (11) and be respectively arranged on the main pedal peace
Two main railings (13) of (15) top surface two sides are shelved, the Your Majesty people channel (1) is pacified by the main channel supporting leg (11)
Loaded on large-scale steel structure;
Described first secondary upper people channel (2) are connected by a middle side part of the interface channel (4) and the Your Majesty people channel (1)
It connects, described first secondary upper people channel (2) include the first secondary pedal mounting rack (22), are mounted equidistant in the described first secondary pedal installation
Several first secondary pedals (23), the lateral two or more for being set to described first secondary pedal mounting rack (22) bottom on frame (22)
People channel stull (21) and the first secondary railing (25) being set on the outside of described first secondary pedal mounting rack (22) top surface in pair,
Described first secondary upper people channel (2) are installed on large-scale steel structure by secondary upper the stull of people channel (21);
Described second secondary upper people channel (3) are connected in the middle part of the other side of the Your Majesty people channel (1), and the described second secondary upper people is logical
Road (3) include the second secondary pedal mounting rack (32), be mounted equidistant on the described second secondary pedal mounting rack (32) several the
Second mate's pedal (33) is equidistantly set to the several to the second subaisle supporting leg of described second secondary pedal mounting rack (32) bottom surface
(34) the second secondary railing (35) and on the outside of described second secondary pedal mounting rack (32) top surface, the described second secondary upper people
Channel (3) is installed on large-scale steel structure by the second subaisle supporting leg (34).
2. the upper people channel according to claim 1 for large steel structure installation, it is characterised in that: with a pair of main channel
Two main channel supporting legs in supporting leg are respectively in the two sides of main pedal mounting rack (15) bottom surface.
3. the upper people channel according to claim 2 for large steel structure installation, it is characterised in that: in first pair
People channel (2) and second secondary upper people channel (3) are distributed in the two sides of the Your Majesty people channel (1).
4. the upper people channel for large steel structure installation according to claim 1 to 3, it is characterised in that: institute
The top for stating interface channel (4) is connect with a middle side part of the Your Majesty people channel (1), the bottom end of the interface channel (4) with
The top connection of described first secondary upper people channel (2), the interface channel (4) include connection pedal mounting rack (42), equidistant peace
Loaded on described several connections pedal (43) connected on pedal mounting rack (42), equidistantly it is set to the connection pedal mounting rack
(42) several pairs of interface channel supporting legs (44) of bottom surface and the company being set on the outside of described connection pedal mounting rack (42) top surface
It connects railing (45), the interface channel (4) is installed on large-scale steel structure by the interface channel supporting leg (44).
5. the upper people channel according to claim 4 for large steel structure installation, it is characterised in that: each described master
The top of railing (13) is respectively equipped with a main life rope (14) on the length direction along the main railing (13).
6. the upper people channel according to claim 5 for large steel structure installation, it is characterised in that: the described first secondary column
The top of bar (25) is equipped with one first secondary life rope (24) along the length direction of the described first secondary railing (25).
7. the upper people channel according to claim 6 for large steel structure installation, it is characterised in that: the described second secondary column
The top of bar (35) is equipped with one second secondary life rope (31) along the length direction of the described second secondary railing (35).
8. the upper people channel according to claim 7 for large steel structure installation, it is characterised in that: the connection railing
(45) top is equipped with a connection life rope (41) along the length direction of connection railing (45).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910026506.2A CN109736596A (en) | 2019-01-11 | 2019-01-11 | Upper people channel for large steel structure installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910026506.2A CN109736596A (en) | 2019-01-11 | 2019-01-11 | Upper people channel for large steel structure installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109736596A true CN109736596A (en) | 2019-05-10 |
Family
ID=66364464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910026506.2A Pending CN109736596A (en) | 2019-01-11 | 2019-01-11 | Upper people channel for large steel structure installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109736596A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1096081A1 (en) * | 1999-07-29 | 2001-05-02 | DOKA Industrie GmbH | Prefabricated guardrail element |
CN203247871U (en) * | 2013-04-22 | 2013-10-23 | 中国能源建设集团江苏省电力建设第三工程公司 | Frame type crawling ladder for closed construction of outer wall plates in windy area |
CN205063350U (en) * | 2015-09-16 | 2016-03-02 | 中建钢构有限公司 | Portable assembled horizontal channel |
CN205206730U (en) * | 2015-12-22 | 2016-05-04 | 重庆益瑞德工程技术有限责任公司 | A engineering ladder for electromechanical device installation |
CN205875660U (en) * | 2016-08-04 | 2017-01-11 | 新誉集团有限公司 | General operation car of ascending a height of telescopic |
CN206844609U (en) * | 2017-03-16 | 2018-01-05 | 天津三建建筑工程有限公司 | People's passage on a kind of assembly scaffold |
CN207347923U (en) * | 2017-10-16 | 2018-05-11 | 中交一公局第二工程有限公司 | Across guardrail walking escape stair |
JP6375434B1 (en) * | 2017-12-18 | 2018-08-15 | 株式会社エフビーエス・ミヤマ | Tarup |
CN208168431U (en) * | 2018-04-25 | 2018-11-30 | 邱盛贵 | Bridge anti-falling safe ladder |
CN208203112U (en) * | 2018-04-13 | 2018-12-07 | 冠鲁建设股份有限公司 | A kind of Cadge ladder for construction of deep base pit |
-
2019
- 2019-01-11 CN CN201910026506.2A patent/CN109736596A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1096081A1 (en) * | 1999-07-29 | 2001-05-02 | DOKA Industrie GmbH | Prefabricated guardrail element |
CN203247871U (en) * | 2013-04-22 | 2013-10-23 | 中国能源建设集团江苏省电力建设第三工程公司 | Frame type crawling ladder for closed construction of outer wall plates in windy area |
CN205063350U (en) * | 2015-09-16 | 2016-03-02 | 中建钢构有限公司 | Portable assembled horizontal channel |
CN205206730U (en) * | 2015-12-22 | 2016-05-04 | 重庆益瑞德工程技术有限责任公司 | A engineering ladder for electromechanical device installation |
CN205875660U (en) * | 2016-08-04 | 2017-01-11 | 新誉集团有限公司 | General operation car of ascending a height of telescopic |
CN206844609U (en) * | 2017-03-16 | 2018-01-05 | 天津三建建筑工程有限公司 | People's passage on a kind of assembly scaffold |
CN207347923U (en) * | 2017-10-16 | 2018-05-11 | 中交一公局第二工程有限公司 | Across guardrail walking escape stair |
JP6375434B1 (en) * | 2017-12-18 | 2018-08-15 | 株式会社エフビーエス・ミヤマ | Tarup |
CN208203112U (en) * | 2018-04-13 | 2018-12-07 | 冠鲁建设股份有限公司 | A kind of Cadge ladder for construction of deep base pit |
CN208168431U (en) * | 2018-04-25 | 2018-11-30 | 邱盛贵 | Bridge anti-falling safe ladder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499167A (en) | A kind of ready-package attached type lifting scaffold inclining anti-fall device | |
CN104609281A (en) | Domestic lift | |
CN109736596A (en) | Upper people channel for large steel structure installation | |
CN206309003U (en) | A kind of ready-package attached type lifting scaffold inclining anti-fall device | |
CN104612391B (en) | Construction of prevention work platform for skyscraper | |
CN103058090A (en) | Multifunctional lifting device | |
CN103359663A (en) | Seat basket | |
CN206859639U (en) | Attachment type raise scaffold wall-attached supporting seat | |
CN206521189U (en) | Elevator counterweight | |
CN205023667U (en) | Six steady rail sedan -chair framves go up and down | |
CN205077614U (en) | Core section of thick bamboo system with emergent function of fleing | |
CN203699622U (en) | Landing door sill device | |
CN102616637A (en) | Elevator hoistway sill assembly | |
CN108584673B (en) | A kind of improved ladle hanging apparatus | |
CN202644964U (en) | Anti-dropping device of attached type hoisting scaffold | |
CN201321314Y (en) | Emergency rescue device for machine-roomless elevators | |
CN109250605A (en) | A kind of paperback rack-track | |
CN205602985U (en) | No computer lab hauler fixing device | |
CN210594860U (en) | Fixing device for elevator balancing weight | |
CN206126569U (en) | Passenger stair sedan -chair top rope sheave fixing device | |
CN203566689U (en) | Safe slide-rail system for electric traction rolling stock debugging | |
CN203257111U (en) | Building construction safety protection device | |
CN205076619U (en) | Single hoisting point double -deck elevator hanging flower basket | |
CN104329018A (en) | Lift well crawling ladder device | |
CN211689967U (en) | A safe slide rail device that is used for steel sheet combination beam earthquake damage to overhaul |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |
|
RJ01 | Rejection of invention patent application after publication |