CN206839587U - A kind of ring steel belt scheduling and planning device - Google Patents

A kind of ring steel belt scheduling and planning device Download PDF

Info

Publication number
CN206839587U
CN206839587U CN201720724207.2U CN201720724207U CN206839587U CN 206839587 U CN206839587 U CN 206839587U CN 201720724207 U CN201720724207 U CN 201720724207U CN 206839587 U CN206839587 U CN 206839587U
Authority
CN
China
Prior art keywords
frame
steel band
roller
fixing axle
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720724207.2U
Other languages
Chinese (zh)
Inventor
杜巍
李锋
杜新生
聂玉凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zibo Lu Work Granulation Equipment Science And Technology Ltd
Original Assignee
Zibo Lu Work Granulation Equipment Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zibo Lu Work Granulation Equipment Science And Technology Ltd filed Critical Zibo Lu Work Granulation Equipment Science And Technology Ltd
Priority to CN201720724207.2U priority Critical patent/CN206839587U/en
Application granted granted Critical
Publication of CN206839587U publication Critical patent/CN206839587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)

Abstract

It the utility model is related to ring steel belt debugging technique field, especially a kind of ring steel belt scheduling and planning device, including two frames, multiple carrying rollers are sequentially provided between two frames, viscose glue strip device and steel band automatic soldering device, the side of the steel band automatic soldering device is provided with driving drum, and driving drum is located at the outside of frame, the side of the driving drum is provided with cutter, the side of the cutter is provided with steel band centering platform, the side of the steel band centering platform is provided with unwinding device, the side of the carrying roller is provided with and takes out roller arrangement, and take out the outside that roller arrangement is located at frame, the side for taking out roller arrangement is provided with passive roller.The utility model can also reduce operational error, improve Product Precision, lift product qualification rate, increasing the performance of enterprises improves production process, economizes on resources, and improves resource utilization, improving end properties increases inspection process before product export, operation of the simulation steel band on machine, control product quality.

Description

A kind of ring steel belt scheduling and planning device
Technical field
It the utility model is related to ring steel belt debugging technique field, more particularly to a kind of ring steel belt scheduling and planning device.
Background technology
Existing ring steel belt debugging plan is simple production equipment, although can realize steel strip cutting, adhesive tape vulcanization, receive Packing is put, but the trial operation of steel band can not be realized, can not accurately examine the operational factor of steel band, so that steel band is being debugged During automaticity it is relatively low, also need to be carried steel band, so as to improve the labour of staff, extend production institute Need time so that reduction production efficiency.
Utility model content
The purpose of this utility model is that journey is automated during debugging in order to solve steel band present in prior art Spend relatively low, also need to be carried steel band, so as to improve the labour of staff, extend the time needed for production, so that The shortcomings that reducing production efficiency, and a kind of ring steel belt scheduling and planning device proposed.
To achieve these goals, the utility model employs following technical scheme:
A kind of ring steel belt scheduling and planning device, including two frames are designed, are sequentially provided between two frames more Individual carrying roller, viscose glue strip device and steel band automatic soldering device, the side of the steel band automatic soldering device are provided with driving drum, and Driving drum is located at the outside of frame, and the side of the driving drum is provided with cutter, and the side of the cutter is provided with steel band Centering platform, the side of the steel band centering platform are provided with unwinding device, and the side of the carrying roller, which is provided with, takes out roller arrangement, and takes out roller Device is located at the outside of frame, and the side for taking out roller arrangement is provided with passive roller.
Preferably, the roller arrangement of taking out includes fixing axle, and the fixing axle is between two frames, and the two of fixing axle End through frame side wall and extend to the outside of frame, the frame is provided with corresponding with the end position of fixing axle the Two support blocks, and the second support block is located at the lower section of fixing axle, the upper surface of second support block is provided with corresponding with fixing axle Fixed block, and one end of fixing axle is plugged on the inside of fixed block, also passes through bearing activity between the fixing axle and frame Connect, be coaxially installed with live-roller in the fixing axle, the upper and lower of the live-roller is equipped with fix bar, and the two of fix bar End is connected with two frames respectively, and the bottom of frame is provided with supporting plate, and the bottom surface of supporting plate is provided with the first support block, described The top of supporting plate is provided with supporting plate, and supporting plate is located at the outside of frame, and the bottom surface of the supporting plate is provided with multiple pulleys, and pulley Bottom and the upper surface of supporting plate, and can be placed on the upper of supporting plate along the upper surface slide of supporting plate, the live-roller Surface.
Preferably, the viscose glue strip device includes installation frame, and the installation frame is arranged between two frames, institute The inside for stating installation frame is provided with pressing plate, and multiple cylinders are connected between pressing plate and the inside top surface of installation frame, the peace The inner bottom surface of frame of framing up is provided with two the 3rd support blocks corresponding with press plate position and heating plate, and two the 3rd support blocks are located at The both sides of heating plate.
Preferably, the steel band automatic soldering device is steel belt welding machine.
Preferably, the steel band centering platform includes base, and the base is located at the side of cutter, the base it is upper Surface is provided with two installing plates, and two installing plates offer multiple mounting grooves, the inner bottom of the mounting groove on relative side Face is provided with screw rod, and the first pressure roller is socketed with the screw rod, is set between the bottom surface of first pressure roller and mounting groove inner bottom surface There is spring, and spring is socketed on screw rod, the installing plate is provided with the second pressure roller with the first pressure roller position correspondence, and second Pressure roller is located at the lower section of the first pressure roller, and the mounting groove arranges in a symmetrical manner at least provided with six.
Preferably, the unwinding device is unreeling machine.
The utility model proposes a kind of ring steel belt scheduling and planning device, beneficial effect is:By adding passive rolling Cylinder, take out roller arrangement, carrying roller, viscose glue strip device, steel band automatic soldering device, driving drum, cutter, steel band centering platform and put Winding apparatus, combining structure is used to the said equipment so that topology layout is more reasonable, compact, can reduce space occupancy, can It is adjusted with the specification according to steel band, improves the flexibility of operation, can also so improve the automaticity in debugging process, Labor intensity is reduced, reduces working time so that operating efficiency dramatically increases.The utility model can also reduce operational error, carry High product precision, lifts product qualification rate, and the increase performance of enterprises improves production process, economized on resources, improves resource utilization, carry Inspection process before high end properties increase product export, operation of the simulation steel band on machine, control product quality.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of ring steel belt scheduling and planning device structural front view;
Fig. 2 be the utility model proposes a kind of ring steel belt scheduling and planning device structural side view;
Fig. 3 be the utility model proposes a kind of ring steel belt scheduling and planning device viscose top apparatus structure schematic diagram;
Fig. 4 be the utility model proposes a kind of ring steel belt scheduling and planning device steel band centering platform structure main view Figure;
Fig. 5 be the utility model proposes a kind of ring steel belt scheduling and planning device steel band centering platform structure vertical view Figure.
In figure:Passive roller 1, take out roller arrangement 2, frame 3, carrying roller 4, viscose glue strip device 5, steel band automatic soldering device 6, biography Dynamic roller 7, cutter 8, steel band centering platform 9, unwinding device 10, installing plate 11, fixing axle 12, bearing 13, live-roller 14, support Plate 15, pulley 16, the first support block 17, supporting plate 18, fix bar 19, fixed block 20, projection 21, the second support block 22, cylinder 23rd, the 3rd support block 24, heating plate 25, pressing plate 26, installation frame 27, locking nut 28, screw rod 29, the first pressure roller 30, installation Groove 31, the second pressure roller 32, base 33, spring 34.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely retouch, it is clear that the embodiment retouched is only the utility model part of the embodiment, rather than whole embodiments.
Reference picture 1-5, a kind of ring steel belt scheduling and planning device, including two frames 3, set successively between two frames 3 There are multiple carrying rollers 4, viscose glue strip device 5 and steel band automatic soldering device 6, unwinding device 10 is unreeling machine.
Steel band automatic soldering device 6 is steel belt welding machine, and viscose glue strip device 5 includes installation frame 27, installation frame 27 Between two frames 3, the inside of installation frame 27 is provided with pressing plate 26, and the inside top surface of pressing plate 26 and installation frame 27 Between be connected with multiple cylinders 23, the inner bottom surface of installation frame 27 is provided with two the 3rd support blocks with the position correspondence of pressing plate 26 24 and heating plate 25, two the 3rd support blocks 24 be located at the both sides of heating plate 25.
The side of steel band automatic soldering device 6 is provided with driving drum 7, and driving drum 7 is located at the outside of frame 3, transmission The side of roller 7 is provided with cutter 8, and the side of cutter 8 is provided with steel band centering platform 9, and the side of steel band centering platform 9 is provided with Unwinding device 10, steel band centering platform 9 include base 33, and base 33 is located at the side of cutter 8, and the upper surface of base 33 is provided with Two installing plates 35, two installing plates 35 offer multiple mounting grooves 31 on relative side, and the inner bottom surface of mounting groove 31 is set There is screw rod 29, the first pressure roller 30 is socketed with screw rod 29, is provided between the bottom surface of the first pressure roller 30 and the inner bottom surface of mounting groove 31 Spring 34, and spring 34 is socketed on screw rod 29, installing plate 35 is provided with the second pressure roller 32 with the position correspondence of the first pressure roller 30, And second pressure roller 32 be located at the lower section of the first pressure roller 30, mounting groove 31 arranges in a symmetrical manner at least provided with six.
The side of carrying roller 4 is provided with and takes out roller arrangement 2, and taking out roller arrangement 2 includes fixing axle 12, and fixing axle 12 is located at two frames 3 Between, and the both ends of fixing axle 12 run through the side wall of frame 3 and extend to the outside of frame 3, frame 3 is provided with and fixing axle Second support block 22 corresponding to 12 end position, and the second support block 22 is located at the lower section of fixing axle 12, the second support block 22 Upper surface be provided with fixed block 20 corresponding with fixing axle 12, and one end of fixing axle 12 is plugged on the inside of fixed block 20, Gu Also it is flexibly connected between dead axle 12 and frame 3 by bearing 13, live-roller 14 is coaxially installed with fixing axle 12, live-roller 14 Upper and lower is equipped with fix bar 19, and the both ends of fix bar 19 are connected with two frames 3 respectively, and the bottom of frame 3 is provided with branch Fagging 18, and the bottom surface of supporting plate 18 is provided with the first support block 17, the top of supporting plate 18 is provided with supporting plate 15, and supporting plate 15 is located at The outside of frame 3, the bottom surface of supporting plate 15 are provided with multiple pulleys 16, and the bottom of pulley 16 and the upper surface of supporting plate 18, And the upper surface of supporting plate 15 can be placed on along the upper surface slide of supporting plate 18, live-roller 14, and take out roller arrangement 2 and be located at frame 3 outside, the side for taking out roller arrangement 2 are provided with passive roller 1.
Operation principle:Steel band to be produced is placed on the unwinding device 10 of device one end in web-like, by unwinding device 10 are put into steel band on steel band centering platform 9, further according to steel band specification requirement blanking, the position of passive roller 1 are adjusted, suitable Size at cut off by plate shearing machine 8, line, polishing, the vulcanization of steel band both sides, Ran Houjing are then carried out on viscose glue strip device 5 The steel band automatic soldering device 6 at steel band two is crossed, just produces the ring steel belt with adhesive tape protection, and can be filled in this debugging Put and carry out steel band trial operation and service check, joint sealing of finally being packed at winder forms final finished ring steel belt.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model Within enclosing.

Claims (6)

1. a kind of ring steel belt scheduling and planning device, including two frames (3), it is characterised in that between two frames (3) It is sequentially provided with multiple carrying rollers (4), viscose glue strip device (5) and steel band automatic soldering device (6), the steel band automatic soldering device (6) side is provided with driving drum (7), and driving drum (7) is located at the outside of frame (3), the side of the driving drum (7) Provided with cutter (8), the side of the cutter (8) is provided with steel band centering platform (9), and the one of the steel band centering platform (9) Side is provided with unwinding device (10), and the side of the carrying roller (4), which is provided with, takes out roller arrangement (2), and takes out roller arrangement (2) and be located at frame (3) Outside, the side for taking out roller arrangement (2) is provided with passive roller (1).
2. a kind of ring steel belt scheduling and planning device according to claim 1, it is characterised in that described to take out roller arrangement (2) Including fixing axle (12), the fixing axle (12) is between two frames (3), and frame is run through at the both ends of fixing axle (12) (3) side wall simultaneously extends to the outside of frame (3), and the frame (3) is provided with corresponding with the end position of fixing axle (12) Second support block (22), and the second support block (22) is located at the lower section of fixing axle (12), the upper table of second support block (22) Face is provided with fixed block (20) corresponding with fixing axle (12), and one end of fixing axle (12) is plugged on the inside of fixed block (20), Also it is flexibly connected by bearing (13) between the fixing axle (12) and frame (3), is coaxially installed with the fixing axle (12) Live-roller (14), the upper and lower of the live-roller (14) are equipped with fix bar (19), and the both ends of fix bar (19) are respectively with two Individual frame (3) connection, and the bottom of frame (3) is provided with supporting plate (18), and the bottom surface of supporting plate (18) is provided with the first support block (17), the top of the supporting plate (18) is provided with supporting plate (15), and supporting plate (15) is located at the outside of frame (3), the supporting plate (15) bottom surface is provided with multiple pulleys (16), and the bottom of pulley (16) and the upper surface of supporting plate (18), and along branch The upper surface slide of fagging (18), the live-roller (14) can be placed on the upper surface of supporting plate (15).
A kind of 3. ring steel belt scheduling and planning device according to claim 1, it is characterised in that the viscose glue strip device (5) installation frame (27) is included, the installation frame (27) is arranged between two frames (3), the installation frame (27) Inside be provided with pressing plate (26), and be connected with multiple cylinders (23) between the inside top surface of pressing plate (26) and installation frame (27), The inner bottom surface of the installation frame (27) is provided with two the 3rd support blocks (24) and heating plate with pressing plate (26) position correspondence (25), two the 3rd support blocks (24) are located at the both sides of heating plate (25).
A kind of 4. ring steel belt scheduling and planning device according to claim 1, it is characterised in that the steel band automatic welding Device (6) is steel belt welding machine.
A kind of 5. ring steel belt scheduling and planning device according to claim 1, it is characterised in that the steel band centering platform (9) base (33) is included, the base (33) is located at the side of cutter (8), and the upper surface of the base (33) is provided with two Installing plate (35), offers multiple mounting grooves (31) on the relative side of two installing plates (35), the mounting groove (31) it is interior Portion bottom surface is provided with screw rod (29), is socketed with the first pressure roller (30) on the screw rod (29), the bottom surface of first pressure roller (30) and Spring (34) is provided between mounting groove (31) inner bottom surface, and spring (34) is socketed on screw rod (29), the installing plate (35) The second pressure roller (32) with the first pressure roller (30) position correspondence is provided with, and the second pressure roller (32) is located under the first pressure roller (30) Side, the mounting groove (31) arrange in a symmetrical manner at least provided with six.
A kind of 6. ring steel belt scheduling and planning device according to claim 1, it is characterised in that the unwinding device (10) For unreeling machine.
CN201720724207.2U 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device Active CN206839587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720724207.2U CN206839587U (en) 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720724207.2U CN206839587U (en) 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device

Publications (1)

Publication Number Publication Date
CN206839587U true CN206839587U (en) 2018-01-05

Family

ID=60801038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720724207.2U Active CN206839587U (en) 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device

Country Status (1)

Country Link
CN (1) CN206839587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107138961A (en) * 2017-06-21 2017-09-08 淄博鲁工造粒装备科技有限公司 A kind of ring steel belt scheduling and planning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107138961A (en) * 2017-06-21 2017-09-08 淄博鲁工造粒装备科技有限公司 A kind of ring steel belt scheduling and planning device

Similar Documents

Publication Publication Date Title
CN206633073U (en) A kind of building board cutter device being moved easily
CN105236181A (en) Feeding method and device for cotton packing machine
CN206839587U (en) A kind of ring steel belt scheduling and planning device
CN204366541U (en) Horizontal Machining centers processing passenger car axle frock
CN206370467U (en) Battery end twines glue machine
CN206702343U (en) Shape extrusion device
CN105799979B (en) A kind of battery cover board laminator
CN107138961A (en) A kind of ring steel belt scheduling and planning device
CN209321338U (en) A kind of corrugated case production bundling apparatus for being convenient for corrugated board
CN106863892A (en) A kind of efficient hot press
CN207226410U (en) A kind of gasket quality inspection conveying device
CN209275769U (en) A kind of aluminum foil coil press
CN205238609U (en) Generator system arber press and material feeding unit thereof
CN108817917B (en) Press mounting equipment for assembling pump core
CN207174125U (en) A kind of rock wool packing machine
CN208962568U (en) A kind of Full-automatic pressure-holding machine
CN208086106U (en) A kind of rectilinear coordinates recrater
CN206301904U (en) Grid strip uncoiler idler structure
CN205996492U (en) Biserial conical bearing self centering seal cover pressing machine
CN112071608A (en) High-frequency transformer production line
CN206019927U (en) A kind of automatic transplanter structure of balancing machine
CN206954651U (en) A kind of heat-sealing device for bath towel production
CN206234200U (en) The hold-down gear of single cylinder locking position
CN210847907U (en) Special processing platform of hydraulic pressure puncher
CN115320964B (en) Powder packaging ribbon assembly line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant