CN107138961A CN201710474542.6A CN201710474542A CN107138961A CN 107138961 A CN107138961 A CN 107138961A CN 201710474542 A CN201710474542 A CN 201710474542A CN 107138961 A CN107138961 A CN 107138961A
Authority
CN
China
Prior art keywords
frame
steel band
roller
fixing axle
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710474542.6A
Other languages
Chinese (zh)
Inventor
杜巍
李锋
杜新生
聂玉凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zibo Lu Work Granulation Equipment Science And Technology Ltd
Original Assignee
Zibo Lu Work Granulation Equipment Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zibo Lu Work Granulation Equipment Science And Technology Ltd filed Critical Zibo Lu Work Granulation Equipment Science And Technology Ltd
Priority to CN201710474542.6A priority Critical patent/CN107138961A/en
Publication of CN107138961A publication Critical patent/CN107138961A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus

Abstract

The present invention relates to ring steel belt debugging technique field, especially a kind of ring steel belt scheduling and planning device, including two frames, multiple carrying rollers are sequentially provided between two frames, viscose glue strip device and steel band automatic soldering device, the side of the steel band automatic soldering device is provided with driving drum, and driving drum is located at the outside of frame, the side of the driving drum is provided with cutter, the side of the cutter is provided with steel band centering platform, the side of the steel band centering platform is provided with unwinding device, the side of the carrying roller is provided with and takes out roller arrangement, and take out the outside that roller arrangement is located at frame, the side for taking out roller arrangement is provided with passive roller.The present invention can also reduce operational error, improve Product Precision, lift product qualification rate, increasing the performance of enterprises improves production process, economizes on resources, and improves resource utilization, improve inspection process before end properties increase product export, operation of the simulation steel band on machine, control product quality.

Description

A kind of ring steel belt scheduling and planning device
Technical field
The present invention relates to ring steel belt debugging technique field, more particularly to a kind of ring steel belt scheduling and planning device.
Background technology
Existing ring steel belt debugging plan is simple production equipment, although can realize steel strip cutting, adhesive tape vulcanization, receive Packing is put, but the trial operation of steel band can not be realized, the operational factor of steel band can not be accurately examined, so that steel band is in debugging During automaticity it is relatively low, also need to be carried steel band, so as to improve the labour of staff, extension production institute Need time so that reduction production efficiency.
The content of the invention
The invention aims to solve steel band present in prior art during debugging automaticity compared with It is low, also need to be carried steel band, so as to improve the labour of staff, the time extended needed for production so that reduction The shortcoming of production efficiency, and a kind of ring steel belt scheduling and planning device proposed.
To achieve these goals, present invention employs following technical scheme:
Design be sequentially provided between a kind of ring steel belt scheduling and planning device, including two frames, two frames it is many Individual carrying roller, viscose glue strip device and steel band automatic soldering device, the side of the steel band automatic soldering device are provided with driving drum, and Driving drum is located at the outside of frame, and the side of the driving drum is provided with cutter, and the side of the cutter is provided with steel band Centering platform, the side of the steel band centering platform is provided with unwinding device, and the side of the carrying roller, which is provided with, takes out roller arrangement, and takes out roller Device is located at the outside of frame, and the side for taking out roller arrangement is provided with passive roller.
It is preferred that, the roller arrangement of taking out includes fixing axle, and the fixing axle is located between two frames, and the two of fixing axle End through frame side wall and extend to the outside of frame, the frame is provided with corresponding with the end position of fixing axle the Two support blocks, and the second support block is located at the lower section of fixing axle, the upper surface of second support block is provided with corresponding with fixing axle Fixed block, and one end of fixing axle is plugged on the inside of fixed block, also passes through bearing activity between the fixing axle and frame Live-roller is coaxially installed with connection, the fixing axle, the upper and lower of the live-roller is equipped with fix bar, and the two of fix bar End is connected with two frames respectively, and the bottom of frame is provided with supporting plate, and the bottom surface of supporting plate is provided with the first support block, described The top of supporting plate is provided with supporting plate, and supporting plate is located at the outside of frame, and the bottom surface of the supporting plate is provided with multiple pulleys, and pulley Bottom and the upper surface of supporting plate, and along the upper surface slide of supporting plate, the live-roller can be placed on the upper of supporting plate Surface.
It is preferred that, the viscose glue strip device includes installation frame, and the installation frame is arranged between two frames, institute The inside of installation frame is stated provided with being connected with multiple cylinders, the peace between pressing plate, and pressing plate and the inside top surface of installation frame The inner bottom surface of frame of framing up is provided with two the 3rd support blocks corresponding with press plate position and heating plate, and two the 3rd support blocks are located at The both sides of heating plate.
It is preferred that, the steel band automatic soldering device is steel belt welding machine.
It is preferred that, the steel band centering platform include base, the base be located at cutter side, the base it is upper Surface offers multiple mounting grooves, the inner bottom of the mounting groove provided with two installing plates, two installing plates on relative side Face is provided with screw rod, the screw rod and is socketed with the first pressure roller, is set between the bottom surface of first pressure roller and mounting groove inner bottom surface There is spring, and spring is socketed on screw rod, the installing plate is provided with the second pressure roller corresponding with the first pressure roller position, and second Pressure roller is located at the lower section of the first pressure roller, and the mounting groove is arranged at least provided with six, and in a symmetrical manner.
It is preferred that, the unwinding device is unreeling machine.
A kind of ring steel belt scheduling and planning device proposed by the present invention, beneficial effect is:By adding passive roller, taking out Roller arrangement, carrying roller, viscose glue strip device, steel band automatic soldering device, driving drum, cutter, steel band centering platform and unreel dress Put, combining structure is used to the said equipment so that topology layout is more reasonable, compact, space occupancy, Ke Yigen can be reduced It is adjusted according to the specification of steel band, improves the flexibility of operation, can also so improve the automaticity in debugging process, is reduced Labor intensity, reduces working time so that operating efficiency is dramatically increased.The present invention can also reduce operational error, improve product essence Degree, lifts product qualification rate, and the increase performance of enterprises improves production process, economized on resources, improves resource utilization, improve into moral character Inspection process before product export, operation of the simulation steel band on machine, control product quality can be increased.
Brief description of the drawings
Fig. 1 is a kind of structural front view of ring steel belt scheduling and planning device proposed by the present invention;
Fig. 2 is a kind of structural side view of ring steel belt scheduling and planning device proposed by the present invention;
Fig. 3 is a kind of viscose top apparatus structure schematic diagram of ring steel belt scheduling and planning device proposed by the present invention;
Fig. 4 is a kind of steel band centering platform structure front view of ring steel belt scheduling and planning device proposed by the present invention;
Fig. 5 is a kind of steel band centering platform structure top view of ring steel belt scheduling and planning device proposed by the present invention.
In figure:Passive roller 1, take out roller arrangement 2, frame 3, carrying roller 4, viscose glue strip device 5, steel band automatic soldering device 6, pass Dynamic roller 7, cutter 8, steel band centering platform 9, unwinding device 10, installing plate 11, fixing axle 12, bearing 13, live-roller 14, support Plate 15, pulley 16, the first support block 17, supporting plate 18, fix bar 19, fixed block 20, projection 21, the second support block 22, cylinder 23rd, the 3rd support block 24, heating plate 25, pressing plate 26, installation frame 27, locking nut 28, screw rod 29, the first pressure roller 30, installation Groove 31, the second pressure roller 32, base 33, spring 34.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is retouched, it is clear that the embodiment retouched is only a part of embodiment of the invention, rather than whole embodiments.
Set successively between reference picture 1-5, a kind of ring steel belt scheduling and planning device, including two frames 3, two frames 3 There are multiple carrying rollers 4, viscose glue strip device 5 and steel band automatic soldering device 6, unwinding device 10 is unreeling machine.
Steel band automatic soldering device 6 is steel belt welding machine, and viscose glue strip device 5 includes installation frame 27, installation frame 27 Between two frames 3, the inside of installation frame 27 is provided with pressing plate 26, and the inside top surface of pressing plate 26 and installation frame 27 Between be connected with multiple cylinders 23, the inner bottom surface of installation frame 27 is provided with two the 3rd support blocks corresponding with the position of pressing plate 26 24 and heating plate 25, two the 3rd support blocks 24 are located at the both sides of heating plate 25.
The side of steel band automatic soldering device 6 is provided with driving drum 7, and driving drum 7 is located at the outside of frame 3, transmission The side of roller 7 is provided with cutter 8, and the side of cutter 8 is provided with steel band centering platform 9, and the side of steel band centering platform 9 is provided with Unwinding device 10, steel band centering platform 9 includes base 33, and base 33 is located at the side of cutter 8, and the upper surface of base 33 is provided with Two installing plates 35, two installing plates 35 offer multiple mounting grooves 31 on relative side, and the inner bottom surface of mounting groove 31 is set Have and the first pressure roller 30 is socketed with screw rod 29, screw rod 29, be provided between the bottom surface of the first pressure roller 30 and the inner bottom surface of mounting groove 31 Spring 34, and spring 34 is socketed on screw rod 29, installing plate 35 is provided with second pressure roller 32 corresponding with the position of the first pressure roller 30, And second pressure roller 32 be located at the lower section of the first pressure roller 30, mounting groove 31 arranges at least provided with six, and in a symmetrical manner.
The side of carrying roller 4 is provided with roller arrangement 2 is taken out, and taking out roller arrangement 2 includes fixing axle 12, and fixing axle 12 is located at two frames 3 Between, and fixing axle 12 two ends through frame 3 side wall and extend to the outside of frame 3, frame 3 is provided with and fixing axle 12 corresponding second support block 22 of end position, and the second support block 22 is located at the lower section of fixing axle 12, the second support block 22 Upper surface be provided with fixed block 20 corresponding with fixing axle 12, and one end of fixing axle 12 is plugged on the inside of fixed block 20, Gu Also it is flexibly connected between dead axle 12 and frame 3 by bearing 13, live-roller 14 is coaxially installed with fixing axle 12, live-roller 14 Upper and lower is equipped with fix bar 19, and the two ends of fix bar 19 are connected with two frames 3 respectively, and the bottom of frame 3 is provided with branch Fagging 18, and the bottom surface of supporting plate 18 is provided with the first support block 17, the top of supporting plate 18 is provided with supporting plate 15, and supporting plate 15 is located at The outside of frame 3, the bottom surface of supporting plate 15 is provided with multiple pulleys 16, and bottom and the upper surface of supporting plate 18 of pulley 16, And along the upper surface slide of supporting plate 18, live-roller 14 can be placed on the upper surface of supporting plate 15, and take out roller arrangement 2 positioned at frame 3 outside, the side for taking out roller arrangement 2 is provided with passive roller 1.
Operation principle:Steel band to be produced is placed on the unwinding device 10 of device one end in web-like, by unwinding device 10 are put into steel band on steel band centering platform 9, further according to steel band specification requirement blanking, the position of passive roller 1 are adjusted, suitable Size at cut off by plate shearing machine 8, the line of steel band both sides, polishing are then carried out on viscose glue strip device 5, is vulcanized, Ran Houjing The steel band automatic soldering device 6 at steel band two is crossed, the ring steel belt protected with adhesive tape is just produced, it is possible in this debugging dress Progress steel band trial operation and service check are put, joint sealing formation final finished ring steel belt of finally being packed at winder.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (6)

1. a kind of ring steel belt scheduling and planning device, including two frames (3), it is characterised in that between two frames (3) It is sequentially provided with multiple carrying rollers (4), viscose glue strip device (5) and steel band automatic soldering device (6), the steel band automatic soldering device (6) side is provided with driving drum (7), and driving drum (7) is located at the outside of frame (3), the side of the driving drum (7) Provided with cutter (8), the side of the cutter (8) is provided with steel band centering platform (9), the one of the steel band centering platform (9) Side is provided with unwinding device (10), and the side of the carrying roller (4), which is provided with, takes out roller arrangement (2), and takes out roller arrangement (2) positioned at frame (3) Outside, the side for taking out roller arrangement (2) be provided with passive roller (1).
2. a kind of ring steel belt scheduling and planning device according to claim 1, it is characterised in that described to take out roller arrangement (2) Including fixing axle (12), the fixing axle (12) is located between two frames (3), and frame is run through at the two ends of fixing axle (12) (3) side wall and the outside for extending to frame (3), the frame (3) is provided with corresponding with the end position of fixing axle (12) Second support block (22), and the second support block (22) is located at the lower section of fixing axle (12), the upper table of second support block (22) Face is provided with fixed block (20) corresponding with fixing axle (12), and one end of fixing axle (12) is plugged on the inside of fixed block (20), Also it is flexibly connected, is coaxially installed with the fixing axle (12) by bearing (13) between the fixing axle (12) and frame (3) Live-roller (14), the upper and lower of the live-roller (14) is equipped with fix bar (19), and fix bar (19) two ends respectively with two Individual frame (3) connection, and the bottom of frame (3) is provided with supporting plate (18), and the bottom surface of supporting plate (18) is provided with the first support block (17), the top of the supporting plate (18) is provided with supporting plate (15), and supporting plate (15) is located at the outside of frame (3), the supporting plate (15) bottom surface is provided with multiple pulleys (16), and the upper surface of bottom and the supporting plate (18) of pulley (16), and along branch The upper surface slide of fagging (18), the live-roller (14) can be placed on the upper surface of supporting plate (15).
3. a kind of ring steel belt scheduling and planning device according to claim 1, it is characterised in that the viscose glue strip device (5) installation frame (27) is included, the installation frame (27) is arranged between two frames (3), the installation frame (27) Inside provided with being connected with multiple cylinders (23) between pressing plate (26), and the inside top surface of pressing plate (26) and installation frame (27), The inner bottom surface of the installation frame (27) is provided with two the 3rd support blocks (24) corresponding with pressing plate (26) position and heating plate (25), two the 3rd support blocks (24) are located at the both sides of heating plate (25).
4. a kind of ring steel belt scheduling and planning device according to claim 1, it is characterised in that the steel band automatic welding Device (6) is steel belt welding machine.
5. a kind of ring steel belt scheduling and planning device according to claim 1, it is characterised in that the steel band centering platform (9) base (33) is included, the base (33) is located at the side of cutter (8), and the upper surface of the base (33) is provided with two Offer multiple mounting grooves (31) on installing plate (35), the relative side of two installing plates (35), the mounting groove (31) it is interior Portion bottom surface is provided with screw rod (29), is socketed with the first pressure roller (30) on the screw rod (29), the bottom surface of first pressure roller (30) and Spring (34) is provided between mounting groove (31) inner bottom surface, and spring (34) is socketed on screw rod (29), the installing plate (35) The second pressure roller (32) corresponding with the first pressure roller (30) position is provided with, and the second pressure roller (32) is located under the first pressure roller (30) Side, the mounting groove (31) arranges at least provided with six, and in a symmetrical manner.
6. a kind of ring steel belt scheduling and planning device according to claim 1, it is characterised in that the unwinding device (10) For unreeling machine.
CN201710474542.6A 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device Pending CN107138961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710474542.6A CN107138961A (en) 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710474542.6A CN107138961A (en) 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device

Publications (1)

Publication Number Publication Date
CN107138961A true CN107138961A (en) 2017-09-08

Family

ID=59782680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710474542.6A Pending CN107138961A (en) 2017-06-21 2017-06-21 A kind of ring steel belt scheduling and planning device

Country Status (1)

Country Link
CN (1) CN107138961A (en)

Similar Documents

Publication Publication Date Title
CN205237201U (en) Electric cut -off machine
CN206633073U (en) A kind of building board cutter device being moved easily
CN105329663B (en) A kind of on-line automatic section pickup system of emery wheel mesh sheet
CN108435862A (en) A kind of continuous punching equipment of brake shrapnel
CN107138961A (en) A kind of ring steel belt scheduling and planning device
CN206839587U (en) A kind of ring steel belt scheduling and planning device
CN107777388A (en) A kind of conveying equipment for being used to increase frictional force
CN208020394U (en) A kind of building glued board shaping equipment
CN207874357U (en) A kind of making children's chairs automatic casing cutter tubing Bidirectional clamping apparatus
CN210312669U (en) Winding mechanism of cloth inspecting machine
CN104129670A (en) Pre-filming device
CN209939139U (en) Goods transmission device for packaging equipment with screening function
CN209321338U (en) A kind of corrugated case production bundling apparatus for being convenient for corrugated board
CN104097061B (en) Tank container General assembling table
CN105799979B (en) A kind of battery cover board laminator
CN207226410U (en) A kind of gasket quality inspection conveying device
CN206301904U (en) Grid strip uncoiler idler structure
CN205204373U (en) Material feeding unit of package cotton machine
CN204197339U (en) The packing device of inspecting and winding machine
CN107434141A (en) A kind of manual entrainment device of ribbon conveyer
CN206014027U (en) A kind of new go out cloth flattening device
CN206613904U (en) A kind of NC turret punch machine
CN106671219A (en) Hot press automatic production line
CN205990079U (en) A kind of automatic splicer
CN212099505U (en) Quick equipment for packing

Legal Events