CN206828976U - A kind of bridge construction beam slab crosshead - Google Patents

A kind of bridge construction beam slab crosshead Download PDF

Info

Publication number
CN206828976U
CN206828976U CN201720722054.8U CN201720722054U CN206828976U CN 206828976 U CN206828976 U CN 206828976U CN 201720722054 U CN201720722054 U CN 201720722054U CN 206828976 U CN206828976 U CN 206828976U
Authority
CN
China
Prior art keywords
supporting plate
beam slab
sliding panel
fixedly connected
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720722054.8U
Other languages
Chinese (zh)
Inventor
曹阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jun Qi Construction Engineering Co Ltd
Original Assignee
Jiangsu Jun Qi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jun Qi Construction Engineering Co Ltd filed Critical Jiangsu Jun Qi Construction Engineering Co Ltd
Priority to CN201720722054.8U priority Critical patent/CN206828976U/en
Application granted granted Critical
Publication of CN206828976U publication Critical patent/CN206828976U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge construction beam slab crosshead, belongs to beam slab crosshead field.A kind of bridge construction beam slab crosshead, including the first supporting plate and the second supporting plate, and first supporting plate and the second supporting plate it is symmetrical, first supporting plate and the second supporting plate are connected on beam slab, sliding panel is slidably connected in first supporting plate, hydraulic unit driver is fixedly connected with second supporting plate.It can be realized when carrying out inspection of construction to beam slab, the supporting plate of part first and the second supporting plate are connected on beam slab, worker is initially entered in construction hanging basket, sliding panel is promoted by hydraulic unit driver and hydraulic push rod or so, moved left and right so as to which sliding panel drives construction hanging basket to realize, while pinion rotation is driven by motor, gear with rack in the presence of engaging, motor drives support frame to move forward and backward, and so as to check the various pieces of beam slab bottom, checks convenient and swift.

Description

A kind of bridge construction beam slab crosshead
Technical field
It the utility model is related to beam slab crosshead field, specially a kind of bridge construction beam slab crosshead.
Background technology
After the completion of bridge beam slab erection, the placement location of beam body, seam, dividing plate, crossbeam etc. shows between adjacent beam body Pour quality, be all related to the overall construction quality of later stage bridge, thus set up in beam body finish, seam, dividing plate, crossbeam etc. pour Afterwards, it is necessary to each position of double check beam body bottom surface from below, but due to the particularity of bridge, beam body bottom is from the ground All higher or bridge is in water, and just each position progress minute inspection is extremely difficult below beam body for this, therefore suitable beam slab Crosshead is very necessary.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction beam slab crosshead, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:
A kind of bridge construction beam slab crosshead, including the first supporting plate and the second supporting plate, and the first supporting plate and Two supporting plates are symmetrical, and first supporting plate and the second supporting plate are connected on beam slab, are slided in first supporting plate Sliding panel is connected with, hydraulic unit driver is fixedly connected with second supporting plate, the hydraulic unit driver drive end is connected with Hydraulic push rod, the one end of the hydraulic push rod away from hydraulic unit driver are fixedly linked with sliding panel, and the sliding panel is away from hydraulic pressure One end bottom side of push rod is fixedly connected with link, and the link lower end is fixedly connected with guiding bar, opened in the guiding bar Provided with chute, in the chute sliding plug have support frame, support frame as described above is parallel to each other with sliding panel, and support frame as described above is remote One end of chute is connected with construction hanging basket, and the guiding bar bottom side is fixedly connected with rack, and support frame as described above bottom side passes through connection Plate is fixedly connected with motor, and the motor drive end is connected with and rack meshed gears.
Preferably, first supporting plate and the second supporting plate lower end are fixedly linked by connecting rod, and the sliding panel is right End bottom side is fixedly connected with the first firm bar, and the first firm bar lower slide is connected in connecting rod.
Preferably, support frame as described above left end is fixedly connected with limited block, and limited block offsets with guiding bar.
Preferably, the guiding bar bottom side is fixedly connected with firm guide bracket, is slidably connected in the firm guide bracket Second firm bar, described second one end of firm bar away from firm guide bracket are fixedly linked with support frame.
Compared with prior art, the beneficial effects of the utility model are:When carrying out inspection of construction to beam slab, part first Fagging and the second supporting plate are connected on beam slab, and worker is initially entered in construction hanging basket, pass through hydraulic unit driver and hydraulic push rod Left and right promotes sliding panel, is moved left and right so as to which sliding panel drives construction hanging basket to realize, while is turned by motor band moving gear Dynamic, for gear in the presence of being engaged with rack, motor drives support frame to move forward and backward, so as to each portion to beam slab bottom Divide and checked, checked convenient and swift.
Brief description of the drawings
Fig. 1 is a kind of structural representation of bridge construction beam slab crosshead;
Fig. 2 is a kind of structural representation of bridge construction beam slab crosshead side view.
In figure:The firm guiding of 1- beam slabs, 2- links, 3- sliding panels, the supporting plates of 4- first, 5- guiding bars, 6- chutes, 7- Frame, 8- racks, 9- limited blocks, 10- gears, the supporting plates of 11- second, 12- hydraulic unit drivers, 13- hydraulic push rods, 14- first are steady Gu bar, 15- motors, 16- connecting plates, 17- second consolidate bar, 18- support frames, 19- construction hanging baskets, 20- connecting rods.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1~2, a kind of bridge construction beam slab crosshead, including the first supporting plate 4 and the second supporting plate 11 are referred to, And first supporting plate 4 and the second supporting plate 11 symmetrically, the first supporting plate 4 and the second supporting plate 11 are connected on beam slab 1, the Sliding panel 3 is slidably connected in one supporting plate 4, hydraulic unit driver 12, hydraulic unit driver are fixedly connected with the second supporting plate 11 12 drive ends are connected with hydraulic push rod 13, and the one end of hydraulic push rod 13 away from hydraulic unit driver 12 is fixedly linked with sliding panel 3, sliding Dynamic one end bottom side of the plate 3 away from hydraulic push rod 13 is fixedly connected with link 2, and the lower end of link 2 is fixedly connected with guiding bar 5, Chute 6 is offered in guiding bar 5, in chute 6 sliding plug have support frame 18, support frame 18 is parallel to each other with sliding panel 3, branch The one end of support 18 away from chute 6 is connected with construction hanging basket 19, and the bottom side of guiding bar 5 is fixedly connected with rack 8, the bottom side of support frame 18 Motor 15 is fixedly connected with by connecting plate 16, the drive end of motor 15 is connected with and the meshed gears 10 of rack 8.
First supporting plate 4 and the lower end of the second supporting plate 11 are fixedly linked by connecting rod 20, and the right-hand member bottom side of sliding panel 3 is consolidated Surely the first firm bar 14 is connected with, and the first firm lower slide of bar 14 is connected in connecting rod 20, the first firm bar 14 is firm The device, it is convenient for operating.
The left end of support frame 18 is fixedly connected with limited block 9, and limited block 9 offsets with guiding bar 5, and limited block 9 causes support frame 18 stable slips.
The bottom side of guiding bar 5 is fixedly connected with firm guide bracket 7, and the second firm bar 17 is slidably connected in firm guide bracket 7, Second one end of firm bar 17 away from firm guide bracket 7 is fixedly linked with support frame 18, and the second firm bar 17 further consolidates dress Put, be convenient for operating.
Operation principle:When carrying out inspection of construction to beam slab 1, part the first supporting plate 4 and the second supporting plate 11 are connected to beam On plate 1, worker is initially entered in construction hanging basket 19, and sliding panel 3 is promoted by hydraulic unit driver 12 and hydraulic push rod 14 or so, from And sliding panel 3 drives the realization of construction hanging basket 19 to move left and right, while rotated by motor 15 with moving gear 10, gear 10 exists In the presence of being engaged with rack 8, motor 15 drives support frame 18 movable, so as to the various pieces to the bottom of beam slab 1 Checked, checked convenient and swift.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.

Claims (4)

  1. A kind of 1. bridge construction beam slab crosshead, it is characterised in that:Including the first supporting plate (4) and the second supporting plate (11), And first supporting plate (4) and the second supporting plate (11) symmetrically, first supporting plate (4) and the second supporting plate (11) connection On beam slab (1), sliding panel (3) is slidably connected on first supporting plate (4), it is fixed on second supporting plate (11) to connect Hydraulic unit driver (12) is connected to, hydraulic unit driver (12) drive end is connected with hydraulic push rod (13), the hydraulic push rod (13) one end away from hydraulic unit driver (12) is fixedly linked with sliding panel (3), and the sliding panel (3) is away from hydraulic push rod (13) One end bottom side be fixedly connected with link (2), link (2) lower end is fixedly connected with guiding bar (5), the guiding bar (5) chute (6) is offered on, the interior sliding plug of the chute (6) has support frame (18), support frame as described above (18) and sliding panel (3) it is parallel to each other, the one end of support frame as described above (18) away from chute (6) is connected with construction hanging basket (19), guiding bar (5) bottom Side is fixedly connected with rack (8), and support frame as described above (18) bottom side is fixedly connected with motor (15), institute by connecting plate (16) Motor (15) drive end is stated to be connected with and rack (8) meshed gears (10).
  2. A kind of 2. bridge construction beam slab crosshead according to claim 1, it is characterised in that:First supporting plate (4) it is fixedly linked with the second supporting plate (11) lower end by connecting rod (20), sliding panel (3) the right-hand member bottom side is fixedly connected with First firm bar (14), and first firm bar (14) lower slide is connected in connecting rod (20).
  3. A kind of 3. bridge construction beam slab crosshead according to claim 1, it is characterised in that:Support frame as described above (18) is left End is fixedly connected with limited block (9), and limited block (9) offsets with guiding bar (5).
  4. A kind of 4. bridge construction beam slab crosshead according to claim 1, it is characterised in that:Guiding bar (5) bottom Side is fixedly connected with firm guide bracket (7), slidably connects the second firm bar (17) on the firm guide bracket (7), and described the Two one end of firm bar (17) away from firm guide bracket (7) are fixedly linked with support frame (18).
CN201720722054.8U 2017-06-20 2017-06-20 A kind of bridge construction beam slab crosshead Active CN206828976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720722054.8U CN206828976U (en) 2017-06-20 2017-06-20 A kind of bridge construction beam slab crosshead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720722054.8U CN206828976U (en) 2017-06-20 2017-06-20 A kind of bridge construction beam slab crosshead

Publications (1)

Publication Number Publication Date
CN206828976U true CN206828976U (en) 2018-01-02

Family

ID=60777314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720722054.8U Active CN206828976U (en) 2017-06-20 2017-06-20 A kind of bridge construction beam slab crosshead

Country Status (1)

Country Link
CN (1) CN206828976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629431A (en) * 2018-12-21 2019-04-16 中铁七局集团第三工程有限公司 A kind of bridge construction support frame device facilitating operation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629431A (en) * 2018-12-21 2019-04-16 中铁七局集团第三工程有限公司 A kind of bridge construction support frame device facilitating operation
CN109629431B (en) * 2018-12-21 2020-10-02 中铁七局集团第三工程有限公司 Bridge construction supporting frame device convenient to operate

Similar Documents

Publication Publication Date Title
CN210615577U (en) Novel plate welding line machine
CN206828976U (en) A kind of bridge construction beam slab crosshead
CN108532463A (en) The traversing luffing method of Large-scale Bridge Erector
CN103964343A (en) Lifting turning mobile platform
CN209532534U (en) A kind of welded steel workbench
CN104895339A (en) Convenient method and device for splicing cement board wall
CN106760774A (en) A kind of file two-layer parking apparatus of mobile vehicle-carrying plate frame
CN208321676U (en) A kind of tramcar shaper
CN109317911A (en) A kind of cross column welding production line
CN212663058U (en) Dust device is adopted in opencut coal mining
CN204955135U (en) Rough stone block cutting machine
CN103470265A (en) Self-propelled coal sawing machine for longitudinally cutting coal bed into block coal and cutting method for cutting coal bed by using machine
CN204060722U (en) A kind of trestle trolley adjusting mechanism
CN105756580B (en) A kind of Full automatic oil pipe column comb shifting pipe device
CN207723362U (en) A kind of device for processing stirrup
CN211305322U (en) Welding machine convenient to remove
CN210967618U (en) Welding device for steel structure bridge
CN208778002U (en) A kind of stepping trailer wagon structure of main spar inverted arch trestle
CN208778009U (en) A kind of automation railway single lining trolley device
CN218461588U (en) Hydraulic locking long-stroke auxiliary supporting mechanism for clamp
CN206345491U (en) A kind of environmental protection protective film film rolling device with cleaning function
CN206825630U (en) The cover mold purging system of prefabricated pile
CN207713047U (en) Full-automatic dragger for the production of titanium or titanium alloy Wide and Thick Slab
CN101844163B (en) Machine set for producing medium-caliber straight-seam double-sided submerged-arc welding steel pipe and forming method of steel pipe
CN204955168U (en) Be applied to novel clamping mechanism among stone pillar processingequipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant