CN206828969U - A kind of high pier stud bearing platform counter-force prepressing device - Google Patents

A kind of high pier stud bearing platform counter-force prepressing device Download PDF

Info

Publication number
CN206828969U
CN206828969U CN201720464047.2U CN201720464047U CN206828969U CN 206828969 U CN206828969 U CN 206828969U CN 201720464047 U CN201720464047 U CN 201720464047U CN 206828969 U CN206828969 U CN 206828969U
Authority
CN
China
Prior art keywords
fixed
bearing platform
chassis
anchorage
prepressing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720464047.2U
Other languages
Chinese (zh)
Inventor
董云彪
倪坤林
殷本林
赵春生
曹得生
郭鲲鹏
蒋爱民
张淼
戴声茂
曹刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201720464047.2U priority Critical patent/CN206828969U/en
Application granted granted Critical
Publication of CN206828969U publication Critical patent/CN206828969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high pier stud bearing platform counter-force prepressing device.Including:Pre- splenium, it is arranged at bearing platform precompressed monitoring position, including strut beam and anchorage;Reaction frame portion, it is arranged above pier bottom cushion cap, the vertical lower section of pre- splenium, including the counter-force support of sandwich is made up of upper bed rack and chassis, hydraulic jack is fixed between sandwich, upper strata top of support is fixed with the anchoring of pre-buried bar one end, and pre-buried bar is embedded in pier bottom cushion cap fixed through chassis;With being fixed on plane on strut beam by anchorage, lower end is fixed after sequentially passing through the upper bed rack, hydraulic jack, chassis in reaction frame portion by anchorage and the anchoring of chassis bottom surface for tensioning wirerope upper end.The utility model prepressing device can realize precompressed safety monitoring well, and monitoring process is time-consuming few, and monitoring precompressed cost is low, and easy to operate, payload data can be controlled preferably.Precompressed especially suitable for high pier structure bearing platform monitors.

Description

A kind of high pier stud bearing platform counter-force prepressing device
Technical field
The utility model belongs to building safety monitoring technical field, especially belongs to bearing platform and builds safety monitoring technology neck Domain, more particularly to a kind of high pier stud bearing platform counter-force prepressing device.
Background technology
In high pier stud builds construction, it usually needs build the interim bearing platform of building, platform is built as high pier stud Auxiliary equipment, for the quality and safety for guarantee construction, it is necessary to carry out precompressed prison to the temporary structure as bearing platform Survey.
Traditional precompressed mode of bearing platform typically uses piling prepressing, with the deformation and peace of inspectability bearing platform Total stability.There is more problem in piling prepressing, because prefabricating load is larger, precompressed construction area is smaller so that piling prepressing Object location is higher, slow to platform discharge rate when occurring abnormal such as platform deformation, it is impossible to eliminate potential danger source in time, exist Larger potential safety hazard;Piling prepressing thing is by the work high above the ground frequently lifted simultaneously, and activity duration length, efficiency is low, and preloading is put down Weighing apparatus control is difficult, and precompressed monitoring effect can not meet needs.
The content of the invention
The utility model discloses a kind of high pier stud bearing platform counter-force prepressing device according to the deficiencies in the prior art.This reality It is to provide with new purpose a kind of safer, more efficient, monitoring accurately realizes bearing platform inspection using counter-force precompressed mode Test the device of monitoring.
The utility model is achieved through the following technical solutions:
High pier stud bearing platform counter-force prepressing device, it is characterised in that:Including pre- splenium, reaction frame portion and tensioning wirerope;
Pre- splenium, it is arranged at bearing platform precompressed monitoring position, including strut beam and anchorage;
Reaction frame portion, it is arranged above pier bottom cushion cap, the vertical lower section of pre- splenium, including interlayer is formed by upper bed rack and chassis The counter-force support of structure, hydraulic jack is fixed between sandwich, upper strata top of support is fixed with the anchoring of pre-buried bar one end, pre-buried Bar is embedded in pier bottom cushion cap fixed through chassis;
With being fixed on plane on strut beam by anchorage, lower end sequentially passes through the upper of reaction frame portion for tensioning wirerope upper end Fixed after layer frame, hydraulic jack, chassis by anchorage and the anchoring of chassis bottom surface.
Strut beam described further includes the steel plate that two steel I-beams be arrangeding in parallel and upper and lower plane-welding are fixed, There is hole at the steel plate center that upper and lower plane-welding is fixed, and anchorage is fixed on plane steel plate surface, and tensioning wirerope passes through steel plate center Fixed among hole and two steel I-beams with anchorage anchoring.Vertical add, can also be set between the upper and lower plane steel plate of strut beam Strengthening tendons.
Upper bed rack and chassis described further are formed by steel I-beam, and each reaction frame portion sets two groups of pre-buried bars.Institute Pre-buried bar is stated with chassis by the way that bolt is separable to couple.
The pre-buried bar bottom is welded with cross reinforcing and is embedded in pier bottom cushion cap fixed in advance.
The utility model helpfulness:The utility model provides the prepressing device in the case of a kind of simulating load, can be very Precompressed safety monitoring is realized well, and monitoring process is time-consuming few, and monitoring precompressed cost is low, easy to operate, and payload data can be preferably Control.Precompressed especially suitable for high pier structure bearing platform monitors.The utility model can simulate the lotus in the case of piling prepressing Carry, precompressed whole process only needs a small amount of operating personnel to coordinate, and constructing operation is convenient;Compared with piling prepressing mode, load loading is eliminated Lengthy procedure, reduce potential safety hazard;It is less using material involved by reaction frame pre-pressing, it is generally common using building site I-steel, reinforcing bar and tensioning equipment etc., it is cost-effective.
Brief description of the drawings
Fig. 1 is the utility model prepressing device scheme of installation;
Fig. 2 is the pre- splenium structural representation of the utility model prepressing device;
Fig. 3 is the utility model prepressing device reaction frame portion side structure schematic view;
Fig. 4 is the utility model prepressing device reaction frame portion positive structure diagram.
In figure, 1 is pre- splenium, and 2 be reaction frame portion, and 3 be tensioning wirerope, and 11 be strut beam, and 12 be anchorage, and 21 be upper strata Frame, 22 be chassis, and 23 be oil cylinder, and 24 be pre-buried bar, and 25 be upper anchorage, and 26 be lower anchorage.
Embodiment
The utility model is specifically described below by embodiment, embodiment is served only for carrying out the utility model Further instruction, it is impossible to be interpreted as the limitation to scope of protection of the utility model, those skilled in the art is according to above-mentioned Some nonessential modifications and adaptations that the content of utility model is made fall within the scope of the utility model protection.
With reference to accompanying drawing.
As illustrated, high pier stud bearing platform counter-force prepressing device, including pre- splenium 1, reaction frame portion 2 and tensioning wirerope 3.
Pre- splenium 1, it is arranged at bearing platform precompressed monitoring position, including strut beam 11 and anchorage 12;
Reaction frame portion 2, it is arranged above pier bottom cushion cap, the vertical lower section of pre- splenium 1, including by upper bed rack 21 and the structure of chassis 22 Into the counter-force support of sandwich, hydraulic jack 23, the top surface of upper bed rack 21 and pre-buried one end of bar 24 are fixed between sandwich Anchoring is fixed, and pre-buried bar 24 is embedded in pier bottom cushion cap fixed through chassis 22;
For the upper end of tensioning wirerope 3 with being fixed on plane on strut beam 11 by anchorage 12, lower end sequentially passes through reaction frame Pass through lower anchorage 26 after the upper bed rack 21 in portion 2, hydraulic jack 23, chassis 22 to fix with the anchoring of the bottom surface of chassis 22.
Strut beam 11 includes the steel plate that two steel I-beams be arrangeding in parallel and upper and lower plane-welding are fixed, upper and lower plane There is hole at the steel plate center being welded and fixed, and anchorage 12 is fixed on plane steel plate surface, and tensioning wirerope 3 passes through steel plate centre bore and two Fixed among steel I-beam with the anchoring of anchorage 12.Vertical reinforcement can also be set between the upper and lower plane steel plate of strut beam.
Upper bed rack 21 and chassis 22 are formed by steel I-beam, and each reaction frame portion sets two groups of pre-buried bars 24.
Pre-buried bar 24 couples with chassis 22 by the way that bolt is separable.
The pre-buried bottom of bar 24 is welded with cross reinforcing and is embedded in pier bottom cushion cap fixed in advance.
The installation of device:From top to bottom installed by the way of tower crane cooperation is artificial.First according to live stressing conditions, really The installation site of fixed pre- splenium 1, lifted using tower crane to interim bearing platform of constructing, then strut beam 11, the and of anchorage 12 are installed Tensioning wirerope 3.The upper end of tensioning wirerope 3 is locked by anchorage 12, and lower end freely hangs to platform below.
Pre-buried consolidation pre-buried bar 24 when pier bottom cushion cap pours in lower section, the utility model is using two groups of pre-buried connections of bar 24 one The individual structure of reaction frame portion 2;Reaction frame portion 2 is assembled, chassis 22, oil cylinder 23, upper strata are installed on pre-buried bar 24 successively from the bottom to top Frame 21, wherein chassis 22 are connected with pre-buried bar 24, and bolt is detachable, and the top surface of upper bed rack 21 passes through upper anchorage 25 and pre-buried bar 24 anchorings are fixed.
After tensioning wirerope 3 passes through upper bed rack 21, oil cylinder 23, the lower surface of chassis 22 is locked in by lower anchorage 26.By oil pump Be connected with oil cylinder 23, that is, complete the installation of certain high interim bearing platform counter-force prepressing device of pier stud.
During monitoring application:Chassis 22 and pre-buried bar 24 bolt that is connected are unlocked, upper bed rack 21 is fixed in anchoring State, oil cylinder 23 do not produce any displacement when reinforcing, and chassis 22 allows to move down.After completing aforesaid operations, oil cylinder is opened 23 pairs of reaction frame portions 2, which are further applied load, reaches the purpose of precompressed.

Claims (6)

  1. A kind of 1. high pier stud bearing platform counter-force prepressing device, it is characterised in that:Including pre- splenium, reaction frame portion and tensioning steel Cable;
    Pre- splenium, it is arranged at bearing platform precompressed monitoring position, including strut beam and anchorage;
    Reaction frame portion, it is arranged above pier bottom cushion cap, the vertical lower section of pre- splenium, including sandwich is formed by upper bed rack and chassis Counter-force support, hydraulic jack is fixed between sandwich, upper strata top of support is fixed with the anchoring of pre-buried bar one end, and pre-buried bar is worn Cross chassis and be embedded in fixation in pier bottom cushion cap;
    With being fixed on plane on strut beam by anchorage, lower end sequentially passes through the upper strata in reaction frame portion for tensioning wirerope upper end Fixed after frame, hydraulic jack, chassis by anchorage and the anchoring of chassis bottom surface.
  2. 2. high pier stud bearing platform counter-force prepressing device according to claim 1, it is characterised in that:The strut beam includes The steel plate that two steel I-beams be arrangeding in parallel and upper and lower plane-welding are fixed, the steel plate center that upper and lower plane-welding is fixed have Hole, anchorage are fixed on plane steel plate surface, and tensioning wirerope anchors through steel plate centre bore and two steel I-beams centre with anchorage It is fixed.
  3. 3. high pier stud bearing platform counter-force prepressing device according to claim 2, it is characterised in that:On the strut beam, There is the reinforcement being vertically arranged between lower plane steel plate.
  4. 4. high pier stud bearing platform counter-force prepressing device according to claim 1, it is characterised in that:The upper bed rack and bottom Frame is formed by steel I-beam, and each reaction frame portion sets two groups of pre-buried bars.
  5. 5. high pier stud bearing platform counter-force prepressing device according to claim 4, it is characterised in that:The pre-buried bar and bottom Frame passes through the separable connection of bolt.
  6. 6. high pier stud bearing platform counter-force prepressing device according to claim 1, it is characterised in that:The pre-buried bar bottom It is pre- to be welded with cross reinforcing and be embedded in pier bottom cushion cap fixed.
CN201720464047.2U 2017-04-28 2017-04-28 A kind of high pier stud bearing platform counter-force prepressing device Active CN206828969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720464047.2U CN206828969U (en) 2017-04-28 2017-04-28 A kind of high pier stud bearing platform counter-force prepressing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720464047.2U CN206828969U (en) 2017-04-28 2017-04-28 A kind of high pier stud bearing platform counter-force prepressing device

Publications (1)

Publication Number Publication Date
CN206828969U true CN206828969U (en) 2018-01-02

Family

ID=60770366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720464047.2U Active CN206828969U (en) 2017-04-28 2017-04-28 A kind of high pier stud bearing platform counter-force prepressing device

Country Status (1)

Country Link
CN (1) CN206828969U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110018045A (en) * 2019-03-01 2019-07-16 安徽省交通控股集团有限公司 A kind of counterforce device for pier stud pseudo-static experimental
CN111549688A (en) * 2020-04-29 2020-08-18 贵州省公路工程集团有限公司 Static lifting device for whole-span dismantling of continuous bridge body and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110018045A (en) * 2019-03-01 2019-07-16 安徽省交通控股集团有限公司 A kind of counterforce device for pier stud pseudo-static experimental
CN110018045B (en) * 2019-03-01 2022-01-28 安徽省交通控股集团有限公司 Counterforce device for pier stud pseudo-static test
CN111549688A (en) * 2020-04-29 2020-08-18 贵州省公路工程集团有限公司 Static lifting device for whole-span dismantling of continuous bridge body and construction method

Similar Documents

Publication Publication Date Title
CN104878693B (en) Lateral girder erection structure for truss double-girder type bridge girder erection machine, construction method of erection structure, and lateral girder erection method based on erection structure
CN102493360B (en) Reinforced concrete arch bridge construction method
CN203546626U (en) Suspender replacing device for concrete-filled steel tube arch bridge
CN102080357B (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN102162774B (en) Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN107401232A (en) A kind of underpinning structure and construction method for replacing underproof shear wall concrete
CN107060105B (en) A kind of lifting construction method of multiple steel vestibules between high building
CN103352429A (en) Bracket counter pull loading pre-pressing device and tensioning pre-pressing method thereof
CN106930541A (en) A kind of construction method of suspension type steel vestibule
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN107060070A (en) Load transfer device and the construction method that steel vestibule is lifted with the device
CN203947771U (en) A kind of Bailey beam pendent form support system
CN106401198A (en) Large-span steel gallery lifting equipment and construction method
CN103911957A (en) Prestressed continuous box-girder cantilever construction basket
CN109629461A (en) A method of it does not break off a friendship and carries out cast-in-situ box girder reset and bearing replacement
CN112854008A (en) Prefabricated bridge pier and beam integrated bridge girder erection machine and construction method thereof
CN103485374A (en) Static load test anchor pile connecting structure
CN206828969U (en) A kind of high pier stud bearing platform counter-force prepressing device
CN111648252A (en) Device for pre-pressing 0# block bracket on top of high pier and construction method
Bošnjak et al. Disaster of the bucket wheel excavator caused by extreme environmental impact: Consequences, rescue and reconstruction
CN102877657B (en) Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method
CN207244897U (en) A kind of underpinning structure for replacing underproof shear wall concrete
CN107217669B (en) Pile pulling equipment and quick moving method thereof
CN204676438U (en) The overall chalaza Hoisting System of multi-span girder bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant