CN206823187U - A kind of sleeve column toy - Google Patents

A kind of sleeve column toy Download PDF

Info

Publication number
CN206823187U
CN206823187U CN201720559272.4U CN201720559272U CN206823187U CN 206823187 U CN206823187 U CN 206823187U CN 201720559272 U CN201720559272 U CN 201720559272U CN 206823187 U CN206823187 U CN 206823187U
Authority
CN
China
Prior art keywords
sleeve column
projection
perforation
stop
stop projection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720559272.4U
Other languages
Chinese (zh)
Inventor
马伟平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720559272.4U priority Critical patent/CN206823187U/en
Application granted granted Critical
Publication of CN206823187U publication Critical patent/CN206823187U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of sleeve column toy, including moulding base, the first sleeve column, the second sleeve column, the 3rd sleeve column, the 4th sleeve column, the 5th sleeve column are from left to right sequentially installed with the moulding base, more than 1 piece of stop projection is mounted on first sleeve column, the second sleeve column, the 3rd sleeve column and the 4th sleeve column, first sleeve column, the second sleeve column, the 3rd sleeve column and the 4th sleeve column form with stopping that projection is integrally manufactured;External screw thread is installed on the 5th sleeve column lateral wall, moulding building blocks block is set with first sleeve column, the second sleeve column, the 3rd sleeve column, the 4th sleeve column and the 5th sleeve column, different size of sleeve column perforation two-by-two is offered on every piece of moulding building blocks block.A kind of sleeve column toy described in the utility model, it stops projection and sleeve column is integrally manufactured forms, and the firmness of sleeve column toy is effectively improved, so as to improve the service life of sleeve column toy.

Description

A kind of sleeve column toy
Technical field
It the utility model is related to a kind of sleeve column toy.
Background technology
Sleeve column toy can not only improve the manipulative ability of children, and can temper mental exploitation, thus increasingly by To liking for father and mother.Existing sleeve column toy can be installed on sleeve column stops projection to improve difficulty, but existing stop projection Formed using later stage installation with sleeve column toy, often applied arbitrarily when being at play due to children with brute-force, so as to will soon be The later stage stop projection of installation is broken off with sleeve column, influences the normal use of sleeve column toy.While existing sleeve column toy is also Exist simple in construction, it is impossible to reach the purpose for tempering children's manipulative ability and mental exploitation.
Utility model content
The purpose of this utility model is to provide a kind of sleeve column toy, and it stops projection and sleeve column is integrally manufactured forms, and has Effect improves the firmness of sleeve column toy, so as to improve the service life of sleeve column toy.
In order to achieve the above object, the technical solution of the utility model is:
A kind of sleeve column toy, including moulding base, the first sleeve column, are from left to right sequentially installed with the moulding base Two sleeve columns, the 3rd sleeve column, the 4th sleeve column, the 5th sleeve column, on first sleeve column, the second sleeve column, the 3rd sleeve column and the 4th sleeve column More than 1 piece of stop projection is mounted on, first sleeve column, the second sleeve column, the 3rd sleeve column and the 4th sleeve column are with stopping projection It is integrally manufactured to form;External screw thread is installed on the 5th sleeve column lateral wall, first sleeve column, the second sleeve column, the 3rd sleeve column, Moulding building blocks block is set with 4th sleeve column and the 5th sleeve column, is offered on every piece of moulding building blocks block different big two-by-two Small sleeve column perforation.
The first sleeve column side is separately installed with the first stop projection, the second stop projection, and first sleeve column is another Side is separately installed with the 3rd stop projection, the 4th stop projection, and described first stops that projection and second stops projection in same water In plane, the described 3rd stops that projection and the 4th stops projection in same level, and described first stops projection and the 3rd resistance Keep off projection arranged in dislocation up and down.
The second sleeve column side be sequentially installed with from top to bottom the 5th stop projection, the 6th stop projection, described second Sleeve column opposite side is sequentially installed with the 7th stop projection, the 8th stop projection from top to bottom, and the described 5th stops projection and the 7th Stop projection in same level, the described 6th stops that projection and the 8th stops projection in same level;Described 5th Stop and the 9th stop projection is installed on the second sleeve column between projection and the 7th stop projection, the described 6th stops projection and the Tenth stop projection is installed, the described 9th stops that projection stops that projection is anti-with the tenth on the second sleeve column between eight stop projections To installation.
11st stop projection, the 12nd stop projection are installed, the described 11st stops projection on the 3rd sleeve column Stop arranged in dislocation above and below projection with the 12nd.
The 4th sleeve column side is provided with the 13rd stop projection, and the 4th sleeve column opposite side is provided with the 14th resistance Projection is kept off, the described 13rd stops that projection and the 14th stops projection in same level;It is described 13rd stop projection with The 4th sleeve column side between 14th stop projection is provided with the 15th stop projection, and the described 13rd stops projection and the tenth The 4th sleeve column opposite side between four stop projections is provided with the 16th stop projection, and the described 15th stops projection and the 16th Stop projection in same level, the described 13rd stops that projection and the 15th stops projection arranged in dislocation up and down.
First moulding building blocks block is installed on first sleeve column, first is offered respectively on the first moulding building blocks block Sleeve column perforation, the perforation of the first stopper, second stop through hole, first sleeve column perforation respectively with the perforation of the first stopper, the Two stop through holes are connected installation.
Second moulding building blocks block is installed on second sleeve column, second is offered respectively on the second moulding building blocks block Sleeve column perforation, the perforation of the 3rd stopper, the perforation of the 4th stopper, the perforation of the 5th stopper, second sleeve column perforation respectively with Installation that the perforation of 3rd stopper, the 4th stopper are perforated, the perforation of the 5th stopper is connected.
3rd moulding building blocks block is installed on the 3rd sleeve column, the 3rd is offered respectively on the 3rd moulding building blocks block Sleeve column perforation, the perforation of the 6th stopper, the 3rd sleeve column perforation and the 6th stopper are perforated the installation that is connected.
4th moulding building blocks block is installed on the 4th sleeve column, the 4th is offered respectively on the 4th moulding building blocks block Sleeve column perforation, the perforation of the 7th stopper, the perforation of the 8th stopper, the 4th sleeve column perforation respectively with the perforation of the 7th stopper, The perforation of 8th stopper is connected installation.
External screw thread is installed on the 5th sleeve column lateral wall, the 5th moulding building blocks block is installed on the 5th sleeve column, The perforation of the 5th sleeve column is offered on the 5th moulding building blocks block, being provided with to coordinate with external screw thread in the 5th sleeve column perforation makes Internal thread.
The beneficial effects of the utility model are:A kind of sleeve column toy, it stops projection and sleeve column is integrally manufactured forms, effectively The firmness of sleeve column toy is improved, so as to improve the service life of sleeve column toy.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is rearview of the present utility model;
Fig. 3 is the structural representation of the first moulding building blocks block;
Fig. 4 is the structural representation of the second moulding building blocks block;
Fig. 5 is the structural representation of the 3rd moulding building blocks block;
Fig. 6 is the structural representation of the 4th moulding building blocks block;
Fig. 7 is the structural representation of the 5th moulding building blocks block.
Embodiment
Embodiment 1
A kind of sleeve column toy as shown in Figure 1 and Figure 2, including moulding base 1, from left to right pacify successively on the moulding base 1 Equipped with the first sleeve column 2, the second sleeve column 3, the 3rd sleeve column 4, the 4th sleeve column 5, the 5th sleeve column 6, first sleeve column 2, the second sleeve column 3rd, more than 1 piece of stop projection, first sleeve column 2, the second sleeve column 3, are mounted on the 3rd sleeve column 4 and the 4th sleeve column 5 Three sleeve columns 4 and the 4th sleeve column 5 form with stopping that projection is integrally manufactured;External screw thread is installed on the lateral wall of 5th sleeve column 6, institute State and moulding building blocks block is set with the first sleeve column 2, the second sleeve column 3, the 3rd sleeve column 4, the 4th sleeve column 5 and the 5th sleeve column 6, every piece Different size of sleeve column perforation two-by-two is offered on the moulding building blocks block.
The side of first sleeve column 2 is separately installed with the first stop projection 11, second and stops projection 12, first sleeve column 2 opposite sides are separately installed with the 3rd stop projection the 13, the 4th and stop projection 14, and described first stops that projection 11 and the second stop are convex For block 12 in same level, the described 3rd stops that projection 13 and the 4th stops projection 14 in same level, described first The stop stop projection of projection 11 and the 3rd arranged in dislocation about 13.
The side of second sleeve column 3 is sequentially installed with the 5th stop projection the 21, the 6th and stops projection 22 from top to bottom, described The opposite side of second sleeve column 3 is sequentially installed with the 7th stop stop projection 24 of projection the 23, the 8th from top to bottom, and the 5th stop is convex Block 21 and the 7th stops projection 23 in same level, and the described 6th stops that projection 22 and the 8th stops projection 24 in same water In plane;The 5th stop projection 21 and the 7th, which stops, is provided with the 9th stop projection on the second sleeve column 3 between projection 23 25, the 6th stop projection 22 and the 8th, which stops, is provided with the tenth stop projection 26, institute on the second sleeve column 3 between projection 24 The 9th stop projection 25 is stated reversely to install with the tenth stop projection 26.
11st stop projection the 31, the 12nd is installed on the 3rd sleeve column 4 and stops projection 32, the described 11st stops The stop projection of projection 31 and the 12nd arranged in dislocation about 32.
The side of 4th sleeve column 5 is provided with the 13rd stop projection 41, and the opposite side of the 4th sleeve column 5 is provided with the tenth Four stop projection 42, and the described 13rd stops that projection 41 and the 14th stops projection 42 in same level;Described 13rd Stop that projection 41 and the 14th stops that the side of the 4th sleeve column 5 between projection 42 is provided with the 15th stop projection 43, described the 13 stop projections 41 and the 14th stop that the opposite side of the 4th sleeve column 5 between projection 42 is provided with the 16th stop projection 44, Described 15th stops that projection 43 and the 16th stops projection 44 in same level, the 13rd stop projection 41 and the 15 stop projections arranged in dislocation about 43.
As shown in figure 3, the first moulding building blocks block 15 is installed on first sleeve column 2, the first moulding building blocks block 15 It is upper to offer the first sleeve column the 16, first stopper of perforation perforation the 17, second stop through hole 18, the first sleeve column perforation 16 respectively Be connected installation with the first stopper perforation the 17, second stop through hole 18 respectively.
As shown in figure 4, the second moulding building blocks block 27 is installed on second sleeve column 3, the second moulding building blocks block 27 It is upper to offer perforation the 28, the 3rd stopper perforation the 29, the 4th stopper perforation the 30, the 5th stopper perforation of the second sleeve column respectively 19, the 29, the 4th stopper of being perforated respectively with the 3rd stopper of second sleeve column perforation 28 is perforated the 30, the 5th stopper perforation 19 Be connected installation.
As shown in figure 5, the 3rd moulding building blocks block 33 is installed on the 3rd sleeve column 4, the 3rd moulding building blocks block 33 Upper to offer the 3rd sleeve column the 34, the 6th stopper of perforation perforation 35 respectively, the 3rd sleeve column perforation 34 is worn with the 6th stopper Hole 35 is connected installation.
As shown in fig. 6, the 4th moulding building blocks block 45 is installed on the 4th sleeve column 5, the 4th moulding building blocks block 45 It is upper to offer the 4th sleeve column perforation the 46, the 7th stopper the 47, the 8th stopper of perforation perforation 48, the 4th sleeve column perforation respectively 46 the 47, the 8th stopper perforation 48 of being perforated respectively with the 7th stopper are connected installation.
As shown in fig. 7, being provided with external screw thread on the lateral wall of the 5th sleeve column 6, the 5th is provided with the 5th sleeve column 6 Moulding building blocks block 7, the 5th sleeve column perforation 8 is offered on the 5th moulding building blocks block 7, is installed in the 5th sleeve column perforation 8 There is the internal thread being used cooperatively with external screw thread.
A kind of sleeve column toy of the present embodiment, it stops projection and sleeve column is integrally manufactured forms, and effectively improves sleeve column toy Firmness, so as to improve the service life of sleeve column toy.

Claims (10)

  1. A kind of 1. sleeve column toy, it is characterised in that:Including moulding base(1), the moulding base(1)On from left to right pacify successively Equipped with the first sleeve column(2), the second sleeve column(3), the 3rd sleeve column(4), the 4th sleeve column(5), the 5th sleeve column(6), first sleeve column (2), the second sleeve column(3), the 3rd sleeve column(4)With the 4th sleeve column(5)On be mounted on more than 1 piece of stop projection, described first Sleeve column(2), the second sleeve column(3), the 3rd sleeve column(4)With the 4th sleeve column(5)Formed with stopping that projection is integrally manufactured;Described 5th set Post(6)External screw thread, first sleeve column are installed on lateral wall(2), the second sleeve column(3), the 3rd sleeve column(4), the 4th sleeve column(5) With the 5th sleeve column(6)On be set with moulding building blocks block, offered on every piece of moulding building blocks block different size of two-by-two Sleeve column is perforated.
  2. A kind of 2. sleeve column toy according to claim 1, it is characterised in that:First sleeve column(2)Install respectively side There is the first stop projection(11), second stop projection(12), first sleeve column(2)It is convex that opposite side is separately installed with the 3rd stop Block(13), the 4th stop projection(14), described first stops projection(11)Stop projection with second(12)In same level, Described 3rd stops projection(13)Stop projection with the 4th(14)In same level, described first stops projection(11)With Three stop projection(13)Upper and lower arranged in dislocation.
  3. A kind of 3. sleeve column toy according to claim 1, it is characterised in that:Second sleeve column(3)Side is from top to bottom It is sequentially installed with the 5th stop projection(21), the 6th stop projection(22), second sleeve column(3)Opposite side is from top to bottom successively 7th stop projection is installed(23), the 8th stop projection(24), the described 5th stops projection(21)Stop projection with the 7th (23)In same level, the described 6th stops projection(22)Stop projection with the 8th(24)In same level;It is described 5th stops projection(21)Stop projection with the 7th(23)Between the second sleeve column(3)On be provided with the 9th stop projection(25), Described 6th stops projection(22)Stop projection with the 8th(24)Between the second sleeve column(3)On be provided with the tenth stop projection (26), the described 9th stops projection(25)Stop projection with the tenth(26)Reversely installation.
  4. A kind of 4. sleeve column toy according to claim 1, it is characterised in that:3rd sleeve column(4)On be provided with the tenth One stops projection(31), the 12nd stop projection(32), the described 11st stops projection(31)Stop projection with the 12nd(32) Upper and lower arranged in dislocation.
  5. A kind of 5. sleeve column toy according to claim 1, it is characterised in that:4th sleeve column(5)Side is provided with 13 stop projection(41), the 4th sleeve column(5)Opposite side is provided with the 14th stop projection(42), the described 13rd stops Projection(41)Stop projection with the 14th(42)In same level;Described 13rd stops projection(41)Stop with the 14th Projection(42)Between the 4th sleeve column(5)Side is provided with the 15th stop projection(43), the described 13rd stops projection(41) Stop projection with the 14th(42)Between the 4th sleeve column(5)Opposite side is provided with the 16th stop projection(44), the described tenth Five stop projection(43)Stop projection with the 16th(44)In same level, the described 13rd stops projection(41)With the tenth Five stop projection(43)Upper and lower arranged in dislocation.
  6. A kind of 6. sleeve column toy according to claim 1, it is characterised in that:First sleeve column(2)On be provided with first Moulding building blocks block(15), the first moulding building blocks block(15)It is upper to offer the perforation of the first sleeve column respectively(16), the first stopper Perforation(17), second stop through hole(18), the first sleeve column perforation(16)Perforated respectively with the first stopper(17), second resistance Keep off through hole(18)Be connected installation.
  7. A kind of 7. sleeve column toy according to claim 1, it is characterised in that:Second sleeve column(3)On be provided with second Moulding building blocks block(27), the second moulding building blocks block(27)It is upper to offer the perforation of the second sleeve column respectively(28), the 3rd stopper Perforation(29), the 4th stopper perforation(30), the 5th stopper perforation(19), the second sleeve column perforation(28)Respectively with the 3rd Stopper is perforated(29), the 4th stopper perforation(30), the 5th stopper perforation(19)Be connected installation.
  8. A kind of 8. sleeve column toy according to claim 1, it is characterised in that:3rd sleeve column(4)On be provided with the 3rd Moulding building blocks block(33), the 3rd moulding building blocks block(33)It is upper to offer the perforation of the 3rd sleeve column respectively(34), the 6th stopper Perforation(35), the 3rd sleeve column perforation(34)Perforated with the 6th stopper(35)Be connected installation.
  9. A kind of 9. sleeve column toy according to claim 1, it is characterised in that:4th sleeve column(5)On be provided with the 4th Moulding building blocks block(45), the 4th moulding building blocks block(45)It is upper to offer the perforation of the 4th sleeve column respectively(46), the 7th stopper Perforation(47), the 8th stopper perforation(48), the 4th sleeve column perforation(46)Perforated respectively with the 7th stopper(47), the 8th Stopper is perforated(48)Be connected installation.
  10. A kind of 10. sleeve column toy according to claim 1, it is characterised in that:5th sleeve column(6)Installed on lateral wall There are external screw thread, the 5th sleeve column(6)On the 5th moulding building blocks block is installed(7), the 5th moulding building blocks block(7)On open up There is the perforation of the 5th sleeve column(8), the 5th sleeve column perforation(8)The internal thread being used cooperatively with external screw thread is inside installed.
CN201720559272.4U 2017-05-19 2017-05-19 A kind of sleeve column toy Active CN206823187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720559272.4U CN206823187U (en) 2017-05-19 2017-05-19 A kind of sleeve column toy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720559272.4U CN206823187U (en) 2017-05-19 2017-05-19 A kind of sleeve column toy

Publications (1)

Publication Number Publication Date
CN206823187U true CN206823187U (en) 2018-01-02

Family

ID=60771926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720559272.4U Active CN206823187U (en) 2017-05-19 2017-05-19 A kind of sleeve column toy

Country Status (1)

Country Link
CN (1) CN206823187U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109289212A (en) * 2018-09-26 2019-02-01 浙江哈灵实业有限公司 A kind of wooden toy of children educational exploitation
CN111182950A (en) * 2018-08-08 2020-05-19 山东英才学院 Educational preschool toy
WO2021251951A1 (en) * 2020-06-08 2021-12-16 Lovevery, Inc. Child play puzzle

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111182950A (en) * 2018-08-08 2020-05-19 山东英才学院 Educational preschool toy
CN109289212A (en) * 2018-09-26 2019-02-01 浙江哈灵实业有限公司 A kind of wooden toy of children educational exploitation
WO2021251951A1 (en) * 2020-06-08 2021-12-16 Lovevery, Inc. Child play puzzle
US20230104388A1 (en) * 2020-06-08 2023-04-06 Lovevery, Inc. Child play puzzle
US11865466B2 (en) * 2020-06-08 2024-01-09 Lovevery, Inc. Child play puzzle

Similar Documents

Publication Publication Date Title
CN206823187U (en) A kind of sleeve column toy
CN205073654U (en) How much building blocks educational toy
CN205672560U (en) A kind of child building block toy
CN203560591U (en) Vertical elbow for pallet type bridge rack
CN204273772U (en) Cellular storage ball-collecting rack cabinet
CN204307365U (en) Intelligent developing type fence
CN108374520B (en) Fireproof steel structure column
CN206228948U (en) A kind of Novel building block bindiny mechanism
CN206233378U (en) A kind of attachment structure of column and sill
CN206495136U (en) A kind of Bridge guardrail
CN206249822U (en) A kind of penetrating screen module external member of LED outdoor full colors
CN206995866U (en) A kind of wooden toy
CN205815122U (en) A kind of track block toy
CN204551943U (en) A kind of glass balcony structure
CN204185792U (en) A kind of banister wind-proof device
CN204034240U (en) The only game toy of a kind of wooden number
CN206312337U (en) A kind of earthquake alarm
CN204139404U (en) A kind of point refutes curtain wall
CN205461016U (en) Toy
CN203244719U (en) Elastic string pull handle
CN203694579U (en) Multifunctional combined sliding board
CN203137948U (en) Water-absorption cup mat
CN203499108U (en) Wood plastic pillar for greenhouse
CN207910722U (en) A kind of photovoltaic solar frame
CN206955402U (en) A kind of elevator earthquake isolating equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant