Prior art keywords
module
control
display device
fabric interface
data acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720034758.6U
Other languages
Chinese (zh)
Inventor
王召阳
荆新宁
崔兆龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720034758.6U priority Critical patent/CN206819133U/en
Application granted granted Critical
Publication of CN206819133U publication Critical patent/CN206819133U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The utility model discloses a kind of green building data acquisition analysis system,Mainly include base,Support frame,Control device,Display device,Indicator lamp,Accident warning device,Control panel,Operation device and fabric interface,The base top is provided with support frame,Control device is provided with the top of support frame as described above,Display device is provided with the control device,Indicator lamp,Accident warning device,Control panel,Operation device and fabric interface,The display device side is provided with indicator lamp,The accident warning device is arranged on above display device,Operation device is provided with below the display device,The control panel is arranged on inside control device,The fabric interface is arranged on control device one side,The utility model is simple in construction,It is easy to use,With intelligent controlling device,Effectively can constantly it be monitored and remote control,There are energy-conserving and environment-protective simultaneously,With operation stability height.

Description

A kind of green building data acquisition analysis system
Technical field
It the utility model is related to green building intelligent power distribution monitoring technology field, specially a kind of green building data acquisition With monitoring system.
Background technology
The General Office of the State Council in 2013 (No. 1 text is sent out by the Office of the State Council)《Green building action scheme》In emphasize building " tree Vertical total life cycle theory " and " construction operation ", this two key wordses hited current green building work defect, it is necessary to Give the attention of height.Data show that the carbon emission amount of green building operation phase accounts for the 90% of the life cycle environment assessment carbon emission amount More than.Therefore, the behavior energy saving of green building operation phase and equipment effective operation management are the lifeblood of green building.Among these The problem of green building electric stability and energy saving have turned into whole world common concern and paid attention to, so to the electricity using electric energy The research of gas system and its key technology is particularly important.Architectural electricity system energy-saving safe electricity consumption system should meet that building are built Build each intelligent service system efficient stable safe operation requirement;Resident should be met to comfortable, harmonious office, study and daily life life Environmental requirement living;The technical requirements such as electric safety of building electricity consumption and energy-saving environmental protection should be met.But existing architectural electricity System can not but realize above-mentioned requirements.
Utility model content
The purpose of this utility model is to provide a kind of green building data acquisition analysis system, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:A kind of green building data acquisition and monitoring System, mainly including base, support frame, control device, display device, indicator lamp, accident warning device, control panel, operation Device and fabric interface, the base top are provided with support frame, control device, the control are provided with the top of support frame as described above Display device, indicator lamp, accident warning device, control panel, operation device and fabric interface, the display are provided with device Device side is provided with indicator lamp, and the accident warning device is arranged on above display device, is set below the display device There is operation device, the control panel is arranged on inside control device, and the fabric interface is arranged on control device one side; Control panel include drive module, control module, micro treatment module, communication module, remote control module, data acquisition module, A/D modules, data read module, data processing module, circuit module, switching value information module and fault alarm module, it is described Drive module is electrically connected with control module, micro treatment module and communication module, and the control module is electrically connected with data acquisition module Block, A/D modules, data read module and data processing module, the micro treatment module are electrically connected with circuit module, switching value letter Module and fault alarm module are ceased, the communication module is electrically connected with remote control module;Switching value information module includes air-conditioning Control module, elevator pull module, lighting module, plumbing module, security module and gate inhibition's module;Set inside control device There is one layer of electromagnetism interference layer;Fabric interface sets interface for electronization.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple in construction, easy to use, tool There is intelligent controlling device, effectively can constantly be monitored and remote control, while there are energy-conserving and environment-protective, and operation stability is high; In order to realize that it is constantly monitored and remote control, the utility model employ communication module and be electrically connected with remote control mould Block;In order to improve the stability and anti-interference of its operation, the utility model employs to be internally provided with control device One layer of electromagnetism interference layer;In order to improve its expansibility, the utility model fabric interface sets interface for electronization.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model control panel theory diagram;
In figure:1st, base;2nd, support frame;3rd, control device;4th, display device;5th, indicator lamp;6th, accident warning device; 7th, control panel;8th, operation device;9th, fabric interface;10th, drive module;11st, control module;12nd, micro treatment module;13rd, lead to Interrogate module;14th, remote control module;15th, data acquisition module;16th, A/D modules;17th, data read module;18th, at data Manage module;19th, circuit module;20th, switching value information module;21st, fault alarm module;22nd, airconditioning control module;23rd, elevator Pull module;24th, lighting module;25th, plumbing module;26th, security module;26th, gate inhibition's module.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of green building data acquisition and monitoring system System, mainly include base 1, support frame 2, control device 3, display device 4, indicator lamp 5, accident warning device 6, control panel 7, Operation device 8 and fabric interface 9, the top of base 1 are provided with support frame 2, and the top of support frame 2 is provided with control device 3, controlled Display device 4, indicator lamp 5, accident warning device 6, control panel 7, operation device 8 and fabric interface 9 are provided with device 3, The side of display device 4 is provided with indicator lamp 5, and accident warning device 6 is arranged on the top of display device 4, and the lower section of display device 4 is set There is operation device 8, control panel 7 is arranged on inside control device 3, and fabric interface 9 is arranged on the one side of control device 3.This Utility model is simple in construction, easy to use, has intelligent controlling device, effectively can constantly be monitored and remote control, simultaneously It is high with energy-conserving and environment-protective, and operation stability.
In the present embodiment, control panel 7 includes drive module 10, control module 11, micro treatment module 12, communication module 13rd, remote control module 14, data acquisition module 15, A/D modules 16, data read module 17, data processing module 18, electricity Road module 19, switching value information module 20 and fault alarm module 21, drive module 10 are electrically connected with control module 11, microprocessor Module 12 and communication module 13, control module 11 are electrically connected with data acquisition module 15, A/D modules 16, data read module 17 With data processing module 18, micro treatment module 12 is electrically connected with circuit module 19, switching value information module 20 and fault alarm mould Block 21, communication module 13 are electrically connected with remote control module 14.Switching value information module 20 includes airconditioning control module 22, electricity Ladder pulls module 23, lighting module 24, plumbing module 25, security module 26 and gate inhibition's module 27, in the utility model, in order to It can realize that it is constantly monitored and remote control, employ communication module and be electrically connected with remote control module;Inside control device 3 It is provided with one layer of electromagnetism interference layer;In order to improve the stability and anti-interference of its operation;Fabric interface 9 is electronization Interface is set, in order to improve its expansibility.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (1)

1. a kind of green building data acquisition analysis system, mainly including base (1), support frame (2), control device (3), aobvious Showing device (4), indicator lamp (5), accident warning device (6), control panel (7), operation device (8) and fabric interface (9), it is special Sign is:Support frame (2) is provided with the top of the base (1), control device (3) is provided with the top of support frame as described above (2), it is described Display device (4), indicator lamp (5), accident warning device (6), control panel (7), operation device are provided with control device (3) (8) and fabric interface (9), display device (4) side are provided with indicator lamp (5), and the accident warning device (6) is arranged on Above display device (4), operation device (8) is provided with below the display device (4), the control panel (7) is arranged on control Device (3) processed is internal, and the fabric interface (9) is arranged on control device (3) one side;Control panel (7) includes driving mould Block (10), control module (11), micro treatment module (12), communication module (13), remote control module (14), data acquisition module (15), A/D modules (16), data read module (17), data processing module (18), circuit module (19), switching value information mould Block (20) and fault alarm module (21), the drive module (10) are electrically connected with control module (11), micro treatment module (12) With communication module (13), the control module (11) is electrically connected with data acquisition module (15), A/D modules (16), digital independent Module (17) and data processing module (18), the micro treatment module (12) are electrically connected with circuit module (19), switching value information Module (20) and fault alarm module (21), the communication module (13) are electrically connected with remote control module (14);Switching value is believed Cease module (20) include airconditioning control module (22), elevator pull module (23), lighting module (24), plumbing module (25), Security module (26) and gate inhibition's module (27);Control device (3) is internally provided with one layer of electromagnetism interference layer;Fabric interface (9) For electronization, interface is set.
CN201720034758.6U 2017-01-12 2017-01-12 A kind of green building data acquisition analysis system Expired - Fee Related CN206819133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720034758.6U CN206819133U (en) 2017-01-12 2017-01-12 A kind of green building data acquisition analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720034758.6U CN206819133U (en) 2017-01-12 2017-01-12 A kind of green building data acquisition analysis system

Publications (1)

Publication Number Publication Date
CN206819133U true CN206819133U (en) 2017-12-29

Family

ID=60751176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720034758.6U Expired - Fee Related CN206819133U (en) 2017-01-12 2017-01-12 A kind of green building data acquisition analysis system

Country Status (1)

Country Link
CN (1) CN206819133U (en)

Similar Documents

Publication Publication Date Title
CN203907451U (en) Solar air purification street lamp
CN202758490U (en) Traffic light possessing power-off detection function
CN206338756U (en) It is a kind of based on the solar street light being wirelessly transferred
CN206819133U (en) A kind of green building data acquisition analysis system
CN205229760U (en) Green building data collecting and monitoring system
CN204648090U (en) A kind of solar powered external wall of building LED illumination System based on DSP
CN204015900U (en) A kind of remote controlled solar energy curtain
CN202384681U (en) Outdoor prefabricated substation with ventilation structure
CN203673667U (en) Parking stall indicating and guiding device for parking lot
CN206790740U (en) Nuclear power station is met an urgent need intelligent floor instruction device
CN206755039U (en) A kind of road lamp energy-saving circuit control system
CN206625192U (en) A kind of remote controlled intelligent low-power consumption water conservancy gate
CN201360371Y (en) Illumination control system of machine room
CN206347499U (en) One kind automation street lamp
CN203910037U (en) Parking stall indication guiding system in parking lot of scenic spot
CN204131144U (en) A kind of two MCU wind-solar hybrid intelligent controller
CN204537657U (en) A kind of emergency exit indicating lamp
CN206069104U (en) Novel energy-saving elevator based on super capacitor
CN205231731U (en) Green building electric energy electric system
CN102486272A (en) Intelligent elevator lamp
CN204425262U (en) A kind of Novel removable solar recharging combined socket and switch equipment
CN104367151A (en) Novel solar intelligent curtain
CN203689645U (en) Gas concentration detection and alarm device
CN202758489U (en) Solar traffic post
CN203261543U (en) Zigbee-based streetlamp system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20190112