CN205229760U - Green building data collecting and monitoring system - Google Patents

Green building data collecting and monitoring system Download PDF

Info

Publication number
CN205229760U
CN205229760U CN201520947430.4U CN201520947430U CN205229760U CN 205229760 U CN205229760 U CN 205229760U CN 201520947430 U CN201520947430 U CN 201520947430U CN 205229760 U CN205229760 U CN 205229760U
Authority
CN
China
Prior art keywords
module
green building
remote control
building data
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520947430.4U
Other languages
Chinese (zh)
Inventor
吴征天
付保川
朱树先
朱学莉
胡惠轶
郭胜辉
李长宁
祝勇俊
高涵文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University of Science and Technology
Original Assignee
Suzhou University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University of Science and Technology filed Critical Suzhou University of Science and Technology
Priority to CN201520947430.4U priority Critical patent/CN205229760U/en
Application granted granted Critical
Publication of CN205229760U publication Critical patent/CN205229760U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model discloses a green building data collecting and monitoring system, include: gather subassembly, controlling means and remote control logical unit, it includes IPC5454 module, IPC5352 module and high -speed capture card and communication connection respectively to gather the subassembly use the electric system, the IPC5454 module is used for sample and hold, conversion, reading and data processing, the IPC5352 module is used for gathering switching value information, high -speed capture card is used for according to the trouble enabling signal, simultaneous acquisition three -phase fault emergence fore -and -after wave form and supply analysis trouble, the communication of remote control logical unit is connected controlling means's output. In this way, the utility model discloses green building data collecting and monitoring system has advantages such as novel structure, real -time supervision, remote control convenience, stable performance, high -efficient operation, energy -concerving and environment -protective, intelligent optimization, has extensive market prospect in green building data collecting and monitoring system's popularization.

Description

A kind of green building data acquisition analysis system
Technical field
The utility model relates to green building intelligent power distribution monitoring field, particularly relates to a kind of green building data acquisition analysis system.
Background technology
2013 the General Office of the State Council (No. 1 literary composition is sent out by the Office of the State Council) " green building action scheme " in emphasize buildings " establishing total life cycle theory " and " construction operation ", these two key wordses have hited the work defect of current green building, need the attention giving height.The carbon emission amount of data display green building operation phase accounts for more than 90% of this life cycle environment assessment carbon emission amount.Therefore, the behavior energy saving of green building operation phase and the management of equipment effective operation are the lifeblood of green building.Wherein green building electric stability and energy saving have become the problem be jointly concerned about and paid attention in the whole world, so seem particularly important to the use electrical system of electric energy and the research of gordian technique thereof for these.
Architectural electricity security of system Event tourism system should meet building construction each intelligent service system efficient stable safe operation requirement; Resident should be met to comfortable, harmonious office, study and routine life environmental requirement; The technical requirements such as electric safety of building electricity consumption and energy-saving and cost-reducing environmental protection should be met.But existing architectural electricity system but can not realize above-mentioned requirements.
Utility model content
The technical matters that the utility model mainly solves is to provide a kind of green building data acquisition analysis system, by adopting IPC5454 module, IPC5352 module and high-speed collection card are respectively to the current information of using electricity system, information of voltage and switching information carry out detecting and sending control device to, control further by remote control logic device, realize the Intellectualized monitoring to system in building, novel structure, Real-Time Monitoring, remote control is convenient, stable performance, Effec-tive Function, energy-conserving and environment-protective, intelligent optimization, market outlook are widely had popularizing of green building data acquisition analysis system.
For solving the problems of the technologies described above, the utility model provides a kind of green building data acquisition analysis system, for gathering the status information of using electricity system and Long-distance Control, comprise: acquisition component, control device and remote control logic device, described acquisition component comprises IPC5454 module, IPC5352 module with high-speed collection card and respectively communication is connected described using electricity system, described IPC5454 module is for maintenance of sampling, conversion, reading and data processing, described IPC5352 module is for gathering switching value information, described high-speed collection card is used for according to fault initiating signal, gather the waveform before and after three-phase fault generation and supply analysis fault simultaneously, the communication of described remote control logic device connects the output terminal of described control device.
In the utility model preferred embodiment, described remote control logic device is electrically connected and controls the switchgear of described using electricity system.
In the utility model preferred embodiment, described using electricity system comprises heating ventilation air-conditioning system, elevator pulls system, illuminator, supply and drain water system, electromechanical equipment, safety defense monitoring system, gate control system one or more.
The beneficial effects of the utility model are: the utility model green building data acquisition analysis system has the advantages such as novel structure, Real-Time Monitoring, remote control convenience, stable performance, Effec-tive Function, energy-conserving and environment-protective, intelligent optimization, have market outlook widely popularizing of green building data acquisition analysis system.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of green building data acquisition analysis system one of the present utility model preferred embodiment.
Embodiment
Be clearly and completely described to the technical scheme in the utility model embodiment below, obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The utility model embodiment comprises:
A kind of green building data acquisition analysis system, for gathering the status information of using electricity system 6 and Long-distance Control, comprising: acquisition component, control device 4 and remote control logic device 5.
Described acquisition component comprise IPC5454 module 1, IPC5352 module 2 with high-speed collection card 3 and respectively communication be connected described using electricity system 6, described IPC5454 module 1 is for maintenance, conversion, reading and the data processing of sampling, described IPC5352 module 2 is for gathering switching value information, described high-speed collection card 3 is for according to fault initiating signal, gather the waveform before and after three-phase fault generation and supply analysis fault, the communication of described remote control logic device 5 connects the output terminal of described control device 4 simultaneously.
Preferably, described remote control logic device 5 is electrically connected and controls the switchgear of described using electricity system 6.
Preferably, described using electricity system 6 comprises heating ventilation air-conditioning system, elevator pulls system, illuminator, supply and drain water system, electromechanical equipment, safety defense monitoring system, gate control system one or more.
The beneficial effect of the utility model green building data acquisition analysis system is:
One, by adopting IPC5454 module, IPC5352 module and high-speed collection card detect and send control device to the current information of using electricity system, information of voltage and switching information, novel structure, Real-Time Monitoring, stable performance, Effec-tive Function, energy-conserving and environment-protective respectively;
Two, by adopting remote control logic device to carry out Long-distance Control to using electricity system, the Intellectualized monitoring to system in building is achieved, remote control convenience, intelligent optimization.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model description to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present utility model.

Claims (3)

1. a green building data acquisition analysis system, for gathering the status information of using electricity system and Long-distance Control, it is characterized in that, comprise: acquisition component, control device and remote control logic device, described acquisition component comprises IPC5454 module, IPC5352 module with high-speed collection card and respectively communication is connected described using electricity system, described IPC5454 module is for maintenance of sampling, conversion, reading and data processing, described IPC5352 module is for gathering switching value information, described high-speed collection card is used for according to fault initiating signal, gather the waveform before and after three-phase fault generation and supply analysis fault simultaneously, the communication of described remote control logic device connects the output terminal of described control device.
2. green building data acquisition analysis system according to claim 1, is characterized in that, described remote control logic device is electrically connected and controls the switchgear of described using electricity system.
3. green building data acquisition analysis system according to claim 1, it is characterized in that, described using electricity system comprises heating ventilation air-conditioning system, elevator pulls system, illuminator, supply and drain water system, electromechanical equipment, safety defense monitoring system, gate control system one or more.
CN201520947430.4U 2015-11-25 2015-11-25 Green building data collecting and monitoring system Expired - Fee Related CN205229760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520947430.4U CN205229760U (en) 2015-11-25 2015-11-25 Green building data collecting and monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520947430.4U CN205229760U (en) 2015-11-25 2015-11-25 Green building data collecting and monitoring system

Publications (1)

Publication Number Publication Date
CN205229760U true CN205229760U (en) 2016-05-11

Family

ID=55904811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520947430.4U Expired - Fee Related CN205229760U (en) 2015-11-25 2015-11-25 Green building data collecting and monitoring system

Country Status (1)

Country Link
CN (1) CN205229760U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373056A (en) * 2015-11-25 2016-03-02 苏州科技学院 Green building data acquisition and monitoring system
CN105807625A (en) * 2016-05-17 2016-07-27 南京二十六度建筑节能工程有限公司 Smart window data collecting and monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373056A (en) * 2015-11-25 2016-03-02 苏州科技学院 Green building data acquisition and monitoring system
CN105807625A (en) * 2016-05-17 2016-07-27 南京二十六度建筑节能工程有限公司 Smart window data collecting and monitoring system

Similar Documents

Publication Publication Date Title
CN205229760U (en) Green building data collecting and monitoring system
CN204425271U (en) There is the photovoltaic supervising device of arc-detection function
CN204649927U (en) A kind of primary cut-out state monitoring device
CN203057607U (en) Circuit control system for sunlight illumination and commercial power LED illumination complementation
CN202495139U (en) Ammeter data GPRS collecting system
CN202309086U (en) Intelligent zero-crossing switching reactive power compensation device
CN108980093A (en) A kind of blower drive module for air-conditioning
CN204215192U (en) A kind of buoy supervisory system for harbour water front water environment multi-parameter monitoring
CN204706947U (en) Solar panel is directly to LED display electric power system
CN210039082U (en) Intelligent electricity utilization safety detection equipment based on EnOcean communication technology
CN105373056A (en) Green building data acquisition and monitoring system
CN104362589B (en) A kind of sectionalised protection device for high overload distribution transformer
CN103857132A (en) Novel circuit control system with complementation between sunlight illumination and mains supply LED illumination
CN205231851U (en) Green building power distribution monitoring system based on ARM and linux
CN105375629A (en) ARM and Linux-based green building distribution monitoring system
CN202032704U (en) Air-conditioner energy saving controller
CN204065750U (en) A kind of multifunctional high pressure on-off controller based on embedded technology
CN204290273U (en) A kind of sectionalised protection device for high overload distribution transformer
CN204131144U (en) A kind of two MCU wind-solar hybrid intelligent controller
CN203967758U (en) A kind of reactive power compensation system with temperature acquisition function
CN204069448U (en) A kind of wind/solar hybrid street light controller monitored
CN204887593U (en) Street lamp illumination adaptive control system based on illumination luminance
CN103956786A (en) Double-MCU wind-solar complementary intelligent controller
CN105375630A (en) Intelligent distribution monitoring system for green building
CN220870976U (en) Photovoltaic intelligent control, monitored control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20181125

CF01 Termination of patent right due to non-payment of annual fee