CN206813002U - Cableway carries the special rope locking machine of rope - Google Patents

Cableway carries the special rope locking machine of rope Download PDF

Info

Publication number
CN206813002U
CN206813002U CN201720336038.5U CN201720336038U CN206813002U CN 206813002 U CN206813002 U CN 206813002U CN 201720336038 U CN201720336038 U CN 201720336038U CN 206813002 U CN206813002 U CN 206813002U
Authority
CN
China
Prior art keywords
rope
wedge
pedestal
carrying
carries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720336038.5U
Other languages
Chinese (zh)
Inventor
冯俊滔
李青
王宏晖
李志明
辛玉宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Sinohydro Tianjin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Tianjin Engineering Co Ltd filed Critical Sinohydro Tianjin Engineering Co Ltd
Priority to CN201720336038.5U priority Critical patent/CN206813002U/en
Application granted granted Critical
Publication of CN206813002U publication Critical patent/CN206813002U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model provides a kind of cableway carrying special rope locking machine of rope, including the first pedestal, the second pedestal, wedge portion;It is connected between first pedestal and the second pedestal by least two fastening bolts, the wedged hole being provided through between the first pedestal and the second pedestal;Wedge portion is combined by the first wedge and the second wedge, wedge portion can be inserted in wedged hole, and match with wedged hole, the carrying rope groove penetrated along its length is provided with the contact surface of the first wedge and the second wedge, the depth for carrying rope groove is less than carrying rope radius, and wedge portion can be fitted in wedged hole by fastening fastening bolt.The utility model is simple in construction, it is easy to operate, security performance is higher, can effectively solve to rock when cableway length is longer in the prior art larger, earth anchor is easily damaged, the problems such as potential safety hazard existing for carrying rope using rope card is fixed, influences ropeway operation efficiency, and cableway later stage operation expense is high.

Description

Cableway carries the special rope locking machine of rope
Technical field
Carrying rope rope locking machine frock field is the utility model is related to, especially a kind of cableway carrying special rope locking machine of rope.
Background technology
Km construction cableway carrying rope both ends are individually fixed on the support of upper and lower earth anchor, form the carrying of aerial cableway Track.Earth anchor is more to bear based on pulling force, light caused by even at the upper and lower earth anchor because carrying Suo Changdu is longer It is micro- to rock, it is also possible to cause to carry significantly rocking for rope, cause earth anchor to damage or loosen, cause security incident.Therefore All carrying rope is fixed using multiple rope cards in general construction cableway, but km construction cableway stress is larger, is blocked using rope Security incident easily occurs, and carries rope tensile force and cannot be guaranteed.In addition after ropeway operation, carrying rope can produce certain shape Become, it is necessary to carry the secondary pretensions of Suo Jinhang, and it is existing carrying rope pretension when, it is necessary to remove rope card, it is secondary it is pre- it is next again Block fixed carrying rope with rope, complex operation, input maintenance cost is high, also tends to influence the operation of cableway normal construction.
The content of the invention
In view of the above the shortcomings that prior art, it is an object of the invention to provide a kind of cableway to carry rope personality card rope Device, for solving to rock larger when cableway length is longer in the prior art, earth anchor is easily damaged, and is blocked fixed carrying rope using rope and is deposited Potential safety hazard, influence ropeway operation efficiency, and the problems such as cableway later stage operation expense is high.
In order to achieve the above objects and other related objects, the present invention provides a kind of cableway carrying special rope locking machine of rope, including First pedestal, the second pedestal, wedge portion;It is connected between first pedestal and second pedestal by least two fastening bolts Connect, the wedged hole being provided through between first pedestal and second pedestal;The wedge portion is by the first wedge and Two wedges are combined, and the wedge portion can be inserted in the wedged hole, and are matched with the wedged hole, in the first wedge The carrying rope groove penetrated along its length, the depth of the carrying rope groove are provided with the contact surface of body and second wedge Degree is less than the carrying rope radius, and fastening the fastening bolt can be fitted in the wedge portion in the wedged hole.
Preferably, more than the first pedestal 10mm is exposed in the big end end face in the wedge portion.
Further, the wedged hole is by the first wedge-shaped impression on first pedestal and on the second pedestal The second wedge-shaped impression collectively constitute.
Further, size, the structure of first pedestal and the second pedestal are identical.
Further, first pedestal and second pedestal are cast steel, and are made by casting.
Further, in the first wedge-shaped impression small end of first pedestal and/or the second wedge-shaped impression of the second pedestal Flange is additionally provided with small end end face, at least two holes are provided with the flange, adjustment spiral shell is installed in the silk hole Bolt, standby tight nut is installed in the adjustment bolt.
Further, the adjustment bolt on first pedestal and second pedestal is two and is symmetrically distributed in institute State carrying rope groove both sides.
Further, the carrying rope groove is semi-circular recesses, and its depth ratio carries the small 2~5mm of rope radius.
Further, the fastening bolt quantity between first pedestal and second pedestal is eight, is arranged symmetrically in First wedge-shaped impression or the second wedge-shaped impression both sides.
As described above, the utility model, has the advantages that:In locking will carrying rope through the first pedestal and the After wedged hole between two pedestals, then (wedge portion small end refers in embedded carrying rope groove between first wedge and the second wedge To Impact direction), then the wedge portion being made up of the first wedge and the second wedge is inserted in wedged hole, screwing fastening bolt will First wedge and the second wedge pre-pressing, wedge portion then is impacted with tup, makes the first wedge and the second wedge in wedged hole Mutual jam-packed under extruding, because the depth of carrying rope groove is less than carrying rope radius, in the first wedge and the second wedge phase Carrying rope can mutually be held tightly during extruding.During work, because carrying rope is heavier, held in the presence of self gravitation or carrying weight One larger frictional force of the first wedge and the second wedge can be given by carrying rope, the first wedge and the second wedge is moved to wedged hole small end It is dynamic, it is tighter so as to which rope be embraced.In regular maintenance, by adjusting the adjustment bolt of wedge portion small end it can be made to hold out against admittedly Fixed rack, it will realize and carry Suo Erci pretensions, it is simple to operate, it is easy to safeguard, improves construction ropeway operation safety coefficient, prolong Carrying rope service life is grown.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is Fig. 1 left view;
Fig. 3 is A-A in Fig. 1 to sectional view;
Fig. 4 is scheme of installation of the present utility model.
In figure:1st, the first pedestal 2, the second pedestal
3rd, wedge portion 4, wedged hole
5th, fastening bolt 6, flange
7th, earth anchor 8, fixed support
9th, rope 10, adjustment bolt are carried
31st, the first wedge 32, the second wedge
33rd, rope groove 41, the first wedge-shaped impression are carried
42nd, the second wedge-shaped impression
Embodiment
Structure, ratio, size depicted in Figure of description etc., only to coordinate the content disclosed in specification, with Understand for those skilled in the art and read, be not limited to the enforceable qualifications of the utility model, therefore do not have skill Essential meaning in art, the modification of any structure, the change of proportionate relationship or the adjustment of size, do not influenceing the utility model institute Under the effect of producing and the purpose that can reach, it all should still fall what can be covered in the technology contents disclosed in the utility model In the range of.Meanwhile cited such as " on ", " under ", "front", "rear", " centre " term in this specification, it is merely convenient to chat That states understands, and is not used to limit the enforceable scope of the utility model, and its relativeness is altered or modified, without substantive change Under more technology contents, when being also considered as the enforceable category of the utility model.
As shown in figures 1-4, the utility model is that a kind of cableway carries the special rope locking machine of rope, including the first pedestal 1, second Pedestal 2, wedge portion 3;It is connected between first pedestal 1 and the second pedestal 2 by least two fastening bolts 5, the first pedestal 1 and The wedged hole 4 being provided through between two pedestals 2;Wedge portion 3 is combined by the first wedge 31 and the second wedge 32, wedge portion 3 can insert in wedged hole, and the gradient of the first wedge 31 and slope and wedged hole 4 on the second wedge 32 matches, The carrying rope groove 33 penetrated along its length, carrying rope groove 33 are provided with the contact surface of one wedge 31 and the second wedge 32 Depth be less than carrying the radius of rope 9, fastening fastening bolt 5 wedge portion can be fitted in wedged hole 4.
In locking, after wedged hole 4 of the rope through the first pedestal 1 and the second pedestal 2 will be carried, then embedded first wedge , then will be by the first wedge 31 in carrying rope groove 33 between the wedge 32 of body 31 and second (small end of wedge portion 3 deviates from earth anchor 7) Inserted with the wedge portion 3 of the second wedge 32 composition in wedged hole 4, screw fastening bolt 5 by the first wedge 31 and the second wedge 32 Pre-pressing, the end of wedge portion 3 then is impacted with tup, makes the first wedge 31 and the second wedge 32 phase under the extruding of wedged hole 4 Mutual jam-packed, because the depth of carrying rope groove 33 is less than the radius of carrying rope 9, in the first wedge 31 and the phase of the second wedge 32 Carrying rope can mutually be held tightly during extruding.During work, because carrying rope 9 is heavier, in the presence of self gravitation or carrying weight Carrying rope 9 can give the first wedge 31 and the second wedge 32 1 larger frictional force, make the first wedge 31 and the second wedge 32 to Wedged hole small end moves, tighter so as to which rope be embraced.
The big end end face in wedge portion 3 is exposed more than first pedestal 10mm, directly can impact wedge with tup when mounted The big end end face in portion 3 carries out pretension.
Wedged hole 4 can be by first wedge-shaped impression 41 being individually opened on the first pedestal 1 and flat second Body 2 forms, can also be recessed by the first wedge-shaped impression 41 on the first pedestal 1 and the on the second pedestal 2 second wedge shape Groove 42 collectively constitutes, and 42 common stress of the first wedge-shaped impression 41 and the second wedge-shaped impression, is more uniformly stressed when collectively constituting, peace Full performance is higher.
It is preferred that the first pedestal 1 is identical with size, the structure of the second pedestal 2, so it is easy to batch making.First pedestal 1 and second pedestal 2 be preferably cast steel, and pass through cast make.
On the first wedge-shaped impression small end of the first pedestal 1 and/or the second wedge-shaped impression small end end face of the second pedestal 2 also Flange 6 is provided with, at least two holes are provided with flange 6, adjustment bolt 10 is installed in silk hole, pacified in adjustment bolt 10 Equipped with standby tight nut.In regular maintenance, by adjusting the adjustment bolt 10 of the small end of wedge portion 3 it can be made to hold out against fixed support 8, it is standby tight locking by standby tight nut after holding out against, the secondary pretension of carrying rope 9 will be realized, it is simple to operate, it is easy to safeguard, improves Construction ropeway operation safety coefficient, extend carrying rope service life.
Adjustment bolt 10 on first pedestal 1 and the second pedestal 2 is two and is symmetrically distributed in 33 liang of carrying rope 9 groove Side, such adjustment bolt 10 are more uniformly stressed, and safety coefficient is higher.
It is preferably semi-circular recesses to carry rope groove 33, prevents from carrying rope deformation, depth of groove is smaller by 2 than the carrying radius of rope 9 ~5mm, it can so ensure that wedge portion 3 can effectively extrude tight carrying rope 9 under the extruding of wedged hole.
The quantity of fastening bolt 5 between first pedestal 1 and the second pedestal 2 is 8, is arranged symmetrically in the first wedge-shaped impression or the Two wedge-shaped impression both sides, so make the frictional force between the pedestal 1 of wedge portion 3 and first and the second pedestal 2 bigger, it is safer to have Effect.
In summary, the utility model is simple in construction, easy to operate, and security performance is higher, can effectively solve existing skill Rock larger when cableway length is longer in art, earth anchor is easily damaged, use the fixed carrying rope of rope card existing for potential safety hazard, influence Ropeway operation efficiency, and the problems such as cableway later stage operation expense is high.So the utility model effectively overcomes existing skill Some practical problems in art are so as to having very high value and using meaning.
Above-mentioned embodiment only illustrative principle of the present utility model and its effect are new not for this practicality is limited Type.The utility model also has many aspects to be improved on the premise of without prejudice to overall thought, for being familiar with this technology Personage all can carry out modifications and changes to above-described embodiment without prejudice under spirit and scope of the present utility model.Therefore, Such as those of ordinary skill in the art is without departing from the spirit disclosed in the utility model and institute under technological thought All equivalent modifications completed or change, should be covered by claim of the present utility model.

Claims (9)

1. a kind of cableway carries the special rope locking machine of rope, it is characterised in that including the first pedestal, the second pedestal, wedge portion;Described Be connected between one pedestal and second pedestal by least two fastening bolts, first pedestal and second pedestal it Between the wedged hole that is provided through;The wedge portion is combined by the first wedge and the second wedge, and the wedge portion can insert In the wedged hole, and match with the wedged hole, opened on the contact surface of first wedge and second wedge There is a carrying rope groove penetrated along its length, the depth of the carrying rope groove is less than the carrying rope radius, described in fastening The wedge portion can be fitted in the wedged hole by fastening bolt.
2. cableway according to claim 1 carries the special rope locking machine of rope, it is characterised in that the big end end face in the wedge portion Expose more than the first pedestal 10mm.
3. cableway according to claim 2 carries the special rope locking machine of rope, it is characterised in that the wedged hole is by positioned at described The first wedge-shaped impression on first pedestal and the second wedge-shaped impression on the second pedestal collectively constitute.
4. cableway according to claim 3 carries the special rope locking machine of rope, it is characterised in that first pedestal and second Size, the structure of body are identical.
5. cableway according to claim 4 carries the special rope locking machine of rope, it is characterised in that first pedestal and described the Two pedestals are cast steel, and are made by casting.
6. cableway according to claim 5 carries the special rope locking machine of rope, it is characterised in that the first of first pedestal Flange is additionally provided with second wedge-shaped impression small end end face of wedge-shaped impression small end and/or the second pedestal, is set on the flange There are at least two holes, adjustment bolt is installed in the silk hole, standby tight nut is installed in the adjustment bolt.
7. cableway according to claim 6 carries the special rope locking machine of rope, it is characterised in that first pedestal and described the Adjustment bolt on two pedestals is two and is symmetrically distributed in the carrying rope groove both sides.
8. cableway according to claim 7 carries the special rope locking machine of rope, it is characterised in that the carrying rope groove is semicircle Connected in star, the small 2~5mm of its depth ratio carrying rope radius.
9. cableway according to claim 8 carries the special rope locking machine of rope, it is characterised in that first pedestal and described the Fastening bolt quantity between two pedestals is eight, is arranged symmetrically in first wedge-shaped impression or the second wedge-shaped impression both sides.
CN201720336038.5U 2017-03-31 2017-03-31 Cableway carries the special rope locking machine of rope Expired - Fee Related CN206813002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720336038.5U CN206813002U (en) 2017-03-31 2017-03-31 Cableway carries the special rope locking machine of rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720336038.5U CN206813002U (en) 2017-03-31 2017-03-31 Cableway carries the special rope locking machine of rope

Publications (1)

Publication Number Publication Date
CN206813002U true CN206813002U (en) 2017-12-29

Family

ID=60752101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720336038.5U Expired - Fee Related CN206813002U (en) 2017-03-31 2017-03-31 Cableway carries the special rope locking machine of rope

Country Status (1)

Country Link
CN (1) CN206813002U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109554968A (en) * 2019-01-14 2019-04-02 中国十七冶集团有限公司 The device and its construction method of the carrying rope laying of aerial cableway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109554968A (en) * 2019-01-14 2019-04-02 中国十七冶集团有限公司 The device and its construction method of the carrying rope laying of aerial cableway
CN109554968B (en) * 2019-01-14 2024-02-20 中国十七冶集团有限公司 Device for laying carrier cable of aerial cableway and construction method thereof

Similar Documents

Publication Publication Date Title
CN201553986U (en) Stay cable steel anchoring beam structure
CN206813002U (en) Cableway carries the special rope locking machine of rope
CN201742033U (en) Anti-tripping wire blocker
CN201528158U (en) Connecting tool for balanced mount points of dual-string insulators
CN203682924U (en) Windproof emergency device
CN203411903U (en) Cable saddle structure of horizontal drawing rope bridge
CN204139212U (en) A kind of anchoring pile static load test equipment
CN204644869U (en) Drag-line bridge tower anchoring structure
CN203429793U (en) Aluminium alloy hinged shoe joint device
CN208900539U (en) A kind of retainer applied on milling train ball bearing and the bearing using it
CN204418371U (en) Load reliever
CN203627470U (en) Tension expansion locking device
CN203682908U (en) Emergent anti-wind device of rail-type hoisting machinery
CN202748269U (en) Steel wire rope undamage fixture
CN207117123U (en) A kind of wedge-shaped insulating tension clamp
CN206385470U (en) Curved surface ripple type energy consumer for flexible protective hangar tunnel
CN206855363U (en) A kind of device for withdrawing bearing race of support
CN201327699Y (en) Safety billboard
CN201646284U (en) Rear tow hook of airport trailer
CN204986238U (en) Prestressing force base group
CN205678059U (en) Rotary wedge capping
CN203411904U (en) Connecting structure of horizontal drawing rope bridge stability cable
CN205632168U (en) Contact net wire barrow suitable for subway line
CN207436542U (en) A kind of wedge type lowering device
CN202508772U (en) Rear anchorage device for steel truss girder erecting crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 300384 Tianjin Binhai New Area High-tech Zone Huayuan Industrial Area No. 2, 4-2101

Patentee after: STECOL Corp.

Address before: 300384 Tianjin Binhai New Area Tianjin Huayuan Industrial Area, No. 2 Rongyuan road 4-2101

Patentee before: Sinohydro Tianjin Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229