CN206812319U - Calender - Google Patents

Calender Download PDF

Info

Publication number
CN206812319U
CN206812319U CN201720490503.0U CN201720490503U CN206812319U CN 206812319 U CN206812319 U CN 206812319U CN 201720490503 U CN201720490503 U CN 201720490503U CN 206812319 U CN206812319 U CN 206812319U
Authority
CN
China
Prior art keywords
calender
fixed
workbench
feed chamber
rubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720490503.0U
Other languages
Chinese (zh)
Inventor
罗皓
彭建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANCHANG HANTIAN SCIENCE & TECHNOLOGY GROUP Co.,Ltd.
Original Assignee
Zhaoqing Institute Of General Aviation Guangzhou Institute Of Aeronautics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Institute Of General Aviation Guangzhou Institute Of Aeronautics filed Critical Zhaoqing Institute Of General Aviation Guangzhou Institute Of Aeronautics
Priority to CN201720490503.0U priority Critical patent/CN206812319U/en
Application granted granted Critical
Publication of CN206812319U publication Critical patent/CN206812319U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of calender, including a workbench, a feed chamber is provided with the upper surface of the workbench, discharging opening is provided with the side of the feed chamber, the discharging opening is connected by a baffle plate assembly with a pre- calender device, a vacuum extractor is provided with the side of the pre- calender device, the vacuum extractor includes a vacuum pipe and the air exhauster located at the vacuum pipe upper surface, an after-treatment device is provided with the side of the vacuum extractor.The utility model proposes calender actually roll operation when, rubber raw materials are subjected to preliminary calendering process through pre- calender device first and are transported to vacuum extractor progress vacuumize process afterwards, to eliminate the bubble inside rubber, then post-treated device carries out calendering process and obtains finished product again.The utility model proposes calender can effectively remove bubble in rubber, improve the total quality of product, meet production application demand.

Description

Calender
Technical field
It the utility model is related to calendering manufacturing equipment technical field, more particularly to a kind of calender.
Background technology
In manufacturing technology field is rolled, calender is a kind of extremely common calendaring tool.Specifically, calender (calender) refer to, by two or more rollers, arranging by certain forms, at a certain temperature, by rubber or modeling Material compacting extension can carry out the machine of kiss-coating into certain thickness and the film of surface configuration to fiber curtain canvas or wirecord fabric Tool.
When reality carries out calendering process to rubber, the surface appearance for the rubber after repressed processing often occur is more The problem of bubble and shrinkage cavity, this will influence the total quality of product to a certain extent, or even not meet factory calibration.
Utility model content
Based on this, the purpose of this utility model is to propose that one kind can effectively eliminate rubber when carrying out calendering operation The new calender of blibbing, to improve product quality, meet production application demand.
The utility model proposes a kind of calender, including a workbench, wherein, it is provided with one in the upper surface of the workbench Feed chamber, discharging opening is provided with the side of the feed chamber, and the discharging opening is connected by a baffle plate assembly and a pre- calender device Connect, the pre- calender device includes the first fixed column, and a pre- calender stack is fixed with first fixed column, described pre- Calender stack includes the first pony press and the second pony press, and a vacuum extractor is provided with the side of the pre- calender device, The vacuum extractor includes a vacuum pipe and the air exhauster located at the vacuum pipe upper surface, in the vacuum means The side put is provided with an after-treatment device, and the after-treatment device includes the second fixed column and in second fixed column Rear calender stack, it is described after calender stack include the first pressure roller and the second pressure roller.
The calender, wherein, an agitating device and a pressurizing unit are provided with the upper surface of the feed chamber, it is described Agitating device is a stirring motor, and the pressurizing unit is a compressor.
The calender, wherein, it is fixed with a fan assembly, the fan assembly in the side of the feed chamber upper end Including be fixed at the fixed plate of the feed chamber upper end, be fixed at fixed plate lower surface side blower fan and with institute State the connected air outlet of blower fan.
The calender, wherein, the baffle plate assembly includes first baffle and second baffle, the first baffle and institute It is equal with the width of the discharging opening to state the spacing between second baffle.
The calender, wherein, the side of processing unit is connected with a product outlet in the rear, the product outlet with Shear positioned at the worktable upper surface is located on the same line, and the shear includes a support frame, set The connecting pole and be fixed at described that shear motor and the shear motor in the support frame upper surface are directly connected to The shear blade of connecting pole one end.
The calender, wherein, a conveying device is additionally provided with the side of the workbench, the conveying device includes one Delivery board and uniformly multiple rollers on the delivery board.
The calender, wherein, it is provided with a disposable box in the lower section of the conveying device.
The calender, wherein, support meanss are additionally provided with the lower surface of the workbench, the support meanss include one Support column and the pedestal for being fixed at described support column one end, the pedestal are truncated cone-shaped.
The calender, wherein, the workbench is cuboid, and the workbench is made up of cast iron or cast steel material.
The utility model proposes calender actually roll operation when, first by rubber raw materials through pre- calender device carry out Vacuum extractor is transported to after preliminary calendering process and carries out vacuumize process, to eliminate the bubble inside rubber, is then passed through again After-treatment device carries out calendering process and obtains finished product.The utility model proposes calender effectively can remove in rubber Bubble, improve the total quality of product, meet production application demand.
Brief description of the drawings
Fig. 1 is the overall structure diagram of calender in the utility model first embodiment;
Fig. 2 be Fig. 1 shown in calender in fan assembly schematic enlarged-scale view;
Fig. 3 be Fig. 1 shown in calender in pre- calender device schematic enlarged-scale view;
Fig. 4 be Fig. 1 shown in calender in vacuum extractor schematic enlarged-scale view;
Fig. 5 be Fig. 1 shown in calender in after-treatment device schematic enlarged-scale view;
Fig. 6 be Fig. 1 shown in calender in shear schematic enlarged-scale view;
Fig. 7 be Fig. 1 shown in calender in conveying device schematic enlarged-scale view;
Fig. 8 is the overall structure diagram of calender in the utility model second embodiment.
Primary symbols explanation:
Workbench 10 Vacuum pipe 151
Feed chamber 11 Air exhauster 152
Discharging opening 12 Second fixed column 161
Baffle plate assembly 13 Calender stack afterwards 162
Pre- calender device 14 Support frame 181
Vacuum extractor 15 Connecting pole 182
After-treatment device 16 Shear blade 183
Product outlet 17 Shear motor 184
Shear 18 Delivery board 191
Conveying device 19 Roller 192
Disposable box 20 Support column 1011
Support meanss 101 Pedestal 1012
Agitating device 111 Fixed plate 1131
Pressurizing unit 112 Blower fan 1132
Fan assembly 113 Air outlet 1133
First baffle 131 First pony press 1421
Second baffle 132 Second pony press 1422
First fixed column 141 First pressure roller 1621
Pre- calender stack 142 Second pressure roller 1622
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings State.Preferred embodiment of the present utility model is given in accompanying drawing.But the utility model can come in fact in many different forms It is existing, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to public affairs of the present utility model Open content more thorough and comprehensive.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model The implication that the technical staff in domain is generally understood that is identical.It is simply in term used in the description of the present utility model herein The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include The arbitrary and all combination of one or more related Listed Items.
Fig. 1 to Fig. 7, a kind of calender, including a workbench 10 are referred to, one is provided with the upper surface of the workbench 10 Feed chamber 11, discharging opening 12 is provided with the side of the feed chamber 11, the discharging opening 12 is pre- by a baffle plate assembly 13 and one Calender device 14 connects, and is provided with a vacuum extractor 15 in the side of the pre- calender device 14, the vacuum extractor 15 wraps A vacuum pipe 151 and the air exhauster 152 located at the upper surface of vacuum pipe 151 are included, in the vacuum extractor 15 Side is provided with an after-treatment device 16, and support meanss 101, the support meanss are additionally provided with the lower surface of the workbench 10 101 include a support column 1011 and are fixed at the pedestal 1012 of described one end of support column 1011, and the pedestal 1012 is circle Platform shape, the pedestal 1012 of the truncated cone-shaped can increase the stability of the workbench 10, and the workbench 10 is cuboid, described Workbench 10 is made up of cast iron or cast steel material, and in the present embodiment, the workbench 10 is made up of cast iron materials, setting master If in order to lift the integral hardness of the workbench 10, so as to extend the actual life of the workbench 10.
Specifically, for the feed chamber 11, be provided with the upper surface of the feed chamber 11 agitating device 111 and One pressurizing unit 112, wherein the agitating device 111 is a stirring motor, the pressurizing unit 112 is a compressor.It is described Agitating device 111 is mainly stirred to the rubber raw materials in the feed chamber 11, to cause rubber raw materials being pressed It is well mixed as much as possible before system, ensure being smoothed out for calendering work.The pressurizing unit 112 is mainly used in the original Rubber in material room 11 is extruded from the discharging opening 12, when needing to carry out calendering operation, is switched on power and is opened the extruding dress Put 112, the pressurizing unit 112 is just by the rubber raw materials after the agitating device 111 stirs from the discharging opening Extrusion carries out follow-up calendering process in 12.In addition, it is fixed with a fan assembly in the side of the upper end of feed chamber 11 113, the fan assembly 113 includes being fixed at the fixed plate 1131 of the upper end of feed chamber 11, is fixed at the fixation The blower fan 1132 of the lower surface side of plate 1131 and the air outlet 1133 being connected with the blower fan 1132.Specifically, due to passing through The temperature of rubber raw materials after stirring and extrusion process may be higher, is unfavorable for follow-up calendering process, it is therefore desirable to rubber Collagen material carries out appropriate cooling processing.When rubber raw materials are extruded from the discharging opening 12, now in the fan assembly 113 Blower fan 1132 just start operation, air blast processing is carried out to the rubber raw materials of extrusion, to accelerate distributing for heat, so as to realize drop The effect of warm.
For the baffle plate assembly 13, the baffle plate assembly 13 includes first baffle 131 and second baffle 132, institute It is equal with the width of the discharging opening 12 to state the spacing between first baffle 131 and the second baffle 132.The setting is mainly In order to ensure that the smooth output of rubber raw materials and follow-up smoothly enter in the pre- calender device 14 carry out calendering process, Prevent rubber leaks outside during conveying the problem of.
For the pre- calender device 14, the pre- calender device 14 includes the first fixed column 141, solid described first A pre- calender stack 142 is fixed with fixed column 141, the pre- calender stack 142 includes the first pony press 1421 and second Pony press 1422.In actually operation is rolled, rubber raw materials enter first pony press by the baffle plate assembly 13 Pre- calendering process is carried out between 1421 and second pony press 1422.Similarly, it is described for the after-treatment device 16 After-treatment device 16 includes the second fixed column 161, calender stack 162 after being fixed with one in second fixed column 161, institute Stating rear calender stack 162 includes the first pressure roller 1621 and the second pressure roller 1622.Rubber after vacuumize process is carried out Calendering process is carried out again between first pressure roller 1621 and second pressure roller 1622.
In addition, the side of processing unit 16 is connected with a product outlet 17 in the rear, the product outlet 17 with Shear 18 positioned at the upper surface of workbench 10 is located on the same line, and the shear 18 includes a carriage Body 181, the shear motor 184 located at the upper surface of support frame 181, the connection being directly connected to the shear motor 184 Post 182 and the shear blade 183 for being fixed at described one end of connecting pole 182.After rubber raw materials complete calendering operation, lead to Cross the shear 18 and shear treatment, when being sheared, the band of shear motor 184 are carried out to the rubber product after calendering The connecting pole 182 is moved, and then drives the shear blade 183 to carry out shear treatment to the rubber after calendering to obtain final production Product.
, it is necessary to be conveyed to rubber after final rubber is obtained by shearing, in the present embodiment, A conveying device 19 is additionally provided with the side of the workbench 10, the conveying device 19 is including a delivery board 191 and uniformly Multiple rollers 192 on the delivery board 191.Rubber passes through multiple rollings on the delivery board 191 Cylinder 192 enters down one of packaging process.
When carrying out actual calendering operation, the rubber raw materials in the feed chamber 11 are passed through into the agitating device first 111 be stirred after through the pressurizing unit 112 carry out extrusion process, by the rubber raw materials after stirring and evenly mixing from it is described go out Extruded in material mouth 12.The rubber raw materials of extrusion are entered in the pre- calender device 14 by the baffle plate assembly 13 and carry out precompressed Prolong processing, then the rubber after pre- calendering process is transported in the vacuum extractor 15 again and carries out vacuumizing place Reason, after the vacuum extractor 15 extracts the bubble in rubber out, the rubber is entered back into the after-treatment device 16 Calendering process is carried out again, is entered after through the product outlet 17 in the shear 18 and is carried out shear treatment.Shearing Rubber afterwards is transported in next process through the conveying device 19 and carries out subsequent treatment.
Referring to Fig. 8, for the calender in second embodiment, in its embodiment and above-mentioned first embodiment Roughly the same, it is differed only in, and is provided with a disposable box 20 in the lower section of the conveying device 19, the disposable box 20 is mainly used in Collect the conveying device 19 and convey the rubber product after the clipped processing to come, be easy to staff is unified subsequently to be located Reason, improves actual processing efficiency.
The utility model proposes calender actually roll operation when, first by rubber raw materials through pre- calender device carry out Vacuum extractor is transported to after preliminary calendering process and carries out vacuumize process, to eliminate the bubble inside rubber, is then passed through again After-treatment device carries out calendering process and obtains finished product.The utility model proposes calender effectively can remove in rubber Bubble, improve the total quality of product, meet production application demand.
Above example only expresses several embodiments of the present utility model, and its description is more specific and detailed, but simultaneously Therefore the limitation to the utility model patent scope can not be interpreted as.It should be pointed out that the ordinary skill for this area For personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this The protection domain of utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (9)

1. a kind of calender, including a workbench, it is characterised in that a feed chamber is provided with the upper surface of the workbench, The side of the feed chamber is provided with discharging opening, and the discharging opening is connected by a baffle plate assembly with a pre- calender device, described pre- Calender device includes the first fixed column, and a pre- calender stack, the pre- calender stack are fixed with first fixed column Including the first pony press and the second pony press, a vacuum extractor is provided with the side of the pre- calender device, it is described to take out very Empty device includes a vacuum pipe and the air exhauster located at the vacuum pipe upper surface, in the side of the vacuum extractor Provided with an after-treatment device, the after-treatment device includes the second fixed column and the rear calendering in second fixed column Component, the rear calender stack include the first pressure roller and the second pressure roller.
2. calender according to claim 1, it is characterised in that be provided with an agitating device in the upper surface of the feed chamber And a pressurizing unit, the agitating device is a stirring motor, and the pressurizing unit is a compressor.
3. calender according to claim 1, it is characterised in that be fixed with a wind in the side of the feed chamber upper end Thermomechanical components, the fan assembly include being fixed at the fixed plate of the feed chamber upper end, are fixed at the fixed plate following table The blower fan of face side and the air outlet being connected with the blower fan.
4. calender according to claim 1, it is characterised in that the baffle plate assembly includes first baffle and second gear Plate, the spacing between the first baffle and the second baffle are equal with the width of the discharging opening.
5. calender according to claim 1, it is characterised in that the side of processing unit is connected with a finished product in the rear Outlet, the product outlet are located on the same line with the shear positioned at the worktable upper surface, the shearing dress Put the shear motor including a support frame, located at the support frame upper surface, the company being directly connected to the shear motor Connect post and be fixed at the shear blade of described connecting pole one end.
6. calender according to claim 1, it is characterised in that conveying dress is additionally provided with the side of the workbench Put, the conveying device includes a delivery board and uniformly multiple rollers on the delivery board.
7. calender according to claim 6, it is characterised in that be provided with a disposable box in the lower section of the conveying device.
8. calender according to claim 1, it is characterised in that support dress is additionally provided with the lower surface of the workbench Put, the support meanss include a support column and are fixed at the pedestal of described support column one end, and the pedestal is truncated cone-shaped.
9. calender according to claim 1, it is characterised in that the workbench is cuboid, and the workbench is by casting Iron or cast steel material are made.
CN201720490503.0U 2017-05-04 2017-05-04 Calender Active CN206812319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720490503.0U CN206812319U (en) 2017-05-04 2017-05-04 Calender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720490503.0U CN206812319U (en) 2017-05-04 2017-05-04 Calender

Publications (1)

Publication Number Publication Date
CN206812319U true CN206812319U (en) 2017-12-29

Family

ID=60754215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720490503.0U Active CN206812319U (en) 2017-05-04 2017-05-04 Calender

Country Status (1)

Country Link
CN (1) CN206812319U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844841A (en) * 2020-07-20 2020-10-30 徐州吉赛飞新材料科技有限公司 Graphene heat dissipation film vacuum calendering device
CN112092227A (en) * 2020-09-03 2020-12-18 徐梦雪 Rubber processing is with mixing auxiliary assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111844841A (en) * 2020-07-20 2020-10-30 徐州吉赛飞新材料科技有限公司 Graphene heat dissipation film vacuum calendering device
CN112092227A (en) * 2020-09-03 2020-12-18 徐梦雪 Rubber processing is with mixing auxiliary assembly

Similar Documents

Publication Publication Date Title
CN206812319U (en) Calender
CN106733006A (en) A kind of air convection disintegrating apparatus with preliminary crushing function
CN214665831U (en) Paper support drying device
CN206899304U (en) A kind of full-automatic cutting machine
CN203945528U (en) Plastics sucking moulding machine production line and waste material crusher thereof and waste material recovery device
CN207028130U (en) An a kind of machine has more the process units of case and bag pipe bar
CN105839233A (en) Non-woven fabric opener
CN113046968A (en) Dyeing machine is used in scarf processing
CN213020820U (en) Cosmetic powder drying device
CN206870221U (en) A kind of high temperature film wrap-up
CN206326920U (en) A kind of speciality paper production impression device
CN206372907U (en) A kind of air convection disintegrating apparatus with preliminary crushing function
CN206612191U (en) PLC controls sugarfree foods roll marks forming machine
CN206952116U (en) A kind of Novel aluminum alloy plate production equipment
CN213261052U (en) Plastic uptake machine convenient to cool
CN211036421U (en) Dyeing apparatus for tailoring
CN114311210A (en) Leveling and skin-sticking device for furniture board production and processing method
CN206324215U (en) A kind of multi-functional spreading-and-cooling machine
CN212945092U (en) Plate conveying device for production of plate rolling machine
CN106583408A (en) Automatic stripping equipment for glass of door bodies of waste refrigerators
CN104441353B (en) Mold quick change device for a wood-plastic forming machine
CN208629890U (en) A kind of plastic-suction forming equipment accurately cut
CN209322097U (en) A kind of feeding device for garment production
CN206780590U (en) Efficient door pocket complex production system
CN210453351U (en) Cast film processing is with integration leftover bits recovery processing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210428

Address after: 330013 north of Yingxiong Avenue, Nanchang Economic and Technological Development Zone, Nanchang City, Jiangxi Province (office building) (628, 6th floor)

Patentee after: NANCHANG HANTIAN SCIENCE & TECHNOLOGY GROUP Co.,Ltd.

Address before: 526060, 14 floor, Huijin center, Xinyuan West Road, Duanzhou District, Zhaoqing, Guangdong, Zhaoqing

Patentee before: ZHAOQING GUANGYINGKE GENERAL AVIATION Research Institute

TR01 Transfer of patent right