CN206805409U - A kind of hospital architecture energy management equipment - Google Patents

A kind of hospital architecture energy management equipment Download PDF

Info

Publication number
CN206805409U
CN206805409U CN201720585030.2U CN201720585030U CN206805409U CN 206805409 U CN206805409 U CN 206805409U CN 201720585030 U CN201720585030 U CN 201720585030U CN 206805409 U CN206805409 U CN 206805409U
Authority
CN
China
Prior art keywords
energy
display screen
management device
information
main frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720585030.2U
Other languages
Chinese (zh)
Inventor
温启树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Pingtan Kai Chuan Environmental Protection Technology Co Ltd
Original Assignee
Fujian Pingtan Kai Chuan Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Pingtan Kai Chuan Environmental Protection Technology Co Ltd filed Critical Fujian Pingtan Kai Chuan Environmental Protection Technology Co Ltd
Priority to CN201720585030.2U priority Critical patent/CN206805409U/en
Application granted granted Critical
Publication of CN206805409U publication Critical patent/CN206805409U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a kind of hospital architecture energy management equipment, its structure includes main frame, energy programme manager, energy quality manager, conditional curve display screen, information filing management device, managerial report display screen, output port, fixing hole, connection jaws, energy programme manager is by being electrically connected to the surface of main frame, information filing management device is by information processing display screen, radiate grid, control button forms, information processing display screen is embedded in the surface of information filing management device, radiating grid are fixedly connected on the top of information filing management device, information filing management device is fixedly connected on the right of energy quality manager, output port is fixedly connected on the left side of main frame, fixing hole is fixedly connected on the top of main frame, connection jaws are evenly distributed in the surface of main frame.The utility model can be realized carries out filing management to related energy information, the problem of avoiding causing historic energy information to lose, effectively increases the intelligence degree of equipment.

Description

A kind of hospital architecture energy management equipment
Technical field
The utility model is a kind of hospital architecture energy management equipment, belongs to technical field of energy management.
Background technology
Energy management system is the rationalization scheme and using the energy to help industrial production enterprise while expanding production, Unit product energy resource consumption is reduced, is increased economic efficiency, reduces information-based managing and control system for the purpose of CO2 discharge capacitys.Energy management System uses layered distribution type system architecture, each classification energy consumption data such as electric power to building, combustion gas and water is acquired, Processing, and building energy consumption situation is analyzed, realize building energy conservation application etc..On this celestial body, with energy growing tension and ring Border deteriorates, and the solution for finding raising efficiency of energy utilization arrives social family as small, arrives the whole society such as enterprise and government greatly Corporation responsibility.All kinds of water, electricity, gas equipment are that industrial plants, social infrastructure and all kinds of building construction are thrown with classification energy consumption One of main composition part of money and daily operating cost, the configuration of rational deployment energy facilities and management and control function can significantly improve Facility and efficiency of energy utilization simultaneously reduce cost.
Prior art published application number is a kind of CN201210295879.8 building energy management system, including energy consumption number According to acquisition module, data processing module, core algorithm module, web application module, energy consumption data acquisition module gathers user's State with energy information, and the real time energy consumption data collected are passed into data processing module;Data processing module, from energy consumption data According to certain rule extraction data in acquisition module, and according to the demand of web application module, the data of extraction are carried out clearly Wash processing;Core algorithm module obtained from data processing module needed for data, and respective handling is carried out, by the data after processing Send web application module to;Web application module obtains data from core algorithm module and data processing module.The system energy Effective detection goes out in energy for building management and energy for building caused by energy efficiency of equipment problem is unreasonable, and provides effective improve and build View, improve energy for building efficiency;And the system have comprehensive, efficient, perfect, safety, intelligence, it is flexible the advantages of.It is but existing Technology due to can not to related energy information carry out filing management, may cause historic energy information lose the problem of.
Utility model content
In view of the deficienciess of the prior art, the utility model purpose is to provide a kind of hospital architecture energy management equipment, To solve prior art due to filing management can not be carried out to related energy information, asking for historic energy information loss may be caused Topic.
To achieve these goals, the utility model is to realize by the following technical solutions:A kind of hospital architecture energy Source control equipment, its structure include main frame, energy programme manager, energy quality manager, conditional curve display screen, information and returned Shelves manager, managerial report display screen, output port, fixing hole, connection jaws, the energy programme manager is by being electrically connected to The surface of main frame, the energy quality manager are fixedly connected on the right of energy programme manager, and the conditional curve is shown Screen is embedded in the surface of energy quality manager, and described information filing management device is pressed by information processing display screen, radiating grid, control Button forms, and described information processing display screen is embedded in the surface of information filing management device, and the radiating grid are fixedly connected on information The top of filing management device, the control button are connected to the surface of information filing management device, the managerial report by keyway Display screen is fixedly connected on energy quality pipe by being electrically connected to the right of conditional curve display screen, described information filing management device The right of device is managed, the output port is fixedly connected on the left side of main frame, and the fixing hole is fixedly connected on the top of main frame, institute It is evenly distributed in the surface of main frame to state connection jaws.
Further, the energy programme manager is made up of display screen, regulation button, and the display screen is embedded in the energy The surface of plan manager, the regulation button are fixedly connected on the surface of energy programme manager by keyway.
Further, the regulation button is that 4 size identicals are circular.
Further, the quantity of the fixing hole is 2.
Further, the quantity of the connection jaws is 5-7.
Further, the operating system that described information filing management device uses is Windows NT/Windows7.
Further, the output port is shaped as rectangle.
The beneficial effects of the utility model:By provided with information filing management device, it is possible to achieve related energy information is entered Row filing management, the problem of avoiding causing historic energy information to lose, effectively increase the intelligence degree of equipment.
Brief description of the drawings
By reading the detailed description made with reference to the following drawings to non-limiting example, other spies of the present utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural representation of hospital architecture energy management equipment of the utility model.
Fig. 2 is the structural representation of the utility model information filing management device.
In figure:Main frame -1, energy programme manager -2, energy quality manager -3, conditional curve display screen -4, information are returned Shelves manager -5, managerial report display screen -6, output port -7, fixing hole -8, connection jaws -9, information processing display screen -50, dissipate Hot grid -51, control button -52, display screen -20, regulation button -21.
Embodiment
Technological means, creation characteristic, reached purpose and effect to realize the utility model are easy to understand, below With reference to embodiment, the utility model is expanded on further.
Refer to Fig. 1-Fig. 2, the utility model provides a kind of hospital architecture energy management equipment, its structure include main frame 1, Energy programme manager 2, energy quality manager 3, conditional curve display screen 4, information filing management device 5, managerial report are shown Screen 6, output port 7, fixing hole 8, connection jaws 9, the energy programme manager 2 are described by being electrically connected to the surface of main frame 1 Energy quality manager 3 is fixedly connected on the right of energy programme manager 2, and the conditional curve display screen 4 is embedded in the energy The surface of quality manager 3, described information filing management device 5 is by information processing display screen 50, radiating grid 51,52 groups of control button Into described information processing display screen 50 is embedded in the surface of information filing management device 5, and the radiating grid 51 are fixedly connected on information The top of filing management device 5, the control button 52 are connected to the surface of information filing management device 5, the management by keyway Report display screen 6 is fixedly connected on energy by being electrically connected to the right of conditional curve display screen 4, described information filing management device 5 The right of source quality manager 3, the output port 7 are fixedly connected on the left side of main frame 1, and the fixing hole 8 is fixedly connected on The top of main frame 1, the connection jaws 9 are evenly distributed in the surface of main frame 1, and the energy programme manager 2 is by display screen 20, tune Section button 21 forms, and the display screen 20 is embedded in the surface of energy programme manager 2, and the regulation button 21 is consolidated by keyway Surely the surface of energy programme manager 2 is connected to, the regulation button 21 is that 4 size identicals are circular, the fixing hole 8 Quantity is 2, and the quantity of the connection jaws 9 is 5-7, and the output port 7 is shaped as rectangle, described information filing management The operating system that device 5 uses is Windows NT/Windows7.
Information filing management device described in this patent is the basic subsystems of energy management system, perfect energy information Collection, storage, management and effective utilization of the energy, bar is created further to be excavated, analyzing, processing and being handled to data Part.
In use, first checking for the whether firm connection of each several part, after confirming Plant in good condition, equipment is connected to suitably Position, the connecting line of equipment is accessed into power supply, energy programme manager, energy quality manager, information filing management device are opened Open, and be adjusted by control button, the equipment can start normal work afterwards.
Main frame -1 of the present utility model, energy programme manager -2, energy quality manager -3, conditional curve display screen - 4th, information filing management device -5, managerial report display screen -6, output port -7, fixing hole -8, connection jaws -9, information processing are shown Screen -50, radiating grid -51, control button -52, display screen -20, regulation button -21, part is universal standard part or this area The part that technical staff knows, its structure and principle all can be learnt or by conventional reality for this technology personnel by technical manual Proved recipe method knows, the utility model solve the problems, such as be prior art due to filing management can not be carried out to related energy information, The problem of historic energy information may be caused to lose, the utility model is combined with each other by above-mentioned part, by provided with information Filing management device, it is possible to achieve filing management is carried out to related energy information, the problem of avoiding causing historic energy information to lose, The intelligence degree of equipment is effectively increased, it is described in detail below:
Described information filing management device 5 is made up of information processing display screen 50, radiating grid 51, control button 52, the letter Breath processing display screen 50 is embedded in the surface of information filing management device 5, and the radiating grid 51 are fixedly connected on information filing management The top of device 5, the control button 52 are connected to the surface of information filing management device 5 by keyway.
In embodiment 1 of the present utility model, the quantity of the connection jaws is 5, what described information filing management device used Operating system is Windows7;
In embodiment 2 of the present utility model, the quantity of the connection jaws is 7, what described information filing management device used Operating system is Windows NT.
Embodiment 1 Embodiment 2
Processing speed It hurry up Quickly
Security of system energy Typically It is high
In summary, when connection jaws of the present utility model quantity use 7, information filing management device use operation system When system uses Windows NT, security of system of the present utility model can be higher, and processing speed reaches optimum state.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above, for For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and without departing substantially from this In the case of the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the utility model is by institute Attached claim rather than described above limit, it is intended that will fall in the implication and scope of the equivalency of claim All changes are included in the utility model.Any reference in claim should not be considered as to the involved right of limitation It is required that.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (5)

1. a kind of hospital architecture energy management equipment, its structure includes main frame (1), energy programme manager (2), energy quality pipe Manage device (3), conditional curve display screen (4), information filing management device (5), managerial report display screen (6), output port (7), solid Determine hole (8), connection jaws (9), it is characterised in that:
For the energy programme manager (2) by being electrically connected to the surface of main frame (1), the energy quality manager (3) is fixed The right of energy programme manager (2) is connected to, the conditional curve display screen (4) is embedded in energy quality manager (3) Surface;
Described information filing management device (5) is made up of information processing display screen (50), radiating grid (51), control button (52), institute The surface that information processing display screen (50) is embedded in information filing management device (5) is stated, the radiating grid (51) are fixedly connected on letter The top of filing management device (5) is ceased, the control button (52) is connected to the surface of information filing management device (5) by keyway;
The managerial report display screen (6) is by being electrically connected to the rights of conditional curve display screen (4), described information filing management Device (5) is fixedly connected on the right of energy quality manager (3), and the output port (7) is fixedly connected on a left side for main frame (1) Side, the fixing hole (8) are fixedly connected on the top of main frame (1), and the connection jaws (9) are evenly distributed in the surface of main frame (1).
A kind of 2. hospital architecture energy management equipment according to claim 1, it is characterised in that:The energy programme management Device (2) is made up of display screen (20), regulation button (21), and the display screen (20) is embedded in the table of energy programme manager (2) Face, the regulation button (21) are fixedly connected on the surface of energy programme manager (2) by keyway.
A kind of 3. hospital architecture energy management equipment according to claim 2, it is characterised in that:The regulation button (21) It is circular for 4 size identicals.
A kind of 4. hospital architecture energy management equipment according to claim 1, it is characterised in that:The fixing hole (8) Quantity is 2.
A kind of 5. hospital architecture energy management equipment according to claim 1, it is characterised in that:The connection jaws (9) Quantity is 5-7.
CN201720585030.2U 2017-05-24 2017-05-24 A kind of hospital architecture energy management equipment Expired - Fee Related CN206805409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720585030.2U CN206805409U (en) 2017-05-24 2017-05-24 A kind of hospital architecture energy management equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720585030.2U CN206805409U (en) 2017-05-24 2017-05-24 A kind of hospital architecture energy management equipment

Publications (1)

Publication Number Publication Date
CN206805409U true CN206805409U (en) 2017-12-26

Family

ID=60742355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720585030.2U Expired - Fee Related CN206805409U (en) 2017-05-24 2017-05-24 A kind of hospital architecture energy management equipment

Country Status (1)

Country Link
CN (1) CN206805409U (en)

Similar Documents

Publication Publication Date Title
CN102708446B (en) A kind of method of setting up the emergent intelligent command system of flood control
CN102545213B (en) System and method for managing line loss of power grid in real time
CN110378809A (en) A kind of intelligent check method of supervisory control of substation information table information data
CN107944284B (en) Method and system for internal security control of enterprise data
CN102968438B (en) History data store control system in comprehensive monitoring system
CN105260866A (en) Locker box-opening fault detection method
CN106203782A (en) A kind of power marketing industry expands whole process process management and control real-time exhibition method
CN102495916A (en) Multi-application-system panoramic modeling method based on object matching
CN101364284A (en) Production management system for electrical power system
CN107451708A (en) A kind of grid equipment monitoring information confidence association analysis method based on Apriori algorithm
CN103064919A (en) Method and device for preserving configuration parameters in business system
CN105469212A (en) Two-dimensional code-based power transformation equipment electrified detection data management device
CN203894809U (en) Main belt type security check layer-management system
CN105894237A (en) Intelligent distributing and recycling management method with functions of voice guide and face recognition
CN106168766A (en) The energy monitor management system of a kind of Smart Home and carbon assets management method
CN102930007B (en) User in large-area power-cuts emergency processing sends a telegram in reply urgency level sorting technique
CN206805409U (en) A kind of hospital architecture energy management equipment
CN111199351A (en) RFID-based intelligent production process tracing system and method
CN109597380A (en) A kind of wisdom energy management plateform system based on Internet of Things and cloud computing technology
CN111049157B (en) Distribution network transformer reactive compensation condition analysis method
CN105930952A (en) Energy consumption analysis and evaluation system for power distribution equipment
CN211183538U (en) Marketing platform district line loss application platform based on big data
CN205302373U (en) Manpower resource management model
CN202886976U (en) Region-county integrated intelligent operating ticket system
CN106372769A (en) Power safeguarding monitoring system

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180524