CN206804013U - Shield tunnel measures mobile platform - Google Patents

Shield tunnel measures mobile platform Download PDF

Info

Publication number
CN206804013U
CN206804013U CN201720703246.4U CN201720703246U CN206804013U CN 206804013 U CN206804013 U CN 206804013U CN 201720703246 U CN201720703246 U CN 201720703246U CN 206804013 U CN206804013 U CN 206804013U
Authority
CN
China
Prior art keywords
platform
steel platform
steel
support bar
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720703246.4U
Other languages
Chinese (zh)
Inventor
曹泱
赵永生
常江
刘宝生
隋国梁
李军涛
张雪利
宁彤
周旭彤
牛斌
田磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No1 Development & Construction Co Ltd
BEIJING ZHUZONG GROUP Co Ltd
Original Assignee
Beijing No1 Development & Construction Co Ltd
BEIJING ZHUZONG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No1 Development & Construction Co Ltd, BEIJING ZHUZONG GROUP Co Ltd filed Critical Beijing No1 Development & Construction Co Ltd
Priority to CN201720703246.4U priority Critical patent/CN206804013U/en
Application granted granted Critical
Publication of CN206804013U publication Critical patent/CN206804013U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of shield tunnel measures mobile platform, including:Steel platform, the steel platform is horizontally disposed with, steel platform is provided with a pair of steel platform fixed seats and a pair of adjustment screw fixed seats by the side of shield duct piece, the steel platform fixing bolt being connected with shield duct piece is installed with the steel platform fixed seat, the steel platform adjustment screw of adjustment steel platform levelness is installed with the adjustment screw fixed seat;Adjustable length support bar, the adjustable length support bar are located on the downside of steel platform, and the upper end of adjustable length support bar is hingedly connected to side of the steel platform away from shield duct piece, and the lower end of adjustable length support bar is connected with support bar fixing bolt.The utility model is installed on shield duct piece, can be used cooperatively with tunnel walkway board, on the premise of shield-tunneling construction is not influenceed, is improved Observation personnel and is increased the security of interim observation station newly, and can be efficiently completed shield measurement task.

Description

Shield tunnel measures mobile platform
Technical field
A kind of fixation measuring equipment used in the makeover process of shield measuring system control point is the utility model is related to use Platform.
Background technology
Shield e measurement technology is that the control on the premise of Tunnel control network survey to the supporting automatic guiding system of shield clicks through Row amendment, i.e., it is supporting to shield automatic with the high-precision coordinate after its repetition measurement and elevation by the high-precision repetition measurement in control point The low level control point of guidance system(Prism location and the coordinate and elevation at Laser Measuring station location)It is modified, to reach tunnel The purpose of road insertion.
The mode of shield measuring system control point amendment relies primarily on open traverse and measured, and the control point in tunnel is past It is past to lay every 100 meters at 1 point, therefore usually require to increase interim control point during observation.Current interim control points layout mode Generally within tunneled central, laying is marked using sleeper, the laying mode has the following disadvantages:1st, shield-tunneling construction is influenceed to enter Degree;2nd, there is larger security risk in Observation personnel;3rd, pointing precision is low and is easily destroyed.
Utility model content
The purpose of this utility model is to provide a kind of shield tunnel measurement mobile platform, to solve traditional shield measurement For system when being controlled amendment, the laying mode at its interim control point can influence shield-tunneling construction progress and security risk is big Technical problem.
To achieve the above object, the utility model adopts the following technical scheme that:A kind of shield tunnel measures mobile platform, It is characterized in that including:
Steel platform, the steel platform are horizontally disposed with, and steel platform is provided with a pair of steel platform fixed seats by the side of shield duct piece Screw fixed seats are adjusted with a pair, the steel platform fixing bolt being connected with shield duct piece is installed with the steel platform fixed seat, The steel platform adjustment screw of adjustment steel platform levelness is installed with the adjustment screw fixed seat;
Adjustable length support bar, the adjustable length support bar are located on the downside of steel platform, the upper end of adjustable length support bar Side of the steel platform away from shield duct piece is hingedly connected to, the lower end of adjustable length support bar is connected with support bar fixing bolt.
Preferably, the steel platform is provided with the special connecting screw of pedestal.
Preferably, the steel platform is provided with transverse horizontal bubble and vertical equity bubble.
Preferably, position of the position of the steel platform fixing bolt higher than steel platform adjustment screw.
Preferably, bearing, the adjustable length are welded with the lower surface of side of the steel platform away from shield duct piece The upper end of support bar is be hinged on the bearing by hinge.
Preferably, the lower end of the adjustable length support bar is provided with bolt joint seat, the support bar fixing bolt connection On bolt joint seat.
Preferably, the bolt joint seat is the vertical steel plate for being provided with cross bolts hole.
Preferably, the adjustable length support bar includes upper connecting rod, lower connecting rod and length adjusting screws, described Be equipped with spaced apart link bolt hole on upper connecting rod, lower connecting rod, the length adjusting screws through upper connecting rod and Link bolt hole on lower connecting rod, and then upper connecting rod and lower connecting rod are connected.
Preferably, the steel platform is one piece of horizontal steel plate.
Preferably, the steel platform fixed seat is to be provided with the vertical steel plate in cross bolts hole, the adjustment screw fixed seat To be provided with the vertical steel plate of horizontal thread connecting hole.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model successfully solves problem above, and it is installed on shield duct piece, can match somebody with somebody with tunnel walkway board Close and use, be a kind of platform of fixation measuring equipment.The utility model improves sight on the premise of shield-tunneling construction is not influenceed Survey personnel and the security for increasing interim observation station newly, and shield measurement task can be efficiently completed.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is structure of the main view of the present utility model.
Fig. 2 is Fig. 1 left view schematic diagram.
Fig. 3 is Fig. 1 schematic top plan view.
Reference:1- steel platforms, 2- steel platforms fixing bolt, 3- steel platforms adjustment screw, 4- steel platforms are fixed Seat, 5- adjustment screws fixed seat, the special connecting screw of 6- pedestals, 7- transverse horizontals bubble, 8- vertical equities bubble, 9- Adjustable length support bar, 10- support bars fixing bolt, 11- bearings, 12- hinges, 13- bolt joint seats, connect on 14- Bar, 15- lower connecting rods, 16- length adjusting screws, 17- link bolt hole.
Embodiment
For embodiment referring to shown in Fig. 1-3, this shield tunnel measures mobile platform, including:
Steel platform 1, the steel platform 1 is horizontally disposed, and steel platform 1 is fixed by the side of shield duct piece provided with a pair of steel platforms Seat 4 and a pair of adjustment screw fixed seats 5, steel platform fixed seat 4 and adjustment screw fixed seat 5 are to be provided with horizontal thread connecting hole Vertical steel plate, be installed with the steel platform fixing bolt 2 being connected with shield duct piece, the adjustment in the steel platform fixed seat 4 The steel platform adjustment screw 3 of adjustment steel platform levelness, the position of the steel platform fixing bolt 2 are installed with screw fixed seat 5 Put the position higher than steel platform adjustment screw 3.Steel platform 1 is provided with the special connecting screw 6 of pedestal.It is additionally provided with steel platform 1 flat Platform apparatus for leveling.
Adjustable length support bar 9, the adjustable length support bar 9 are located at the downside of steel platform 1, adjustable length support bar 9 Upper end is hingedly connected to side of the steel platform 1 away from shield duct piece, and the lower end of adjustable length support bar 9 is connected with support bar and fixed Bolt 10.
In the present embodiment, bearing 11 is welded with the lower surface of side of the steel platform 1 away from shield duct piece, the length can The upper end of support bar 9 is adjusted to be hinged on by hinge 12 on the bearing 11.
In the present embodiment, the lower end of adjustable length support bar 9 is provided with bolt joint seat 13, the support bar fixing bolt 10 It is connected on bolt joint seat 13, bolt joint seat 13 is the vertical steel plate for being provided with cross bolts hole.
In the present embodiment, adjustable length support bar 9 includes upper connecting rod 14, lower connecting rod 15 and length adjusting screws 16, spaced apart link bolt hole 17, the length adjusting screws 16 are equipped with the upper connecting rod 14, lower connecting rod 15 Connected through the link bolt hole 17 on upper connecting rod 14 and lower connecting rod 15, and then by upper connecting rod 14 and lower connecting rod 15 Come.
The steel platform 1 is Instrument observation platform.In the present embodiment, steel platform 1 is one piece of square horizontal steel plate, long 40cm, wide 20cm, thick 2cm, in the long side centre position of steel platform 1, base is installed at the lateral edges 8cm of 1 short side of steel platform one The special connecting screw 6 of seat.
The platform apparatus for leveling is used to provide observation data for the leveling of Instrument observation platform.In the present embodiment, platform Apparatus for leveling is transverse horizontal bubble 7 and vertical equity bubble 8, and transverse horizontal bubble 7 and vertical equity bubble 8 use structure glue It is individually fixed in long side and the short side top of steel platform.
The steel platform fixed seat 4, adjustment screw fixed seat 5, steel platform fixing bolt 2 and steel platform adjustment screw 3 are Platform fixing device, it is welded in steel platform 1.The platform fixing device is for flattening, retainer instrument observation platform.
The vertical steel plate that two steel platform fixed seats 4 are the long 8cm thickness 1.5cm of wide 3cm, diameter is opened by the downward 3cm in top 1.5cm cross bolts hole, coordinate the 2 diameter 1.4cm steel platform fixing of steel platform fixing bolt 2.
Horizontal thread company is opened in the vertical steel plate that two adjustment screw fixed seats 5 are the long 5cm thickness 1.5cm of wide 3cm, middle part Connect hole and coordinate 2 diameter 1.5cm steel platform adjustment screw 3 to play regulation steel platform horizontal force.
The adjustable length support bar 9 is used for steel platform fixing 1, and enough safety coefficients are provided for platform fixing device, And increase the stability of steel platform 1, to ensure the accuracy of observation of shield tunnel measurement.
Specific erection sequence of the present utility model is as follows:
1st, operating personnel are according to observation requirementses initial option survey station approximate range.
2nd, steel platform fixed seat 4 is reserved with cross bolts hole, according to the position in cross bolts hole, is selected in shield duct piece side wall Select punch position and mark.
3rd, using impact drill(Bit diameter 12mm)The marked locations perforate successively in section of jurisdiction.
4th, while bolt tight steel platform fixing bolt 2 using steel platform adjust screw 3 by Instrument observation platform adjust to Level simultaneously tentatively fastens(Because the side wall of shield duct piece is arc, the position of steel platform fixing bolt 2 is adjusted higher than steel platform again The position of whole screw 3, the position of steel platform adjustment screw 3 withstand on the position of indent, it is possible to conditioning instrumentation observation platform Levelness).
5th, adjustable length support bar 9 is rotated to possible angle, then collapsing length Adjustable bracing bar 9, in shield duct piece position Put and find reasonable diagonal brace position and make marks.
6th, drilled in marked locations and fasten adjustable length support bar 9, to reach the purpose of diagonal brace steel platform 1.
7th, after completing above step, measuring apparatus can be arranged in steel platform 1 and carry out tunnel survey by operating personnel, such as Walkway board has been installed in shield-tunneling construction, and then operating personnel can stand and are observed above walkway board, better.

Claims (10)

1. a kind of shield tunnel measures mobile platform, it is characterised in that including:
Steel platform(1), the steel platform(1)It is horizontally disposed, steel platform(1)Consolidate by the side of shield duct piece provided with a pair of steel platforms Reservation(4)With a pair of adjustment screw fixed seats(5), the steel platform fixed seat(4)On be installed with the steel being connected with shield duct piece Platform fixing bolt(2), the adjustment screw fixed seat(5)On be installed with adjustment steel platform levelness steel platform adjustment screw (3);Adjustable length support bar(9), the adjustable length support bar(9)Positioned at steel platform(1)Downside, adjustable length support bar (9)Upper end be hingedly connected to steel platform(1)Side away from shield duct piece, adjustable length support bar(9)Lower end be connected with Support bar fixing bolt(10).
2. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The steel platform(1)On set There is the special connecting screw of pedestal(6).
3. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The steel platform(1)On set There is transverse horizontal bubble(7)With vertical equity bubble(8).
4. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The steel platform fixing bolt (2)Position higher than steel platform adjustment screw(3)Position.
5. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The steel platform(1)It is remote Bearing is welded with the lower surface of the side of shield duct piece(11), the adjustable length support bar(9)Upper end pass through hinge (12)It is hinged on the bearing(11)On.
6. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The adjustable length support bar (9)Lower end be provided with bolt joint seat(13), the support bar fixing bolt(10)It is connected to bolt joint seat(13)On.
7. shield tunnel according to claim 6 measures mobile platform, it is characterised in that:The bolt joint seat(13) To be provided with the vertical steel plate in cross bolts hole.
8. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The adjustable length support bar (9)Including upper connecting rod(14), lower connecting rod(15)And length adjusting screws(16), the upper connecting rod(14), lower connection Bar(15)On be equipped with spaced apart link bolt hole(17), the length adjusting screws(16)Through upper connecting rod(14)With Lower connecting rod(15)On link bolt hole(17), and then by upper connecting rod(14)And lower connecting rod(15)Connect.
9. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The steel platform(1)For one Block horizontal steel plate.
10. shield tunnel according to claim 1 measures mobile platform, it is characterised in that:The steel platform fixed seat (4)To be provided with the vertical steel plate in cross bolts hole, the adjustment screw fixed seat(5)To be provided with the vertical of horizontal thread connecting hole Steel plate.
CN201720703246.4U 2017-06-16 2017-06-16 Shield tunnel measures mobile platform Active CN206804013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720703246.4U CN206804013U (en) 2017-06-16 2017-06-16 Shield tunnel measures mobile platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720703246.4U CN206804013U (en) 2017-06-16 2017-06-16 Shield tunnel measures mobile platform

Publications (1)

Publication Number Publication Date
CN206804013U true CN206804013U (en) 2017-12-26

Family

ID=60746241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720703246.4U Active CN206804013U (en) 2017-06-16 2017-06-16 Shield tunnel measures mobile platform

Country Status (1)

Country Link
CN (1) CN206804013U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734422A (en) * 2020-07-29 2020-10-02 中铁十六局集团北京轨道交通工程建设有限公司 Movable total station fixing equipment and fixing method suitable for shield automatic guidance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734422A (en) * 2020-07-29 2020-10-02 中铁十六局集团北京轨道交通工程建设有限公司 Movable total station fixing equipment and fixing method suitable for shield automatic guidance

Similar Documents

Publication Publication Date Title
CN104389313A (en) Positioning perpendicularity adjusting device and method of dual-spliced I-shaped steel latticed column
CN111155383A (en) Large-span self-anchored steel box girder suspension bridge track lofting and measuring method
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN206804013U (en) Shield tunnel measures mobile platform
CN107570757A (en) A kind of precisely apparatus for controlling of lifting and drilling equipment
CN107268446A (en) Tower Column of A Cable Stayed Bridge beam synchronous construction measurement apparatus and its measuring method
CN201391091Y (en) Super high-rise building giant steel member mounting measurement pre-control and correcting system
CN102966254A (en) Measuring tower used for construction of stub matching method and arrangement thereof
CN103422485B (en) Angle adjustable converter for measuring deposition deformation along horizontal direction
CN207095554U (en) A kind of Wavelike steel webplate speed surveys locator
CN205954495U (en) Formwork system is used in construction of large -span continuous beam bridge bridge pier in deep water mound back timber section
CN213274210U (en) Height difference monitor for swivel beam construction
CN204982905U (en) Positioner is used in lattice column construction
CN203323740U (en) Building settlement nondestructive measurement leveling rod bracket
CN210658479U (en) Pile position checking device for pile foundation in percussion drilling construction
CN101852066A (en) Device and method for arranging track of drilling machine
CN216159888U (en) Fixing support for roadbed and pavement settlement observation scale
CN209841014U (en) Height difference monitoring instrument for bottom of swivel beam and top of junction pier
CN212158617U (en) Portable CP II centering device for high-speed rail encryption
CN205954497U (en) Large -span continuous beam bridge bridge pier in deep water mound top bracket pre -compaction construction structures
CN209722608U (en) Continuous rigid frame PC track girder precise measurement positioning device
CN208139978U (en) A kind of Subway Station Platform door surveying setting-out device
CN206670615U (en) One kind correction Sopwith staff
CN207816268U (en) It is a kind of to measure high pylom
CN206752503U (en) A kind of tiltedly template slope control instrument

Legal Events

Date Code Title Description
GR01 Patent grant