CN206801589U - Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis - Google Patents

Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis Download PDF

Info

Publication number
CN206801589U
CN206801589U CN201720374233.7U CN201720374233U CN206801589U CN 206801589 U CN206801589 U CN 206801589U CN 201720374233 U CN201720374233 U CN 201720374233U CN 206801589 U CN206801589 U CN 206801589U
Authority
CN
China
Prior art keywords
fixed
hoist cylinder
longitudinal beam
lifting
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720374233.7U
Other languages
Chinese (zh)
Inventor
马小利
吴小峰
黄炬银
周明升
薛彬
初雷
卫强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201720374233.7U priority Critical patent/CN206801589U/en
Application granted granted Critical
Publication of CN206801589U publication Critical patent/CN206801589U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is the lifting traveller and lifting sliding sleeve in orbit placed bottom and be provided with road wheel, and it is connected with each other longitudinally through bottom girder, vertical columns and connect to form door frame by transverse beam on bottom girder, hoist cylinder is fixed between lifting traveller and column, column side installation and adjustment leading screw, installation side push oil cylinder and hoist cylinder between transverse beam and longitudinal beam, longitudinal beam bottom is fixed reductor and is connected by steel wire rope with arc formwork, longitudinal beam top is fixed support beam and support post and fixed with arc formwork, bottom girder and longitudinal beam bottom installation elevating screw.Overcome the defects of presently used chassis is present, dismounting is not had to after an anchor section of having constructed, can be voluntarily quickly through the section after any two linings completion in tunnel, because being provided with the passage of height lifting, it is available for all kinds of Construction traffics to pass through not other working procedures of shadow, carried out using bulk steel form assembled, panel concrete spillage is few, and the concrete surface poured is smooth, has ensured construction quality.

Description

Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
Technical field
It the utility model is related to a kind of constructing tunnel two and serve as a contrast trolley for concrete construction, specifically a kind of lining of tunnel anchorage section two is mixed Solidifying soil application work belongs to road and bridge construction field without dismounting chassis.
Background technology
The energy-saving and emission-reduction proposed in national basis construction fast development, environmental protection construction theory, while require to mitigate construction The labor intensity of personnel.There are many anchor sections to need to apply using two lining chassis casting concretes, railway in daily constructing tunnel Just need to set an anchor section at interval of certain distance in Super Long Tunnel in work.Typically it is barricaded as full hall frame, frame pipe with scaffold pipe 0.5 meter of grid is formed, longitudinal length is generally 6 meters.Side and top surface prolong tunnel camber and are set as type, camber with more i-beam frames Panel is paved into fritter punching block again on the outside of I-steel, then carries out concreting.This method is needed with substantial amounts of frame pipe, button Part, clamp etc., and need more workmen, and frame pipe full width is set up that construction safety can just be effectively ensured, and is so constructed Vehicle is just impassable, has blocked the normal construction process before anchor section, have impact on normal construction procedure, has made construction speed tight Lag again.Also it is exactly often to have constructed after 6 meters of anchor sections, it is necessary to all dismantle, then carry steel form, camber I-steel, shelf Reinstalled again to next anchor section, so carry time consuming, serious adds construction cost, reduces efficiency of construction.
The content of the invention
The utility model overcomes defect existing for the current lining of tunnel anchorage section two dismounting chassis, so as to disclose a kind of tunnel Anchor section two serves as a contrast concrete construction without dismounting chassis.
The technical solution of the utility model is:
It is placed in parallel two sleepers on tunnel ground, trapped orbit on sleeper, places two root bottom parts on every track and set There is the lifting traveller of road wheel, lifting sliding sleeve is set with outside lifting traveller, lifting sliding sleeve is longitudinally connected with each other by bottom girder respectively, Equidistant some root posts of fixation are distinguished on two foundation beam tops, and column upper end connects to form door frame by transverse beam respectively, each door Frame is connected with each other between longitudinal direction by tie-beam, and hoist cylinder telescopic end is fixed in lifting traveller upper end respectively, and hoist cylinder is fixed End is separately fixed on column, column side difference installation and adjustment leading screw, distinguishes installation side push oil cylinder at transverse beam both ends, side pushes away Hoist cylinder fixing end is connected above oil cylinder respectively, longitudinal beam, longitudinal beam both ends bottom point are fixed above hoist cylinder telescopic end Not Gu Ding reductor, reductor is connected by steel wire rope with arc formwork, and camber template is connected with each other by several hinge points, Support beam is fixed on longitudinal beam top, and support post, support beam both ends and support post top and arc mould are fixed in support beam top Plate is fixed, and elevating screw is installed in two foundation beams and two longitudinal beam bottoms respectively, and control cabinet is arranged on bottom girder.
The defects of the utility model is overcome present in presently used chassis, dismounting is not had to after an anchor section of often having constructed, Human resources can be saved, the air reduced in tunnel is dirty voluntarily quickly through the section after any two linings completion in tunnel Dye, simple to operate, rapid and convenient.The utility model is additionally provided with the passage of height lifting simultaneously, is available for all kinds of Construction traffics to lead to Cross, will not shadow others working procedure, besides carried out using the steel form of bulk assembled, panel concrete spillage is few, pours Concrete surface it is smooth, ensured construction quality, saved the time, improved efficiency of construction, be that one kind meets preferable tunnel Road anchor section two serves as a contrast concrete construction without dismounting chassis.
Brief description of the drawings
Accompanying drawing 1 is main structure diagram of the present utility model.
Accompanying drawing 2 for the utility model accompanying drawing 1 A-A to diagrammatic cross-section.
Reference title is as follows:Sleeper 1, track 2, road wheel 3, traveller 4 is lifted, lift sliding sleeve 5, hoist cylinder 6, bottom Beam 7, column 8, transverse beam 9, tie-beam 10, elevating screw 11, side push oil cylinder 12, longitudinal beam 13, support beam 14, support post 15, arc formwork 16, reductor 17, steel wire rope 18, adjusting screw 19, control cabinet 20.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:
It is placed in parallel two sleepers 1 on tunnel ground, trapped orbit 2 on sleeper 1, places two foundation on every track 2 Portion is provided with the lifting traveller 4 of road wheel 3, and lifting sliding sleeve 5 is set with outside lifting traveller 4, and the longitudinal direction of lifting sliding sleeve 5 passes through bottom girder 7 respectively It is connected with each other, fixes five root posts 8 the top of two foundation beam 7 is equidistant respectively, the upper end of column 8 is connected by transverse beam 9 respectively Door frame is formed, is connected with each other between each door frame longitudinal direction by tie-beam 10, lifting traveller 4 upper end is fixed hoist cylinder 6 and stretched respectively Contracting end, the fixing end of hoist cylinder 6 are separately fixed on column 8, the side of column 8 difference installation and adjustment leading screw 19, in 9 liang of transverse beam End installation side push oil cylinder 12 respectively, side push oil cylinder 12 connect the fixing end of hoist cylinder 6 respectively above, on the telescopic end of hoist cylinder 6 Longitudinal beam 13 is fixed in face, and reductor 17 is fixed in the both ends bottom of longitudinal beam 13 respectively, and reductor 17 passes through steel wire rope 18 and arc mould Plate 16 is connected, and camber template 16 is connected with each other by four hinge points, the top of longitudinal beam 13 fixation support beam 14, in support beam 14 Support post 15 is fixed in portion, and the both ends of support beam 14 fix with the top of support post 15 and arc formwork 16, two foundation beams 7 and two Elevating screw 11 is installed in the bottom of longitudinal beam 13 respectively, and control cabinet 20 is arranged on bottom girder 7.
During operation, first the utility model is walked in orbit using road wheel, after being sent into tunnel anchorage section specified location, risen Drop oil cylinder starts extension and arc formwork top to specified location, side push oil cylinder is stretched, and makes camber template placed in the middle, passes through adjusting screw Extension fixed station height, the arc formwork top that sidepiece is hinged is to specified location, hoist cylinder and adjusting screw fixing lock After death, casting concrete is started, after wait pours completion and confirms solidification, hoist cylinder shrinks, and drives arc formwork to decline, and adjusts Leading screw is saved to shrink, reductor drives the recovery of arc formwork sidepiece, after arc formwork playback, enters back into next anchor section and is operated, The method is by that analogy.

Claims (2)

1. tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis, it is characterised in that:Two pillows are placed in parallel on tunnel ground Wood(1), sleeper(1)Upper trapped orbit(2), every track(2)Two root bottom parts of upper placement are provided with road wheel(3)Lifting traveller (4), lift traveller(4)Outer suit lifting sliding sleeve(5), lift sliding sleeve(5)Longitudinal direction passes through bottom girder respectively(7)It is connected with each other, two Foundation beam(7)Distinguish equidistant some root posts of fixation in top(8), column(8)Upper end passes through transverse beam respectively(9)Connection is formed Door frame, pass through tie-beam between each door frame longitudinal direction(10)It is connected with each other, lifts traveller(4)Hoist cylinder is fixed in upper end respectively(6) Telescopic end, hoist cylinder(6)Fixing end is separately fixed at column(8)On, column(8)Distinguish installation and adjustment leading screw in side(19), In transverse beam(9)Distinguish installation side push oil cylinder in both ends(12), side push oil cylinder(12)Connect hoist cylinder respectively above(6)It is fixed End, hoist cylinder(6)Longitudinal beam is fixed above telescopic end(13), longitudinal beam(13)Reductor is fixed in both ends bottom respectively(17), Reductor(17)Pass through steel wire rope(18)With arc formwork(16)Connection, camber template(16)Mutually interconnected by several hinge points Connect, longitudinal beam(13)Support beam is fixed on top(14), support beam(14)Support post is fixed on top(15), support beam(14)Both ends With support post(15)Top and arc formwork(16)It is fixed, two foundation beams(7)With two longitudinal beams(13)Install respectively bottom Elevating screw(11), control cabinet(20)Installed in bottom girder(7)On.
2. tunnel anchorage section two according to claim 1 serves as a contrast concrete construction without dismounting chassis, it is characterised in that:In two foundation Beam(7)Top is equidistant respectively to fix five root posts(8), camber template(16)It is connected with each other by four hinge points.
CN201720374233.7U 2017-04-11 2017-04-11 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis Withdrawn - After Issue CN206801589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720374233.7U CN206801589U (en) 2017-04-11 2017-04-11 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720374233.7U CN206801589U (en) 2017-04-11 2017-04-11 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis

Publications (1)

Publication Number Publication Date
CN206801589U true CN206801589U (en) 2017-12-26

Family

ID=60731868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720374233.7U Withdrawn - After Issue CN206801589U (en) 2017-04-11 2017-04-11 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis

Country Status (1)

Country Link
CN (1) CN206801589U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060823A (en) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060823A (en) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN107060823B (en) * 2017-04-11 2024-05-14 中铁二十一局集团第三工程有限公司 Non-dismantling trolley for tunnel anchor section secondary lining concrete construction

Similar Documents

Publication Publication Date Title
JP5047680B2 (en) Construction method of continuous viaduct
CN107060823A (en) Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN107476337A (en) The prefabricated side wall assembling and construction method in open cut subway assembled station
CN108824199B (en) Arch bridge construction method of underneath type hanging basket
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN114059825A (en) Structure of road protection shed crossing large flow under limited clearance and construction method thereof
CN214993219U (en) Concrete placement platform truck is contained to apron
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN206801589U (en) Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN210685373U (en) Trolley system suitable for concrete structure factory building construction
CN109577206B (en) Hollow high pier formwork system and construction method
CN112211112A (en) Steel box girder installation method adopting double-guide-girder erection machine on existing bridge
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN207296399U (en) Continuous placing is molded overall assembled stair template system
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN115418983A (en) Construction method for prefabricated box culvert in highway-railway combined large-section shield tunnel
CN205501840U (en) A braced system for construction of overpass cast -in -situ box girder
CN201588172U (en) Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete

Legal Events

Date Code Title Description
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20171226

Effective date of abandoning: 20240514

AV01 Patent right actively abandoned

Granted publication date: 20171226

Effective date of abandoning: 20240514

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned