CN206800667U - Plugging device for gap between seal glass curtain wall and civil engineering wall - Google Patents

Plugging device for gap between seal glass curtain wall and civil engineering wall Download PDF

Info

Publication number
CN206800667U
CN206800667U CN201720714726.0U CN201720714726U CN206800667U CN 206800667 U CN206800667 U CN 206800667U CN 201720714726 U CN201720714726 U CN 201720714726U CN 206800667 U CN206800667 U CN 206800667U
Authority
CN
China
Prior art keywords
wall
civil engineering
glass curtain
gap
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720714726.0U
Other languages
Chinese (zh)
Inventor
徐梦
江山
王宝盛
闫宏刚
林茂青
刘迎新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhuo Yuan Architectural Design Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Qingdao Jianan Construction Group Co Ltd
Original Assignee
Shandong Zhuo Yuan Architectural Design Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhuo Yuan Architectural Design Co Ltd, Qingdao Zhongjia Construction Group Co Ltd, Qingdao Jianan Construction Group Co Ltd filed Critical Shandong Zhuo Yuan Architectural Design Co Ltd
Priority to CN201720714726.0U priority Critical patent/CN206800667U/en
Application granted granted Critical
Publication of CN206800667U publication Critical patent/CN206800667U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model proposes a kind of plugging device for being used for gap between seal glass curtain wall and civil engineering wall, including the foamed glue being filled between glass curtain wall and civil engineering wall, also include the rough ground for sheltering from gap between the glass curtain wall and civil engineering wall, and the sealing plate being filled between the rough ground and the foamed glue;The rough ground is fixedly connected on the civil engineering wall, and the rough ground is outer covered with decorative base;The decorative base outside civil engineering wall with being also covered with putty layer;The putty layer and the glass curtain wall contact position are by sealing glue sticking, to seal the gap between the putty layer and glass curtain wall.The gap between glass curtain wall and civil engineering wall can be fully sealed in the plugging device, effectively avoid the generation got damp with Seepage.

Description

Plugging device for gap between seal glass curtain wall and civil engineering wall
Technical field
The utility model belongs to glass curtain wall mounting technique field, more particularly to one kind is used for seal glass curtain wall and civil engineering The plugging device in gap between wall.
Background technology
When glass curtain wall is installed, expansion gap is generally left between glass curtain wall and civil engineering wall, the gap is generally sharp Blocked with foamed glue.However, it is this simple by the way of foamed glue is blocked, still suffer from use Deficiency, such as:Easily occur Moisture Regain after long-term use, be also possible that seepage when rainy.Therefore, how to strengthen to glass The sealing in gap between curtain wall and civil engineering wall, avoid the occurrence of and get damp and seepage, be a current technical problem for being badly in need of solving.
Utility model content
The utility model is directed to above-mentioned technical problem, proposes a kind of for being stitched between seal glass curtain wall and civil engineering wall The plugging device of gap, can be fully sealed the gap between glass curtain wall and civil engineering wall, effectively avoid getting damp and Seepage Generation.
In order to achieve the above object, the technical solution adopted in the utility model is:
It is a kind of be used between seal glass curtain wall and civil engineering wall gap plugging device, including be filled in glass curtain wall with Foamed glue between civil engineering wall, in addition to the rough ground in gap between the glass curtain wall and civil engineering wall is sheltered from, and The sealing plate being filled between the rough ground and the foamed glue;The rough ground is fixedly connected on the civil engineering wall, institute It is outer covered with decorative base to state rough ground;The decorative base outside civil engineering wall with being also covered with putty layer;The putty layer with The glass curtain wall contact position is by sealing glue sticking, to seal the gap between the putty layer and glass curtain wall.
Preferably, the rough ground is fixedly connected on the civil engineering wall by timber wedge.
Preferably, the decorative base includes the core-board basic unit being covered in outside the rough ground, and it is covered in Plasterboard outside the core-board basic unit.
Preferably, the core-board basic unit is fixedly connected on the rough ground, the gypsum by decorating pneumatic nail Plate is fixedly connected by tapping screw with the core-board basic unit and rough ground.
Preferably, the sealing plate is A level benzene plates.
Compared with prior art, it is the advantages of the utility model with beneficial effect:
1st, the plugging device provided by the utility model for being used for gap between seal glass curtain wall and civil engineering wall, by close Gap between shrouding and foamed glue fitted seal glass curtain wall and civil engineering wall, further shelters from glass curtain by rough ground Gap between wall and civil engineering wall, and decorative base and putty layer are covered outside rough ground, make glass curtain wall and civil engineering wall Between gap be fully sealed, effectively prevent the generation got damp with Seepage;
2nd, the plugging device provided by the utility model for being used for gap between seal glass curtain wall and civil engineering wall, Neng Gouman Sufficient glass curtain wall needs with the incrustation at civil engineering wall connecting, extends the service life of incrustation.
Brief description of the drawings
Fig. 1 is the closure for being used for gap between the seal glass curtain wall and civil engineering wall dress that the utility model embodiment provides The structural representation put;
Above in each figure:1st, glass curtain wall;2nd, civil engineering wall;3rd, foamed glue;4th, sealing plate;5th, rough ground;6th, base is decorated Layer;61st, core-board basic unit;62nd, plasterboard;7th, putty layer;8th, fluid sealant;9th, timber wedge;10th, the pneumatic nail of decoration;11st, self tapping spiral shell Nail.
Embodiment
Below, the utility model is specifically described by exemplary embodiment.It should be appreciated, however, that do not having In the case of being further discussed below, element, structure and features in an embodiment can also be advantageously incorporated into other implementations In mode.
As shown in figure 1, it the utility model is related to a kind of closure for being used for gap between seal glass curtain wall and civil engineering wall Device, including the foamed glue 3 being filled between glass curtain wall 1 and civil engineering wall 2, in addition to shelter from glass curtain wall 1 and civil engineering The rough ground 5 in gap between wall 2, and the sealing plate 4 being filled between rough ground 5 and foamed glue 3;Rough ground 5, which is fixed, to be connected Civil engineering wall 2 is connected to, rough ground 5 is outer covered with decorative base 6;Decorative base 6 is also covered with putty layer 7 outside with civil engineering wall 2, So that plugging device connects as one with civil engineering wall 2;Putty layer 7 is be bonded by fluid sealant 8 with the contact position of glass curtain wall 1, with close The gap sealed between putty layer 7 and glass curtain wall 1.
As shown in figure 1, in a specific embodiment of the present utility model, rough ground 5 is fixedly connected on civil engineering by timber wedge 9 Wall 2.Because timber wedge 9 can be embedded in wall higher depth, thus using the connection of timber wedge 9 rough ground 5 can be made to be firmly connected to soil Build wall 2.It is understood that rough ground 5 can also be fixedly connected by those skilled in the art using other connected modes In civil engineering wall 2, as long as ensureing stable connection.
As shown in figure 1, in a specific embodiment of the present utility model, decorative base 6 includes being covered in outside rough ground 5 Core-board basic unit 61, and the plasterboard 62 being covered in outside core-board basic unit 61.Core-board base is installed outside rough ground 5 The decorative base 6 that layer 61 and plasterboard 62 are engaged, it is easy to carry out incrustation in glass curtain wall 1 and the junction of civil engineering wall 2, Meet Art Design requirement.It is understood that those skilled in the art can also use the decorative base 6 of other structures, only It is easy to carry out incrustation in glass curtain wall 1 and the junction of civil engineering wall 2.
Further, as shown in figure 1, core-board basic unit 61 is fixedly connected on rough ground 5, stone by decorating pneumatic nail 10 Cream plate 62 is fixedly connected by tapping screw 11 with core-board basic unit 61 and rough ground 5.It is this to follow closely 10 Hes using decoration is pneumatic The connected mode that tapping screw 11 is attached, simple installation and stable connection.It is understood that those skilled in the art Core-board basic unit 61 and plasterboard 62 can be sequentially connected to rough ground 5 using other connected modes, as long as ensureing to connect Connect firm.
As shown in figure 1, in a specific embodiment of the present utility model, sealing plate 4 is A level benzene plates.This A levels benzene plate tool There are A level fire-protection ratings, the gap between the seal glass curtain wall 1 of foamed glue 3 and civil engineering wall 2 can not only be coordinated, additionally it is possible to rise To fireproofing function.It is understood that those skilled in the art can also use the sealing plate 4 of other forms, as long as can match somebody with somebody Close the gap between the seal glass curtain wall 1 of foamed glue 3 and civil engineering wall 2.
Using during gap, foamed glue 3 is filled in first between the plugging device seal glass curtain wall 1 and civil engineering wall 2 Between glass curtain wall 1 and civil engineering wall 2, sealing plate 4 is fitted in the side of foamed glue 3, with further seal glass curtain wall 1 with Gap between civil engineering wall 2.Then, the gap between glass curtain wall 1 and civil engineering wall 2 is sheltered from rough ground 5, and by wood Keel 5 are fixedly connected on civil engineering wall 2.Then, decorative base 6 is installed outside rough ground 5, in order in glass curtain wall 1 and soil Build the junction of wall 2 and carry out incrustation.It is greasy with scraping last layer outside civil engineering wall 2 in decorative base 6 after decorative base 6 is installed Sublayer 7, plugging device is connected as one with civil engineering wall 2, left no gaps between plugging device and civil engineering wall 2.It is meanwhile greasy Sublayer 7 stamps fluid sealant 8 with the contact position of glass curtain wall 1, with the gap between sealant layer 7 and glass curtain wall 1.
The plugging device provided by the utility model for being used for gap between seal glass curtain wall and civil engineering wall, passes through sealing Gap between plate 4 and the fitted seal glass curtain wall 1 of foamed glue 3 and civil engineering wall 2, further shelters from glass by rough ground 5 Gap between glass curtain wall 1 and civil engineering wall 2, and decorative base 6 and putty layer 7 are covered outside rough ground 5, make glass curtain wall 1 Gap between civil engineering wall 2 is fully sealed, and effectively prevent the generation got damp with Seepage.Meanwhile, it is capable to meet glass Glass curtain wall 1 and the incrustation of the junction of civil engineering wall 2 need, and extend the service life of incrustation.

Claims (5)

1. for the plugging device in gap between seal glass curtain wall and civil engineering wall, including it is filled in glass curtain wall (1) and soil The foamed glue (3) built between wall (2), it is characterised in that:Also include sheltering from the glass curtain wall (1) and civil engineering wall (2) Between gap rough ground (5), and the sealing plate (4) being filled between the rough ground (5) and the foamed glue (3);Institute State rough ground (5) and be fixedly connected on the civil engineering wall (2), the rough ground (5) is outside covered with decorative base (6);The dress Decorations basic unit (6) outside civil engineering wall (2) with being also covered with putty layer (7);The putty layer (7) contacts with the glass curtain wall (1) Place is bonded by fluid sealant (8), to seal the gap between the putty layer (7) and glass curtain wall (1).
2. the plugging device according to claim 1 for being used for gap between seal glass curtain wall and civil engineering wall, its feature It is:The rough ground (5) is fixedly connected on the civil engineering wall (2) by timber wedge (9).
3. the plugging device according to claim 1 for being used for gap between seal glass curtain wall and civil engineering wall, its feature It is:The decorative base (6) includes being covered in the core-board basic unit (61) of the rough ground (5) outside, and is covered in institute State the plasterboard (62) of core-board basic unit (61) outside.
4. the plugging device according to claim 3 for being used for gap between seal glass curtain wall and civil engineering wall, its feature It is:The core-board basic unit (61) is fixedly connected on the rough ground (5), the plasterboard by decorating pneumatic nail (10) (62) it is fixedly connected by tapping screw (11) with the core-board basic unit (61) and rough ground (5).
5. the plugging device according to claim 1 for being used for gap between seal glass curtain wall and civil engineering wall, its feature It is:The sealing plate (4) is A level benzene plates.
CN201720714726.0U 2017-06-19 2017-06-19 Plugging device for gap between seal glass curtain wall and civil engineering wall Expired - Fee Related CN206800667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720714726.0U CN206800667U (en) 2017-06-19 2017-06-19 Plugging device for gap between seal glass curtain wall and civil engineering wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720714726.0U CN206800667U (en) 2017-06-19 2017-06-19 Plugging device for gap between seal glass curtain wall and civil engineering wall

Publications (1)

Publication Number Publication Date
CN206800667U true CN206800667U (en) 2017-12-26

Family

ID=60747999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720714726.0U Expired - Fee Related CN206800667U (en) 2017-06-19 2017-06-19 Plugging device for gap between seal glass curtain wall and civil engineering wall

Country Status (1)

Country Link
CN (1) CN206800667U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653382A (en) * 2018-11-27 2019-04-19 上海宝冶集团有限公司 Gap construction technology at the top of masonry wall between main structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653382A (en) * 2018-11-27 2019-04-19 上海宝冶集团有限公司 Gap construction technology at the top of masonry wall between main structure

Similar Documents

Publication Publication Date Title
CN207974448U (en) A kind of kitchen threshold stone connection structure
CN101168994A (en) Outside thermal insulation construction method for anchoring and sticking composite thermal insulation plate outside wall
CN210713288U (en) Waterproof device for splicing outer walls of prefabricated buildings
CN206800667U (en) Plugging device for gap between seal glass curtain wall and civil engineering wall
CN100557162C (en) Anchoring composite insulation boards cast polyurethane exterior wall outer thermal insulation construction method
CN103266672B (en) External wall heat preservation system and construction technology of recombination of polystyrene foam and heat preservation inorganic fireproof plate
CN101168991A (en) Outside thermal insulation construction method for cement-base lightweight plate outside wall
CN207092302U (en) A kind of water-proof metal curtain wall
CN209040319U (en) A kind of assembly concrete building prefabrication exterior wall horizontal joint node structure
CN210482785U (en) Anti-leakage umbrella-shaped joint of ventilation vertical pipe on roof
CN205134570U (en) Waterproof construction of compound outer wall of light
CN204899013U (en) Prefabricated side wall body of resistance to deformation
CN207999024U (en) A kind of kitchen threshold stone connection component
CN110685539A (en) Sealing method between dry-hanging stone curtain wall and window frame
CN205153571U (en) Outer wall bolt hole novel to drawing block structure
CN101798865B (en) Stone gluing process for outer-wall heat insulating decoration
CN212176379U (en) Dampproofing heat preservation of assembled building outer wall decorates intergral template
CN204754038U (en) Exhaust structure of integration board heat preservation system
CN209874314U (en) Integrated wallboard of integration is decorated in heat preservation
CN106150019A (en) Closed waterproof compound soft ceramic tile
CN206829392U (en) A kind of external wall insulation
CN206495357U (en) Assembled wall anticracking crack structure
CN205875575U (en) Flexible soft rock heat decorative integration plate
CN218028301U (en) Wall surface cracking-prevention leveling structure in humid environment
CN205116575U (en) Board fixing base waterproof gasket upright lockstitches a border

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20190619