CN206797899U - It is easily installed the cement package bags bending machine of maintenance - Google Patents

It is easily installed the cement package bags bending machine of maintenance Download PDF

Info

Publication number
CN206797899U
CN206797899U CN201720469145.5U CN201720469145U CN206797899U CN 206797899 U CN206797899 U CN 206797899U CN 201720469145 U CN201720469145 U CN 201720469145U CN 206797899 U CN206797899 U CN 206797899U
Authority
CN
China
Prior art keywords
packaging bag
assembly
origuchi
bag
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720469145.5U
Other languages
Chinese (zh)
Inventor
黄凡
黄一凡
陈建光
孙景良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruian Jun Bo Machinery Co Ltd
Original Assignee
Ruian Jun Bo Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruian Jun Bo Machinery Co Ltd filed Critical Ruian Jun Bo Machinery Co Ltd
Priority to CN201720469145.5U priority Critical patent/CN206797899U/en
Application granted granted Critical
Publication of CN206797899U publication Critical patent/CN206797899U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supplying Of Containers To The Packaging Station (AREA)

Abstract

It the utility model is related to a kind of cement package bags bending machine for being easily installed maintenance, including organic frame, move bagging apparatus and the stranding bagging apparatus arranged along process direction, Origuchi assembly, described frame includes frame and the mounting bracket for Origuchi assembly integrated installation, Origuchi assembly placed cavity is provided with frame, the top of Origuchi assembly placed cavity has upper port, and mounting bracket is removably mounted in the Origuchi assembly placed cavity.Origuchi assembly is counted using independently installed set up, and facilitates the dismounting and maintenance of Origuchi assembly.

Description

It is easily installed the cement package bags bending machine of maintenance
Technical field
Packing machinery technology is the utility model is related to, specifically cement package bags bending machine.
Background technology
Braided packing bag, also known as snakeskin bag, be widely used in fertilizer, cement this, the packaging field such as chemicals.Such as Fig. 9 institutes Show, be a kind of existing woven bag, the width both sides of woven bag have M sides 3', and woven bag needs the sack piece bag of Origuchi Include corresponding to the valve port piece 1' at the 3' of the side M sides and grey edge strip 2' of gear.
In cement manufacture production, braided packing bag is mainly used when transporting cement, and in general braided packing bag is set Be equipped with a valve port, cement be exactly from braided packing bag sewed after valve port pour into, but traditional braided packing bag is all adopted Turnover storage is manually carried out, is not only lavished labor on, increases production cost, and production efficiency is low, can not meet to produce need Ask.
In order to solve the above technical problems, the unremitting effort through technical staff, the equipment folded for braided packing bag sack It is developed.At present, bag of cement bending machine mainly includes frame, moves bagging apparatus, rubs bagging apparatus and Origuchi assembly with the hands, moves bagging apparatus For being inputted packaging bag and transferring packaging bag along process direction, the sack piece that bagging apparatus is used to needing packaging bag into Origuchi is rubbed with the hands Rubbing separates, and Origuchi assembly realizes that the sack of packaging bag folds, and generally has the splitting mechanism of sack piece adsorbing separation, valve port piece Tui Zhe mechanisms, flange fold mechanism.Origuchi assembly is the key component that main actions are completed on cement package bags bending machine, and it is pacified Adjustment tries and safeguarded to be particularly important, but the frame of existing bag of cement bending machine uses and builds the integral structure to be formed, Each part on Origuchi assembly carries out installation and debugging directly in frame, and the dismounting that this mode has Origuchi assembly part is safeguarded The defects of inconvenient.
The content of the invention
The present utility model purpose:The defects of to overcome prior art to exist, it is total that the utility model provides a kind of Origuchi Counted into using independently installed set up, facilitate the cement package bags bending machine of dismounting and the maintenance of Origuchi assembly.
To achieve the above object, the utility model provides following technical scheme:
A kind of cement package bags bending machine for being easily installed maintenance, including organic frame, move bagging apparatus and along process direction Stranding bagging apparatus, the Origuchi assembly of arrangement, it is characterised in that:Described frame includes frame main body and for the integrated peace of Origuchi assembly The mounting bracket of dress, Origuchi assembly placed cavity is provided with frame main body, the top of Origuchi assembly placed cavity has upper port, installation Frame is removably mounted in the Origuchi assembly placed cavity.
By using above-mentioned technical proposal, Origuchi assembly is designed using single mounting bracket, and so in assembling, Origuchi is total Into can independent assembling and setting, convenience in transport, realize that monoblock type is installed in frame main body after the completion of assembling, the maintenance Origuchi in later stage Disassembled on total integral slave frame body, convenient dismounting and maintenance, the Origuchi of Origuchi assembly installation is reserved in frame main body Assembly placed cavity, the installation of the upper port of Origuchi assembly placed cavity to Origuchi assembly, which is realized, steps down, and facilitates the installation of Origuchi assembly.
Preferably, the side that the lateral run-out of the Origuchi assembly placed cavity moves bagging apparatus is the insertion connected with upper port Set.
Under the structure design, the port same installation reached to Origuchi assembly in side is stepped down, i.e. Origuchi assembly part can It is exposed through side port, convenient installation, while Origuchi assembly can be movable into and out Origuchi assembly placed cavity through horizontal side port, The dismounting of Origuchi assembly is more convenient.
Preferably, the bagging apparatus that moves includes the conveyer belt of transmission packaging bag, keeps off bag mechanism and be matched with conveyer belt The bag compression framework of side, rubbing with the hands there is the correction station that correction is moved for packaging bag between bagging apparatus and Origuchi assembly, station of rectifying a deviation Place is provided with deviation correction mechanism, and deviation correction mechanism includes packaging bag contraposition reference plate and puts in order plate, packaging bag contraposition reference plate with put in order plate The width both sides of packaging bag rest area are oppositely disposed in, packaging bag contraposition reference plate is fixedly installed in frame main body, returned Put plate to be snug fit in frame main body with the direction along remote, close packaging bag contraposition reference plate, put in order plate and be connected with driving Its close to and away from packaging bag contraposition reference plate correction driver, packaging bag contraposition reference plate and put in order to be spaced between plate and formed Packaging bag correction vallecular cavity, the gear bag mechanism include the first gear bag assembly positioned at the packaging bag approaching side for rubbing bagging apparatus with the hands, are located at The second gear bag assembly and third gear bag assembly of side, second gear bag assembly and third gear bag group are sent out in the packaging bag for rubbing bagging apparatus with the hands Part is divided into the both sides of the packaging bag direction of transfer of packaging bag correction vallecular cavity.
Under the structure design, packaging bag is before stranding bagging apparatus, correction station and Origuchi assembly is entered respectively through three groups of gears Bag assembly stop so that the conveying of packaging bag is reliable, into correction station packaging bag under the thrusting action for putting in order plate, to bag Pack contraposition reference plate leans on, and realizes the positional deviation correction of packaging bag, ensures reliable into Origuchi at the Origuchi assembly of packaging bag.
Preferably, the front end of the packaging bag contraposition reference plate and to put in order the front end of plate be in be rectified a deviation vallecular cavity to packaging bag Outer side to overturn forms packaging bag and imports swash plate.Under the structure design, before packaging bag importing swash plate causes packaging bag correction vallecular cavity Port presentation is horn-like, is easy to packaging bag to import in packaging bag correction vallecular cavity.
Preferably, the packaging bag contraposition reference plate corresponds to a side position of Origuchi assembly in frame main body frame. Under the structure design, packaging bag contraposition reference plate, which is located at packaging, needs the side of Origuchi, can ensure packaging bag contraposition reference plate With the contraposition of Origuchi assembly accurately and reliably, it is easily installed debugging.
Preferably, the conveyer belt is included through the first conveyer belt of position corresponding to the stranding bagging apparatus and through folding Second conveyer belt of position, the charging side band section of the second conveyer belt and the exit side band section of first conveyer belt corresponding to mouth assembly It is overlapping along process direction of transfer and be laterally dislocatedly distributed, the overlap zone section of feed side band section of second conveyer belt is made to accept Band section, the gear tongue of third gear bag assembly are located at medium position of the undertaking of the second conveyer belt with segment length direction, the bag pressing machine Structure includes the pressure zone component with the rolling press-wheel of first conveyer belt corresponding matching and with the second conveyer belt corresponding matching, pressure zone group Part includes the annular pressure zone with the second conveyer belt corresponding matching, and supplies the front end guide roller of annular pressure zone winding, end to lead Way roller, front end guide roller and end guide roller are respectively arranged on the front and back of Origuchi assembly, front end guide roller pair Should at the undertaking band fragment position of the second conveyer belt, the rear of front end guide roller be provided with front of Origuchi assembly by dynamic pressure Belt wheel, between the strap up and down of annular pressure zone, passive pressure zone wheel load is located on the lower strap of annular pressure zone passive pinch roller, Front end guide roller and passive pinch roller are intervally arranged along packaging bag direction of transfer, and annular pressure zone is in front end guide roller and passively Band Duan Weiyu between pinch roller accepts the crimp band section coordinated with section, and front end guide roller is combined with driving front end guide roller Lift to drive the lift drive mechanism of annular pressure zone crimp band section lifting and swinging.
Under the structure design, rub with the hands and use first conveyer belt and the second conveyer belt at bagging apparatus and Origuchi assembly, be easy to pack The transmission of bag;And entrainment bag is reached using the second conveyer belt and the cooperation of annular pressure zone for packaging bag to be transported into Origuchi station Pack, packaging bag transfer is reliable, avoids bag clamping;First conveyer belt and the second conveyer belt realize holding for packaging bag using overlapping simultaneously Connect, third gear bag assembly realizes that packaging bag is blocked in relevant position;When packaging bag needs to be transferred to Origuchi station, front end is oriented to Roller declines in the driving of lift drive mechanism, and the crimp band section of annular pressure zone pushes down packaging bag, realizes transfer, has packaging bag Transfer the advantages of reliable.
Preferably, upper positioning pinch roller is provided with above the passive pinch roller, upper positioning pinch roller is located at annular pressure zone Above upper strap, the upper strap counter stopper of upper positioning pinch roller and annular pressure zone, the upper positioning pinch roller circumferentially direction Provided with circular orientation trough of belt, the upper strap of annular pressure zone is positioned through circular orientation trough of belt.
Under the structure design, further reach in annular pressure zone swing process to the tension of annular pressure zone so that Reach positioning in the lifting process of annular pressure zone front end, ensure that annular pressure zone and the second conveyer belt coordinate reliably.
Preferably, the lift drive mechanism includes guide wheel lifting drive cylinder, rocker, linkage swing arm and lift pressure turn Axle, the rocker include two oscillating decks positioned opposite, and the oscillating deck rear end is the pivot dress end being installed in frame, is swung Front edge of board is liftable swinging end, and front end guide roller installation axle is provided between the swinging end of two oscillating decks, and front end is oriented to Roller is rotatably assorted in the guide roller installation axle of front end, and locating rotation is arranged at two swings respectively at the lift pressure rotating shaft both ends In the middle part of plate, eccentric wheel is installed with lift pressure rotating shaft, the support wheel for supporting eccentric wheel, support are combined with below eccentric wheel Location and installation is taken turns in frame, the linkage swing arm is fixedly connected in lift pressure rotating shaft, the drive of the guide wheel lifting drive cylinder Swing arm is articulated with linkage swing arm, and the actuating arm of guide wheel lifting drive cylinder is into can be along linkage pendulum arm length direction Relative sliding Mode be matched with linkage swing arm on.
Under the structure design, guide wheel lifts the actuating arm expanding-contracting action of drive cylinder, through linkage swinging arm swing, so as to shake Lift pressure axis of rotation, lift pressure rotating shaft on eccentric wheel also concomitant rotation, eccentric wheel are supported on support wheel, so as to drive lift pressure turn Axle lifts, and then drives the swinging end lifting of oscillating deck, that is, reaches the lifting driving of front guide roller;With structure letter Singly, the advantages of having stable behavior is reliable.
Preferably, the Origuchi assembly includes splitting mechanism, valve port Pian Tuizhe mechanisms, flange fold mechanism and driver Structure, the splitting mechanism, valve port Pian Tuizhe mechanisms, flange fold mechanism and transmission mechanism are integrated to be assemblied on mounting bracket, frame On motor is installed, the splitting mechanism includes two pieces of suction discs positioned opposite up and down, and two pieces of suction discs are respectively upper suction disc With lower suction disc, grasping part is formed between two pieces of suction discs, and two pieces of suction disc sides are installed on mounting bracket through pivot, two pieces of suction discs Opposite side is that the open side in opening and closing movement, two pieces of suction discs are provided with vacuum sucking holes around pivot swing, and the valve port piece pushes away folding machine Structure includes that tabs can be pushed away along the valve port piece of the grasping part reciprocally swinging between two pieces of suction discs, and the flange fold mechanism includes dividing Other two pieces of flange folded sheets to the grey edge strip turnover of two of packaging bag gears, it is positioned opposite above and below two pieces of flange folded sheets, two pieces Flange folded sheet is respectively upper overturning folded sheet and lower flange folded sheet, and the transmission mechanism includes mainshaft mechanism and countershaft machine Structure, mainshaft mechanism includes main shaft, be connected main shaft and valve port piece pushes away the valve port piece of tabs and pushes away tabs transmission component, is connected The lower flange folded sheet transmission of the lower suction disc transmission component and be connected main shaft and lower flange folded sheet of main shaft and lower suction disc Component, countershaft mechanism include countershaft, be connected countershaft and upper suction disc upper suction disc transmission component and be connected countershaft and The upper overturning folded sheet transmission component of upper overturning folded sheet, the main shaft connect with countershaft synchronous interaction, the output of motor Axle is connected with main shaft one end, and the main shaft other end is connected with through transmission belt or driving-chain with countershaft gearing.
Under the structure design, realize motor output after and meanwhile drive each several part of Origuchi assembly, realize that each several part has bar not Disorderly work, to be designed by each action part according to Origuchi assembly in main shaft and countershaft, main shaft one end coordinates with motor, The main shaft other end coordinates with countershaft, has the advantages of compact-sized, stable transmission is reliable.
Preferably, the open side of two pieces of suction discs is extended with the extension board of corresponding packaging bag valve port piece, two pieces of suctions The first sucker with vacuum sucking holes independence is equipped with the extension board of plate, is additionally provided with two pieces of suction disc open sides and vacuum Second sucker of sucker independence, the second sucker are located at an end position relative with extension board on the suction disc, the first sucker and Two suckers releasable packaging bag bag webs when pushing away folding packaging bag valve port piece.
Under the structure design, on two pieces of suction discs in addition to traditional suction hole design, also using corresponding packaging bag valve port piece Place sets the extension board of the sucker of band first, to the valve port piece specific adsorption of packaging bag, i.e., the packaging bag M sides with valve port piece is carried out Peel off, the second sucker carries out adsorption stripping to the M sides of packaging bag opposite side, the sack peeling effect of packaging bag is improved, after convenient Phase valve port piece pushes away the turnover of tabs folding operation and the grey edge strip of gear, improves folding work reliability, and the first sucker and second inhale Disk is separate with vacuum sucking holes, and the first sucker and the second sucker can carry out adsorbing separation to the M sides of packaging bag, push away Releasable packaging bag bag webs when rolling over packaging bag valve port piece, so it is more beneficial for pushing away jack knife and pushing away rolling over packaging bag valve port piece, avoiding M sides from inhaling The excessive and convenient turnover for keeping off grey edge strip is opened, sack is improved and folds reliability.
The utility model is further described below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the cement package bags bending machine structural representation after the utility model specific embodiment front end guide roller declines Figure;
Fig. 2 is the cement package bags bending machine structural representation after the utility model specific embodiment front end guide roller rises Figure;
Fig. 3 is the utility model specific embodiment frame main body structural representation;
Fig. 4 is the utility model specific embodiment Origuchi assembly structure schematic diagram;
Fig. 5 is structural representation of the utility model specific embodiment after mounting bracket part tie-beam is omitted;
Fig. 6 is the fit structure schematic diagram of the utility model specific embodiment splitting mechanism and its drive mechanism;
Fig. 7 is the utility model specific embodiment suction plate structure schematic diagram;
Fig. 8 is part A partial enlarged view in Fig. 2;
Fig. 9 is the woven bag structure diagram of the utility model specific embodiment.
Embodiment
Referring to accompanying drawing 1 ~ 8, it should be pointed out that, " preceding " and " rear " described in the utility model using packaging bag conveying direction as With reference to being " preceding " towards the top side of packaging bag conveying direction, corresponding relative opposite side is " rear ".Positioned at the work of frame Make on face, vertical with packaging bag conveying direction is " lateral ".
A kind of cement package bags bending machine for being easily installed maintenance disclosed in the utility model, including organic frame 1, move it is packed Put and the stranding bagging apparatus 3 along the arrangement of process direction, Origuchi assembly 4, described frame 1 include frame main body 11 and for Origuchis The mounting bracket 41 of assembly integrated installation, Origuchi assembly placed cavity 110, Origuchi assembly placed cavity 110 are provided with frame main body 11 Top there is upper port 111, mounting bracket 41 is removably mounted in the Origuchi assembly placed cavity 110, in mounting bracket 41 Bottom carries out fastening through bolt and reaches detachable installation.For convenience of the installation of Origuchi assembly, the Origuchi assembly placed cavity 110 The side that lateral run-out moves bagging apparatus is that the insertion connected with upper port is set.Origuchi assembly is designed using single mounting bracket, So assembling when, Origuchi assembly can independent assembling and setting, convenience in transport, realize that monoblock type is installed to frame master after the completion of assembling On body, the maintenance Origuchi in later stage always disassembles in integral slave frame body frame, convenient dismounting and maintenance, frame main body machine The Origuchi assembly placed cavity of Origuchi assembly installation is reserved on frame, the upper port and side port of Origuchi assembly placed cavity are total to Origuchi Into installation realize step down, facilitate the installation of Origuchi assembly, while Origuchi assembly can be movable into and out rolling over through horizontal side port Mouth assembly placed cavity, the dismounting of Origuchi assembly are more convenient.Decorative panel or chamber door etc. can be installed outside usual frame.
In this specific embodiment, the bagging apparatus that moves includes the conveyer belt of transmission packaging bag, keeps off bag mechanism and be matched with Bag compression framework above conveyer belt, rubbing with the hands there is the correction work rectified a deviation for packaging bag movement between bagging apparatus 3 and Origuchi assembly 4 , deviation correction mechanism 5 is provided with station of rectifying a deviation, deviation correction mechanism 5 includes packaging bag contraposition reference plate 51 and puts in order plate 52, packaging bag pair Position datum plate 51 is consolidated with the width both sides that plate 52 is oppositely disposed in packaging bag rest area, packaging bag contraposition reference plate 51 is put in order Dingan County is snug fit at loaded on plate 52 in frame main body 11, is put in order with the direction along remote, close packaging bag contraposition reference plate 51 In frame main body 1, correction driver 53 that plate 52 is connected with its close and remote packaging bag contraposition reference plate 51 of driving is put in order, this Driver 53 of being rectified a deviation in specific embodiment uses cylinder, simple in construction, is used as common other drivings in mechanical field also same certainly Sample is applicable, such as motor, oil cylinder, packaging bag contraposition reference plate 51 and puts in order interval between plate 52 and forms packaging bag correction groove Chamber 50, the gear bag mechanism include the first gear bag assembly 61 positioned at the packaging bag approaching side for rubbing bagging apparatus 3 with the hands, positioned at stranding bagging apparatus Packaging bag send out the second gear bag assembly 62 and third gear bag assembly 63 of side, second gear bag assembly 62 and third gear bag assembly 63 are divided into the both sides of the packaging bag direction of transfer of packaging bag correction vallecular cavity 50.
To ensure that correction is reliable, the packaging bag contraposition reference plate 51 corresponds to the one of Origuchi assembly 4 in frame main body 1 Side position.The front end of the packaging bag contraposition reference plate 51 and the front end for putting in order plate 52 are in on the outside of packaging bag correction vallecular cavity Upset forms packaging bag and imports swash plate 511.
This specific embodiment is further arranged to, and the conveyer belt is included through position corresponding to the stranding bagging apparatus 3 First conveyer belt 71 and the second conveyer belt 72 through position corresponding to Origuchi assembly 4, i.e. the first delivery bag realize packaging bag Pick to rubbing with the hands and carry out rubbing bag operation with the hands at bagging apparatus, complete to realize that packaging bag exports after rubbing bag with the hands, the second conveyer belt realizes that packaging bag connects Progress Origuchi operation at Origuchi assembly is delivered to, realizes that packaging bag exports after completing Origuchi, the charging side band of the second conveyer belt 72 Section is overlapping along process direction of transfer with the exit side band section of first conveyer belt 71 and is laterally dislocatedly distributed, and makes second conveyer belt The overlap zone section of 72 feed side band section is accepts band section 721, and the gear tongue of third gear bag assembly 63 is located at the second conveyer belt 72 The medium position with the length direction of section 721 is accepted, the bag compression framework includes the rolling pressure with the corresponding matching of first conveyer belt 71 Wheel 21 and the pressure zone component 22 with the corresponding matching of the second conveyer belt 72, the position of wherein rolling press-wheel are arranged to this area routine Technology, pressure zone component 22 includes the annular pressure zone 221 with the corresponding matching of the second conveyer belt 72, and supplies the annular winding of pressure zone 221 Front end guide roller 222, end guide roller 223, front end guide roller 222 and end guide roller 223 are respectively arranged on folding The front and back of mouthful assembly 4, that is, realize annular pressure zone 221 around be located at can after front end guide roller 222 and rear end guide wheel 223 Through region corresponding to Origuchi assembly 4, the corresponding undertaking band opening position of section 721 in the second conveyer belt 72 of front end guide roller 222, The rear of front end guide roller 222 is provided with the passive pinch roller 224 positioned at the front of Origuchi assembly 4, and passive pinch roller 224 is located at ring Between the strap up and down of shape pressure zone 221, the passive pressure of pinch roller 224 is on the lower strap of annular pressure zone 221, front end guide roller 222 and passive pinch roller 224 be intervally arranged along packaging bag direction of transfer, annular pressure zone 221 is in front end guide roller 222 and passive Band Duan Weiyu between pinch roller 224 accepts the crimp band section 2211 coordinated with section 721, and front end guide roller 222 is combined with drive Dynamic front end guide roller 222 is lifted to drive the lift drive mechanism of the annular lifting and swinging of 221 crimp band section of pressure zone 2211.Rub bag with the hands First conveyer belt and the second conveyer belt are used at device and Origuchi assembly, is easy to the transmission of packaging bag;And it is used for packaging bag It is transported to Origuchi station and entrainment packaging bag is reached using the second conveyer belt and the cooperation of annular pressure zone, packaging bag transfer is reliable, avoids Bag clamping;First conveyer belt and the second conveyer belt use the overlapping undertaking for realizing packaging bag simultaneously, and third gear bag assembly realizes packaging Bag is blocked in relevant position;When packaging bag needs to be transferred to Origuchi station, drive of the front end guide roller in lift drive mechanism Dynamic to decline, the crimp band section of annular pressure zone pushes down packaging bag, realizes transfer, and there is packaging bag to transfer the advantages of reliable.
Further, the passive top of pinch roller 224 is provided with upper positioning pinch roller 225, and upper positioning pinch roller 225 is located at Above the upper strap of annular pressure zone 221, the upper strap counter stopper of upper positioning pinch roller 225 and annular pressure zone 221 is described fixed Circumferentially direction is provided with circular orientation trough of belt 2251 to position pinch roller 225, and the upper strap of annular pressure zone 221 is positioned through circular orientation Trough of belt 2251.
In this specific embodiment, the lift drive mechanism includes guide wheel lifting drive cylinder 226, rocker, linkage swing arm 228 and lift pressure rotating shaft 229, the rocker includes two oscillating decks 227 positioned opposite, and the rear end of oscillating deck 227 is pivot End is filled loaded on the pivot in frame 1, the front end of oscillating deck 227 is liftable swinging end, is set between the swinging end of two oscillating decks 227 There is front end guide roller installation axle, front end guide roller 222 is rotatably assorted in the guide roller installation axle of front end, and the lift pressure turns Locating rotation is arranged at two middle parts of oscillating deck 227 to the both ends of axle 229 respectively, and eccentric wheel is installed with lift pressure rotating shaft 229 2291, the lower section of eccentric wheel 2291 is combined with the support wheel 2292 for supporting eccentric wheel 2291, the location and installation of support wheel 2292 in In frame 1, support wheel preferentially uses design bearing, simple in construction, and rotatably, the linkage swing arm 228 is fixedly connected on lift Press in rotating shaft 229, the actuating arm of the guide wheel lifting drive cylinder 226 is articulated with linkage swing arm 228, and guide wheel lifting driving The actuating arm of cylinder 226 into can along linkage the length direction Relative sliding of swing arm 228 mode be matched with linkage swing arm 228 on. Linkage swing arm 228 is provided with bar-shaped trough, and the actuating arm of guide wheel lifting drive cylinder 226 is through bearing pin(Or positioning sliding block)Inserting The actuating arm of linkage and guide wheel lifting drive cylinder is realized in bar-shaped trough to be slided along bar-shaped trough is relative, so as to realize guide wheel liter The actuating arm expanding-contracting action driving linkage swing arm for dropping drive cylinder rotates.The actuating arm of guide wheel lifting drive cylinder 226 is flexible dynamic Make, through linking, swing arm 228 is swung, and is rotated so as to shake lift pressure rotating shaft 229, the eccentric wheel 2291 in lift pressure rotating shaft 229 is also therewith Rotate, eccentric wheel 2291 is supported on support wheel 2292, under the eccentric action of eccentric wheel 2291, realizes driving lift 229 liters of rotating shaft of pressure Drop, and then drive the swinging end lifting of oscillating deck 227, that is, reach the lifting driving of front end guide roller 222;With structure Simply, the advantages of having stable behavior is reliable.Certainly scheme feasible as the utility model, lift drive mechanism are acted on for driving Front end guide roller lifting, which reaches, drives the crimp band section of annular pressure zone to swing, the drive of the crimp band section swing of so annular pressure zone Also there is other structures form in motivation structure, such as can also use motor-driven gear to rotate, gear coordinates fan-shaped in the prior art Fluted disc;Or the installation axle using motor direct-drive swing span;Or using cylinder direct drive front end guide roller Lifting, cylinder is arranged on by the way of the horizontal slip in frame etc..
In this specific embodiment, the Origuchi assembly 4 includes splitting mechanism 43, valve port Pian Tuizhe mechanisms 44, flange and folded Mechanism 45 and transmission mechanism 46, the splitting mechanism 43, valve port Pian Tuizhe mechanisms 44, flange fold mechanism 45 and transmission mechanism 46 it is integrated be assemblied on mounting bracket 41, motor 42 is installed in frame 1, frame main body is preferentially installed on using motor On 11, it may alternatively be integrated within certainly on mounting bracket, the splitting mechanism 43 includes two pieces of suction discs 431 positioned opposite up and down, two pieces Suction disc 431 is respectively upper suction disc 431a and lower suction disc 431b, and grasping part, two pieces of suction discs 431 1 are formed between two pieces of suction discs 431 Side is installed on mounting bracket 41 through pivot, the open side that it is in opening and closing movement around pivot swing that the opposite side of two pieces of suction discs 431, which is, and two Block suction disc 431 is provided with vacuum sucking holes 4311, and the valve port Pian Tuizhe mechanisms 44 include can be along the clamping between two pieces of suction discs 431 The valve port piece of space reciprocally swinging pushes away tabs 441, and the flange fold mechanism 45 is included respectively to two grey sides of gear of packaging bag Two pieces of flange folded sheets 451 of the ' of bar 2 turnovers, two pieces of flange folded sheets are positioned opposite about 451, and two pieces of flange folded sheets 451 divide Not Wei upper overturning folded sheet 451a and lower flange folded sheet 451b, the transmission mechanism 46 includes mainshaft mechanism and countershaft mechanism, Mainshaft mechanism includes main shaft 461, be connected main shaft 461 and valve port piece pushes away the valve port piece of tabs 441 and pushes away tabs transmission component, connection Lower suction disc transmission component and be connected main shaft 461 and the lower flange folded sheet of dynamic connection main shaft 461 and lower suction disc 431b 451b lower flange folded sheet transmission component, countershaft mechanism include countershaft 462, be connected countershaft 462 and upper suction disc 431a Upper suction disc transmission component and be connected countershaft 462 and upper overturning folded sheet 451a upper overturning folded sheet transmission component, institute State main shaft 461 to connect with the synchronous interaction of countershaft 462, output shaft and the one end of main shaft 461 of motor 42 are connected(Using skin Belt wheel and belt, which are realized, to be driven, and belt is not shown in figure), the other end of main shaft 461 with through transmission belt 463 or driving-chain with Countershaft 462 is connected.
The valve port piece pushes away tabs transmission component and pushes away tabs driving cam 4631, installation on main shaft 461 including being installed on On frame 41 close to push away at tabs driving cam 4631 be provided with push away tabs driving rack 4632, push away tabs driving the one end of rack 4632 with The cam path for pushing away tabs driving cam 4631 is connected, and pushes away the tabs driving other end of rack 4632 and is engaged with and pushes away tabs sliding tooth Wheel 4633, push away tabs drive gear 4633 and push away tabs 441 with valve port piece being connected, valve port piece pushes away tabs 441 and pushed away through valve port piece Tabs installation axle 442 rotate be arranged on mounting bracket 41, push away tabs drive gear 4633 be fixedly mounted on valve port piece push away tabs peace Fill axle 442 and realize linkage, the lower suction disc transmission component includes the lower suction disc driving cam 4641 being installed on main shaft 461, peace Shelve and be provided with lower suction disc driving rack 4642 on 41 at lower suction disc driving cam 4641, lower suction disc driving rack 4642 one end It is connected with the cam path of lower suction disc driving cam 4641, the lower suction disc driving other end of rack 4642 is engaged with lower suction disc driving Gear 4643, lower suction disc drive gear 4643, which is connected, lower suction disc power transmission shaft 4644, is installed on lower suction disc power transmission shaft 4644 There is lower suction disc driven gear 4645, the lower engagement of suction disc driven gear 4644 is combined with lower suction disc zigzag tread patterns rack 4646, lower suction Plate zigzag tread patterns rack 4646 is hinged with lower suction disc transmission arm 4647, lower suction disc transmission arm 4647 and the be hinged companies of lower suction disc 431b Connect, the lower flange folded sheet transmission component includes the lower flange folded sheet driving cam 4651 being arranged on main shaft 461, installation Frame 41 is being provided with lower flange folded sheet driving rack 4652, lower flange folded sheet at lower flange folded sheet driving cam 4651 Driving one end of rack 4652 and the cam path of lower flange folded sheet driving cam 4651 are connected, lower flange folded sheet sliding tooth The engagement of the other end of bar 4652 is combined with lower flange folded sheet driving gear pair 4653, lower flange folded sheet driving gear pair 4653 Dynamic to be connected with lower flange folded sheet installation axle 4654, lower flange folded sheet 451b is installed on lower flange folded sheet installation axle 4654 On, lower flange folded sheet driving gear pair 4653 includes lower the first travelling gear of flange folded sheet 4653a that intermeshing coordinates With the second travelling gear of lower flange folded sheet 4653b, the first travelling gear of lower flange folded sheet and lower flange folded sheet sliding tooth Bar engagement coordinates, and the second travelling gear of lower flange folded sheet is installed in lower flange folded sheet installation axle 4654.The upper suction disc Transmission component includes the upper suction disc driving cam 4661 being installed on countershaft 462, and mounting bracket 41 is close to upper suction disc driving cam Upper suction disc driving rack 4662, upper suction disc driving one end of rack 4662 and the cam of upper suction disc driving cam 4661 are provided with 4661 Groove is connected, and upper suction disc driving rack 4662 other end engagement is combined with suction disc drive gear 4663, upper suction disc sliding tooth Wheel 4663 is connected and has upper suction disc power transmission shaft 4664, and suction disc travelling gear 4665 is provided with upper suction disc power transmission shaft 4664, The upper engagement of suction disc travelling gear 4665 is combined with suction disc zigzag tread patterns rack 4666, and upper suction disc zigzag tread patterns rack 4666 is be hinged There is upper suction disc transmission arm 4667, upper suction disc transmission arm 4667 is articulated and connected with upper suction disc 431a, upper overturning folded sheet transmission component Including the upper overturning folded sheet driving cam 4671 being installed on countershaft 462, mounting bracket 41 is close to the driving of upper overturning folded sheet Upper overturning folded sheet driving rack 4672 is provided with cam 4671, upper overturning folded sheet driving one end of rack 4672 is rolled over upper overturning The cam path of lamination driving cam 4671 is connected, and the other end engagement of upper overturning folded sheet driving rack 4672 is combined with Flange folded sheet driving gear pair 4673, upper overturning folded sheet driving gear pair 4673, which is connected, the installation of upper overturning folded sheet Axle 4674, upper overturning folded sheet 451a are installed in upper overturning folded sheet installation axle 4674, upper overturning folded sheet driving gear pair 4673 include upper overturning folded sheet the first travelling gear 4673a and the travelling gear of upper overturning folded sheet second that intermeshing coordinates 4673b, the travelling gear of upper overturning folded sheet first engage cooperation, upper overturning folded sheet second with upper overturning folded sheet driving rack Travelling gear is installed in upper overturning folded sheet installation axle 4674.Coordinated using cam and rack-and-pinion and reach transmission, transmission knot Structure is simple, and stable transmission is reliable, is easily installed and regulation reaches synergy.
In addition, the open side of two pieces of suction discs 431 is extended with the corresponding ' of packaging bag valve port piece 1 extension board 4312, two pieces The first sucker 4313 is equipped with the extension board 4312 of the suction disc 431, is additionally provided with two pieces of open sides of suction disc 431 Two suckers 4314, the second sucker 4314 are located at an end position relative with extension board 4312 on the suction disc 431.On two pieces of suction discs In addition to traditional suction hole design, also using the extension board that the sucker of band first is set at corresponding packaging bag valve port piece, to packaging bag The M sides in side specific adsorption, the second sucker improves bag to the specific adsorption on the M sides in opposite side of packaging bag The sack peeling effect of pack, facilitate later stage valve port piece to push away the folding of tabs folding operation and the grey edge strip of gear, improve bender Make reliability.Moreover, by the first sucker on two pieces of suction discs and the second sucker and vacuum sucking holes into being independently arranged, first Sucker and the second sucker releasable packaging bag bag webs when pushing away folding packaging bag valve port piece, the first sucker and the second sucker can be controlled synchronously System.

Claims (10)

1. a kind of cement package bags bending machine for being easily installed maintenance, including organic frame, move bagging apparatus and arranged along process direction Stranding bagging apparatus, the Origuchi assembly of cloth, it is characterised in that:Described frame includes frame main body and supplies Origuchi assembly integrated installation Mounting bracket, Origuchi assembly placed cavity is provided with frame main body, the top of Origuchi assembly placed cavity has upper port, mounting bracket It is removably mounted in the Origuchi assembly placed cavity.
2. the cement package bags bending machine of maintenance is easily installed according to claim 1, it is characterised in that:The Origuchi assembly The side that the lateral run-out of placed cavity moves bagging apparatus is that the insertion connected with upper port is set.
3. the cement package bags bending machine of maintenance is easily installed according to claim 1, it is characterised in that:The shifting bagging apparatus Including transmitting the conveyer belt of packaging bag, keeping off bag mechanism and the bag compression framework being matched with above conveyer belt, bagging apparatus and folding are being rubbed with the hands There is the correction station for packaging bag movement correction between mouth assembly, be provided with deviation correction mechanism at correction station, deviation correction mechanism includes Packaging bag contraposition reference plate and put in order plate, packaging bag contraposition reference plate and put in order the width that plate is oppositely disposed in packaging bag rest area Direction both sides, packaging bag contraposition reference plate are fixedly installed in frame main body, put in order plate to align base along remote, close packaging bag The direction of quasi- plate is snug fit in frame main body, put in order plate be connected with driving its close to and away from packaging bag contraposition reference plate Rectify a deviation driver, packaging bag contraposition reference plate and put in order interval between plate and form packaging bag correction vallecular cavity, the gear bag mechanism bag Include the first gear bag assembly positioned at the packaging bag approaching side for rubbing bagging apparatus with the hands, the second gear of side is sent out positioned at the packaging bag for rubbing bagging apparatus with the hands Bag assembly and third gear bag assembly, second gear bag assembly and third gear bag assembly are divided into the packaging bag of packaging bag correction vallecular cavity The both sides of direction of transfer.
4. the cement package bags bending machine of maintenance is easily installed according to claim 3, it is characterised in that:The packaging bag pair The front end of position datum plate and the front end for putting in order plate are in the side to overturn formation packaging bag importing swash plate to outside packaging bag correction vallecular cavity.
5. the cement package bags bending machine of maintenance is easily installed according to claim 3, it is characterised in that:The packaging bag pair Position datum plate corresponds to a side position of Origuchi assembly in frame main body.
6. the cement package bags bending machine of maintenance is easily installed according to claim 3, it is characterised in that:The conveyer belt bag Include through the first conveyer belt of position corresponding to the stranding bagging apparatus and the second conveying through position corresponding to Origuchi assembly Band, the charging side band section of the second conveyer belt is overlapping along process direction of transfer with the exit side band section of first conveyer belt and lateral mistake Bit distribution, making the overlap zone section of feed side band section of second conveyer belt, the gear tongue of third gear bag assembly is set to accept band section In medium position of the undertaking of the second conveyer belt with segment length direction, the bag compression framework includes and first conveyer belt corresponding matching Rolling press-wheel and pressure zone component with the second conveyer belt corresponding matching, pressure zone component includes and the second conveyer belt corresponding matching Annular pressure zone, and for annular pressure zone winding front end guide roller, end guide roller, front end guide roller and end are led Way roller is respectively arranged on the front and back of Origuchi assembly, the corresponding undertaking band fragment position in the second conveyer belt of front end guide roller Place, the rear of front end guide roller are provided with the passive pinch roller in front of Origuchi assembly, and passive pinch roller is located at annular pressure zone Strap up and down between, passive pressure zone wheel load located at annular pressure zone lower strap on, front end guide roller and passive pinch roller edge Packaging bag direction of transfer is intervally arranged, and band Duan Weiyu of the annular pressure zone between front end guide roller and passive pinch roller accepts band Duan Peihe crimp band section, front end guide roller are combined with the lifting of driving front end guide roller to drive annular pressure zone crimp band section The lift drive mechanism of lifting and swinging.
7. the cement package bags bending machine of maintenance is easily installed according to claim 6, it is characterised in that:The passive pressure zone Wheel top is provided with upper positioning pinch roller, and upper positioning pinch roller is above the upper strap of annular pressure zone, upper positioning pinch roller and ring The upper strap counter stopper of shape pressure zone, the upper positioning pinch roller are circumferentially provided with circular orientation trough of belt in direction, annular pressure zone Upper strap is positioned through circular orientation trough of belt.
8. the cement package bags bending machine of maintenance is easily installed according to claim 6 or 7, it is characterised in that:The lifting Drive mechanism includes guide wheel lifting drive cylinder, rocker, linkage swing arm and lift pressure rotating shaft, and the rocker includes two relative cloth The oscillating deck put, the oscillating deck rear end are the pivot dress end being installed in frame, and swing front edge of board is liftable swinging end, two Front end guide roller installation axle is provided between the swinging end of individual oscillating deck, front end guide roller is rotatably assorted in front end guide roller In installation axle, locating rotation is arranged in the middle part of two oscillating decks respectively at the lift pressure rotating shaft both ends, is fixedly mounted in lift pressure rotating shaft There is an eccentric wheel, be combined with the support wheel for supporting eccentric wheel below eccentric wheel, support wheel location and installation is described in frame Movable pendulum arm is fixedly connected in lift pressure rotating shaft, and the actuating arm of the guide wheel lifting drive cylinder is articulated with linkage swing arm, and is led The actuating arm of wheel lifting drive cylinder along the mode of linkage pendulum arm length direction Relative sliding into can be matched with linkage swing arm.
9. the cement package bags bending machine of maintenance is easily installed according to claim 1, it is characterised in that:The Origuchi assembly Including splitting mechanism, valve port Pian Tuizhe mechanisms, flange fold mechanism and transmission mechanism, the splitting mechanism, valve port piece push away folding Mechanism, flange fold mechanism and transmission mechanism are integrated to be assemblied on mounting bracket, and motor, the splitting machine are provided with frame Structure includes two pieces of suction discs positioned opposite up and down, and two pieces of suction discs are respectively upper suction disc and lower suction disc, and folder is formed between two pieces of suction discs Space is held, two pieces of suction disc sides are installed on mounting bracket through pivot, and the opposite side of two pieces of suction discs is to swing to move in folding around pivot The open side of work, two pieces of suction discs are provided with vacuum sucking holes, and the valve port Pian Tuizhe mechanisms include can be along the folder between two pieces of suction discs The valve port piece for holding space reciprocally swinging pushes away tabs, and the flange fold mechanism includes respectively turning over two grey edge strips of gear of packaging bag Two pieces of flange folded sheets of folding, positioned opposite above and below two pieces of flange folded sheets, two pieces of flange folded sheets are respectively that upper overturning folds Plate and lower flange folded sheet, the transmission mechanism include mainshaft mechanism and countershaft mechanism, and mainshaft mechanism includes main shaft, is connected The valve port piece that main shaft and valve port piece push away tabs pushes away tabs transmission component, be connected the lower suction disc transmission component of main shaft and lower suction disc And the lower flange folded sheet transmission component of be connected main shaft and lower flange folded sheet, countershaft mechanism includes countershaft, linkage connects Connect the upper suction disc transmission component of countershaft and upper suction disc and the upper overturning folded sheet of be connected countershaft and upper overturning folded sheet passes Dynamic component, the main shaft connect with countershaft synchronous interaction, and output shaft and main shaft one end of motor are connected, the main shaft The other end is connected with through transmission belt or driving-chain with countershaft gearing.
10. the cement package bags bending machine of maintenance is easily installed according to claim 9, it is characterised in that:Two pieces of institutes The open side for stating suction disc is extended with the extension board of corresponding packaging bag valve port piece, be equipped with the extension board of two pieces of suction discs with very First sucker of suction hole independence, the second sucker with vacuum sucking holes independence is additionally provided with two pieces of suction disc open sides, the Two suckers are located at an end position relative with extension board on the suction disc, the first sucker and the second sucker and are pushing away folding packaging bag valve port Releasable packaging bag bag webs during piece.
CN201720469145.5U 2017-04-28 2017-04-28 It is easily installed the cement package bags bending machine of maintenance Expired - Fee Related CN206797899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720469145.5U CN206797899U (en) 2017-04-28 2017-04-28 It is easily installed the cement package bags bending machine of maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720469145.5U CN206797899U (en) 2017-04-28 2017-04-28 It is easily installed the cement package bags bending machine of maintenance

Publications (1)

Publication Number Publication Date
CN206797899U true CN206797899U (en) 2017-12-26

Family

ID=60738782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720469145.5U Expired - Fee Related CN206797899U (en) 2017-04-28 2017-04-28 It is easily installed the cement package bags bending machine of maintenance

Country Status (1)

Country Link
CN (1) CN206797899U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482761A (en) * 2018-03-21 2018-09-04 芜湖恒耐特传动设备有限公司 A kind of packaging bag segmentation carrying method
CN114589965A (en) * 2022-03-08 2022-06-07 温州民望机械设备有限公司 Woven bag opening folding machine and opening folding method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482761A (en) * 2018-03-21 2018-09-04 芜湖恒耐特传动设备有限公司 A kind of packaging bag segmentation carrying method
CN114589965A (en) * 2022-03-08 2022-06-07 温州民望机械设备有限公司 Woven bag opening folding machine and opening folding method
CN114589965B (en) * 2022-03-08 2023-11-28 温州民望机械设备有限公司 Woven bag mouth folding machine and mouth folding method

Similar Documents

Publication Publication Date Title
CN206797899U (en) It is easily installed the cement package bags bending machine of maintenance
CN103129758A (en) Full-automatic packing system for flexible packing food bags
CN105015021B (en) A kind of full-automatic paper bowl overlay film cutting machine with paper roll set roller function
CN108513863A (en) The double bagging punching press sack filling machines of coiled strip formula
CN202540806U (en) Paper bag port folding and bonding device
CN107031118A (en) Paper and membrane composite integrated machine
CN105235287B (en) A kind of full-automatic paper bag machine puts bottom card device
CN207028325U (en) Corrugated case bonding paste punch-out equipment
CN202038698U (en) Rubber plate conveying device for automatic capsule production line
CN205113850U (en) Full -automatic panty -shape diapers packaging production line
CN207090575U (en) A kind of new type auto paper guide
CN106005643B (en) A kind of plate Double-face gummed paper adhering device
CN104129527A (en) Packaging machine
CN106564214A (en) Paper bag package production line equipment
CN211167738U (en) Label conveying device
CN201849932U (en) Rubber plate conveying and turning device
CN210634873U (en) Automatic equipment of packing clothing, tearing gluey envelope
CN205167676U (en) Limit machine is glued in container bag reinforcement
CN208248616U (en) Bagging clamping device
CN208258602U (en) The double bagging punching press sack filling machines of coiled strip formula
CN205916409U (en) Horizontal folding device of slip sheet in gloves
CN207157659U (en) A kind of automatically unpacking bottom sealing system for the vanning of multi-brand barrel
CN206719650U (en) The flanging assembly of cement package bags bending machine
CN205770418U (en) A kind of double-connecting rod type medical adhesive tape box packing machine inhales case structure
CN206885483U (en) The shifting bagging apparatus of bag of cement bending machine

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20190428