CN206794643U - A kind of location structure before the continuous pier bag of steel pipe - Google Patents
A kind of location structure before the continuous pier bag of steel pipe Download PDFInfo
- Publication number
- CN206794643U CN206794643U CN201720686750.8U CN201720686750U CN206794643U CN 206794643 U CN206794643 U CN 206794643U CN 201720686750 U CN201720686750 U CN 201720686750U CN 206794643 U CN206794643 U CN 206794643U
- Authority
- CN
- China
- Prior art keywords
- pier
- profiling
- bao
- bag
- drift
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses the location structure before a kind of continuous pier bag of steel pipe, is made up of pier Bao Mo, movable block, drift die holder, pier bag drift, guide plate, plate washer, bearing under pier Bao Mo, profiling in profiling;Pier Bao Mo is arranged on the upside of pier Bao Mo under profiling wherein in profiling, and semi-circular recesses are offered among pier Bao Mo under pier Bao Mo and profiling in profiling;Pier Bao Mo end is set with movable block under pier Bao Mo and profiling in profiling;The pier bag drift is arranged in profiling on the left of pier Bao Mo, and the grafting of pier bag ram bottom is arranged on the low order end of drift die holder;The guide plate is arranged on the front side of pier bag drift;Plate washer is arranged on the centre of pier Bao Mo under pier Bao Mo and profiling in pier bag drift and profiling, and the end of plate washer is sleeved on bearing, and back-up ring and centring ring are respectively installed with left and right sides of it;The bearing is arranged on the front side of guide plate;The utility model is designed reasonably, it is simple in construction, it is possible to achieve the positioning before the continuous pier bag of steel pipe, and operate more convenient.
Description
Technical field
It the utility model is related to pipe bending technique field, the location structure before specifically a kind of continuous pier bag of steel pipe.
Background technology
With the fast development of automobile industry, automobile have become people go on a journey irreplaceable main means of transport it
One, and the engine manufacture connected mode especially therein as core driving source plays key leading role.
Motivation pipeline connecting mode, its design process will especially carry out crucial control processing procedure with manufacturing process, once occur
Sealing property is bad, and engine will be made to lose original ability to work, for drive vehicle we cause accidental bodily injury;
The connection of automobile engine pipeline is generally made up of metal rigid steel conduit, flexible pipe and other pipeline fittingses;In modern manufacturing, pipe and pipe
Connection is largely connected using flexible pipe, i.e., can make up steel pipe type position due to by the type caused by various factors by flexible pipe characteristic
Displacement is moved, and causes difficult formed with pipe fitting of assembling to connect;And Dun Bao quality will directly influence the whole pipe-line system of automobile
Quality.
Utility model content
The purpose of this utility model is to provide the location structure before a kind of continuous pier bag of steel pipe, to solve above-mentioned background skill
The problem of being proposed in art.
To achieve the above object, the utility model provides following technical scheme:
A kind of location structure before continuous pier bag of steel pipe, including the location structure body before the continuous pier bag of steel pipe;The steel
It is by pier Bao Mo, movable block, drift die holder, Dun Bao under pier Bao Mo, profiling in profiling to manage the location structure body before continuous pier bag
Drift, guide plate, plate washer, bearing composition;Pier Bao Mo is arranged on the upside of pier Bao Mo under profiling wherein in profiling, Dun Bao in profiling
Semi-circular recesses are offered under mould and profiling among pier Bao Mo, and specification is identical;Pier Bao Mo under pier Bao Mo and profiling in profiling
End be set with movable block;The pier bag drift is arranged on the left side of pier Bao Mo under pier Bao Mo and profiling in profiling, pier Bao Chong
Head bottom grafting is arranged on the low order end of drift die holder;The guide plate is arranged on the front side of drift die holder and pier bag drift;Institute
The centre that plate washer is arranged on pier Bao Mo under pier Bao Mo and profiling in pier bag drift and profiling is stated, the end of plate washer is sleeved on bearing
On, and back-up ring and centring ring are respectively installed with left and right sides of it;The bearing is arranged on the front side of guide plate.
As further program of the utility model:Manhole is offered on the movable block.
As the utility model further scheme:Pier Bao Mo is formed using cold-working Making mold in the profiling.
As the utility model further scheme:Pier Bao Mo is formed using cold-working Making mold under the profiling.
As the utility model further scheme:The centring ring is provided with locked screw.
Compared with prior art, the beneficial effects of the utility model are:The utility model is designed reasonably, it is simple in construction, can
To realize the positioning before the continuous pier bag of steel pipe, and operate more convenient.
Brief description of the drawings
Fig. 1 be a kind of continuous pier bag of steel pipe before location structure structural representation.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, in the utility model embodiment, the location structure before a kind of continuous pier bag of steel pipe, including steel pipe connecting
Location structure body before continuous pier bag;Location structure body before the continuous pier bag of steel pipe is by pier bag mould 1, profiling in profiling
Lower pier bag mould 2, movable block 3, drift die holder 4, pier bag drift 5, guide plate 6, plate washer 7, bearing 8 form;Dun Bao wherein in profiling
Mould 1 is arranged on the upside of pier bag mould 2 under profiling, is offered among pier bag mould 2 under pier bag mould 1 and profiling in profiling semicircle recessed
Groove, and specification is identical;The end of pier bag mould 2 is set with movable block 3 under pier bag mould 1 and profiling in profiling;The pier bag drift 5 is set
The left side of the pier bag mould 2 under pier bag mould 1 and profiling in profiling is put, the bottom grafting of pier bag drift 5 is arranged on the most right of drift die holder 4
End;The guide plate 6 is arranged on the front side of drift die holder 4 and pier bag drift 5;The plate washer 7 is arranged on pier bag drift 5 and profiling
The centre of pier bag mould 2 under upper pier bag mould 1 and profiling, the end of plate washer 7 is sleeved on bearing 8, and is covered respectively at left and right sides of it
Equipped with back-up ring and centring ring;The bearing 8 is arranged on the front side of guide plate 6.
Manhole is offered on the movable block 3.
Pier bag mould 1 is formed using cold-working Making mold in the profiling.
Pier bag mould 2 is formed using cold-working Making mold under the profiling.
The centring ring is provided with locked screw.
Operation principle of the present utility model is:Steel pipe is by posser hydraulic drive, and pier bag mould presses pipe fitting, by drift
Die holder drive drift motion, by the parameter set, pier bag drift moves to the stroke set, make steel pipe on pier Bao Mo into
Type, a Dun Bao are completed;Then Dun Bao is continuously finished, is carried out continuously pier bag operation completion.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (5)
1. the location structure before a kind of continuous pier bag of steel pipe, it is characterised in that including the location structure sheet before the continuous pier bag of steel pipe
Body;Location structure body before the continuous pier bag of steel pipe is by pier Bao Mo, movable block, drift under pier Bao Mo, profiling in profiling
Die holder, pier bag drift, guide plate, plate washer, bearing composition;Pier Bao Mo is arranged on the upside of pier Bao Mo under profiling wherein in profiling,
Semi-circular recesses are offered among pier Bao Mo under pier Bao Mo and profiling in profiling, and specification is identical;Pier Bao Mo and imitative in profiling
Pier Bao Mo end is set with movable block under shape;The pier bag drift is arranged on a left side of pier Bao Mo under pier Bao Mo and profiling in profiling
Side, the grafting of pier bag ram bottom are arranged on the low order end of drift die holder;The guide plate is arranged on drift die holder and pier bag drift
Front side;The plate washer is arranged on the centre of pier Bao Mo under pier Bao Mo and profiling in pier bag drift and profiling, the end set of plate washer
On bearing, and back-up ring and centring ring are respectively installed with left and right sides of it;The bearing is arranged on the front side of guide plate.
2. the location structure before the continuous pier bag of a kind of steel pipe according to claim 1, it is characterised in that on the movable block
Offer manhole.
3. the location structure before the continuous pier bag of a kind of steel pipe according to claim 1, it is characterised in that pier in the profiling
Bao Mo is formed using cold-working Making mold.
4. the location structure before the continuous pier bag of a kind of steel pipe according to claim 1, it is characterised in that pier under the profiling
Bao Mo is formed using cold-working Making mold.
5. the location structure before the continuous pier bag of a kind of steel pipe according to claim 1, it is characterised in that on the centring ring
Provided with locked screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720686750.8U CN206794643U (en) | 2017-06-14 | 2017-06-14 | A kind of location structure before the continuous pier bag of steel pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720686750.8U CN206794643U (en) | 2017-06-14 | 2017-06-14 | A kind of location structure before the continuous pier bag of steel pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206794643U true CN206794643U (en) | 2017-12-26 |
Family
ID=60746172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720686750.8U Expired - Fee Related CN206794643U (en) | 2017-06-14 | 2017-06-14 | A kind of location structure before the continuous pier bag of steel pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206794643U (en) |
-
2017
- 2017-06-14 CN CN201720686750.8U patent/CN206794643U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203426248U (en) | Novel double-wedge punching die | |
CN105537360A (en) | Forward-backward drawing and forming method for metal plate soft mould | |
CN206215785U (en) | The double end single-station pipe end forming machines of TM60D I | |
CN203426247U (en) | Novel cantilever type piercing die | |
CN206794643U (en) | A kind of location structure before the continuous pier bag of steel pipe | |
CN206854495U (en) | A kind of location structure before the continuous pier bag of steel pipe | |
CN203304411U (en) | V-shaped rubber bent die | |
CN205702004U (en) | A kind of energy-efficient automobile stamping parts | |
CN103287500B (en) | Top cover beam and forming die of top cover beam and machining method of top cover beam | |
CN205519047U (en) | Nuclear trunk line extrusion frock | |
CN206868921U (en) | Fender curring and sizing die lateral pressing mechanism | |
CN206966377U (en) | A kind of curved equipment of steel pipe connecting | |
CN205929179U (en) | Rubber bush assembly seals glues muscle mould structure | |
CN206229899U (en) | A kind of stamping machine | |
CN203484525U (en) | Novel pipe bending, flaring and flanging die | |
CN209334509U (en) | A kind of colloid fluid die pressing molding device | |
CN203621222U (en) | Drawing die | |
CN203448482U (en) | Compacting and forming tool of corrugated plate for boiler | |
CN206028631U (en) | Automobile control arm forges mould | |
CN104498324A (en) | Novel water seal tank, and processing die and processing method thereof | |
CN203061621U (en) | Double-layer die for bend pipe | |
CN203621251U (en) | Expansion modeling internal die mechanism | |
CN109290421A (en) | Liquid-filling shaping mold | |
CN203541293U (en) | Novel pipe bending die and pipe bending machine with novel pipe bending dies | |
CN203578658U (en) | Formation tool for driven bevel gears |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171226 Termination date: 20200614 |