CN206793351U - Sewage water inspection well integration waste gas treatment equipment - Google Patents

Sewage water inspection well integration waste gas treatment equipment Download PDF

Info

Publication number
CN206793351U
CN206793351U CN201720573534.2U CN201720573534U CN206793351U CN 206793351 U CN206793351 U CN 206793351U CN 201720573534 U CN201720573534 U CN 201720573534U CN 206793351 U CN206793351 U CN 206793351U
Authority
CN
China
Prior art keywords
fixedly connected
waste gas
breather pipe
inspection well
sewage water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720573534.2U
Other languages
Chinese (zh)
Inventor
曾迪阳
曾金富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Wight Environmental Technology Co Ltd
Original Assignee
Shaoxing Wight Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Wight Environmental Technology Co Ltd filed Critical Shaoxing Wight Environmental Technology Co Ltd
Priority to CN201720573534.2U priority Critical patent/CN206793351U/en
Application granted granted Critical
Publication of CN206793351U publication Critical patent/CN206793351U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a kind of sewage water inspection well integration waste gas treatment equipment, solves the problems, such as waste gas in sewage water inspection well, its drip irrigation device is to include support bar, supporting plate is fixedly connected with described support bar, also include plasma and system, waste gas collecting system, gas blow-off system, induced draught system, solar power system occurs, reach the purpose of waste gas in timely processing sewage water inspection well.

Description

Sewage water inspection well integration waste gas treatment equipment
Technical field
A kind of waste gas treatment equipment is the utility model is related to, more specifically, it relates to which a kind of integration of sewage water inspection well is useless Gas disposal equipment.
Background technology
Inspection shaft is used in the turning of drainage pipeline, branch, fallen etc., and in order to check, the well of dredging, scientific name is inspection Look into well, inspection shaft typically has several meters of depths, below easily aggregation as the waste gas of the poisonous and harmful class such as carbon dioxide, hydrogen sulfide.
At present, notification number is that CN205340574U Chinese patent discloses a kind of sewage treatment plant's exhaust treatment system, It includes a kind of sewage treatment plant's exhaust treatment system, it is characterised in that:Including adsorption tanks, trash separator, photocatalyst decomposer, life Thing Absorption of Medium tank, purification water washing tank and exhaust tower;Connection air inlet pipe on the upside of one end of the adsorption tanks, the inside of adsorption tanks is filled out Filled with deodorization adsorption particle;Gas outlet is provided with the downside of the opposite side of the adsorption tanks, gas outlet is connected by airway tube and trash separator Connect;The inside of the trash separator is provided with gas solid separation film crosswise;The bottom gas outlet of the trash separator passes through airway tube and light Catalyst decomposer connects;The gas outlet of the photocatalyst decomposer is communicated in Biomedia tourie by airway tube;It is described Biomedia tourie is connected in purification water washing tank by airway tube;The purification water washing tank is connected to exhaust by airway tube At the air inlet of tower.
The mode of this exhaust-gas treatment is that sewage is uniformly converged into sewage treatment plant, then passes through adsorption tanks, trash separator, light Catalyst decomposer and Biomedia tourie are handled caused waste gas in sewage, but when sewage flows in inspection shaft still Waste gas can be produced, waste gas can overflow from inspection shaft, pollute the air around inspection shaft.
Utility model content
In view of the deficienciess of the prior art, the utility model is that providing a kind of sewage water inspection well integration exhaust-gas treatment sets It is standby, the means of harmless treatment are carried out by collecting waste gas in sewage water inspection well, reach the mesh of waste gas in timely processing sewage water inspection well 's.
To achieve the above object, the utility model provides following technical scheme:At a kind of sewage water inspection well integration waste gas Equipment, including support bar are managed, supporting plate is fixedly connected with described support bar, also includes plasma and system occurs, including The plasma generator being fixedly connected in the supporting plate and the controller being fixedly connected on the support bar, the grade from Air inlet and gas outlet are provided with electronic generator, the plasma generator electrically connects with the controller;Gas sampling system System, including the 3rd breather pipe that one end is penetrated in sewage water inspection well, the other end of the 3rd breather pipe are fixedly connected with second and led to Tracheae, the described one end of second breather pipe away from the 3rd breather pipe are fixedly connected with the air inlet;Gas blow-off system, including The first breather pipe being fixedly connected on the gas outlet, the one end of first breather pipe away from plasma generator, which is fixed, to be connected It is connected to the part that keeps off the rain;Induced draught system, including it is fixedly connected on the air-introduced machine of the first ventilation inside pipe wall;Solar power system, Including the solar panels being connected on the support bar and the energy storage device being fixedly connected on the support bar, the solar energy Plate electrically connects with the energy storage device, the energy storage device and controller, air inducing mechatronics.
By using above-mentioned technical proposal, solar power system is that system occurs for plasma and induced draught system is supplied Electricity, waste gas is reached plasma generator along the 3rd breather pipe and the second breather pipe, after processing along the first breather pipe from Keep off the rain discharge at part, reach the purpose of waste gas in timely processing sewage water inspection well, reduce the exhaust emission sewage basement in sewage water inspection well The purpose of well surrounding air.
The utility model is further arranged to:Installing plate is fixedly connected with described support bar, on described installing plate It is provided with the actuator that driving solar panels rotate.
By using above-mentioned technical proposal, the actuator on installing plate can change the angles of solar panels to adapt to difference The different position of the season sun, solar panels is absorbed solar energy as much as possible in each season, improve solar panels Operating efficiency.
The utility model is further arranged to:It is on a mounting board and intermeshing that described actuator includes rotation connection Drive gear and travelling gear, the drive rod being fixedly connected on the travelling gear and turn being fixedly connected on drive gear Lever, the one end of the rotating bar away from drive gear are fixedly connected with the solar panels, and use is provided with the drive rod In the Fastener by drive rod fixation on a mounting board.
By using above-mentioned technical proposal, the rotational band nutating gear of drive rod rotates, and travelling gear drives sliding tooth Wheel rotates, and drive gear rotational band turn lever rotates, and rotating bar, which rotates, is changed the angle of solar panels, makes solar energy Plate can carry out the change of angle with the difference in season, and Fastener positions to drive rod, reduce what drive rod rotated Amplitude, reduce the amplitude that solar panels rotate.
The utility model is further arranged to:Described Fastener includes spill spin block, elastic component and clamping block, the driving Offer card tieholen on bar, the card tieholen interior edge card tieholen has been in axial sliding connection the clamping block, on the clamping block The elastic component is fixedly connected with, the one end of the elastic component away from clamping block is fixedly connected with the spill spin block, the rotation Block is threadedly coupled with the card tieholen, and described clamping block pushes against with installing plate.
By using above-mentioned technical proposal, by screwing spill spin block, spill spin block extruding elastic component, make elastic component to clamping block Pressure is produced, clamping block and installing plate is pushed against, reduces the relative movement between Fastener and installing plate, when rotating rotation During bar, spill spin block is unscrewed, elastic component is reduced the pressure of clamping block, clamping block no longer pushes against with installing plate, enables rotating bar It is enough to rotate.
The utility model is further arranged to:The described part that keeps off the rain is L-shaped, is provided with and is used on the inwall of the part that keeps off the rain Stop the skewback that rainwater enters in first breather pipe.
By using above-mentioned technical proposal, the part that keeps off the rain can stop to rainwater, reduce rainwater and enter the first breather pipe Interior probability, skewback will can again export into the rainwater to keep off the rain in part, further reduce rainwater and enter in the first breather pipe Probability.
The utility model is further arranged to:The described part that keeps off the rain includes ventilating part and occlusion part, on described ventilating part Integrated setting has fixed plate, is connected between the ventilating part and occlusion part by the fixed plate, shape between the fixed plate Into the steam vent of supplied gas discharge.
By using above-mentioned technical proposal, rainwater can be blocked in outside ventilating part by occlusion part, reduced rainwater and entered first Probability in breather pipe.
The utility model is further arranged to:Between the first described breather pipe and gas outlet, second breather pipe with It is fixedly connected between air inlet, the 3rd breather pipe by fixture.
By using above-mentioned technical proposal, the setting of fixture makes the first breather pipe, the second breather pipe and the 3rd breather pipe Easily disassembled replacing, there is certain practicality.
The utility model is further arranged to:Described fixture includes retainer ring and is fixedly connected in the retainer ring Sealing ring, the retainer ring both ends are fixedly connected by bolt and nut.
By using above-mentioned technical proposal, retainer ring will can interfix between pipeline, sealing ring can by pipeline it Between gap sealed, place gas leakage, the fixed form of bolt and nut facilitates disassembly and installation.
In summary, the utility model has the advantages that:
Directly the waste gas in sewage water inspection well can be handled, without will be located after sewage collecting to sewage treatment plant Reason, reduces the probability that waste gas in sewage distributes near sewage water inspection well;
Solar panels can carry out the adjustment of angle to different seasons, improve the efficiency that solar panels collect energy;
The portion of keeping off the rain can stop to rainwater, while ensureing to be vented, reduce interference of the rainwater to equipment;
Energy disassembly and installation, facilitates worker to change the pipeline to suffer erosion between pipeline.
Brief description of the drawings
Fig. 1 is external structure schematic diagram of the present utility model;
Fig. 2 is the attachment structure schematic diagram for embodying installing plate and solar panels;
Fig. 3 is to embody the attachment structure diagrammatic cross-section between spill spin block and clamping block;
Fig. 4 is the structural representation of fixture;
Fig. 5 is the diagrammatic cross-section for the part that keeps off the rain for embodying embodiment 1;
Fig. 6 is the diagrammatic cross-section for the part that keeps off the rain for embodying embodiment 2.
Reference:1st, support bar;11st, supporting plate;2nd, plasma generator;21st, controller;22nd, air inlet;23rd, go out Gas port;31st, the first breather pipe;32nd, the second breather pipe;33rd, the 3rd breather pipe;34th, keep off the rain part;341st, skewback;342nd, ventilating part; 343rd, occlusion part;344th, fixed plate;345th, steam vent;4th, installing plate;41st, swingle;42nd, drive gear;421st, rotating bar; 43rd, travelling gear;431st, drive rod;5th, solar panels;51st, energy storage device;6th, spill spin block;61st, card tieholen;62nd, elastic component; 63rd, clamping block;7th, fixture;71st, retainer ring;72nd, sealing ring;8th, sewage water inspection well;9th, air-introduced machine.
Embodiment
The utility model is described further referring to the drawings.
Embodiment 1:As shown in figure 1, a kind of sewage water inspection well integration waste gas treatment equipment, including section is in the branch of cylinder Strut 1, it is rectangular supporting plate 11 that section is fixedly connected with support bar 1, in addition to system, plasma hair occur for plasma Raw system includes the controller 21 being fixedly connected on support bar 1 and the plasma generator 2 being fixedly connected in supporting plate 11, Controller 21 is electrically connected with plasma generator 2 by circuit.
Plasma generator 2 is provided at both ends with air inlet 22 and gas outlet 23, and gas sampling is connected with air inlet 22 System, waste gas collecting system include the second L-shaped breather pipe 32 being fixedly connected on by fixture 7 on air inlet 22 and led to Cross fixture 7 and be connected to the second breather pipe 32 away from the 3rd L-shaped breather pipe 33 on the one end of air inlet 22, the 3rd breather pipe 33 one end away from the second breather pipe 32 are penetrated in sewage water inspection well 8.
As shown in Figure 1 and Figure 5, gas blow-off system, gas discharge system are connected with the gas outlet 23 of plasma generator 2 The first L-shaped breather pipe 31 that system includes being fixedly connected on by fixture 7 on gas outlet 23 leads to being fixedly connected on first Keep off the rain part 34 of the tracheae 31 away from the one end of gas outlet 23, the part 34 that keeps off the rain are the body of L-shaped, are fixedly connected on the inwall for the part 34 that keeps off the rain Have a skewback 341, skewback 341 can stop portions rainwater enter in the first breather pipe 31.
Induced draught system is connected with the inwall of first breather pipe 31, induced draught system includes being fixedly connected on the first breather pipe 31 The air-introduced machine 9 of inwall.
As shown in figure 1, being connected with solar power system on support bar 1, solar power system includes being connected to support Solar panels 5 and the energy storage device 51 being fixedly connected on support bar 1 on bar 1, energy storage device 51 and solar panels 5 pass through line Road is electrically connected, and energy storage device 51 is also electrically connected with controller 21, air-introduced machine 9 by circuit.
As shown in Figures 2 and 3, the installing plate 4 in cuboid is fixedly connected with support bar 1, three are fixedly connected with installing plate 4 It is individual to have section for circular swingle 41, pass through bearing on the outer wall of swingle 41(Do not illustrate in figure)It is rotatably connected to two drives Moving gear 42 and a travelling gear 43, drive gear 42 are located at the both sides of travelling gear 43 and intermeshed with travelling gear 43, Drive gear 42 and travelling gear 43 are all spur gear.The rotating bar of strip is respectively fixedly connected with two drive gears 42 421, the one end of rotating bar 421 away from drive gear 42 is fixedly connected with solar panels 5, and length is fixedly connected with travelling gear 43 The drive rod 431 of bar shaped, section is offered on drive rod 431 as circular card tieholen 61, the internal thread of card tieholen 61, which is connected with, to be cut Face is the spill spin block 6 of T-shaped, and spill spin block 6 is fixedly connected with elastic component 62 close to one end of card tieholen 61, and elastic component 62 is spring, The one end of elastic component 62 away from spill spin block 6 is fixedly connected with section as circular clamping block 63, and clamping block 63 is in card tieholen 61 Pushed against along being in axial sliding connection for card tieholen 61, and with the surface of installing plate 4.
As shown in figure 4, fixture 7 includes retainer ring 71 annular in shape and is fixedly connected on the material of the inner surface of retainer ring 71 For the sealing ring 72 of rubber, the both ends of retainer ring 71 are connected by bolt and nut.
In summary, system occurs for solar power system article on plasma and induced draught system is powered, and air-introduced machine 9 starts After work, suction caused by air-introduced machine 9 makes waste gas in sewage water inspection well be reached along the 3rd breather pipe 33 and the second breather pipe 32 etc. The air inlet 22 of ion generator 2, plasma generator 2 are handled waste gas, the harmful substance in waste gas is changed into harmless Carbon dioxide and water, be purified waste gas, purified gas flows out from gas outlet 23, is discharged into along the first breather pipe 31 It is outdoor.Because the position of the sun throughout the year is different from, worker is by rotation of drive rod 431 come the position to solar panels 5 Be adjusted, then drive rod 431 be fixed by rotating spill spin block 6, make solar panels 5 in each season as far as possible The most solar energy of acquisition.Due to containing substantial amounts of sulphur system material in the waste gas of sewage water inspection well, it is acid that generation can be combined with water Material, pipeline is eroded, therefore need to change pipeline after a longer time of use, by releasing bolt and nut pair The fixation of fixture 7 can carry out dismounting and change to pipeline.
Embodiment 2:As shown in Figure 5 and Figure 6, the difference uniquely from embodiment 1 be keep off the rain part 34 structure it is different, implement The pipe that part 34 is L-shaped that keeps off the rain of example 1, is provided with skewback 341, the rain for the part 34 that keeps off the rain will be entered by playing on the inwall for the part 34 that keeps off the rain The effect that water is discharged from skewback 341, reduce the rainwater entered in the first breather pipe 31;The part 34 that keeps off the rain of embodiment 2 is included in circle The ventilating part 342 of tubulose and tapered occlusion part 343, the projected area of occlusion part 343 cover ventilating part 342 close to occlusion part 343 one end, by two sections with the integrated setting of occlusion part 343 it is rectangle between ventilating part 342 and occlusion part 343 Fixed plate 344 be fixedly connected, between two fixed plates 344 formed supplied gas discharge the steam vent 345 being rectangle, ventilation Between the first breather pipe 31 and occlusion part 343, occlusion part 343 can block to ventilating part 342 in portion 342, reduce into Enter the rainwater in ventilating part 342.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

1. a kind of sewage water inspection well integration waste gas treatment equipment, it is characterized in that:Including support bar (1), on described support bar (1) Supporting plate (11) is fixedly connected with, is also included
Plasma occur system, including the plasma generator (2) being fixedly connected in the supporting plate (11) be fixedly connected Controller (21) on the support bar (1), air inlet (22) and gas outlet are provided with the plasma generator (2) (23), the plasma generator (2) electrically connects with the controller (21);
Waste gas collecting system, including the 3rd breather pipe (33) that one end is penetrated in sewage water inspection well, the 3rd breather pipe (33) The other end is fixedly connected with the second breather pipe (32), second breather pipe (32) one end and institute away from the 3rd breather pipe (33) Air inlet (22) is stated to be fixedly connected;
Gas blow-off system, including the first breather pipe (31) being fixedly connected on the gas outlet (23), first ventilation The one end of pipe (31) away from plasma generator (2) is fixedly connected with the part that keeps off the rain (34);
Induced draught system, including it is fixedly connected on the air-introduced machine (9) of the first breather pipe (31) inwall;
Solar power system, including the solar panels (5) that are connected on the support bar (1) and it is fixedly connected on the support Energy storage device (51) on bar (1), the solar panels (5) electrically connect with the energy storage device (51), the energy storage device (51) electrically connected with controller (21), air-introduced machine (9).
2. sewage water inspection well integration waste gas treatment equipment according to claim 1, it is characterized in that:Described support bar (1) On be fixedly connected with installing plate (4), be provided with described installing plate (4) driving solar panels (5) rotate actuator.
3. sewage water inspection well integration waste gas treatment equipment according to claim 2, it is characterized in that:Described actuator includes It is rotatably connected on installing plate (4) and intermeshing drive gear (42) and travelling gear (43), is fixedly connected on the biography Drive rod (431) on moving gear (43) and the rotating bar (421) being fixedly connected on drive gear (42), the rotating bar (421) one end away from drive gear (42) is fixedly connected with the solar panels (5), is provided with the drive rod (431) For the Fastener being fixed on drive rod (431) on installing plate (4).
4. sewage water inspection well integration waste gas treatment equipment according to claim 3, it is characterized in that:Described Fastener includes Spill spin block (6), elastic component (62) and clamping block (63), card tieholen (61), the card tieholen are offered on the drive rod (431) (61) interior edge card tieholen (61) has been in axial sliding connection the clamping block (63), is fixedly connected on the clamping block (63) Elastic component (62) is stated, the one end of the elastic component (62) away from clamping block (63) is fixedly connected with the spill spin block (6), the rotation Switch block (6) is threadedly coupled with the card tieholen (61), and described clamping block (63) pushes against with installing plate (4).
5. sewage water inspection well integration waste gas treatment equipment according to claim 1, it is characterized in that:The described part that keeps off the rain (34) It is L-shaped, the skewback entered for stopping rainwater in first breather pipe (31) is provided with the inwall of the part that keeps off the rain (34) (341)。
6. sewage water inspection well integration waste gas treatment equipment according to claim 1, it is characterized in that:The described part that keeps off the rain (34) Including ventilating part (342) and occlusion part (343), integrated setting has fixed plate (344) on described ventilating part (342), described Connected between ventilating part (342) and occlusion part (343) by the fixed plate (344), formed and supplied between the fixed plate (344) The steam vent (345) of gas discharge.
7. sewage water inspection well integration waste gas treatment equipment according to claim 1, it is characterized in that:The first described breather pipe (31) between gas outlet (23), pass through between second breather pipe (32) and air inlet (22), the 3rd breather pipe (33) Fixture (7) is fixedly connected.
8. sewage water inspection well integration waste gas treatment equipment according to claim 7, it is characterized in that:Described fixture (7) Including retainer ring (71) and the sealing ring (72) being fixedly connected in the retainer ring (71), retainer ring (71) both ends pass through Bolt and nut is fixedly connected.
CN201720573534.2U 2017-05-22 2017-05-22 Sewage water inspection well integration waste gas treatment equipment Active CN206793351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720573534.2U CN206793351U (en) 2017-05-22 2017-05-22 Sewage water inspection well integration waste gas treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720573534.2U CN206793351U (en) 2017-05-22 2017-05-22 Sewage water inspection well integration waste gas treatment equipment

Publications (1)

Publication Number Publication Date
CN206793351U true CN206793351U (en) 2017-12-26

Family

ID=60741742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720573534.2U Active CN206793351U (en) 2017-05-22 2017-05-22 Sewage water inspection well integration waste gas treatment equipment

Country Status (1)

Country Link
CN (1) CN206793351U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108303216A (en) * 2018-01-02 2018-07-20 京东方科技集团股份有限公司 A kind of gas-detecting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108303216A (en) * 2018-01-02 2018-07-20 京东方科技集团股份有限公司 A kind of gas-detecting device

Similar Documents

Publication Publication Date Title
CN212166837U (en) Filter equipment for nitrogen generator
CN206793351U (en) Sewage water inspection well integration waste gas treatment equipment
CN109126432B (en) High-efficient desulfurization absorption tower
CN207324416U (en) A kind of mine dedusting and purifying device
CN205933509U (en) Sewage treatment device based on graphite alkene
CN109469153B (en) Double-flow-pipe rainwater collecting, treating and utilizing system
CN114016595B (en) Water storage device of sponge urban complex
CN215463231U (en) Tail gas catalytic combustion system for anion resin workshop
CN215208967U (en) Energy-saving waste fitting discharging for town road
CN206001620U (en) Perfuming device is killed in a kind of chemical workshop air cleaning
CN210410139U (en) A gas cleaning device for integration of SOx/NOx control demercuration dust removal
CN211189654U (en) Exhaust treatment device with good purification effect
CN2423944Y (en) Horizontal water film dust removing desulurizer
CN207745621U (en) The tail gas activated carbon adsorption case prepared for H acid monosodium salt
CN207708744U (en) A kind of exhaust-gas treatment air extractor
CN206911073U (en) A kind of spray water mist deduster
CN216223410U (en) Baking waste gas collecting device for positive and negative electrode coating machine
CN206965420U (en) A kind of chemical materials processing air cleaning unit
CN219168079U (en) Waste gas treatment absorption tower
CN216342386U (en) Adjust clarification plant of automobile exhaust purification back emission
CN110523147A (en) A kind of environment-friendly type industrial waste-gas purifier
CN109185045A (en) A kind of large-scale wind driven generator applied to urban industry park
CN108607284A (en) A kind of arterial street lamppost based on solar energy and wind energy is with simply removing haze device
CN214299671U (en) Ultra-thin lithium electricity copper foil electrolyte counteracts filter
CN215486119U (en) Ventilation device for preventing coal mine gas from exceeding limit

Legal Events

Date Code Title Description
GR01 Patent grant