CN206787569U - A kind of cast-type control measurement stake - Google Patents
A kind of cast-type control measurement stake Download PDFInfo
- Publication number
- CN206787569U CN206787569U CN201720739234.7U CN201720739234U CN206787569U CN 206787569 U CN206787569 U CN 206787569U CN 201720739234 U CN201720739234 U CN 201720739234U CN 206787569 U CN206787569 U CN 206787569U
- Authority
- CN
- China
- Prior art keywords
- surface layer
- cast
- control measuring
- layer
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005259 measurement Methods 0.000 title description 8
- 239000002344 surface layer Substances 0.000 claims abstract description 64
- 238000007789 sealing Methods 0.000 claims abstract description 3
- 239000010410 layer Substances 0.000 claims description 24
- 230000002787 reinforcement Effects 0.000 claims description 7
- 230000007423 decrease Effects 0.000 claims description 5
- 239000002689 soil Substances 0.000 abstract description 16
- 238000000034 method Methods 0.000 abstract description 12
- 230000000694 effects Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000000243 solution Substances 0.000 description 4
- 239000003637 basic solution Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
本专利公开了一种现浇式控制测量桩,包括用于混凝土浇灌的管道,管道一端的外壁上设有用于夯实泥土的压面层,管道的另一端设有用于密封管道的垫面层,且压面层位于垫面层上方;管道的长度至少为60cm,压面层的厚度为8‑15cm,垫面层的厚度为10‑20cm。本方案主要解决了传统控制测量桩的埋设工艺地域限制和运输不便的问题。
This patent discloses a cast-in-place control measuring pile, which includes a pipe for pouring concrete. The outer wall of one end of the pipe is provided with a surface layer for compacting soil, and the other end of the pipe is provided with a cushion surface layer for sealing the pipe. And the pressing surface layer is located above the cushion surface layer; the length of the pipeline is at least 60cm, the thickness of the pressure surface layer is 8-15cm, and the thickness of the cushion surface layer is 10-20cm. This scheme mainly solves the problems of geographical limitation and inconvenient transportation of the buried process of traditional control measuring piles.
Description
技术领域technical field
本实用新型涉及一种测绘工程的控制测量桩领域。The utility model relates to the field of control measuring piles for surveying and mapping engineering.
背景技术Background technique
在工程施工过程中,测量是必不可少一道工序,需要工作人员到施工现场进行埋设控制测量桩。In the process of engineering construction, measurement is an indispensable process, and staff are required to go to the construction site to bury control measurement piles.
目前,控制测量桩的埋设工艺流程是:在厂房或固定的地方将控制测量桩浇筑好,再将浇筑好的控制测量桩运输到待埋设控制点的位置。实际操作过程中,控制测量桩浇筑过程中需要一个固定、宽敞的场地,有一定的地域限制;另外,浇筑好的控制测量桩较为笨重,不宜运输,尤其是控制点位置距离公路较远的地方,需要多个工作人员一起搬运,其搬运过程非常费劲,并且成本较高。At present, the embedding process of the control measuring pile is as follows: the control measuring pile is poured in a factory building or a fixed place, and then the poured control measuring pile is transported to the position of the control point to be buried. In the actual operation process, a fixed and spacious site is required in the pouring process of the control measuring pile, and there are certain geographical restrictions; in addition, the poured control measuring pile is relatively heavy and not suitable for transportation, especially where the control point is far away from the road , need multiple workers to move together, the handling process is very strenuous, and the cost is relatively high.
实用新型内容Utility model content
本实用新型意在提供一种现浇式控制测量桩,以解决传统控制测量桩的埋设工艺地域限制和运输不便的问题。The utility model intends to provide a cast-in-place control measuring pile to solve the problems of geographical limitation and inconvenient transportation of the buried process of the traditional control measuring pile.
为了达到上述目的,本实用新型的基础方案如下:一种现浇式控制测量桩,包括用于混凝土浇灌的管道,所述管道一端的外壁上设有用于夯实泥土的压面层,管道的另一端设有用于密封管道的垫面层,且压面层位于垫面层上方;所述管道的长度至少为60cm,所述压面层的厚度为8-15cm,所述垫面层的厚度为10-20cm。In order to achieve the above object, the basic scheme of the utility model is as follows: a cast-in-place control measuring pile, including a pipeline for pouring concrete, the outer wall of one end of the pipeline is provided with a surface layer for compacting soil, the other of the pipeline One end is provided with the backing layer that is used for sealing pipeline, and the pressure surface layer is positioned at the top of the backing layer; The length of described pipeline is at least 60cm, and the thickness of described pressure surface layer is 8-15cm, and the thickness of described backing layer is 10-20cm.
基础方案的原理:在预埋设的地点挖坑,坑的宽度从上之下逐渐减小,且坑的最小宽度大于管道的宽度,坑的底部放置垫面层;将管道放入坑内,管道的底部与垫面层连接,并利用垫面层对管道的底部进行密封。The principle of the basic scheme: dig a pit at the pre-embedded site, the width of the pit gradually decreases from top to bottom, and the minimum width of the pit is greater than the width of the pipe, and a cushion layer is placed at the bottom of the pit; the pipe is placed in the pit, and the width of the pipe The bottom is connected with the bedding layer, and the bottom of the pipe is sealed by the bedding layer.
向坑内填满泥土并覆盖垫面层,将压面层与管道连接并覆盖泥土,利用压面层夯实泥土,使得泥土紧实;通过压面层、垫面层和紧实的泥土对管道进行限位,使得管道的定位效果更佳、更稳定。向管道内浇灌混凝土即可制得控制测量桩,该控制测量桩可作为一个基准点,便于测量其坐标,方便后期的工程施工。Fill the pit with soil and cover the cushion surface layer, connect the pressure surface layer with the pipeline and cover the soil, use the pressure surface layer to tamp the soil to make the soil compact; use the pressure surface layer, cushion surface layer and compacted soil to carry out the pipeline The position limit makes the positioning effect of the pipeline better and more stable. The control measuring pile can be made by pouring concrete into the pipeline, and the controlling measuring pile can be used as a reference point, which is convenient for measuring its coordinates and facilitating later engineering construction.
基础方案的优点:本方案利用管道充当控制测量桩的移动模具,根据预埋设的地点可在不同的位置进行现场浇灌混凝土,制得控制测量桩,相较于传统控制测量桩的埋设工艺,本方案有效的解决了地域限制的问题,并且不需要提前浇筑标石,减少了相应的工序,实用性更强。Advantages of the foundation scheme: this scheme uses pipes as the mobile mold of the control measurement pile, and concrete can be poured on site at different positions according to the pre-embedded location to obtain the control measurement pile. Compared with the traditional control measurement pile embedding process, this The scheme effectively solves the problem of geographical restrictions, and does not need to pour marker stones in advance, which reduces the corresponding procedures and is more practical.
相较于传统控制测量桩的运输,本方案将运输控制测量桩转变为运输混凝土材料,降低了运输难度和运输成本,为运输提供了便利。Compared with the transportation of traditional control measurement piles, this scheme transforms the transportation control measurement piles into transportation of concrete materials, which reduces the difficulty and cost of transportation and provides convenience for transportation.
另外:1、管道的长度至少为60cm,管道的长度可根据控制点等级的不同做相应调整。2、将压面层的厚度设置为8-15cm,将垫面层的厚度设置为10-20cm,此范围值的压面层和垫面层配合泥土对管道的限位效果好。In addition: 1. The length of the pipeline is at least 60cm, and the length of the pipeline can be adjusted according to the level of the control point. 2. Set the thickness of the pressure surface layer to 8-15cm, and set the thickness of the cushion surface layer to 10-20cm. The pressure surface layer and the cushion surface layer in this range can cooperate with the soil to limit the pipe.
优选方案一:作为基础方案的优选方案,所述管道为PVC排水管,通过上述设置,PVC排水管价格便宜,且施工便捷,安装功效高。Preferred option 1: As the preferred option of the basic solution, the pipe is a PVC drainage pipe. Through the above configuration, the PVC drainage pipe is cheap, easy to construct, and has high installation efficiency.
优选方案二:作为优选方案一的优选方案,所述PVC排水管直径为200-1000mm,通过上述设置,可满足不同等级控制点的要求。Preferred option 2: As a preferred option of preferred option 1, the PVC drainage pipe has a diameter of 200-1000 mm, and through the above configuration, it can meet the requirements of different levels of control points.
优选方案三:作为基础方案的又一优选方案,所述压面层与垫面层的间距为25-42cm,通过上述设置,此范围值的压面层和垫面层对泥土的限位效果好,进一步提高了对管道的限位效果。Preferred option three: As another preferred option of the basic solution, the distance between the pressing surface layer and the cushion surface layer is 25-42cm. Through the above settings, the limiting effect of the pressure surface layer and the cushion surface layer on the soil in this range Well, the limit effect on the pipeline has been further improved.
优选方案四:作为基础方案的又一优选方案,还包括加固层,所述加固层套接于垫面层的外壁上,通过上述设置,加固层对垫面层可起到限位和稳定效果,进一步提高垫面层对管道限位的稳定性。Optimum solution 4: As another preferred solution of the basic solution, a reinforcement layer is also included, and the reinforcement layer is sleeved on the outer wall of the bedding layer. Through the above configuration, the reinforcement layer can limit and stabilize the bedding layer , to further improve the stability of the bedding layer to the pipeline limit.
优选方案五:作为优选方案四的优选方案,所述垫面层与加固层一体成型,通过上述设置,一体成型的结构稳定性更高,进一步提高垫面层对管道限位的稳定性。Preferred Solution 5: As a preferred solution of Preferred Option 4, the cushioning layer and the reinforcement layer are integrally formed. Through the above-mentioned configuration, the structural stability of the integral formation is higher, and the stability of the cushioning layer to the pipe is further improved.
优选方案六:作为基础方案的又一优选方案,所述压面层的宽度从上至下逐渐增大,所述垫面层的宽度从上至下逐渐减小,通过上述设置,垫面层的形状与坑的内壁更匹配、更贴合,增加了垫面层与坑的内壁的接触面积,增大了摩擦力,进而加强了对管道的限位效果;由于垫面层用于夯实泥土的面为垫面层的底部,因此,垫面层的宽度从上至下逐渐增大,可进一步节省材料的耗费,降低成本。Preferred Scheme Six: As another preferred scheme of the basic scheme, the width of the press surface layer gradually increases from top to bottom, and the width of the cushion surface layer gradually decreases from top to bottom. Through the above settings, the cushion surface layer The shape of the pit is more matched and fitted to the inner wall of the pit, which increases the contact area between the cushion surface layer and the inner wall of the pit, increases the friction force, and then strengthens the position-limiting effect on the pipeline; because the cushion surface layer is used to compact the soil The surface is the bottom of the cushion surface layer, therefore, the width of the cushion surface layer gradually increases from top to bottom, which can further save material consumption and reduce costs.
优选方案七:作为优选方案六的优选方案,所述压面层和垫面层均由混凝土制得,通过上述设置,压面层、垫面层均与控制测量桩的材料相同,无需另外准备,使用更方便。Optimum option 7: As an optimal option of preferred option 6, both the pressure surface layer and the cushion surface layer are made of concrete. Through the above settings, the pressure surface layer and the cushion surface layer are all the same material as the control measuring pile, and no additional preparation is required , more convenient to use.
附图说明Description of drawings
图1为本实用新型一种现浇式控制测量桩实施例的结构示意图;Fig. 1 is a structural schematic diagram of an embodiment of a cast-in-place control measuring pile of the present invention;
图2为图1的俯视图。FIG. 2 is a top view of FIG. 1 .
具体实施方式detailed description
下面通过具体实施方式对本实用新型作进一步详细的说明:The utility model is described in further detail below by means of specific embodiments:
说明书附图中的附图标记包括:PVC排水管1、压面层2、垫面层3。The reference signs in the accompanying drawings of the specification include: PVC drainage pipe 1 , pressure surface layer 2 , cushion surface layer 3 .
实施例基本如附图1和图2所示:一种现浇式控制测量桩,包括用于混凝土浇灌的PVC排水管1,且PVC排水管1的直径为200mm,PVC排水管1的长度为60cm,PVC排水管1的长度和直径可根据控制点等级的不同做相应调整;PVC排水管1的上端外壁固定连接有用混凝土制得的压面层2,PVC排水管1的下端固定连接有用混凝土制得的垫面层3。Embodiment is shown in Figure 1 and Figure 2 basically: a kind of cast-in-place control measuring pile, comprises the PVC drainage pipe 1 that is used for concrete pouring, and the diameter of PVC drainage pipe 1 is 200mm, and the length of PVC drainage pipe 1 is The length and diameter of the PVC drainage pipe 1 can be adjusted accordingly according to the different levels of control points; the outer wall of the upper end of the PVC drainage pipe 1 is fixedly connected with the pressure surface layer 2 made of concrete, and the lower end of the PVC drainage pipe 1 is fixedly connected with the concrete The prepared cushion surface layer 3.
压面层2的厚度为10cm,垫面层3的厚度为15cm,且压面层2与垫面层3的间距为35cm;压面层2的宽度从上至下逐渐增大,垫面层3的宽度从上至下逐渐减小;垫面层的形状与坑的内壁更匹配、更贴合,增加了垫面层与坑的内壁的接触面积,增大了摩擦力,进而加强了对PVC排水管的限位效果;由于垫面层用于夯实泥土的面为垫面层的底部,因此,垫面层的宽度从上至下逐渐增大,可进一步节省材料的耗费,降低成本。The thickness of the pressure surface layer 2 is 10cm, the thickness of the cushion surface layer 3 is 15cm, and the distance between the pressure surface layer 2 and the cushion surface layer 3 is 35cm; the width of the pressure surface layer 2 increases gradually from top to bottom, and the cushion surface layer The width of 3 gradually decreases from top to bottom; the shape of the cushioning layer matches and fits better with the inner wall of the pit, which increases the contact area between the cushioning layer and the inner wall of the pit, increases the friction force, and strengthens the frictional force. The limit effect of the PVC drainage pipe; since the surface of the cushion surface is used to tamp the soil is the bottom of the cushion surface layer, the width of the cushion surface layer gradually increases from top to bottom, which can further save material consumption and reduce costs.
本实施例中,在预埋设的地点挖坑,坑的宽度从上之下逐渐减小,且坑的最小宽度大于PVC排水管1的宽度,坑的底部铺设有垫面层3;将PVC排水管1放入坑内,PVC排水管1的底部伸入垫面层3内固定,并利用垫面层3对PVC排水管1的下端进行密封和定位。In this embodiment, a pit is dug at the pre-buried place, the width of the pit gradually decreases from top to bottom, and the minimum width of the pit is greater than the width of the PVC drainage pipe 1, and the bottom of the pit is laid with a bedding layer 3; the PVC drainage The pipe 1 is put into the pit, and the bottom of the PVC drain pipe 1 extends into the bedding layer 3 to be fixed, and the bedding layer 3 is used to seal and position the lower end of the PVC drain pipe 1 .
向坑内填满泥土并覆盖垫面层3,在泥土表面铺设有压面层2并与PVC排水管1的上端外壁固接,利用压面层2夯实泥土使得泥土紧实,并且,压面层2还能对PVC排水管1的上端进行定位;通过压面层2、垫面层3和紧实的泥土对PVC排水管1进行限位,使得PVC排水管1的定位效果更佳、更稳定。向PVC排水管1内浇灌混凝土即可制得控制测量桩,该控制测量桩可作为一个基准点,便于测量其坐标,方便后期的工程施工。Fill the pit with soil and cover the cushion surface layer 3, lay a pressure surface layer 2 on the soil surface and fix it with the upper outer wall of the PVC drainage pipe 1, use the pressure surface layer 2 to tamp the soil to make the soil compact, and the pressure surface layer 2. The upper end of the PVC drainage pipe 1 can also be positioned; the PVC drainage pipe 1 is limited by the pressing surface layer 2, the cushion surface layer 3 and the compacted soil, so that the positioning effect of the PVC drainage pipe 1 is better and more stable . The control measuring pile can be obtained by pouring concrete into the PVC drainage pipe 1, and the controlling measuring pile can be used as a reference point, which is convenient for measuring its coordinates and facilitating later engineering construction.
以上所述的仅是本实用新型的实施例,方案中公知的具体结构和/或特性等常识在此未作过多描述。应当指出,对于本领域的技术人员来说,在不脱离本实用新型结构的前提下,还可以作出若干变形和改进,这些也应该视为本实用新型的保护范围,这些都不会影响本实用新型实施的效果和专利的实用性。本申请要求的保护范围应当以其权利要求的内容为准,说明书中的具体实施方式等记载可以用于解释权利要求的内容。What has been described above is only an embodiment of the present invention, and common knowledge such as specific structures and/or characteristics known in the scheme are not described here too much. It should be pointed out that for those skilled in the art, under the premise of not departing from the structure of the utility model, some deformations and improvements can also be made, and these should also be regarded as the protection scope of the utility model, and these will not affect the utility model. Effects of novel implementations and utility of patents. The scope of protection required by this application shall be based on the content of the claims, and the specific implementation methods and other records in the specification may be used to interpret the content of the claims.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720739234.7U CN206787569U (en) | 2017-06-23 | 2017-06-23 | A kind of cast-type control measurement stake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720739234.7U CN206787569U (en) | 2017-06-23 | 2017-06-23 | A kind of cast-type control measurement stake |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206787569U true CN206787569U (en) | 2017-12-22 |
Family
ID=60718077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720739234.7U Expired - Fee Related CN206787569U (en) | 2017-06-23 | 2017-06-23 | A kind of cast-type control measurement stake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206787569U (en) |
-
2017
- 2017-06-23 CN CN201720739234.7U patent/CN206787569U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106840086B (en) | Quick consolidation soft soil test device of ultralow position vacuum preloading method | |
CN106703050A (en) | Expansive soil road cutting side slope reinforced soil back-pressure seepage-preventive supporting structure and construction method thereof | |
CN104060631B (en) | A kind of manhole mouth elevation Dynamic controlling structure | |
CN108560542B (en) | A kind of bidirectional reinforcement of waste tire covering building slag and construction method thereof | |
CN104404983B (en) | A kind of ride well device and construction method thereof for jacking construction | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN102635113A (en) | Construction method for hydraulic vibrating sinking pipe cast-in-place piles | |
CN108412016A (en) | Underground tube body assures construction method | |
CN102041814A (en) | Novel composite pile (ground) foundation and application method thereof | |
CN102493485B (en) | A construction method of filling slope protection retaining wall | |
CN111794030A (en) | The method of widening the embankment foundation at the building through the embankment | |
CN104695417B (en) | A kind of manufacture method of grouting behind shaft or drift lining broken stone pile | |
CN113323017B (en) | Construction method of side wall fertilizer groove foam concrete backfill system | |
CN206787569U (en) | A kind of cast-type control measurement stake | |
CN206220108U (en) | Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction | |
CN110552378A (en) | Underground space roof subsides post-cast strip and seals structure in advance | |
CN106836034B (en) | A flexible load-reducing system and construction method of high-fill cover slab culvert | |
CN203891012U (en) | Novel filling pile with prearranged clay pile | |
CN104727289B (en) | A kind of construction method controlling multi-layered aquifer leakage-releasing water protection surrounding | |
CN208137097U (en) | Prefabricated seepage well | |
CN203096758U (en) | Hard concrete smooth foundation pit for installing drainage pipeline | |
CN207109805U (en) | Wear the compound isolation pile of bridge pier in a kind of tunnel side | |
CN206971040U (en) | A kind of special discharge structure in walking road surface | |
CN107063178B (en) | Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof | |
CN207904912U (en) | Band expands shoe stake side two-step-filling construction of prefabricated piles structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20180623 |
|
CF01 | Termination of patent right due to non-payment of annual fee |