CN206783622U - A kind of selexol process process unit - Google Patents

A kind of selexol process process unit Download PDF

Info

Publication number
CN206783622U
CN206783622U CN201720574578.7U CN201720574578U CN206783622U CN 206783622 U CN206783622 U CN 206783622U CN 201720574578 U CN201720574578 U CN 201720574578U CN 206783622 U CN206783622 U CN 206783622U
Authority
CN
China
Prior art keywords
line
pipeline
ball valve
valve
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720574578.7U
Other languages
Chinese (zh)
Inventor
杨柳青青
王建军
林列
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xiyouzhicheng Petroleum Technology Co Ltd
Original Assignee
Sichuan Xiyouzhicheng Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Xiyouzhicheng Petroleum Technology Co Ltd filed Critical Sichuan Xiyouzhicheng Petroleum Technology Co Ltd
Priority to CN201720574578.7U priority Critical patent/CN206783622U/en
Application granted granted Critical
Publication of CN206783622U publication Critical patent/CN206783622U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model belongs to selexol process technical field, specifically, it is related to a kind of selexol process process unit, including the first gas-liquid separator, absorption tower, the second gas-liquid separator, foam-catching tank, regenerator, sulfur filtration pond, lean pump, flushing pump, air blower, wherein air blower and the first motor are electrically connected with, and lean pump and the second motor are electrically connected with, and flushing pump and the 3rd motor are electrically connected with.After sulfurous gas enters absorption tower, the gas after desulfurization is sent in regenerator after the second gas-liquid separator;Caused sulfur-bearing foam delivers to desulfurizing agent rich solution in regenerator after foam-catching tank precipitates;Desulfurizing agent rich solution in absorption tower is then sent directly in regenerator, selexol process process unit provided by the utility model to the processed gas in absorption tower, sulfur-bearing foam, desulfurizing agent rich solution by taking different handling process, the clogging for solving selexol process process unit.

Description

A kind of selexol process process unit
Technical field
A kind of selexol process process unit is the utility model is related to, belongs to selexol process technical field.
Background technology
The natural gas of reservoir extraction contains some sour gas generally in addition to containing vapor, toward contact, these sour gas Body is usually the gaseous impurities such as hydrogen sulfide, mercaptan, thioether, and wherein hydrogen sulfide is the maximum acidic components of natural gas Poisoning.My god Hydrogen sulfide content becomes with geographical diversity in right gas, and China Main Natural Gas field belongs to high sulfur-containing natural gas (GB17820- 2012《Natural gas》Mandatory national standards provide, in second category of commodities natural gas H2S contents it is necessary≤20mg/m3.Class I goods In natural gas H2S contents it is necessary≤6mg/m3), hydrogen sulfide not only has very strong toxicity, while also has very strong corrosivity, Gas transmission line is easily done great damage, therefore desulfurization process must all be carried out to the sulfur-containing gas of reservoir extraction.
Currently used selexol process process unit, the problem that pipeline or device are blocked all be present.
Utility model content
The utility model provides a kind of selexol process process unit, it is intended that solving to exist in the prior art Above mentioned problem.
The technical solution of the utility model is as follows:
The utility model provides a kind of selexol process process unit, including the first gas-liquid separator, absorption tower, second Gas-liquid separator, foam-catching tank, regenerator, sulfur filtration pond, lean pump, flushing pump, air blower;
First gas-liquid separator is provided with sour gas admission line, the first outlet line and the first tapping line, and first goes out Gas pipeline is provided with the first blowdown line, and the first outlet line is connected with absorption tower;
Absorption tower is provided with the first feed liquor pipeline, the second feed liquor pipeline, the 3rd feed liquor pipeline, the second outlet line, second Tapping line, the first overflow launder is additionally provided with absorption tower in addition, and corresponding first overflow launder feed tube is provided with absorption tower Line and the first overflow launder drain pipe line, wherein the first feed liquor pipeline and the first outlet line are connected, the first feed liquor pipeline, second enter Liquid pipe line and the first overflow launder feed liquor pipeline are connected with re-injection pipeline respectively, the 3rd feed liquor pipeline and the first overflow launder drain pipe line It is connected respectively with foam-catching tank, the second outlet line and the second gas-liquid separator are connected, and the second outlet line is let out provided with second Pressure pipeline, the second blowdown line and the first blowdown line are connected, and the second tapping line is connected with regenerator;
Second gas-liquid separator is provided with the 3rd outlet line, the 3rd tapping line and the first air inlet, the 3rd escape pipe Line is provided with the 3rd blowdown line, and the 3rd blowdown line and the first blowdown line are connected, and the 3rd tapping line is connected with regenerator, First air inlet and the second outlet line are connected;
Foam-catching tank is provided with the 4th outlet line, the 4th tapping line, the first inlet and the first rinse mouth, the 4th outlet Pipeline and the 3rd feed liquor pipeline are connected, and the 4th tapping line is connected with regenerator and sulfur filtration pond respectively, the first inlet and First overflow launder drain pipe line is connected, and the first rinse mouth is connected by clean-up line with sulfur filtration pond;
Regenerator is provided with air inlet pipeline, the 5th outlet line, the 5th tapping line, the second inlet and the 3rd and entered Liquid mouth, is additionally provided with the second overflow launder in addition in regenerator, and is provided with regenerator corresponding second overflow launder inlet and the Two overflow launder drain pipe lines, air inlet pipeline are connected with air blower, and air inlet pipeline and the second tapping line are connected, drum Blower fan and the first motor are electrically connected with, and the 5th tapping line and the 4th tapping line are connected, the second inlet and the 3rd discharging tube Line is connected, and the 3rd inlet and the 4th tapping line are connected, and the second overflow launder inlet is connected with clean-up line, the second overflow launder Drain pipe line is connected with sulfur filtration pond;
Sulfur filtration pond is provided with the 4th inlet, the 5th inlet, filter and liquid-accumulating trough, the 4th inlet and the 4th Tapping line is connected, and the 5th inlet and the second overflow launder drain pipe line are connected, liquid-accumulating trough respectively with re-injection pipeline and flush pipe Line is connected;
Re-injection pipeline is provided with lean pump, and lean pump and the second motor are electrically connected with;
Clean-up line is provided with flushing pump, and flushing pump and the 3rd motor are electrically connected with.
In embodiment provided by the utility model, level gauging pipeline is additionally provided with above-mentioned first gas-liquid separator, is contained The first ball valve is additionally provided with sulphur admission line, the first outlet line is provided with the second ball valve, is sequentially provided with the first tapping line Hydraulic control circuit, the 3rd ball valve, first manual blowoff valve, the first blowdown line are provided with pressure release loop;
Level gauging pipeline includes the 4th ball valve, liquid level gauge and the 5th ball valve being sequentially connected in series;
Hydraulic control circuit includes the 6th ball valve, hydraulic control valve, the 7th ball valve, stop valve and the second manual blowdown valve, It is connected in parallel after wherein the 6th ball valve, hydraulic control valve and the 7th ball valve are sequentially connected in series and with stop valve, second arranges manually Dirty valve is located between the 6th ball valve and hydraulic control valve;
Pressure release loop includes three pipelines in parallel, and first article of pipeline is provided with the 8th ball valve, rupture disk and the 9th ball valve, the Two articles of pipelines are provided with the tenth ball valve, safety valve and the 11st ball valve, and Article 3 pipeline is provided with the 12nd ball valve, and rupture disk It is provided with pressometer.
In embodiment provided by the utility model, level gauging pipeline, and the first feed liquor are additionally provided with above-mentioned absorption tower Pipeline is provided with the 13rd ball valve, and the second feed liquor pipeline is provided with the 14th ball valve, the 3rd feed liquor pipeline is provided with the 15th ball Valve, the second outlet line are provided with the 16th ball valve, and the second blowdown line is provided with pressure release loop, and the second tapping line is provided with 3rd manual blowdown valve and hydraulic control circuit, the first overflow launder feed liquor pipeline are provided with the 17th ball valve, and the first overflow launder goes out Liquid pipe line is provided with the 18th ball valve.
In embodiment provided by the utility model, above-mentioned second gas-liquid separator is provided with level gauging pipeline, and the 3rd Outlet line is provided with the 19th ball valve, and the 3rd tapping line is provided with the 4th manual blowdown valve, the 20th ball valve and hydraulic pressure control Loop processed, and the 3rd blowdown line is provided with pressure release loop.
In embodiment provided by the utility model, above-mentioned foam-catching tank is provided with level gauging pipeline, the 4th outlet line The 21st ball valve is provided with, the 4th tapping line is divided into regenerator connecting pipeline and sulfur filtration pond connecting pipeline again, regeneration Tower connecting pipeline is provided with the 22nd ball valve and hydraulic control circuit, and sulfur filtration pond connecting pipeline is provided with the 23rd ball Valve, the 4th tapping line are provided with the 5th manual blowdown valve, and clean-up line is provided with check-valves.
In embodiment provided by the utility model, above-mentioned regenerator is provided with level gauging pipeline, and sulfur filtration pond connects Adapter line is provided with the 24th ball valve and hydraulic control circuit, and overflow launder inlet is connected with clean-up line, on clean-up line Provided with the 25th ball valve.
In embodiment provided by the utility model, water charge line and plus desulfurizing agent pipe are additionally provided with above-mentioned sulfur filtration pond Line.
In embodiment provided by the utility model, in the liquid level gauge and hydraulic control circuit in above-mentioned level gauging pipeline Hydraulic control valve be connected, after the liquid level that liquid level gauge measures reaches the liquid level of setting, hydraulic control valve is from closure State switchs to opening.
In embodiment provided by the utility model, liquid desulfurizing agent is provided with absorption tower.
The beneficial effects of the utility model are:Sulfurous gas enters absorption tower and desulfurizing agent reacts and carries out desulfurization work Industry:Escaping gas enters the second gas-liquid separator in desulfuration operations;Caused sulfur-bearing foam flows into foam-catching tank;The desulfurization of generation Agent rich solution is then sent to regenerator, and selexol process process unit provided by the utility model passes through to absorption tower desulfuration operations mistake Gas, sulfur-bearing foam, the desulfurizing agent rich solution occurred in journey takes different handling process respectively, solves in selexol process The blockage problem occurred in technical process in each device and related pipeline due to sulfur deposition.In addition, the utility model provides Selexol process process unit be also specially provided with flushing pump and clean-up line, can be to foam-catching tank, regenerator and therebetween Connecting pipeline is rinsed, and further improves the anti-clogging of the selexol process process unit.
Brief description of the drawings
, below will be to required in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment The accompanying drawing used is briefly described, it will be appreciated that and the following drawings illustrate only some embodiments of the present utility model, therefore not The restriction to scope is should be considered as, for those of ordinary skill in the art, on the premise of not paying creative work, Other related accompanying drawings can also be obtained according to these accompanying drawings.
The selexol process process unit structure chart that Fig. 1 the utility model embodiments provide;
The first structure of gas liquid separator figure that Fig. 2 the utility model embodiments provide;
The level gauging line construction figure that Fig. 3 the utility model embodiments provide;
The hydraulic control circuit structure chart that Fig. 4 the utility model embodiments provide;
The pressure release loop structure figure that Fig. 5 the utility model embodiments provide;
The absorption tower structure chart that Fig. 6 the utility model embodiments provide;
The second structure of gas liquid separator figure that Fig. 7 the utility model embodiments provide;
The foam-catching tank structure chart that Fig. 8 the utility model embodiments provide;
The regenerator structure chart that Fig. 9 the utility model embodiments provide;
The sulfur filtration pool structure figure that Figure 10 the utility model embodiments provide.
Shown in figure:100- selexol process process units;The gas-liquid separators of 1- first;10- sour gas admission lines; The ball valves of 101- first;The outlet lines of 11- first;The ball valves of 110- second;The tapping lines of 12- first;The ball valves of 120- the 3rd;122- One manual blowdown valve;The blowdown lines of 13- first;2- absorption towers;20- the first feed liquor pipelines;The ball valves of 200- the 13rd;21- second Feed liquor pipeline;The ball valves of 210- the 14th;The feed liquor pipelines of 22- the 3rd;The ball valves of 220- the 15th;The outlet lines of 23- second;230- 16 ball valves;The tapping lines of 24- second;The manual blowdown valves of 240- the 3rd;The overflow launders of 25- first;26- the first overflow launder feed tubes Line;The ball valves of 260- the 17th;27- the first overflow launder drain pipe lines;The ball valves of 270- the 18th;The blowdown lines of 28- second;3- second Gas-liquid separator;The outlet lines of 30- the 3rd;The ball valves of 300- the 19th;The tapping lines of 31- the 3rd;The ball valves of 310- the 20th;311- 4th manual blowdown valve;The air inlets of 32- first;The blowdown lines of 33- the 3rd;4- foam-catching tanks;The outlet lines of 40- the 4th;400- 21 ball valves;The tapping lines of 41- the 4th;410- regenerator connecting pipelines;412- sulfur filtrations pond connecting tube;413- the 20th Two ball valves;The ball valves of 414- the 23rd;The manual blowdown valves of 415- the 5th;The ball valves of 416- the 24th;The inlets of 42- first;43- First rinse mouth;5- regenerators;50- air inlet pipelines;The outlet lines of 51- the 5th;The tapping lines of 52- the 5th;53- second enters Liquid mouth;The inlets of 54- the 3rd;The overflow launders of 55- second;56- the second overflow launder inlets;57- the second overflow launder drain pipe lines; 58- air blowers;The motors of 59- first;6- sulfur filtrations pond;The inlets of 60- the 4th;The inlets of 61- the 5th;62- filters;63- Liquid-accumulating trough;64- water charge lines;65- adds desulfurizing agent pipeline;7- re-injection pipelines;70- lean pumps;The motors of 71- second;8- flush pipes Line;80- flushing pumps;The motors of 81- the 3rd;82- check-valves;The ball valves of 83- the 25th;14- level gauging pipelines;The balls of 140- the 4th Valve;142- liquid level gauges;The ball valves of 144- the 5th;15- hydraulic control circuits;The ball valves of 150- the 6th;151- hydraulic control valves;152- Seven ball valves;153- stop valves;The manual blowdown valves of 154- second;16- pressure releases loop;The ball valves of 160- the 8th;161- rupture disks;162- 9th ball valve;The ball valves of 163- the tenth;164- safety valves;The ball valves of 165- the 11st;The ball valves of 166- the 12nd;167- pressure measxurements Meter.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
To make the purpose, technical scheme and advantage of the utility model embodiment clearer, below in conjunction with this practicality Accompanying drawing in new embodiment, the technical scheme in the utility model embodiment is clearly and completely described, shown So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.Therefore, below It is new that the detailed description of embodiment of the present utility model to providing in the accompanying drawings is not intended to limit this claimed practicality The scope of type, but it is merely representative of selected embodiment of the present utility model.Based on the embodiment in the utility model, ability All other embodiment that domain those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
In description of the present utility model, it is to be understood that the term of indicating position or position relationship is based on accompanying drawing Shown orientation or position relationship, it is for only for ease of description the utility model and simplifies description, rather than indicates or imply institute The equipment or element of finger must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this reality With new limitation.
Embodiment:
A kind of selexol process process unit 100, including the first gas-liquid separator 1, absorption tower 2, the second gas-liquid separator 3rd, foam-catching tank 4, regenerator 5, sulfur filtration pond 6, lean pump 70, flushing pump 80, air blower 58.
First gas-liquid separator 1 is provided with sour gas admission line 10, the first outlet line 11 and the first tapping line 12, First outlet line 11 is provided with the first blowdown line 13, and the first outlet line 11 is connected with absorption tower 2.
Absorption tower 2 is provided with the first feed liquor pipeline 20, the second feed liquor pipeline 21, the 3rd feed liquor pipeline 22, the second escape pipe Line 23, the second tapping line 24, are additionally provided with the first overflow launder 25 in addition in absorption tower 2, and are provided with absorption tower 2 corresponding the One overflow launder feed liquor pipeline 26 and the first overflow launder drain pipe line 27, wherein the first feed liquor pipeline 20 and the phase of the first outlet line 11 Even, the first feed liquor pipeline 20, the second feed liquor pipeline 21 and the first overflow launder feed liquor pipeline 26 are connected with re-injection pipeline 7 respectively, the Three feed liquor pipelines 22 and the first overflow launder drain pipe line 27 are connected with foam-catching tank 4 respectively, the second outlet line 23 and the second gas-liquid Separator 3 is connected, and the second outlet line 23 is provided with the second blowdown line 28, the second blowdown line 28 and the first blowdown line 13 are connected, and the second tapping line 24 is connected with regenerator 5.
Specifically, the first feed liquor pipeline 20 is used to absorb the sulfide in sulfurous gas;Second feed liquor pipeline 21 is used to tie up Hold the liquid level in absorption tower 2;First overflow launder feed liquor pipeline 26 is used to rinse through the desulfurizing agent lean solution in re-injection pipeline 7 First overflow launder 25;First overflow launder drain pipe line 27 is used to deliver to sulfur-bearing foam in foam-catching tank 4, and containing in foam-catching tank 4 Sulphur gas is then reentered in absorption tower 2 through the 3rd feed liquor pipeline 22.
Second gas-liquid separator 3 is provided with the 3rd outlet line 30, the 3rd tapping line 31 and the first air inlet 32, and the 3rd Outlet line 30 is provided with the 3rd blowdown line 33, and the 3rd blowdown line 33 is connected with the first blowdown line 13, the 3rd discharging tube Line 31 is connected with regenerator 5, and the first air inlet 32 is connected with the second outlet line 23.
Foam-catching tank 4 is provided with the 4th outlet line 40, the 4th tapping line 41, the first inlet 42 and the first rinse mouth 43, the 4th outlet line 40 is connected with the 3rd feed liquor pipeline 22, the 4th tapping line 41 respectively with regenerator 5 and sulfur filtration pond 6 are connected, and the first inlet 42 is connected with the first overflow launder drain pipe line 27, and the first rinse mouth 43 passes through clean-up line 8 and sulphur Filtering ponds 6 are connected.
Specifically, the first overflow launder drain pipe line 27 is used to enter the sulfurous gas re-injection in foam-catching tank 4 into absorption tower 2 Row desulfuration operations.
Regenerator 5 is provided with air inlet pipeline 50, the 5th outlet line 51, the 5th tapping line 52, the second inlet 53 and the 3rd inlet 54, the second overflow launder 55 is additionally provided with regenerator 5 in addition, and corresponding second is provided with regenerator 5 The overflow launder drain pipe line 57 of overflow launder inlet 56 and second, air inlet pipeline 50 is connected with air blower 58, and air inlet Pipeline 50 is connected with the second tapping line 24, and the motor 59 of air blower 58 and first is electrically connected with, the 5th tapping line 52 and the 4th Tapping line 41 is connected, and the second inlet 53 is connected with the 3rd tapping line 31, the 3rd inlet 54 and the 4th tapping line 41 It is connected, the second overflow launder inlet 56 is connected with clean-up line 8, and the second overflow launder drain pipe line 57 is connected with sulfur filtration pond 6.
Specifically, the first motor 59 rotates for belt driven blower 58.
Sulfur filtration pond 6 is provided with the 4th inlet 60, the 5th inlet 61, filter 62 and liquid-accumulating trough 63, and the 4th enters Liquid mouth 60 is connected with the 4th tapping line 41, and the 5th inlet 61 is connected with the second overflow launder drain pipe line 57, and liquid-accumulating trough 63 divides It is not connected with re-injection pipeline 7 and clean-up line 8,
Re-injection pipeline 7 is provided with lean pump 70, and the motor 71 of lean pump 70 and second is electrically connected with, and the second motor 71 is used for band Dynamic lean pump 70 works.
Clean-up line 8 is provided with flushing pump 80, and the motor 81 of flushing pump 80 and the 3rd is electrically connected with, and the 3rd motor 81 is used for band Dynamic flushing pump 80 works.
In the present embodiment, level gauging pipeline 14 is additionally provided with the first gas-liquid separator 1, on sour gas admission line 10 The first ball valve 101 is additionally provided with, the first outlet line 11 is provided with the second ball valve 110, liquid is sequentially provided with the first tapping line 12 Control loop 15, the 3rd ball valve 120, first manual blowoff valve 122 are pressed, the first blowdown line 13 is provided with pressure release loop 16.
Specifically, above-mentioned first ball valve 101 is normally open valve, when needing to carry out separating operation, the first ball valve 101 is opened, Sulfur-containing gas are allowed to enter through sour gas admission line 10 in the first gas-liquid separator 1;Second ball valve 110 is normally open valve, is used for Gas in first gas-liquid separator 1 is entered in absorption tower 2;3rd ball valve 120 is normally open valve;First manual blowoff valve 122 For normally close valve.
In the present embodiment, above-mentioned level gauging pipeline 14 includes the 4th ball valve 140, the liquid level gauge being sequentially connected in series 142 and the 5th ball valve 144;Hydraulic control circuit 15 includes the 6th ball valve 150, hydraulic control valve 151, the 7th ball valve 152, cut-off The manual blowdown valve 154 of valve 153 and second, wherein the 6th ball valve 150, hydraulic control valve 151 and the company of being sequentially connected in series of the 7th ball valve 152 Be connected in parallel after connecing and with stop valve 153, the second manual blowdown valve 154 located at the 6th ball valve 150 and hydraulic control valve 151 it Between, wherein the 6th ball valve 150, the 7th ball valve 152 are normally open valve, hydraulic control valve 151 is controlled by liquid level gauge 142, stop valve 153 For manually opened valve;Second manual blowdown valve 154 is normally close valve.Pressure release loop 16 includes three pipelines in parallel, first pipeline The 8th ball valve 160, the ball valve 162 of rupture disk 161 and the 9th are provided with, Article 2 pipeline is provided with the tenth ball valve 163, safety valve 164 and the 11st ball valve 165, Article 3 pipeline is provided with the 12nd ball valve 166, and rupture disk 161 is provided with pressometer 167。
Specifically, in the present embodiment, in above-mentioned level gauging pipeline 14 in liquid level gauge 142 and hydraulic control circuit 15 Hydraulic control valve 151 is connected, and after the liquid level that liquid level gauge 142 measures reaches setting height, hydraulic control valve 151 is beaten Open, liquid is circulated through the pipeline where hydraulic control valve 151.
Specifically, in the present embodiment, the 12nd ball valve 166 in above-mentioned pressure release loop 16 is normally close valve, other ball valves It is normally open valve, when air pressure is excessive in the place outlet line of pressure release loop 16, rupture disk 161 and safety valve 164 all will be at them Rupture occurs after the maximum pressure value of setting respectively or opens so that the gas in outlet line is discharged through blowdown line, is prevented Only explosion occurs for device and related pipeline caused by pressure is excessive.
In the present embodiment, level gauging pipeline 14 also is provided with absorption tower 2, and the first feed liquor pipeline 20 is provided with the tenth Three ball valves 200, the second feed liquor pipeline 21 is provided with the 14th ball valve 210, the 3rd feed liquor pipeline 22 is provided with the 15th ball valve 220, the second outlet line 23 is provided with the 16th ball valve 230, and the second blowdown line 28 is provided with pressure release loop 16, the second discharge opeing Pipeline 24 is provided with the 3rd manual blowdown valve 240 and hydraulic control circuit 15, and the first overflow launder feed liquor pipeline 26 is provided with the tenth Seven ball valves 260, the first overflow launder drain pipe line 27 are provided with the 18th ball valve 270.
Specifically, the 13rd ball valve 200 is normally open valve, the desulfurizing agent lean solution in sulfur filtration pond 6 passes through the 13rd ball valve 200 enter in absorption tower 2;14th ball valve 210, the 17th ball valve 260 and the 18th ball valve 270 are normally close valve, main after unlatching It is used to clean absorption tower 2;16th ball valve 230 is normally open valve, for the gas in absorption tower 2 to be delivered into the second gas-liquid separation In device 3;3rd manual blowdown valve 240 is normally close valve.
In the present embodiment, level gauging pipeline 14 also is provided with the second gas-liquid separator 3, and on the 3rd outlet line 30 Provided with the 19th ball valve 300, the 3rd tapping line 31 is provided with the 4th manual blowdown valve 311, the 20th ball valve 310 and hydraulic pressure control Loop 15 processed, and the 3rd blowdown line 33 is provided with pressure release loop 16.
Specifically, the 19th ball valve 300 is normally open valve, for gas after desulfurization in the second gas-liquid separator 3 of discharge;Second Ten ball valves 310 are normally open valve;4th manual blowdown valve 311 is normally close valve.
In the present embodiment, level gauging pipeline 14 also is provided with foam-catching tank 4, and the 4th outlet line 40 is provided with second 11 ball valves 400, the 4th tapping line 41 are divided into regenerator connecting pipeline 410 and sulfur filtration pond connecting pipeline 412 again, regenerated Tower connecting pipeline 410 is provided with the 22nd ball valve 413 and hydraulic control circuit 15, is set in sulfur filtration pond connecting pipeline 412 There is the 23rd ball valve 414, the 4th tapping line 41 is provided with the 5th manual blowdown valve 415, and clean-up line 8 is provided with check-valves 82。
Specifically, the 22nd ball valve 413 is normally open valve, the 23rd ball valve 414 is normally close valve, de- in foam-catching tank 4 After sulphur agent rich solution reaches certain liquid level, the hydraulic control valve 151 on hydraulic control circuit 15 is opened, and desulfurizing agent rich solution is just It can be entered by regenerator connecting pipeline 410 in regenerator 5.When flushing pump 80 works, the 22nd ball valve 413 is closed, and Check-valves 82, the 23rd ball valve 414 are opened, desulfurizing agent lean solution is after the entrance foam-catching tank 4 of clean-up line 8 again from the 4th discharging tube Enter in line 41 along sulfur filtration pond connecting pipeline 412 in sulfur filtration pond 6.
Specifically, when 4 hypertonia of foam-catching tank, in order to prevent foam-catching tank 4 from building the pressure, can open on the 4th outlet line 40 The 21st ball valve 400, the gases at high pressure allowed in foam-catching tank 4 are discharged through the 4th outlet line 40 to reach the purpose of pressure release.
In the present embodiment, regenerator 5 is provided with level gauging pipeline 14, and sulfur filtration pond connecting pipeline 412 is provided with 24th ball valve 416 and hydraulic control circuit 15, the second overflow launder inlet 56 is connected with clean-up line 8, on clean-up line 8 Provided with the 25th ball valve 83.
Specifically, above-mentioned 24th ball valve 416 is normally close valve, for blowdown;25th ball valve 83 is normally close valve, when When flushing pump 80 works, open the 25th ball valve 83 and be used for cleaning and regeneration tower 5.
In the present embodiment, water charge line 64 and plus desulfurizing agent pipeline 65 are additionally provided with sulfur filtration pond 6.
The operation principle of selexol process process unit 100 provided by the utility model is:Sulfurous gas first passes through first The liquid isolated is emitted into cesspool by the first tapping line 12 after gas-liquid separator 1, then sulfurous gas is passed through absorption Desulfuration operations are carried out in tower 2, and (the desulfurizing agent lean solution in absorption tower 2 becomes desulfurization because absorbing the sulfide in sulfurous gas Agent rich solution), caused sweet gas body is sent to the second gas-liquid separator 3 in desulfuration operations, and the second gas-liquid separator 3 is used to separate By desulfurizing agent rich solution that gas carries out and the desulfurizing agent rich solution isolated is delivered into regenerator 5;Contain caused by desulfuration operations Sulphur foam flows into foam-catching tank 4, and the desulfurizing agent rich solution that foam-catching tank 4 is used to separate in sulfur-bearing foam is sent and the desulfurizing agent isolated is rich Liquid delivers to regenerator 5;Desulfurizing agent rich solution is sent directly to regenerator 5 caused by absorption tower 2 in desulfuration operations;On regenerator 5 Air inlet pipeline 50 is used to outside air being sent into regenerator 5 to react with desulfurizing agent rich solution, by desulfurizing agent rich solution Sulfide generation sulphur so that desulfurizing agent rich solution is changed into desulfurizing agent lean solution, and sulphur with desulfurizing agent lean solution successively through the 5th row The tapping line 41 of liquid pipe line 52 and the 4th enters in sulfur filtration pond 6, and sulphur therein is filtered out by filter 62, and desulfurization Agent lean solution enters in liquid-accumulating trough 63 after then passing through filter 62, is back flowed back into again through re-injection pipeline 7 in the presence of lean pump 70 Reacted again with sulfurous gas in absorption tower 2, so as to formed desulfurizing agent lean solution -- desulfurizing agent rich solution -- desulfurizing agent lean solution Cyclic process, flushing pump 80 is opened after the completion of desulfuration operations by clean-up line 8 respectively to foam-catching tank 4, regenerator 5, second Overflow launder 55, the 4th tapping line 41 and the 5th tapping line 52 are rinsed, and flushing liquor is filtered with filter 62, The deposited sulphur solid of foam-catching tank 4, regenerator 5, the 4th tapping line 41 and the 5th tapping line 52 can effectively be avoided Block.
Selexol process process unit provided by the utility model has the beneficial effect that:Sulfurous gas enters absorption tower with taking off Sulphur agent, which reacts, carries out desulfuration operations:Escaping gas enters the second gas-liquid separator in desulfuration operations;Caused sulfur-bearing bubble Foam flows into foam-catching tank;The desulfurizing agent rich solution of generation is then sent to regenerator, selexol process technique dress provided by the utility model Put by taking different places respectively to the gas, sulfur-bearing foam, desulfurizing agent rich solution that occur during the desulfuration operations of absorption tower Science and engineering skill, solves the blocking occurred in selexol process technical process in each device and related pipeline due to sulfur deposition Problem.In addition, selexol process process unit provided by the utility model is also specially provided with flushing pump and clean-up line, can be to catching Foam tank, regenerator and connecting pipeline therebetween are rinsed, and further improve the selexol process process unit Anti-clogging.
It is described above, not make any formal limitation to the utility model, although the utility model has passed through implementation Example is disclosed above, but is not limited to the utility model, any person skilled in the art, is not departing from this practicality In new technique aspects, when the technology contents using the disclosure above make it is a little change or be modified to equivalent variations etc. Embodiment is imitated, as long as being the content without departing from technical solutions of the utility model, according to the technical essence of the utility model to the above Any simple modification, equivalent change and modification that embodiment is made, in the range of still falling within technical solutions of the utility model.

Claims (8)

1. a kind of selexol process process unit, it is characterised in that including the first gas-liquid separator, absorption tower, the second gas-liquid point From device, foam-catching tank, regenerator, sulfur filtration pond, lean pump, flushing pump, air blower;
First gas-liquid separator is provided with sour gas admission line, the first outlet line and the first tapping line, the first escape pipe Line is provided with the first blowdown line, and first outlet line is connected with absorption tower;
Absorption tower is provided with the first feed liquor pipeline, the second feed liquor pipeline, the 3rd feed liquor pipeline, the second outlet line, the second discharge opeing Pipeline, is additionally provided with the first overflow launder in addition in absorption tower, and be provided with absorption tower corresponding first overflow launder feed liquor pipeline and First overflow launder drain pipe line, wherein the first feed liquor pipeline is connected with first outlet line, the first feed liquor pipeline, Two feed liquor pipelines and the first overflow launder feed liquor pipeline are connected with re-injection pipeline respectively, and the 3rd feed liquor pipeline and the first overflow launder go out liquid Pipeline is connected with foam-catching tank respectively, and the second outlet line and the second gas-liquid separator are connected, and the second outlet line is provided with the Two blowdown lines, the second blowdown line are connected with first blowdown line, and the second tapping line is connected with regenerator;
Second gas-liquid separator is provided with the 3rd outlet line, the 3rd tapping line and the first air inlet, on the 3rd outlet line Provided with the 3rd blowdown line, the 3rd blowdown line is connected with first blowdown line, and the 3rd tapping line is connected with regenerator, First air inlet is connected with second outlet line;
Foam-catching tank is provided with the 4th outlet line, the 4th tapping line, the first inlet and the first rinse mouth, the 4th outlet line Be connected with the 3rd feed liquor pipeline, the 4th tapping line is connected with regenerator and sulfur filtration pond respectively, the first inlet and The first overflow launder drain pipe line is connected, and the first rinse mouth is connected by clean-up line with sulfur filtration pond;
Regenerator is provided with air inlet pipeline, the 5th outlet line, the 5th tapping line, the second inlet and the 3rd feed liquor Mouthful, the second overflow launder is additionally provided with regenerator in addition, and corresponding second overflow launder inlet and second are provided with regenerator Overflow launder drain pipe line, air inlet pipeline are connected with air blower, and air inlet pipeline is connected with second tapping line, The air blower and the first motor are electrically connected with, and the 5th tapping line and the 4th tapping line are connected, the second inlet and described 3rd tapping line is connected, and the 3rd inlet is connected with the 4th tapping line, the second overflow launder inlet and the flushing Pipeline is connected, and the second overflow launder drain pipe line is connected with sulfur filtration pond;
Sulfur filtration pond is provided with the 4th inlet, the 5th inlet, filter and liquid-accumulating trough, the 4th inlet and the described 4th Tapping line is connected, and the 5th inlet and the second overflow launder drain pipe line are connected, liquid-accumulating trough respectively with the re-injection pipeline and institute Clean-up line is stated to be connected;
Re-injection pipeline is provided with lean pump, and lean pump and the second motor are electrically connected with;
Clean-up line is provided with flushing pump, and flushing pump and the 3rd motor are electrically connected with.
2. selexol process process unit according to claim 1, it is characterised in that on first gas-liquid separator also Provided with level gauging pipeline, the first ball valve is additionally provided with the sulfur-bearing admission line, first outlet line is provided with second Ball valve, is sequentially provided with hydraulic control circuit, the 3rd ball valve, first manual blowoff valve on first tapping line, and described first Blowdown line is provided with pressure release loop;
Level gauging pipeline includes the 4th ball valve, liquid level gauge and the 5th ball valve being sequentially connected in series;
Hydraulic control circuit includes the 6th ball valve, hydraulic control valve, the 7th ball valve, stop valve and the second manual blowdown valve, wherein It is connected in parallel after 6th ball valve, hydraulic control valve and the 7th ball valve are sequentially connected in series and with stop valve, the second manual blowdown valve Between the 6th ball valve and the hydraulic control valve;
Pressure release loop includes three pipelines in parallel, and first article of pipeline is provided with the 8th ball valve, rupture disk and the 9th ball valve, Article 2 Pipeline is provided with the tenth ball valve, safety valve and the 11st ball valve, and Article 3 pipeline is provided with the 12nd ball valve, and the rupture disk It is provided with pressometer.
3. selexol process process unit according to claim 2, it is characterised in that be additionally provided with the absorption tower described Level gauging pipeline, and the first feed liquor pipeline is provided with the 13rd ball valve, the second feed liquor pipeline is provided with the 14th ball valve, the 3rd Feed liquor pipeline is provided with the 15th ball valve, and the second outlet line is provided with the 16th ball valve, and the second blowdown line is provided with described Pressure release loop, the second tapping line are provided with the 3rd manual blowdown valve and the hydraulic control circuit, the first overflow launder feed tube Line is provided with the 17th ball valve, and the first overflow launder drain pipe line is provided with the 18th ball valve.
4. selexol process process unit according to claim 2, it is characterised in that set on second gas-liquid separator There is a level gauging pipeline, the 3rd outlet line is provided with the 19th ball valve, and the 3rd tapping line is provided with the Four manual blowdown valves, the 20th ball valve and the hydraulic control circuit, and the 3rd blowdown line returns provided with the pressure release Road.
5. selexol process process unit according to claim 2, it is characterised in that the foam-catching tank is provided with the liquid Position measurement pipeline, the 4th outlet line are provided with the 21st ball valve, and the 4th tapping line is divided into regenerator company again Adapter line and sulfur filtration pond connecting pipeline, the regenerator connecting pipeline are provided with the 22nd ball valve and the hydraulic control Loop, sulfur filtration pond connecting pipeline are provided with the 23rd ball valve, and it is manual that the 4th tapping line is provided with the 5th Blowoff valve, the clean-up line are provided with check-valves.
6. selexol process process unit according to claim 5, it is characterised in that the regenerator is provided with the liquid Position measurement pipeline, sulfur filtration pond connecting pipeline is provided with the 24th ball valve and the hydraulic control circuit, described to overflow Chute inlet is connected with clean-up line, and clean-up line is provided with the 25th ball valve.
7. selexol process process unit according to claim 2, it is characterised in that be additionally provided with the sulfur filtration pond Water charge line and plus desulfurizing agent pipeline.
8. the selexol process process unit according to any one of claim 2 to 6, it is characterised in that the level gauging Liquid level gauge in pipeline is connected with the hydraulic control valve in the hydraulic control circuit, when the liquid level that liquid level gauge measures reaches After the liquid level of setting, hydraulic control valve switchs to opening from closure state.
CN201720574578.7U 2017-05-23 2017-05-23 A kind of selexol process process unit Expired - Fee Related CN206783622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720574578.7U CN206783622U (en) 2017-05-23 2017-05-23 A kind of selexol process process unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720574578.7U CN206783622U (en) 2017-05-23 2017-05-23 A kind of selexol process process unit

Publications (1)

Publication Number Publication Date
CN206783622U true CN206783622U (en) 2017-12-22

Family

ID=60711732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720574578.7U Expired - Fee Related CN206783622U (en) 2017-05-23 2017-05-23 A kind of selexol process process unit

Country Status (1)

Country Link
CN (1) CN206783622U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460014A (en) * 2017-05-23 2017-12-12 四川西油致诚石油技术有限公司 A kind of selexol process process unit
CN112295382A (en) * 2019-08-02 2021-02-02 中国石油化工股份有限公司 Absorption tower for treating hydrogen sulfide gas by wet oxidation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460014A (en) * 2017-05-23 2017-12-12 四川西油致诚石油技术有限公司 A kind of selexol process process unit
CN107460014B (en) * 2017-05-23 2024-03-08 四川西油致诚石油技术有限公司 Natural gas desulfurization process device
CN112295382A (en) * 2019-08-02 2021-02-02 中国石油化工股份有限公司 Absorption tower for treating hydrogen sulfide gas by wet oxidation method

Similar Documents

Publication Publication Date Title
CN107930372A (en) A kind of integrated device and methods for using them based on triazine solution desulfurization
CN206783622U (en) A kind of selexol process process unit
CN205461526U (en) Steelmaking tail gas sulphur removal spray set
CN108722161A (en) A kind of system and method removing hydrogen sulfide in oil field companion, secondary anger
CN107715684A (en) A kind of desulfurizer in thermal power plant
CN207899247U (en) A kind of integrated device based on triazine solution desulfurization
CN101597529B (en) Methane bio-desulfurization device
CN107460014A (en) A kind of selexol process process unit
CN204060667U (en) Oil gas field individual well desulfurizer
CN203833906U (en) Natural gas sulfur-removal device
CN206375869U (en) Wet desulphurization device
CN106799126A (en) Device of the ammonia process of desulfurization energy-conservation more than one times
CN206799555U (en) A kind of Novel anti-blockage desulfurizer
CN206304557U (en) A kind of chemistry aspect desulfurating dust-removing equipment
CN209456395U (en) A kind of selexol process process unit
CN208927840U (en) A kind of flue gas of sintering machine system desulfurizing tower resistance-reducing device
CN107569998A (en) A kind of mine tailing smelts three wastes desulphurization system and method
CN208742272U (en) A kind of oxidation regeneration slot improving Regeneration Efficiency for Desulfurization
CN209989198U (en) High-sulfur-content hydrogen sulfide produced water treatment system
CN209049206U (en) A kind of aluminium ash hydrolysis exhaust treatment system
CN207899246U (en) A kind of system based on desulfuration absorbing tower realization automatic cycle, drain and fluid infusion
CN209456394U (en) The device of sour gas in a kind of removing natural gas
CN206887046U (en) A kind of air inducing machine negative pressure or normal pressure getter device
CN206535391U (en) A kind of embrane method Multistage desulfuration device
CN205953514U (en) Sour discharging equipment of condensation in sulphur relieving haperacidity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222