- Prior art keywords
- connecting plate
- copper pipe
- plate
- fixing bracket
- cooper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model discloses a kind of Cooper pipe fixing bracket, including fixed bottom plate, fixed support is installed on the fixed bottom plate, the fixed support includes the first connecting plate, second connecting plate, 3rd connecting plate, 4th connecting plate, first connecting plate is connected by the first bolt with fixed bottom plate, 4th connecting plate is connected with copper pipe fixed mount, the copper pipe fixed mount includes the first copper pipe connecting plate, second copper pipe connecting plate, arc copper pipe location-plate is installed between the first copper pipe connecting plate and the second copper pipe connecting plate, rubber buffer projection is installed on fixation bottom plate below the arc copper pipe location-plate, load bearing support bar is installed between 3rd connecting plate and fixed bottom plate.A kind of Cooper pipe fixing bracket described in the utility model, its is easy for installation, and fastness is good, while copper pipe landing heat exchanging device or copper pipe can be avoided to cause impact damage in itself, effectively improves support bracket fastened practicality.
Description
Technical field
It the utility model is related to a kind of Cooper pipe fixing bracket.
Background technology
The air inlet of finned heat exchanger in freon refrigeration system(Or feed liquor)Pipe, goes out liquid(Or return-air)Pipe and heat exchanger
Between need installation fix.Fixed by right angle stator between existing heat exchanger and copper pipe, fixed using right angle stator,
Do not only exist that degree of firmly installing is low, and fixed copper pipe easily slides, the copper pipe of landing easily with heat exchanger impact damage, together
When can influence the normal use of refrigeration system.
Utility model content
The purpose of this utility model is to provide a kind of Cooper pipe fixing bracket, and its is easy for installation, and fastness is good, while energy
Enough avoid copper pipe landing heat exchanging device or copper pipe from causing impact damage in itself, effectively improve support bracket fastened practicality.
In order to achieve the above object, the technical solution of the utility model is:
A kind of Cooper pipe fixing bracket, including bottom plate is fixed, fixed support, the fixed branch are installed on the fixed bottom plate
Frame includes the first connecting plate, the second connecting plate, the 3rd connecting plate, the 4th connecting plate, the left end and second of first connecting plate
The lower end of connecting plate is vertically connected, and the upper end of second connecting plate and the right-hand member of the 3rd connecting plate are vertically connected, and the described 3rd
The left end of connecting plate is vertically connected with the 4th connecting plate lower end;First connecting plate passes through the first bolt and fixed bottom plate phase
Even, the 4th connecting plate is connected with copper pipe fixed mount, and the copper pipe fixed mount includes the first copper pipe connecting plate, the second copper pipe connects
Fishplate bar, arc copper pipe location-plate, first copper pipe are installed between the first copper pipe connecting plate and the second copper pipe connecting plate
Connecting plate is connected by the second bolt with the 4th connecting plate, and the second copper pipe connecting plate passes through the 3rd bolt and the 4th connecting plate
It is connected;Rubber buffer projection is installed, the 3rd connecting plate is with consolidating on the fixation bottom plate below the arc copper pipe location-plate
Determine load bearing support bar is installed between bottom plate.
The arc copper pipe location-plate madial wall is coated with wearable ceramic coat layer.
First reinforcement is installed, second connecting plate and the 3rd connect between first connecting plate and the second connecting plate
Second reinforcement is installed between fishplate bar, the 3rd reinforcement is installed between the 3rd connecting plate and the 4th connecting plate.
First connecting plate, the second connecting plate, the 3rd connecting plate, the 4th connecting plate is integrally manufactured forms.
The first copper pipe connecting plate, the second copper pipe connecting plate, arc copper pipe location-plate is integrally manufactured forms.
The beneficial effects of the utility model are:A kind of Cooper pipe fixing bracket, its is easy for installation, and fastness is good, while energy
Enough avoid copper pipe landing heat exchanging device or copper pipe from causing impact damage in itself, effectively improve support bracket fastened practicality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Mounting structure schematic diagrams of the Fig. 2 between the utility model copper pipe fixed mount and the 4th connecting plate.
Embodiment
Embodiment 1
A kind of Cooper pipe fixing bracket as shown in Figure 1 and Figure 2, including bottom plate 1 is fixed, fixation is installed on the fixed bottom plate 1
Support, the fixed support include the first connecting plate 2, the second connecting plate 3, the 3rd connecting plate 4, the 4th connecting plate 5, described first
The lower end of the left end of connecting plate 2 and the second connecting plate 3 is vertically connected, upper end and the 3rd connecting plate 4 of second connecting plate 3
Right-hand member is vertically connected, and the left end of the 3rd connecting plate 4 is vertically connected with the lower end of the 4th connecting plate 5;First connecting plate 2 is logical
Cross the first bolt 6 with fixed bottom plate 1 to be connected, the 4th connecting plate 5 is connected with copper pipe fixed mount, and the copper pipe fixed mount includes
First copper pipe connecting plate 7, the second copper pipe connecting plate 8, installed between the first copper pipe connecting plate 7 and the second copper pipe connecting plate 8
There is arc copper pipe location-plate 9, the first copper pipe connecting plate 7 is connected by the second bolt 10 with the 4th connecting plate 5, and described second
Copper pipe connecting plate 8 is connected by the 3rd bolt 11 with the 4th connecting plate 5;The fixation bottom plate 1 of the lower section of arc copper pipe location-plate 9
On rubber buffer projection 12 is installed, load bearing support bar 13 is installed between the 3rd connecting plate 4 and fixed bottom plate 1.Can root
According to the different size of copper pipe fixed mount of different choice of installation copper pipe 18.The setting of rubber buffer projection 12 can avoid copper pipe 18
Slide heat exchanging device or copper pipe 18 causes impact damage in itself.
The madial wall of arc copper pipe location-plate 9 is coated with wearable ceramic coat layer 14.Wearable ceramic coat layer 14 is set
Frictionally damage between arc copper pipe location-plate 9 and copper pipe 18 can be avoided by putting.
First reinforcement 15 is installed between the connecting plate 3 of first connecting plate 2 and second, second connecting plate 3 with
Second reinforcement 16 is installed between the 3rd connecting plate 4, the 3rd is provided between the 3rd connecting plate 4 and the 4th connecting plate 5
Reinforcement 17.
First connecting plate 2, the second connecting plate 3, the 3rd connecting plate 4, the 4th connecting plate 5 is integrally manufactured forms.It is described
First copper pipe connecting plate 7, the second copper pipe connecting plate 8, arc copper pipe location-plate 9 is integrally manufactured forms.
A kind of Cooper pipe fixing bracket of the present embodiment, its is easy for installation, and fastness is good, while copper pipe can be avoided to slide
Heat exchanging device or copper pipe cause impact damage in itself, effectively improve support bracket fastened practicality.
Claims (5)
- A kind of 1. Cooper pipe fixing bracket, it is characterised in that:Including fixed bottom plate(1), the fixed bottom plate(1)On fixation is installed Support, the fixed support include the first connecting plate(2), the second connecting plate(3), the 3rd connecting plate(4), the 4th connecting plate(5), First connecting plate(2)Left end and the second connecting plate(3)Lower end be vertically connected, second connecting plate(3)Upper end With the 3rd connecting plate(4)Right-hand member be vertically connected, the 3rd connecting plate(4)Left end and the 4th connecting plate(5)Lower end is vertical It is connected;First connecting plate(2)Pass through the first bolt(6)With fixed bottom plate(1)It is connected, the 4th connecting plate(5)With copper Tube fixing device is connected, and the copper pipe fixed mount includes the first copper pipe connecting plate(7), the second copper pipe connecting plate(8), first bronze medal Pipe connecting plate(7)With the second copper pipe connecting plate(8)Between arc copper pipe location-plate is installed(9), the first copper pipe connecting plate (7)Pass through the second bolt(10)With the 4th connecting plate(5)It is connected, the second copper pipe connecting plate(8)Pass through the 3rd bolt(11) With the 4th connecting plate(5)It is connected;The arc copper pipe location-plate(9)The fixation bottom plate of lower section(1)On to be provided with rubber buffer convex Block(12), the 3rd connecting plate(4)With fixed bottom plate(1)Between load bearing support bar is installed(13).
- A kind of 2. Cooper pipe fixing bracket according to claim 1, it is characterised in that:The arc copper pipe location-plate(9)It is interior Side wall is coated with wearable ceramic coat layer(14).
- A kind of 3. Cooper pipe fixing bracket according to claim 1, it is characterised in that:First connecting plate(2)With second Connecting plate(3)Between the first reinforcement is installed(15), second connecting plate(3)With the 3rd connecting plate(4)Between be provided with Second reinforcement(16), the 3rd connecting plate(4)With the 4th connecting plate(5)Between the 3rd reinforcement is installed(17).
- A kind of 4. Cooper pipe fixing bracket according to claim 1, it is characterised in that:First connecting plate(2), second connect Fishplate bar(3), the 3rd connecting plate(4), the 4th connecting plate(5)It is integrally manufactured to form.
- A kind of 5. Cooper pipe fixing bracket according to claim 1, it is characterised in that:The first copper pipe connecting plate(7), Two copper pipe connecting plates(8), arc copper pipe location-plate(9)It is integrally manufactured to form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720352310.9U CN206772113U (en) | 2017-04-06 | 2017-04-06 | A kind of Cooper pipe fixing bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720352310.9U CN206772113U (en) | 2017-04-06 | 2017-04-06 | A kind of Cooper pipe fixing bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206772113U true CN206772113U (en) | 2017-12-19 |
Family
ID=60630403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720352310.9U Expired - Fee Related CN206772113U (en) | 2017-04-06 | 2017-04-06 | A kind of Cooper pipe fixing bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206772113U (en) |
-
2017
- 2017-04-06 CN CN201720352310.9U patent/CN206772113U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106322577A (en) | Air conditioner external unit mounting rack with height convenient to adjust | |
CN206772113U (en) | A kind of Cooper pipe fixing bracket | |
CN103572924B (en) | Detachable perforated sound-absorbing ceiling board capable of refrigerating and heating | |
CN203561009U (en) | Detachable punched sound absorption suspended ceiling board capable of refrigerating and heating | |
CN102425254A (en) | Keel connecting device based on suspended curtain wall | |
CN205717838U (en) | A kind of convector mounting bracket | |
CN109195401A (en) | A kind of heat dissipation equipment for large communication equipment room | |
CN213983818U (en) | Outer quick-witted mount of stationary air conditioner | |
CN203559542U (en) | Detachable punched sound absorption suspended ceiling board capable of refrigerating and heating | |
CN209431716U (en) | Heat exchanger assembly and air conditioning unit | |
CN206106923U (en) | Water tank installing support, water tank mounting structure and vehicle | |
CN203559539U (en) | Dismountable nonporous suspended ceiling board capable of refrigerating and heating | |
CN207947671U (en) | A kind of stepper motor mounting bracket | |
CN207599957U (en) | A kind of backboard installation frame structure | |
CN207438729U (en) | A kind of fan coil convenient for wall hanging | |
CN207815534U (en) | A kind of supporting rack of central air conditioner external machine | |
CN202273337U (en) | Keel connecting device based on suspension type curtain wall | |
CN215175570U (en) | Air conditioner installing support with adjustable easily install and remove on building wall | |
CN205984192U (en) | A lamp source fixing device for advertising light boxes | |
CN209381788U (en) | A kind of automobile body-used radiator bracket structure | |
CN204835753U (en) | No windage motor stabilizer blade and motor element thereof | |
CN216844935U (en) | Mounting frame for air conditioner outdoor unit | |
CN215216481U (en) | Air condensing units chassis of simple to operate | |
CN213272954U (en) | Combined air conditioner outdoor unit mounting bracket | |
CN211951709U (en) | Support hanger for comprehensive pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171219 Termination date: 20200406 |