CN206771421U - A kind of tubular preheater channel structure - Google Patents

A kind of tubular preheater channel structure Download PDF

Info

Publication number
CN206771421U
CN206771421U CN201720665771.1U CN201720665771U CN206771421U CN 206771421 U CN206771421 U CN 206771421U CN 201720665771 U CN201720665771 U CN 201720665771U CN 206771421 U CN206771421 U CN 206771421U
Authority
CN
China
Prior art keywords
air
casing
air outlet
air inlet
dividing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720665771.1U
Other languages
Chinese (zh)
Inventor
吕健
潘世新
徐琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201720665771.1U priority Critical patent/CN206771421U/en
Application granted granted Critical
Publication of CN206771421U publication Critical patent/CN206771421U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Air Supply (AREA)

Abstract

Tubular preheater channel structure disclosed in the utility model,Including casing,Flue,First air inlet,First air outlet,Second air inlet,Second air outlet,Heat pipe,Dividing plate,Dividing plate is provided with the middle part of casing,Casing is divided into the first half and lower half,Heat pipe is arranged in casing and passes through dividing plate and be fixed on dividing plate,First air inlet and the first air outlet are arranged on the lower half of casing,Second air inlet and the second air outlet are arranged on the first half of casing,First air outlet and the second air inlet are arranged on the homonymy of casing,Flue is arranged on the first air outlet side,First air inlet simultaneously,First air outlet,Second air inlet and the second air outlet form U-typed air duct with flue,In this structure,Central dividing plate and UNICOM air channel are set up on one group of bobbin carriage,Single bobbin carriage is set to undergo the heat absorption of the both direction of one-time continuous,It is effectively improved the problem of space occupancy rate is low,The structure can be made to save arrangement space in the case of identical heating surface area.

Description

A kind of tubular preheater channel structure
Technical field
The utility model belongs to the technical field of structures of tubular air preheater, specially a kind of tubular preheater bobbin carriage knot Structure.
Background technology
Tubular air preheater is to be handed over using flue gas heat come a kind of gas-gas heat of the air required for heating boiler burning Parallel operation, it is important, indispensable part in station boiler.The main function of air preheater is to heat combustion air simultaneously Exhaust gas temperature is reduced, improves boiler efficiency.The important function of one of which is that air is heated to certain temperature by flue gas, can make fuel Dry and volatile matter effusion is accelerated.
When boiler uses the higher coal of moisture, the desiccant temperature that coal dust needs is higher, it is necessary to obtain about 380 DEG C of left sides A right hot blast, it can just reach the requirement of pulverized coal preparation system drying capacity, and the secondary hot-air that air preheater comes out only needs 320 DEG C or so of offer goes to participate in burning, and the air outlet of existing tubular air preheater leads to boiler by different pipelines First air, Secondary Air position so that First air, the temperature of Secondary Air position are identical, although the temperature of Secondary Air can obtain Ensure, but the temperature of First air is relatively low so that the drying efficiency of coal dust is reduced, and then the thermal efficiency to burn declines.
In boiler using conventional tubular preheater, there is steel construction under every grade of bobbin carriage, in order to exchange heat fully, bobbin carriage height It is unsuitable too high, and be made up of between every grade of bobbin carriage steel construction, expansion joint, a section flue.So it must be deposited between two-stage bobbin carriage It is low in 2 meters or so of structural non-heat exchanging segment, space occupancy rate.
Utility model content
A purpose of the present utility model is in order to overcome the above-mentioned deficiencies of the prior art, and then to provide a kind of preheating of tubular type Device channel structure, the utility model is simple in construction, can effectively improve between conventional pre-heater two-stage bobbin carriage and there must be 2 meters The structural non-heat exchanging segment of left and right, the problem of causing space occupancy rate low, the structure can be made in the situation of identical heating surface area Lower saving arrangement space.
The technical solution of the utility model:
A kind of tubular preheater channel structure, it is characterised in that including casing, flue, the first air inlet, the first air-out Mouth, the second air inlet, the second air outlet, heat pipe, dividing plate, are provided with the dividing plate in the middle part of the casing, and the dividing plate will The casing is separated into the first half and lower half, and the heat pipe is arranged in the casing, pass through and be fixedly installed on it is described every On plate, first air inlet, the first air outlet are arranged on the lower half of the casing, second air inlet, the second air-out Mouth is arranged on the first half of the casing, and the flue is arranged on the side of the casing.
Further, first air outlet and second air inlet are arranged on the homonymy of the casing, the flue It is arranged on the side of first air outlet and second air inlet, it is first air inlet, first air outlet, described Second air inlet and second air outlet form U-typed air duct with the flue.
The utility model has the advantages that relative to prior art:Tubular preheater pipe disclosed in the utility model Box structure, including casing, flue, the first air inlet, the first air outlet, the second air inlet, the second air outlet, heat pipe, dividing plate, Dividing plate is provided with the middle part of casing, casing is divided into the first half and lower half, heat pipe is arranged in casing and passes through dividing plate and fixation On dividing plate, the first air inlet and the first air outlet are arranged on the lower half of casing, and the second air inlet and the second air outlet are set In the first half of casing, the first air outlet and the second air inlet are arranged on the homonymy of casing, and flue is arranged on the first air outlet side, The first air inlet, the first air outlet, the second air inlet and the second air outlet and flue form U-typed air duct simultaneously, this knot In structure, central dividing plate and UNICOM air channel are set up on one group of bobbin carriage, single bobbin carriage is undergone the both direction of one-time continuous Heat absorption, be effectively improved the structural non-heat exchanging segment that there must be 2 meters or so between conventional pre-heater two-stage bobbin carriage, cause space The problem of occupancy is low, the structure can be made to save arrangement space in the case of identical heating surface area.
Additional aspect and advantage of the present utility model will be set forth in part in the description, partly by from following description In become obvious, or recognized by the practice of utility model.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
1- casings in figure;2- flues;The air inlets of 3- first;The air outlets of 4- first;The air inlets of 5- second;The air-out of 6- second Mouthful;7- heat pipes;8- dividing plates.
Embodiment
The utility model is described in detail below with reference to accompanying drawing.
With reference to shown in Fig. 1, tubular preheater channel structure disclosed in the present embodiment, including casing 1, flue 2, the first air intake The 3, first air outlet 4 of mouth, the second air inlet 5, the second air outlet 6, heat pipe 7, dividing plate 8, dividing plate 8 is provided with the middle part of casing 1, Casing 1 is separated into the first half and lower half by dividing plate 8, and heat pipe 7 is arranged in casing 1, is passed through and is fixedly installed on dividing plate 8, First air inlet 3, the first air outlet 4 are arranged on the lower half of casing 1, and the second air inlet 5, the second air outlet 6 are arranged on casing 1 The first half, flue is arranged on the side of casing 1, arrangement space saved in the case of identical heating surface area, is saved simultaneously Steel construction, manufacturing cost is cheap, be more suitable for popularization and application.
Preferably, the flue 2 disclosed in the present embodiment is arranged on the same of the first air outlet 4 and second air inlet 5 Side, the first air inlet 3, the first air outlet 4, the second air inlet 5 and the second air outlet 6 form U-typed air duct with flue 2, In this structure, UNICOM air channel is set up on one group of bobbin carriage, the air of single bobbin carriage is undergone the both direction of one-time continuous Heat absorption, ensure preheater in air heat exchange it is more abundant.
Above example is the exemplary illustration to this patent, does not limit its protection domain, people in the art Member can also be changed to its part, as long as no the Spirit Essence beyond this patent, all in the protection domain of this patent.

Claims (2)

1. a kind of tubular preheater channel structure, it is characterised in that including casing (1), flue (2), the first air inlet (3), One air outlet (4), the second air inlet (5), the second air outlet (6), heat pipe (7), dividing plate (8), set in the middle part of the casing (1) The dividing plate (8) is equipped with, the casing (1) is separated into the first half and lower half by the dividing plate (8), and the heat pipe (7) is set In the casing (1), pass through and be fixedly installed on the dividing plate (8), first air inlet (3), the first air outlet (4) The lower half of the casing (1) is arranged on, second air inlet (5), the second air outlet (6) are arranged on the casing (1) The first half, the flue are arranged on the side of the casing (1).
A kind of 2. tubular preheater channel structure according to claim 1, it is characterised in that first air outlet (4) The homonymy of the casing (1) is arranged on second air inlet (5), the flue (2) is arranged on first air outlet (4) With the side of second air inlet (5), first air inlet (3), first air outlet (4), second air inlet (5) and second air outlet (6) forms U-typed air duct with the flue (2).
CN201720665771.1U 2017-06-08 2017-06-08 A kind of tubular preheater channel structure Active CN206771421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720665771.1U CN206771421U (en) 2017-06-08 2017-06-08 A kind of tubular preheater channel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720665771.1U CN206771421U (en) 2017-06-08 2017-06-08 A kind of tubular preheater channel structure

Publications (1)

Publication Number Publication Date
CN206771421U true CN206771421U (en) 2017-12-19

Family

ID=60636106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720665771.1U Active CN206771421U (en) 2017-06-08 2017-06-08 A kind of tubular preheater channel structure

Country Status (1)

Country Link
CN (1) CN206771421U (en)

Similar Documents

Publication Publication Date Title
CN103836788A (en) Surrounding blowing-in integrated gas hot blast stove
CN104208995A (en) Thermal device and method for increasing temperature of clean boiler smoke obtained by wet desulphurization
CN108343983A (en) Eliminate the device of chimney white plume
WO2022088686A1 (en) Gas boiler tail flue gas energy-saving and emission-reduction system
CN201674926U (en) Coal-fired hot air roaster
CN206478668U (en) Eliminate the device of the white plume of chimney
CN206771421U (en) A kind of tubular preheater channel structure
CN115406100B (en) Indirect heat exchange type hot blast stove
CN208735652U (en) The eliminating white smoke system that a kind of heat exchanger and air preheater combine
CN103131812A (en) Plate-type air and coal gas double-preheating system for hot blast stove
CN205991507U (en) A kind of flue gas air heat-exchange system
CN202470782U (en) Secondary smoke residual heat utilization system for hot blast stove
CN201007492Y (en) Annular furnace exhaust heat highly-effective utilization system
CN210832077U (en) Energy-saving anti-blocking system combining pipe type and two-bin type rotary air preheater
CN203731675U (en) Annular blowing integrated flue gas hot blast stove
CN202074555U (en) Air pre-heater arrangement structure of furnace
CN103111224A (en) Flash mixer
CN102313292B (en) Air outlet structure of tubular air preheater
CN202329231U (en) Energy-saving inclined-bottom heating furnace
CN207035496U (en) A kind of condensation gas boiler
CN210951374U (en) Device for increasing primary air temperature
CN203375424U (en) Vertical type coal-fired steam boiler
CN204923441U (en) High -efficient environmental protection hot -blast furnace
CN203518238U (en) Vehicle-mounted horizontal fuel oil and fuel gas molten salt furnace
CN106765219A (en) A kind of Catalyst Production manufactures heat recovery system

Legal Events

Date Code Title Description
GR01 Patent grant