CN208735652U - The eliminating white smoke system that a kind of heat exchanger and air preheater combine - Google Patents

The eliminating white smoke system that a kind of heat exchanger and air preheater combine Download PDF

Info

Publication number
CN208735652U
CN208735652U CN201820568650.XU CN201820568650U CN208735652U CN 208735652 U CN208735652 U CN 208735652U CN 201820568650 U CN201820568650 U CN 201820568650U CN 208735652 U CN208735652 U CN 208735652U
Authority
CN
China
Prior art keywords
secondary air
branch
flue gas
heat exchanger
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820568650.XU
Other languages
Chinese (zh)
Inventor
周大春
王文选
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Fengye Environmental Technology Group Co ltd
Original Assignee
JIANGSU FENGYE TECHNOLOGY & ENVIRONMENT GROUP Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU FENGYE TECHNOLOGY & ENVIRONMENT GROUP Corp Ltd filed Critical JIANGSU FENGYE TECHNOLOGY & ENVIRONMENT GROUP Corp Ltd
Priority to CN201820568650.XU priority Critical patent/CN208735652U/en
Application granted granted Critical
Publication of CN208735652U publication Critical patent/CN208735652U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Abstract

The utility model discloses a kind of heat exchangers and the eliminating white smoke system that combines of air preheater in environmental protection equipment technical field.Including heat exchanger and air preheater, air preheater and heat exchanger are respectively equipped with input end A1, B1 of a Secondary Air, outlet end A2, B2;Input end A3, B3 of flue gas, outlet end A4, B4.One secondary air inlet end A1 is connected by a secondary air inlet pipe of Secondary Air branch one and one, there is a Secondary Air branch two in one secondary air inlet pipe also branch, one secondary air inlet of Secondary Air branch two and one end B1 is connect, gas inlet end A3 is connect by the first flue gas branch with flue gas inlet tube, there is the second flue gas branch in flue gas inlet tube branch, second flue gas branch is connect with gas inlet end B3, smoke outlet A4 is connect after mixing with smoke outlet B4 with deduster, deduster is connect with desulfurizing tower, and desulfurizing tower is connect after mixing with a Secondary Air outlet end B2 with chimney.The beneficial effects of the utility model are: avoiding low-temperature corrosion, cost is reduced.

Description

The eliminating white smoke system that a kind of heat exchanger and air preheater combine
Technical field
The utility model relates to environmental protection equipment technical fields, white more particularly to a kind of disappearing for heat-engine plant desulfurized tower outlet cigarette The system of cigarette.
Background technique
In recent years, with energy-saving index, the raising of environmental requirement, a series of reduction boiler exhaust gas have been put into effect in each place Temperature and the Policy Conditions for eliminating white cigarette.Heat-engine plant desulfurized tower outlet smoke temperature is 40 DEG C ~ 50 DEG C, direct emission, and water steams in flue gas Air cooling is solidifying, will form " white cigarette, while cold neat stress has strong corrosivity to chimney and flue, so chimney heavy corrosion It is continuous to reinforce, and for the prior art, the service life of chimney anticorrosion is extremely limited, must also repeatedly prevent in power plant's duration Corruption causes maintenance cost high, seriously affects power plant's normal operation.
The method that thermal power plant is used to heat neat stress at present mainly uses MGGH system, and heat medium water is used to pass through suction as medium The heat of desulfurizing tower entrance original flue gas is received to heat the neat stress of desulfurizing tower outlet, to achieve the purpose that eliminate white cigarette.Due to MGGH system divides cooling section and again hot arc, and the temperature and pressure to exchange heat are smaller, cause heat-transfer surface larger, and equipment is heavier, and cost of investment is high, And the heating surface minimum wall temperature of the temperature descending section of MGGH system is nearly all lower than the acid dew-point temperature of flue gas, the heating surface of warming-up section Again directly contacted with neat stress, heat-transfer surface can nearly all encounter low-temperature corrosion, dust stratification, fouling, leakage the problem of.
Thermal power plant's heat loss due to exhaust gas is the main heat loss of power plant boiler simultaneously, heats neat stress behind absorption tower, is made net Flue gas is in an overheated state, can effectively improve " white cigarette " phenomenon, and avoid chimney, boiler flue corrosion, is dropped by flue gas heat-exchange unit Low exhaust gas temperature can efficiently use residual heat from boiler fume, reduce coal consumption, improve economy of power plant benefit.
Utility model content
The purpose of this utility model is to overcome above-mentioned exhaust gas temperatures, and high, chimney emits white cigarette, heat-transfer surface and can encounter The problems such as low-temperature corrosion, dust stratification, fouling, leakage and the eliminating white smoke system that a kind of heat exchanger and air preheater combine is provided.
Purpose of the utility model is realized as follows: the eliminating white smoke system that a kind of heat exchanger and air preheater combine, packet The air preheater for including the heat exchanger of the depressed structure of tubular type gas and being heated to a Secondary Air, the air preheater are equipped with a secondary air inlet A1, a Secondary Air outlet end A2, gas inlet end A3 and smoke outlet A4 are held, the heat exchanger is equipped with a secondary air inlet end B1, a Secondary Air outlet end B2, gas inlet end B3 and smoke outlet B4, secondary air inlet end A1 pass through one or two times The secondary air inlet pipe of wind branch one and one connects, and the secondary air inlet pipe also branch is connected with a Secondary Air branch two, institute It states the secondary air inlet of a Secondary Air branch two and one end B1 to connect, the gas inlet end A3 passes through the first flue gas branch and flue gas Inlet tube connection, the flue gas inlet tube also branch are connected with the second flue gas branch, the second flue gas branch and gas inlet It is connect after holding B3 connection, the smoke outlet A4 to mix with smoke outlet B4 by tee tube with deduster input end, institute It states house outlet end to connect with desulfurizing tower input end, the desulfurizing tower outlet end and a Secondary Air outlet end B2 pass through tee tube It is connect after mixing with chimney bottom.
When the utility model is used, it is respectively enterd after a Secondary Air is generated by a secondary air fan by a secondary air inlet pipe One Secondary Air of Secondary Air branch one and one branch two, the Secondary Air in a Secondary Air branch one enter air preheater, a Secondary Air One Secondary Air of branch two enters heat exchanger, and high-temperature flue gas is generated by boiler, passes through the first flue gas branch respectively by flue gas inlet tube Road and the second flue gas branch enter in air preheater and heat exchanger, and air preheater enters air preheater using the heat of high-temperature flue gas One Secondary Air improves inlet air temperature to reduce exhaust gas temperature, and a Secondary Air passes through Secondary Air outlet end A2 row again Out, flue gas is discharged by the smoke outlet A4 of air preheater, and heat exchanger carries out heat exchange work to high-temperature flue gas and a cold Secondary Air To make, forms low-temperature flue gas and a hot Secondary Air, high-temperature flue gas is still within acid dew point or more by smoke temperature after first and second air cooling, Corrosion-free risk, the low-temperature flue gas of heat exchanger discharge are mixed with the flue gas of smoke outlet A4 discharge again, sequentially enter deduster Cold neat stress is discharged with desulfurizing tower, after cold neat stress is mixed with a Secondary Air outlet end B2 of heat exchanger one Secondary Air of heat being discharged Import chimney bottom discharge.One Secondary Air of heat that heat exchanger is discharged in the system mixes cold neat stress, makes cold neat stress temperature Increase it is in an overheated state, when cold neat stress is heated to form hot neat stress, directly by smoke stack emission to atmosphere, reach eliminate it is white Cigarette and the effect for avoiding flue, chimney corrosion.
The heat exchanger of the depressed structure of tubular type gas in the utility model is using three-dimensional as a further improvement of the utility model, Fin tube heat exchanger, using three-dimensional rib plate pipe as heat exchange element, three-dimensional rib plate heat exchange of heat pipe changes three-dimensional rib plate heat exchange of heat pipe The interior outside of heat pipe is equipped with fin, and compared with prior art, it can carry out variable density design to the fin of itself, adjusts wall Temperature, the cold end wall temperature that can control three-dimensional rib plate heat exchange of heat pipe in this way reach particular value and can avoid low-temperature corrosion, the i.e. tubular type The poor steel of corrosion resistance can be used without low-temperature corrosion risk in the heat exchanger of the depressed structure of gas, so that equipment investment reduces.
In order to control the size of flue gas influent stream amount, flue gas is installed on the second flue gas branch road and adjusts door, flue gas adjusts door can Accurately regulated and controled with the usage amount of high-temperature flue gas needed for heat exchanging device, further to adjust the cold neat stress heating of heating The temperature of required one Secondary Air of heat.
Equally, in order to control the size of a Secondary Air influent stream amount, a Secondary Air tune is installed on a Secondary Air branch two Section door, a secondary air regulation door can be regulated and controled with the usage amount of a Secondary Air needed for heat exchanging device, and adjustable heating is cold One Secondary Air usage amount of heat needed for neat stress heating.
Air preheater heats a Secondary Air in the heat using high-temperature flue gas same as a further improvement of the utility model, When, the low-temperature corrosion for causing air preheater or heat exchanger to generate in order to avoid the temperature of a Secondary Air is too low, in a Secondary Air branch Increase steam air heater on one or on a secondary air inlet pipe, to carry out preheating work to a Secondary Air.
Connecting tube in order to further provide system operation sufficient motive power, between deduster and desulfurizing tower It is exported on upper, the second flue gas branch road, a Secondary Air branch two, on the pipeline of smoke outlet B4 outgassing direction with a Secondary Air It holds and is equipped with blower on the pipeline of B2 outgassing direction.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Wherein, 1 heat exchanger, 2 flue gases adjusting door, 3 flue gas inlet tubes, 4 air preheaters, 5 steam air heaters, 6 one secondary air inlet pipes, 7 one secondary air regulation doors, 8 dedusters, 9 blowers, 10 desulfurizing towers, 11 chimneys, 12 1 Secondary Air branches one, 13 1 Secondary Air branches Two, 14 first flue gas branches, 15 second flue gas branches.
Specific embodiment
The eliminating white smoke system that heat exchanger and air preheater as shown in Figure 1 combines, the heat exchanger 1 including the depressed structure of tubular type gas With the air preheater 4 heated to a Secondary Air, air preheater 4 is equipped with a secondary air inlet end A1, a Secondary Air outlet end A2, cigarette Gas input end A3 and smoke outlet A4, heat exchanger 1 be equipped with a secondary air inlet end B1, a Secondary Air outlet end B2, flue gas into Mouthful end B3 and smoke outlet B4, one or two input end A1 are connected with 5 outlet end of steam air heater, and 5 input end of steam air heater passes through one Secondary Air branch 1 is connect with a secondary air inlet pipe 6, and a secondary air inlet pipe 6 is additionally provided with a Secondary Air branch 2 13, and one Secondary Air branch 2 13 is connect with a secondary air inlet end B1, and a Secondary Air branch 2 13 is equipped with a secondary air regulation door 7, cigarette Gas input end A3 is connect by the first flue gas branch 14 with flue gas inlet tube 3, and flue gas inlet tube 3 is additionally provided with the second flue gas branch 15, the second flue gas branch 15 is connect with gas inlet end B3, and the second flue gas branch 15 is equipped with flue gas and adjusts door 2, exhanst gas outlet End A4 is connect after being mixed with a Secondary Air outlet end B2 by tee tube with 8 input end of deduster, 8 outlet end of deduster and desulfurization 10 input end of tower connection, in the connecting tube between deduster 8 and desulfurizing tower 10,15, one Secondary Air branch on the second flue gas branch road It is equipped on road 2 13, on the pipeline of smoke outlet B4 outgassing direction and on the pipeline of a Secondary Air outlet end B2 outgassing direction Blower 9,10 outlet end of desulfurizing tower import 11 bottom of chimney after mixing with a Secondary Air outlet end B2 by tee tube, and from chimney Top discharge.
When the eliminating white smoke system work that the utility model heat exchanger and air preheater combine, in a secondary air inlet pipe 6 One Secondary Air respectively enters a Secondary Air branch 1 and a Secondary Air branch 2 13 and enters air preheater 4 and heat exchanger 1, flue gas into High-temperature flue gas in mouth pipe 3 passes through the first flue gas branch 14 respectively and the second flue gas branch 15 enters air preheater 4 and heat exchanger 1 Interior, air preheater 4 enters a Secondary Air of air preheater 4 using the heat of high-temperature flue gas, then passes through a Secondary Air outlet end A2 A Secondary Air is discharged, remaining flue gas is discharged by smoke outlet A4, and heat exchanger 1 carries out high-temperature flue gas and a cold Secondary Air Heat exchange work, forms low-temperature flue gas and a hot Secondary Air, the low-temperature flue gas of heat exchanger discharge again with the exhanst gas outlet of air preheater The flue gas mixing for holding A4 discharge, sequentially enters deduster 8 and cold neat stress is discharged in desulfurizing tower 10, in deduster 8 and desulfurizing tower 10 Between connecting tube on, on the second 15, one Secondary Air branch 2 13 of flue gas branch road, the pipeline of smoke outlet B4 outgassing direction It is equipped with blower 9 on upper and a Secondary Air outlet end B2 outgassing direction pipeline, is used to provide power support, cold neat stress and cigarette The discharge of 11 bottom of chimney is imported after one Secondary Air of the heat mixing of gas outlet end B4 discharge.The system reaches no low temperature when working rotten Erosion, the effect of no white cigarette further decrease pollution, save operating cost.
The utility model is not limited to above-described embodiment, for example, steam air heater also can be set in a secondary air inlet pipe Main pipe rail on, while a preheated Secondary Air is provided air preheater and heat exchanger, in technical side disclosed by the utility model On the basis of case, for those skilled in the art according to disclosed technology contents, not needing creative labor can be to it In some technical characteristics make some replacements and deformation, these replacement and deformation it is within the protection scope of the present utility model.

Claims (6)

1. the eliminating white smoke system that a kind of heat exchanger and air preheater combine, which is characterized in that the heat exchange including the depressed structure of tubular type gas Device and the air preheater heated to a Secondary Air, the air preheater are equipped with a secondary air inlet end A1, a Secondary Air outlet end A2, gas inlet end A3 and smoke outlet A4, the heat exchanger are equipped with a secondary air inlet end B1, a Secondary Air outlet end B2, gas inlet end B3 and smoke outlet B4, secondary air inlet end A1 pass through a Secondary Air branch one and one or two times The connection of wind inlet pipe, the secondary air inlet pipe also branch are connected with a Secondary Air branch two, the Secondary Air branch two It is connect with a secondary air inlet end B1, the gas inlet end A3 is connect by the first flue gas branch with flue gas inlet tube, described Flue gas inlet tube also branch is connected with the second flue gas branch, and the second flue gas branch is connect with gas inlet end B3, the cigarette Gas outlet end A4 and smoke outlet B4 connects after being mixed by tee tube with deduster input end, the house outlet end and Desulfurizing tower input end connection, the desulfurizing tower outlet end mixed with a Secondary Air outlet end B2 by tee tube after with chimney bottom Connection.
2. the eliminating white smoke system that a kind of heat exchanger according to claim 1 and air preheater combine, it is characterised in that: described Heat exchanger uses three-dimensional rib plate heat exchange of heat pipe, and the interior outside of the heat exchanger tube of the three-dimensional rib plate heat exchange of heat pipe is equipped with fin.
3. the eliminating white smoke system that a kind of heat exchanger according to claim 1 and air preheater combine, it is characterised in that: described Second flue gas branch road is additionally provided with flue gas and adjusts door.
4. the eliminating white smoke system that a kind of heat exchanger according to claim 1 and air preheater combine, it is characterised in that: described A secondary air regulation door is additionally provided on one Secondary Air branch two.
5. the eliminating white smoke system that a kind of heat exchanger according to claim 1 and air preheater combine, it is characterised in that: also set There is steam air heater, the steam air heater is located on a secondary air inlet pipe or a Secondary Air branch one.
6. the eliminating white smoke system that a kind of heat exchanger according to claim 1-5 and air preheater combine, feature Be: in the connecting tube between the deduster and desulfurizing tower, the second flue gas branch road, on a Secondary Air branch two, flue gas goes out Blower is equipped on the pipeline of mouth end B4 outgassing direction and on the pipeline of a Secondary Air outlet end B2 outgassing direction.
CN201820568650.XU 2018-04-20 2018-04-20 The eliminating white smoke system that a kind of heat exchanger and air preheater combine Active CN208735652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820568650.XU CN208735652U (en) 2018-04-20 2018-04-20 The eliminating white smoke system that a kind of heat exchanger and air preheater combine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820568650.XU CN208735652U (en) 2018-04-20 2018-04-20 The eliminating white smoke system that a kind of heat exchanger and air preheater combine

Publications (1)

Publication Number Publication Date
CN208735652U true CN208735652U (en) 2019-04-12

Family

ID=66023913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820568650.XU Active CN208735652U (en) 2018-04-20 2018-04-20 The eliminating white smoke system that a kind of heat exchanger and air preheater combine

Country Status (1)

Country Link
CN (1) CN208735652U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109945227A (en) * 2019-05-08 2019-06-28 北京国电龙源环保工程有限公司 Reduce system and process that exhaust gas temperature inhibits air preheater low-temperature corrosion
CN110397947A (en) * 2019-07-05 2019-11-01 湖南大唐节能科技有限公司 A kind of air preheater is anti-blocking and enhances heat transfer unit (HTU)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109945227A (en) * 2019-05-08 2019-06-28 北京国电龙源环保工程有限公司 Reduce system and process that exhaust gas temperature inhibits air preheater low-temperature corrosion
CN110397947A (en) * 2019-07-05 2019-11-01 湖南大唐节能科技有限公司 A kind of air preheater is anti-blocking and enhances heat transfer unit (HTU)

Similar Documents

Publication Publication Date Title
CN106090880A (en) A kind of machine stove set heat circulation afterheat recycling system
CN104208995B (en) A kind of thermal device improving boiler wet method desulfurization neat stress temperature and method
CN105135468B (en) Smoke waste heat utilization system
CN207006217U (en) A kind of water-borne formula extension air preheater system
CN208735652U (en) The eliminating white smoke system that a kind of heat exchanger and air preheater combine
WO2022088686A1 (en) Gas boiler tail flue gas energy-saving and emission-reduction system
CN104990063A (en) Hot primary air waste heat utilization device coupled with air heater system in use
CN105571381B (en) A kind of heat medium water pipe heat exchanger control system and method
CN204922939U (en) Wind waste heat utilization equipment of heat with use of fan heater system linking
CN103836609B (en) A kind of emission-reducing system of boiler of power plant exhaust gas dust
CN206234838U (en) Built-in air preheater and the CO boilers with it
CN210434273U (en) Wet flue gas desulfurization white system that disappears
CN209445339U (en) A kind of energy-saving and environment-friendly exhaust gas electricity generation boiler
CN103131812A (en) Plate-type air and coal gas double-preheating system for hot blast stove
CN102012039B (en) Forced circulation air preheat system
CN202630747U (en) Waste heat recovery system capable of improving efficiency of electric dust collector
CN202470782U (en) Secondary smoke residual heat utilization system for hot blast stove
CN210832077U (en) Energy-saving anti-blocking system combining pipe type and two-bin type rotary air preheater
CN210801252U (en) Air preheater prevents stifled and reinforcing heat transfer device
CN100541000C (en) A kind of method of avoiding low temperature corrosion of boiler air preheater
CN209295168U (en) A kind of low temperature exhaust heat recyclable device with water temperature regulation device
CN208042180U (en) A kind of white plume elimination system based on flue gas recirculating technique
CN202002140U (en) Forced circulation air preheating system
CN205535923U (en) Cleaning type coal fired boiler discharges fume waste heat and puies forward matter and utilize system
CN209655343U (en) A kind of Combined air preheater

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 225000 No. 1, Hongyuan Road, high end equipment manufacturing industrial park, Shaobo Town, Jiangdu District, Yangzhou City, Jiangsu Province

Patentee after: Jiangsu Fengye Environmental Technology Group Co.,Ltd.

Address before: 225000 Shaobo town Zhaoguan Jinghang village Jiangdu District Yangzhou City Jiangsu Province