CN206769432U - A kind of construction guardrail - Google Patents

A kind of construction guardrail Download PDF

Info

Publication number
CN206769432U
CN206769432U CN201720491829.5U CN201720491829U CN206769432U CN 206769432 U CN206769432 U CN 206769432U CN 201720491829 U CN201720491829 U CN 201720491829U CN 206769432 U CN206769432 U CN 206769432U
Authority
CN
China
Prior art keywords
pipe
holds
sleeve
screw rod
catch net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720491829.5U
Other languages
Chinese (zh)
Inventor
徐华中
肖雨琴
程远锁
王小东
李凯
邓磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720491829.5U priority Critical patent/CN206769432U/en
Application granted granted Critical
Publication of CN206769432U publication Critical patent/CN206769432U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

It the utility model is related to building field, disclose a kind of construction guardrail, pipe and second, which is held, including first holds pipe, described first, which holds pipe downside, is uniformly provided with the first card pipe, described second, which holds pipe upside, is uniformly provided with the second card pipe, described first, which holds pipe and second, holds pipe surface and is provided with groove, described first, which holds pipe and second, holds rotating shaft is provided with inside pipe, catch net is wound between the rotating shaft, described first, which holds pipe left side, is provided with the 3rd sleeve pipe, described first, which holds pipe right side, is provided with the second sleeve pipe, described second, which holds pipe left side, is provided with Quadruplet pipe, described second, which holds pipe right side, is provided with first sleeve, first screw rod is installed between the first sleeve and the second sleeve pipe, the second screw rod is installed between 3rd sleeve pipe and Quadruplet pipe.The utility model utilizes the first screw rod and the second screw rod, preferably quickly rolls catch net, avoids making catch net be exposed to the sun for a long time, avoids catch net weathering, catch net is protected.

Description

A kind of construction guardrail
Technical field
It the utility model is related to building field, more particularly to a kind of construction guardrail.
Background technology
, it is necessary to which the arranged beneath protection network in construction floor is protected when construction is carried out, and protection network It is primarily used to carry out access to falling object from high altitude, mainly pedestrian is protected, when workmen falls, easily makes pendant Junk damages to user, traditional protection network be typically all be fixedly mounted, without using when also in foreign minister when Between be exposed to the sun, easily make protection network weathering, so that protection network becomes fragile, easily damage protection network, bring unnecessary injury, Some devices when in use, are not easy to be controlled to the size of protection network, so as to which the inconvenient construction site to different area is entered Row protection, what is also had can be collected protection network, generally require and screw is dismantled, cumbersome.
Utility model content
The purpose of this utility model is to solve the deficiencies in the prior art, there is provided a kind of construction guardrail.
The utility model is to be achieved through the following technical solutions:
A kind of construction guardrail, including first hold pipe and second and hold pipe, described first holds on the downside of pipe uniformly First card pipe is installed, described second, which holds pipe upside, is uniformly provided with the second card pipe, and described first, which holds pipe and second, holds Pipe surface is provided with groove, and described first, which holds pipe and second, is held rotating shaft is provided with inside pipe, and guarantor is wound between the rotating shaft Protecting wire net, described first holds the 3rd sleeve pipe is provided with the left of pipe, and described first holds the second sleeve pipe is provided with the right side of pipe, and described the Two hold Quadruplet pipe are provided with the left of pipe, and described second holds first sleeve is provided with the right side of pipe, the first sleeve and the First screw rod is installed between two sleeve pipes, the second screw rod is installed between the 3rd sleeve pipe and Quadruplet pipe.
As optimal technical scheme of the present utility model, first screw rod and first sleeve be slidably connected and with second set Pipe screw thread connects.
As optimal technical scheme of the present utility model, second screw rod be threadedly coupled with Quadruplet pipe and with the 3rd set Pipe is slidably connected.
As optimal technical scheme of the present utility model, chi spring is installed between the rotating shaft and catch net.
As optimal technical scheme of the present utility model, the first card pipe and the second card pipe are formed for magnet.
As optimal technical scheme of the present utility model, the catch net is formed for composite fibre materials.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is preferably quickly collected catch net by setting rotating shaft, convenient quickly to close protection network Firmly, without using when avoid being exposed to the sun for the sun, so as to being protected to protection network, avoid making protection network weathering, pass through First screw rod and the second screw rod are set, fast folding preferably is carried out to protection network, avoids the dismounting to trip bolt, so as to The take-down time has been saved, by setting the first card pipe and the second card to manage, has preferably adsorbed multiple devices, it is convenient to different area Construction area is protected, and so as to add the security of device, expands the use range of device.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1st, the first screw rod, 2, first sleeve, the 3, second sleeve pipe.4th, rotating shaft, the 5, catch net, 6, first card pipe, 7, the One holds pipe, the 8, the 3rd sleeve pipe, and 9, Quadruplet pipe, the 10, second screw rod, 11, groove, 12, second holds pipe, the 13, second card pipe.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of technical scheme:
A kind of construction guardrail, including first hold pipe 7 and second and hold pipe 12, described
One, which holds the downside of pipe 7, is uniformly provided with the first card pipe 6, and described second, which holds the upside of pipe 12, is uniformly provided with the second card Pipe 13, the first card pipe 6 and the second card pipe 13 are that magnet is formed, and described first, which holds pipe 7 and second, holds the surface of pipe 12 and open There is a groove 11, described first, which holds pipe 7 and second, is held rotating shaft 4 is provided with inside pipe 12, and protection is wound between the rotating shaft 4 Net 5, the catch net 5 are formed for composite fibre materials, and chi spring is provided between the rotating shaft 4 and catch net 5, and described first contains Put the left side of pipe 7 and the 3rd sleeve pipe 8 is installed, described first, which holds the right side of pipe 7, is provided with the second sleeve pipe 3, and described second holds pipe 12 Left side is provided with Quadruplet pipe 9, and described second, which holds the right side of pipe 12, is provided with first sleeve 2, the first sleeve 2 and second set First screw rod 1 is installed between pipe 3, first screw rod 1 is slidably connected with first sleeve 2 and is threadedly coupled with the second sleeve pipe 3, Second screw rod 10 is installed, second screw rod 10 and the screw thread of Quadruplet pipe 9 connect between the 3rd sleeve pipe 8 and Quadruplet pipe 9 Connect and be slidably connected with the 3rd sleeve pipe 8.
Operation principle:Hold pipe 7 on the wall of construction building by first first, when using when pull out the Two hold pipe 12, so as to be pulled to catch net 5, catch net 5 are strutted, then rotates the first screw rod 1 and the second screw rod 10, First screw rod 1 is penetrated in the second sleeve pipe 3 and the 3rd sleeve pipe 8, the second screw rod 10 is penetrated in the 3rd sleeve pipe 8 and Quadruplet pipe 9, Catch net 5 is supported, so as to be blocked to falling object from high altitude, it is necessary to when increasing the area of catch net 5, it is only necessary to add Add same device, the second card pipe 13 in the present apparatus is adsorbed using the second card pipe 13, due to the presence of chi spring, when making When user is turned out the first screw rod 1, it will the first screw rod 1 is separated with the second sleeve pipe 3, so that the second screw rod 10 is the 3rd Slided in sleeve pipe 8, catch net 5 is folded, it is convenient that catch net 5 is protected so as to reduce being exposed to the sun for the sun.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction guardrail, including first holds pipe(7)Pipe is held with second(12), it is characterised in that:Described One holds pipe(7)Downside is uniformly provided with the first card pipe(6), described second holds pipe(12)Upside is uniformly provided with the second card pipe (13), described first holds pipe(7)Pipe is held with second(12)Surface is provided with groove(11), described first holds pipe(7)With Two hold pipe(12)Inside is provided with rotating shaft(4), the rotating shaft(4)Between be wound with catch net(5), described first holds pipe (7)Left side is provided with the 3rd sleeve pipe(8), described first holds pipe(7)Right side is provided with the second sleeve pipe(3), described second holds Pipe(12)Left side is provided with Quadruplet pipe(9), described second holds pipe(12)Right side is provided with first sleeve(2), described first Sleeve pipe(2)With the second sleeve pipe(3)Between the first screw rod is installed(1), the 3rd sleeve pipe(8)With Quadruplet pipe(9)Between pacify Equipped with the second screw rod(10).
A kind of 2. construction guardrail according to claim 1, it is characterised in that:First screw rod(1)With first Sleeve pipe(2)Be slidably connected and with the second sleeve pipe(3)Threaded connection.
A kind of 3. construction guardrail according to claim 1, it is characterised in that:Second screw rod(10)With the 4th Sleeve pipe(9)Threaded connection and with the 3rd sleeve pipe(8)It is slidably connected.
A kind of 4. construction guardrail according to claim 1, it is characterised in that:The rotating shaft(4)With catch net(5) Between chi spring is installed.
A kind of 5. construction guardrail according to claim 1, it is characterised in that:The first card pipe(6)With second Card pipe(13)Formed for magnet.
A kind of 6. construction guardrail according to claim 1, it is characterised in that:The catch net(5)It is fine for synthesis Material is tieed up to form.
CN201720491829.5U 2017-05-05 2017-05-05 A kind of construction guardrail Expired - Fee Related CN206769432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720491829.5U CN206769432U (en) 2017-05-05 2017-05-05 A kind of construction guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720491829.5U CN206769432U (en) 2017-05-05 2017-05-05 A kind of construction guardrail

Publications (1)

Publication Number Publication Date
CN206769432U true CN206769432U (en) 2017-12-19

Family

ID=60649346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720491829.5U Expired - Fee Related CN206769432U (en) 2017-05-05 2017-05-05 A kind of construction guardrail

Country Status (1)

Country Link
CN (1) CN206769432U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560898A (en) * 2018-07-03 2018-09-21 河北九晟建材科技有限公司 Metal protection expanded metals integral bonding attachment
CN109115122A (en) * 2018-08-21 2019-01-01 界首市金龙粮食机械购销有限公司 A kind of full-automatic data scanner of 3D white light

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560898A (en) * 2018-07-03 2018-09-21 河北九晟建材科技有限公司 Metal protection expanded metals integral bonding attachment
CN109115122A (en) * 2018-08-21 2019-01-01 界首市金龙粮食机械购销有限公司 A kind of full-automatic data scanner of 3D white light

Similar Documents

Publication Publication Date Title
CN206769432U (en) A kind of construction guardrail
CN204614374U (en) A kind of outdoor LED display screen
CN206859812U (en) Architectural engineering protection network
CN202467231U (en) Closed type vertical-surface protection system special for hanging basket construction
CN103982124A (en) Protective net adjustable in size
CN202645037U (en) Anti-typhoon simple and easy protection device for movable board room
CN209891789U (en) Novel wind mode frequency modulation mass damper that shakes
CN206878403U (en) A kind of cable testing bridge connectivity structure
CN207700436U (en) A kind of steel construction out-hung panel node
CN206001320U (en) A kind of iodine-tungsten lamp support
CN205509232U (en) Lightning -arrest effectual lightning rod
CN204552236U (en) A kind of anti-vibration house
CN204559036U (en) The adjustable hanging fixture of chute
CN206279695U (en) A kind of steel column structure for being easy to lift
CN205941175U (en) Anti impact testing device of portable external wall insulation material
CN204940900U (en) A kind of building operations protection guardrail
CN205805026U (en) A kind of novel wall support means
CN1837540A (en) Anti-crack net for wall
CN204627007U (en) A kind of hole, building site temporary plugging structure
CN206360299U (en) A kind of wall with the rotatable rack of millstones shape
CN201981798U (en) Reserved short-pipe protective cover of floor
CN110158493A (en) The Combined anti-wind canopy of the heavens and method
CN213418704U (en) Civil engineering is with enclosing fender device
CN204266379U (en) For the angle steel tie rod syndeton of Industrial Steel structural construction
CN202774564U (en) Directional adjustable extension umbrella added on sunshade

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

Termination date: 20190505

CF01 Termination of patent right due to non-payment of annual fee