CN108560898A - Metal protection expanded metals integral bonding attachment - Google Patents

Metal protection expanded metals integral bonding attachment Download PDF

Info

Publication number
CN108560898A
CN108560898A CN201810720424.3A CN201810720424A CN108560898A CN 108560898 A CN108560898 A CN 108560898A CN 201810720424 A CN201810720424 A CN 201810720424A CN 108560898 A CN108560898 A CN 108560898A
Authority
CN
China
Prior art keywords
connecting plate
connection component
metal protection
hole
expanded metals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810720424.3A
Other languages
Chinese (zh)
Inventor
王赫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Nine Sheng Building Materials Technology Co Ltd
Original Assignee
Hebei Nine Sheng Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Nine Sheng Building Materials Technology Co Ltd filed Critical Hebei Nine Sheng Building Materials Technology Co Ltd
Priority to CN201810720424.3A priority Critical patent/CN108560898A/en
Publication of CN108560898A publication Critical patent/CN108560898A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings

Abstract

The invention discloses metal protection expanded metals integral bonding attachments, including connecting plate, first connection component and the second connection component, and connecting plate includes symmetrically arranged first connecting plate and the second connecting plate, it is equipped with installing blind at the center of the side of first connecting plate the second connecting plate of direction, installation through-hole is equipped at the center of second connecting plate, and first connection component be detachably connected with installing blind through installation through-hole, first connecting plate and the opposite side of the second connecting plate are equipped with corresponding four baffle groups in position, and four baffle groups are circumferentially evenly arranged in the outside of installing blind, second connection component is U-shaped, wherein the second connection component is circumferentially evenly arranged in the outside of the first connecting plate and the second connecting plate, and second the both ends of connection component be detachably connected respectively with the first connecting plate and the second connecting plate.The new reasonable design of this practicality, simple in structure, installation operation is convenient, and connective stability is high, securely and reliably, avoids security risk, speeds up the work.

Description

Metal protection expanded metals integral bonding attachment
Technical field
The invention belongs to connecting component technical fields, and in particular to metal protection expanded metals integral bonding attachment.
Background technology
In building construction process, in order to ensure the safety of construction personnel, and operate and construct for staff It is convenient, protective frame is often built outside major project framework, meanwhile, it is caused in the construction process because of junk in order to prevent The injury of the masses on building periphery, often adds outer protection screen sheet in protective frame, and outer protection screen sheet functionally integrates The effect of safety net and bridging, currently, the mounting means of outer protection screen sheet or required precision be not relatively high, mounting means list One, unreliable, the effect of stable frame body is not had, security risk is be easy to cause.
Invention content
The purpose of the present invention is to provide metal protection expanded metals integral bonding attachments, to solve to be carried in above-mentioned background technology The problem of going out.
To achieve the above object, the present invention provides following technical scheme:Metal protection expanded metals integral bonding attachment, structure It is characterized by:Including connecting plate, the first connection component and the second connection component, and connecting plate includes symmetrically arranged first connection Plate and the second connecting plate, the first connecting plate towards the second connecting plate side center at be equipped with installing blind, the second connecting plate Center at be equipped with installation through-hole, and the first connection component is detachably connected through installation through-hole with installing blind, and first connects Plate and the opposite side of the second connecting plate are equipped with corresponding four baffle groups in position, and four baffle groups are circumferentially evenly arranged In the outside of installing blind, the second connection component is U-shaped, wherein the second connection component is circumferentially evenly arranged in the first connecting plate With the outside of the second connecting plate, and the both ends of the second connection component detachably connect with the first connecting plate and the second connecting plate respectively It connects.
Preferably, the quantity of the second connection component is two or four or eight.
Preferably, the second connection component includes casing, screw rod and positioning bolt;The both ends of casing are equipped with and screw rod The internal thread of adaptation;Screw rod is two, and is symmetricly set on the both sides of casing, and wherein one end of screw rod, which is equipped with, prevents raising one's hat, another End is vertically installed with positioning through hole, and anti-raise one's hat is movably arranged in casing;Positioning bolt includes the work through positioning through hole Threaded rod below type nut and drum nut.
Preferably, baffle group includes two baffles disposed in parallel, and the distance between two baffles are more than casing Outer diameter.
Preferably, the first connection component is bolt, and installing blind and installation through-hole are equipped with and connect group with first The internal thread of part adaptation.
Preferably, the first connecting plate and the second connecting plate are equipped with the threaded hole being adapted to threaded rod.
Compared with prior art, the new reasonable design of this practicality, simple in structure, installation operation is convenient, and connective stability is high, peace It is complete reliable, security risk is avoided, is speeded up the work.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the left view of the present invention;
Fig. 3 is the structural schematic diagram of the first connecting plate of the invention;
Fig. 4 is the structural schematic diagram of the second connecting plate of the invention;
In figure:The first connection components of 1-, the first connecting plates of 2-, the second connecting plates of 3-, 4- installing blinds, 5- installation through-holes, 6- casings, 7- screw rods, 8- is anti-to raise one's hat, 9- positioning through hole, 10- drum nuts, 11- threaded rods, 12- baffles, 13- threaded holes.
Specific implementation mode
Explanation that the present invention will be further explained below in conjunction with the accompanying drawings, but do not limit the scope of the invention.
In the description of the present invention, it should be noted that the instructions such as term "upper", "lower", "left", "right", "inner", "outside" Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and operation, Therefore it is not considered as limiting the invention.
- 4 are please referred to Fig.1, the present invention provides a kind of technical solution, metal protection expanded metals integral bonding attachment, including connection Plate, the first connection component 1 and the second connection component, and connecting plate includes 2 and second connecting plate of symmetrically arranged first connecting plate 3, installing blind 4 is equipped at the center of side of first connecting plate 2 towards the second connecting plate 3, in the second connecting plate 3 Installation through-hole 5 is equipped at the heart, and the first connection component 1 is detachably connected through installation through-hole 5 with installing blind 4, described the One connecting plate 2 and the opposite side of the second connecting plate 3 are equipped with corresponding four baffle groups in position, and four baffle groups are circumferentially It is evenly arranged in the outside of installing blind 4, second connection component is U-shaped, wherein the second connection component is circumferentially uniform Be arranged in the outside of the first connecting plate 2 and the second connecting plate 3, and the both ends of the second connection component respectively with the first connecting plate 2 and Second connecting plate 3 is detachably connected.
Wherein, in the present embodiment, the quantity of second connection component is two or four or eight.
Wherein, in the present embodiment, second connection component includes casing 6, screw rod 7 and positioning bolt;Described The both ends of casing 6 are equipped with the internal thread being adapted to screw rod 7;The screw rod 7 is two, and is symmetricly set on the two of casing 6 Side, wherein one end of screw rod 7 be equipped with it is anti-raise one's hat 8, the other end is vertically installed with positioning through hole 9, and anti-raise one's hat 8 is movably arranged in In casing 6;The positioning bolt includes the threaded rod through 10 lower section of drum nut 10 and drum nut of positioning through hole 9 11。
Wherein, in the present embodiment, the baffle group includes two baffles 12 disposed in parallel, and two baffles 12 it Between distance be more than casing 6 outer diameter.
Wherein, in the present embodiment, first connection component 1 is bolt, and installing blind 4 and installation through-hole 5 are equal Equipped with the internal thread being adapted to the first connection component 1.
Wherein, in the present embodiment, first connecting plate 2 and the second connecting plate 3 are equipped with and are adapted to threaded rod 11 Threaded hole 13.
The operation principle of the present invention:First connecting plate 2 and the second connecting plate 3 are symmetrically disposed at four metal protection expanded metals Both sides, make one jiao two adjacent on the first connecting plate 2 and the second connecting plate 3 of four metal protection expanded metals it is rectangular Baffle 12 fits, and Primary Location, revoling tube are carried out to the first connecting plate 2 and the second connecting plate 3 by the first connection component 1 6, make both sides screw rod 7 synchronize moved in casing 6, until both sides threaded rod 11 position respectively with the first connecting plate 2 and 13 position of threaded hole on second connecting plate 3 is opposite, and locks, and is further ensured that between attachment device and metal protection expanded metals Connective stability.First connecting plate 2 and the second connecting plate 3 are square, and positioned at the second connection of 2 homonymy of the first connecting plate The quantity of component is two, and the sleeve on each second connection component runs through metal protection expanded metals.
The new reasonable design of this practicality, simple in structure, installation operation is convenient, and connective stability is high, securely and reliably, avoids safety Hidden danger is speeded up the work.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims Variation is included within the present invention, and any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (6)

1. metal protection expanded metals integral bonding attachment, it is characterised in that:Including connecting plate, the first connection component and the second connection group Part, and connecting plate includes symmetrically arranged first connecting plate and the second connecting plate, first connecting plate is connected towards second It is equipped with installing blind at the center of the side of plate, is equipped with installation through-hole at the center of the second connecting plate, and the first connection component passes through It wears installation through-hole to be detachably connected with installing blind, first connecting plate and the opposite side of the second connecting plate are equipped with position Corresponding four baffle groups, and four baffle groups are circumferentially evenly arranged in the outside of installing blind, the described second connection Component is U-shaped, wherein the second connection component is circumferentially evenly arranged in the outside of the first connecting plate and the second connecting plate, and second The both ends of connection component are detachably connected with the first connecting plate and the second connecting plate respectively.
2. metal protection expanded metals integral bonding attachment according to claim 1, it is characterised in that:The second connection group The quantity of part is two or four or eight.
3. metal protection expanded metals integral bonding attachment according to claim 1, it is characterised in that:The second connection group Part includes casing, screw rod and positioning bolt;
The both ends of the casing are equipped with the internal thread being adapted to screw rod;
The screw rod is two, and is symmetricly set on the both sides of casing, and wherein one end of screw rod, which is equipped with, prevents raising one's hat, and the other end hangs down It is straight to be provided with positioning through hole, and anti-raise one's hat is movably arranged in casing;
The positioning bolt includes the drum nut through positioning through hole and the threaded rod below drum nut.
4. metal protection expanded metals integral bonding attachment according to claim 1, it is characterised in that:The baffle group includes Two baffles disposed in parallel, and the distance between two baffles are more than the outer diameter of casing.
5. metal protection expanded metals integral bonding attachment according to claim 1, it is characterised in that:The first connection group Part is bolt, and installing blind and installation through-hole are equipped with the internal thread being adapted to the first connection component.
6. metal protection expanded metals integral bonding attachment according to claim 1, it is characterised in that:First connecting plate It is equipped with the threaded hole being adapted to threaded rod with the second connecting plate.
CN201810720424.3A 2018-07-03 2018-07-03 Metal protection expanded metals integral bonding attachment Pending CN108560898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810720424.3A CN108560898A (en) 2018-07-03 2018-07-03 Metal protection expanded metals integral bonding attachment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810720424.3A CN108560898A (en) 2018-07-03 2018-07-03 Metal protection expanded metals integral bonding attachment

Publications (1)

Publication Number Publication Date
CN108560898A true CN108560898A (en) 2018-09-21

Family

ID=63555114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810720424.3A Pending CN108560898A (en) 2018-07-03 2018-07-03 Metal protection expanded metals integral bonding attachment

Country Status (1)

Country Link
CN (1) CN108560898A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821195A (en) * 2019-11-07 2020-02-21 上海精硕建设发展有限公司 Mesh mounting method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063383A (en) * 2007-05-24 2007-10-31 山西庆霖科技开发有限公司 Multifunctional protection plate
CN103126759A (en) * 2012-12-08 2013-06-05 宁波市鄞州云帆工程咨询有限公司 Push rod disassembling double-way self-locking bone screw
US20170204625A1 (en) * 2014-03-11 2017-07-20 Mate, Llc Safety Band Longitudinal and Transverse Control
CN206769432U (en) * 2017-05-05 2017-12-19 徐华中 A kind of construction guardrail
CN206859715U (en) * 2017-03-30 2018-01-09 吴银娣 A kind of construction safety protection column
CN206903250U (en) * 2017-04-28 2018-01-19 四川建筑职业技术学院 A kind of multifunction architecture engineering protection network
CN208502217U (en) * 2018-07-03 2019-02-15 河北九晟建材科技有限公司 Metal protection expanded metals integral bonding attachment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063383A (en) * 2007-05-24 2007-10-31 山西庆霖科技开发有限公司 Multifunctional protection plate
CN103126759A (en) * 2012-12-08 2013-06-05 宁波市鄞州云帆工程咨询有限公司 Push rod disassembling double-way self-locking bone screw
US20170204625A1 (en) * 2014-03-11 2017-07-20 Mate, Llc Safety Band Longitudinal and Transverse Control
CN206859715U (en) * 2017-03-30 2018-01-09 吴银娣 A kind of construction safety protection column
CN206903250U (en) * 2017-04-28 2018-01-19 四川建筑职业技术学院 A kind of multifunction architecture engineering protection network
CN206769432U (en) * 2017-05-05 2017-12-19 徐华中 A kind of construction guardrail
CN208502217U (en) * 2018-07-03 2019-02-15 河北九晟建材科技有限公司 Metal protection expanded metals integral bonding attachment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821195A (en) * 2019-11-07 2020-02-21 上海精硕建设发展有限公司 Mesh mounting method

Similar Documents

Publication Publication Date Title
CN108560898A (en) Metal protection expanded metals integral bonding attachment
CN208502217U (en) Metal protection expanded metals integral bonding attachment
CN110198005A (en) A kind of heat dissipation air permeable type electric power distributing cabinet
CN104505788B (en) A kind of more hanging point combination hardware fittings of large span hanging tubular bus and its mounting means
CN210408026U (en) Router installation mounted frame
CN210265405U (en) Steel pipe butt joint device of lengthening
CN209746896U (en) Electrostatic discharge simulation device
CN207896623U (en) A kind of pedestal linking cable bearer
CN209457422U (en) A kind of building engineering construction safety guide rail
CN205261860U (en) Dismouting is maintained device and is had its air conditioning unit
CN207927082U (en) A kind of electronic communication cabinet
CN207245045U (en) A kind of fence stairwell protection network
CN208273012U (en) A kind of network security management device
CN205421892U (en) Even wall scaffold for building
CN205583579U (en) Easily line cable frame of installation establishes crane span structure
CN207233656U (en) It is a kind of to be protected after electric process every electric installation
CN209214798U (en) A kind of wireless temperature-measuring terminal
CN213403753U (en) Communication equipment convenient to install on building outer wall
CN219386664U (en) Light flame-retardant board installation inner frame in energy-saving building
CN215166932U (en) Building curtain wall wind-resistant structure
CN209370129U (en) Fan assembly and ventilation equipment
CN217366228U (en) Traction weight fixing device
CN210565319U (en) Fan blade connecting structure of large industrial electric fan
CN106272251A (en) A kind of Anti-off bolt support
CN210195206U (en) Building is climbed and is used protection network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination